10205
|
McGaugh Hall Bedding
|
10205
|
06/09/2020
|
06/23/2020
|
06/09/2020
|
Plans
|
10204
|
CTSA Instructional Space Renovations
|
5112437
|
06/05/2020
|
06/19/2020
|
06/17/2020
|
Plans
|
10203
|
ICS I 4th Floor Renovation
|
5112256
|
06/04/2020
|
06/18/2020
|
06/15/2020
|
Specifications
|
10202
|
EDU 2nd Floor Student Affair's Office Renovation
|
5112500
|
06/02/2020
|
06/16/2020
|
|
|
10201
|
Bren Hall , 4th Flr, Reno
|
5112583
|
06/02/2020
|
06/16/2020
|
06/09/2020
|
Plans/Specifications
|
10200
|
Verano Unit 7 ADA Conversion
|
5112542
|
06/01/2020
|
06/15/2020
|
06/08/2020
|
Plans
|
10199
|
DM 2017-2018 Black Start Generator and PowerMAX Phase 2
|
5112169
|
06/03/2020
|
06/17/2020
|
06/03/2020
|
|
10198
|
McGaugh Hall Bedding
|
5112590
|
05/27/2020
|
06/10/2020
|
|
|
10197
|
SCIP Sculpture and Ceramic Studio Renovations, Phase 3
|
5112331
|
05/27/2020
|
06/10/2020
|
06/08/2020
|
Plans/Specifications
|
10196
|
Middle Earth Showers 2020
|
5112569
|
05/28/2020
|
06/11/2020
|
06/01/2020
|
Plans
|
10195
|
La Mirada Renovation
|
5112473
|
05/29/2020
|
06/12/2020
|
05/29/2020
|
Plans
|
10194
|
Parking Lot 36 Bus Fleet Expansion
|
5112562
|
05/27/2020
|
06/10/2020
|
06/03/2020
|
Plans
|
10193
|
MDEA Renovation
|
5112511
|
05/27/2020
|
06/10/2020
|
|
Plans/Specifications/EH&S Redlines
|
10192
|
ICS I 4th Floor Renovation
|
5112256
|
05/27/2020
|
06/10/2020
|
05/27/2020
|
Specifications
|
10191
|
McGaugh Hall Bedding
|
5112590
|
05/27/2020
|
06/10/2020
|
|
Plans
|
10190
|
SCIP 19/20 Studio 4 Classroom 101 Renovation
|
5112494
|
05/27/2020
|
06/10/2020
|
06/02/2020
|
Plans
|
10189
|
DM Accessibility Accommodations - Irvine Hall Restroom 245
|
5112188 - IH
|
05/27/2020
|
06/10/2020
|
06/02/2020
|
Plans/EH&S Redlines
|
10188
|
EDU 2nd Floor Student Affair's Office Renovation
|
5112500
|
05/26/2020
|
06/09/2020
|
06/02/2020
|
|
10187
|
SCIP 19/20 Chem Lab Reno B42, 352, 552
|
5112441
|
05/26/2020
|
06/09/2020
|
06/01/2020
|
Plans
|
10186
|
ICS I 4th Floor Renovation
|
5112256
|
05/26/2020
|
06/09/2020
|
05/27/2020
|
Specifications
|
10185
|
SC-G 4th Floor Meeting Room Renovation
|
5112461
|
05/22/2020
|
06/05/2020
|
06/08/2020
|
Plans
|
10184
|
SCIP 19/20 Chem Lab Reno B42, 352, 552
|
5112441
|
05/21/2020
|
06/04/2020
|
06/01/2020
|
Plans
|
10183
|
Social Sciences Lab Park & Plaza Level Restroom Renovation
|
5112273
|
05/21/2020
|
06/04/2020
|
05/29/2020
|
Plans
|
10182
|
MIND Renovation MS1 109
|
5112428
|
05/20/2020
|
06/03/2020
|
05/29/2020
|
Plans
|
10181
|
DM Accessibility Accommodations - NS1 - 1413 Lab
|
5112188
|
05/20/2020
|
06/03/2020
|
06/03/2020
|
Plans/Specifications
|
10180
|
Verano Unit 7 ADA Conversion
|
5112542
|
05/19/2020
|
06/02/2020
|
05/28/2020
|
Plans
|
10179
|
Hydrogen Fueling Station
|
5112389
|
05/19/2020
|
06/02/2020
|
06/01/2020
|
Specifications
|
10178
|
2017-18 SCIP Replace Deteriorated Dust Collector and Light Fixture in Sculpture Studio
|
5112156
|
05/18/2020
|
06/01/2020
|
05/29/2020
|
Plans/Specifications
|
10177
|
ICS I 4th Floor Renovation
|
5112256
|
05/15/2020
|
05/29/2020
|
05/19/2020
|
Plans
|
10176
|
Engineering Faculty Research Lab: ET 142
|
5112353
|
05/18/2020
|
06/01/2020
|
05/27/2020
|
Plans
|
10175
|
ELF 205/209 Renovation
|
5112414
|
05/19/2020
|
06/02/2020
|
05/19/2020
|
Plans
|
10174
|
HIMaC
|
5112271
|
05/18/2020
|
06/01/2020
|
05/19/2020
|
FDC Shop Dwg
|
10173
|
ICS I 4th Floor Renovation
|
5112256
|
05/15/2020
|
05/29/2020
|
05/26/2020
|
Plans
|
10172
|
Classroom Renovation
|
5112481
|
05/14/2020
|
05/28/2020
|
05/18/2020
|
Plans
|
10171
|
Construct HIMaC2
|
5112271
|
05/14/2020
|
05/28/2020
|
|
Safety Operations
|
10170
|
HIB Philosophy Department Renovations
|
5112493
|
05/12/2020
|
05/26/2020
|
05/18/2020
|
Plans
|
10169
|
Student Center & Cross-Cultural Center Restroom Renovations
|
5112460
|
05/12/2020
|
05/26/2020
|
05/19/2020
|
Plans
|
10168
|
SC-G 4th Floor Meeting Room Renovation
|
5112461
|
05/14/2020
|
05/28/2020
|
05/14/2020
|
Plans
|
10167
|
HIMaC
|
5112271
|
05/11/2020
|
05/25/2020
|
05/15/2020
|
Mezzanine Fire Proofing
|
10166
|
ICS I 4th Floor Renovation
|
5112256
|
05/11/2020
|
05/25/2020
|
05/13/2020
|
Specifications
|
10165
|
HIMaC
|
5112271
|
05/07/2020
|
05/21/2020
|
05/14/2020
|
Plans (Shop Dwgs/Products)
|
10164
|
MS1 Room 109 Fire Alarm Shop Drawings
|
5112428
|
05/01/2020
|
05/15/2020
|
05/07/2020
|
|
10163
|
Mesa Tower Mailroom Conversion
|
5112581
|
05/06/2020
|
05/20/2020
|
05/14/2020
|
Plans
|
10162
|
Campus Village Grad Housing Interior Renovation
|
5112584
|
05/06/2020
|
05/20/2020
|
05/14/2020
|
Plans
|
10161
|
1st Floor Active Learning Classroom Renovation
|
5112203 - Phase 3
|
05/05/2020
|
05/19/2020
|
05/13/2020
|
Plans/Specifications/EH&S Redlines
|
10160
|
Hydrogen Station -- California/Academy
|
5112389
|
05/01/2020
|
05/15/2020
|
05/06/2020
|
Plans/Specifications
|
10159
|
Med Sci B 274 Floor Sink
|
null
|
05/04/2020
|
05/18/2020
|
05/12/2020
|
Plans
|
10158
|
McGaugh Hall Bedding
|
5112590
|
05/04/2020
|
05/18/2020
|
05/11/2020
|
Plans
|
10157
|
Middle Earth Showers 2020
|
5112569
|
05/04/2020
|
05/18/2020
|
05/11/2020
|
Plans
|
10156
|
Gross Hall Infusion Room
|
5112463
|
05/01/2020
|
05/15/2020
|
05/07/2020
|
|
10155
|
ICS I 4th Floor Renovation
|
5112256
|
05/04/2020
|
05/18/2020
|
05/04/2020
|
Plans
|
10154
|
Small Cap - Humanities Hall 178 Renovation
|
5112150
|
04/30/2020
|
05/14/2020
|
05/05/2020
|
Plans
|
10153
|
ICS I 4th Floor Renovation
|
5112256
|
04/30/2020
|
05/14/2020
|
05/06/2020
|
Plans
|
10152
|
DM 2018-19 Metal Bridges Painting Treatment
|
5112304
|
04/27/2020
|
05/11/2020
|
05/04/2020
|
Plans/Specifications
|
10151
|
DM 2017-2018 Black Start Generator and PowerMAX Phase 2
|
5112169
|
04/30/2020
|
05/14/2020
|
05/01/2020
|
Plans
|
10150
|
SCIP 2018-19 HIB Automatic Door Operator Installation
|
5112339
|
04/23/2020
|
05/07/2020
|
05/04/2020
|
Plans
|
10149
|
HIB Philosophy Department Renovations
|
5112493
|
04/22/2020
|
05/06/2020
|
04/30/2020
|
Plans
|
10148
|
2019-20 SCIP B72, B72A, B & C
|
5112475
|
04/21/2020
|
05/05/2020
|
04/23/2020
|
Plans
|
10147
|
Irvine Hall 264 Renovation
|
5112539
|
04/22/2020
|
05/06/2020
|
04/28/2020
|
Specifications
|
10146
|
Med Sci D Major Building Maintenance
|
5112080
|
04/21/2020
|
05/05/2020
|
04/27/2020
|
Plans
|
10145
|
Parking Structure LED & Wireless Mesh Network
|
5109444
|
04/15/2020
|
04/29/2020
|
04/23/2020
|
Plans
|
10144
|
Med Sci B Major Building Maintenance
|
5112079
|
04/21/2020
|
05/05/2020
|
04/27/2020
|
Plans
|
10143
|
Arroyo Vista Kitchen / Fire Alarm Renovation 2020
|
5112526
|
04/20/2020
|
05/04/2020
|
04/27/2020
|
Plans
|
10142
|
MIND Renovation MS1 109
|
5112428
|
04/16/2020
|
04/30/2020
|
04/21/2020
|
Plans
|
10141
|
SC19/20 Berk Hall Office Renovation
|
5112499
|
04/17/2020
|
05/01/2020
|
04/23/2020
|
|
10140
|
MDEA Renovation
|
5112511
|
04/16/2020
|
04/30/2020
|
04/23/2020
|
Plans/Specifications
|
10139
|
SCIP 2019-2020 Bio Sci 3 Basement Buildout
|
5112488
|
04/15/2020
|
04/29/2020
|
04/22/2020
|
Plans
|
10138
|
HIMaC
|
5112271
|
04/15/2020
|
04/29/2020
|
04/21/2020
|
Mezzanine Fire Proofing
|
10137
|
SC-G 4th Floor Meeting Room Renovation
|
5112461
|
04/15/2020
|
04/29/2020
|
04/21/2020
|
Plans
|
10136
|
Campus Village Grad Housing Interior Renovation
|
5112584
|
04/15/2020
|
04/29/2020
|
04/20/2020
|
Plans
|
10135
|
HIB Philosophy Department Renovations
|
5112501
|
04/14/2020
|
04/28/2020
|
04/20/2020
|
Plans
|
10134
|
Classroom Renovation
|
5112481
|
04/14/2020
|
04/28/2020
|
04/17/2020
|
|
10133
|
SST 5th Floor Renovation
|
5112495
|
04/10/2020
|
04/24/2020
|
|
Plans/Specifications
|
10132
|
2019-20 SCIP B72, B72A, B & C
|
5112475
|
04/09/2020
|
04/23/2020
|
04/17/2020
|
Plans
|
10131
|
SCIP 19/20 Studio 4 Classroom 101 Renovation
|
5112494
|
04/08/2020
|
04/22/2020
|
04/16/2020
|
Plans
|
10130
|
DM Accessibility 17/18 -- Part 2 NS1 Lab 1413
|
5112188-NS1 - Part 2
|
04/08/2020
|
04/22/2020
|
04/15/2020
|
Plans
|
10129
|
DM Accessibility 17/18 -- Part 1 Irvine Hall
|
5112188-IH Part 1
|
04/08/2020
|
04/22/2020
|
04/15/2020
|
Plans
|
10128
|
HIMaC
|
5112271
|
04/08/2020
|
04/22/2020
|
04/13/2020
|
Sprinkler Shops, Rev3
|
10127
|
Engineering Faculty Research Labs: ET 142
|
5112353
|
04/07/2020
|
04/21/2020
|
04/14/2020
|
Plans
|
10126
|
Arroyo Vista Kitchen / Fire Alarm Renovation 2020
|
5112526
|
04/08/2020
|
04/22/2020
|
04/15/2020
|
Plans
|
10125
|
HIMaC
|
5112271
|
04/08/2020
|
04/22/2020
|
04/14/2020
|
Plans (Bulletin #2)
|
10124
|
EDU 2nd Floor Student Affair's Office Renovation
|
5112500
|
04/06/2020
|
04/20/2020
|
04/10/2020
|
|
10123
|
Mesa Tower Mailroom Conversion
|
5112581
|
04/03/2020
|
04/17/2020
|
04/09/2020
|
Plans
|
10122
|
Building Safety Mitigation
|
5112277
|
04/02/2020
|
04/16/2020
|
04/08/2020
|
|
10121
|
Restroom & Lobby Improvements - ELF Corridor
|
5112273
|
04/02/2020
|
04/16/2020
|
04/08/2020
|
Plans/Specifications
|
10120
|
HIMaC
|
5112271
|
04/01/2020
|
04/15/2020
|
04/08/2020
|
Plans
|
10119
|
HIMaC
|
5112271
|
04/01/2020
|
04/15/2020
|
04/06/2020
|
Sprinkler Shops
|
10118
|
2nd Floor Renovation
|
5112468
|
03/31/2020
|
04/14/2020
|
04/03/2020
|
|
10117
|
ICS I 4th Floor Renovation
|
5112256
|
03/30/2020
|
04/13/2020
|
04/01/2020
|
Plans
|
10116
|
SCIP Sculpture and Ceramic Studio Renovations, Phase 3
|
5112331
|
03/24/2020
|
04/07/2020
|
03/26/2020
|
Plans/Specifications
|
10115
|
HIB Philosophy Department Renovations
|
5112493
|
03/24/2020
|
04/07/2020
|
03/31/2020
|
Plans
|
10114
|
Construct HIMaC2
|
5112271
|
03/24/2020
|
04/07/2020
|
04/01/2020
|
RFI #060
|
10113
|
Campus Village Grad Housing Interior Renovation
|
5112584
|
03/24/2020
|
04/07/2020
|
03/31/2020
|
|
10112
|
San Joaquin Landfill
|
5112391
|
03/23/2020
|
04/06/2020
|
03/26/2020
|
Plans
|
10111
|
5112308 Sprague 351-362B Supplemental Cooling
|
5112308
|
03/17/2020
|
03/31/2020
|
04/07/2020
|
|
10110
|
Restroom & Lobby Improvements - ELF Corridor
|
5112273
|
03/18/2020
|
04/01/2020
|
03/24/2020
|
Plans/Specifications
|
10109
|
Phoenix Grill Replace HVAC Package Unit
|
5112550
|
03/18/2020
|
04/01/2020
|
03/26/2020
|
Plans
|
10108
|
2nd Floor Renovation
|
5112468
|
03/16/2020
|
03/30/2020
|
03/30/2020
|
|
10107
|
Building Safety Mitigation
|
5112277
|
03/13/2020
|
03/27/2020
|
03/23/2020
|
|
10106
|
Steinhaus Basement Environmental Chambers
|
5112463
|
03/12/2020
|
03/26/2020
|
03/20/2020
|
|
10105
|
HIMaC
|
5112271
|
03/11/2020
|
03/25/2020
|
03/18/2020
|
Shop Dwg/Materials
|
10104
|
SEC at SL 5th Floor
|
5110290
|
03/11/2020
|
03/25/2020
|
03/17/2020
|
|
10103
|
Engineering Faculty Research Labs: ET 142
|
5112353
|
03/10/2020
|
03/24/2020
|
|
Plans
|
10102
|
Mesa Court Unit III Renovation
|
5112474
|
03/10/2020
|
03/24/2020
|
03/12/2020
|
Plans
|
10101
|
Containers at North Campus
|
5112536
|
03/09/2020
|
03/23/2020
|
03/12/2020
|
Plans
|
10100
|
Social Ecology 1 RM 206F Enlarge Room
|
333838
|
03/09/2020
|
03/23/2020
|
03/09/2020
|
Plans
|
10099
|
Student Center Building A Roof Repairs
|
5112436
|
03/09/2020
|
03/23/2020
|
03/12/2020
|
|
10098
|
Gondolin ADA Conversion
|
5112540
|
03/09/2020
|
03/23/2020
|
03/12/2020
|
Plans
|
10097
|
Aldrich Hall Building Enhancement - Phase-2/2nd Floor Public Space
|
5112374
|
03/06/2020
|
03/20/2020
|
03/11/2020
|
Plans
|
10096
|
SC19/20 Berk Hall Office Renovation
|
5112499
|
03/05/2020
|
03/19/2020
|
03/11/2020
|
|
10095
|
SST 5th Floor Renovation
|
5112495
|
03/05/2020
|
03/19/2020
|
03/10/2020
|
Plans
|
10094
|
SCIP 19/20 Chem Lab Reno B42, 352, 552
|
5112441
|
03/05/2020
|
03/19/2020
|
03/11/2020
|
Plans
|
10093
|
Verano Unit 7 ADA Conversion
|
5112542
|
03/04/2020
|
03/18/2020
|
03/09/2020
|
Plans
|
10092
|
Phoenix Grill Replace HVAC Package Unit
|
5112550
|
03/04/2020
|
03/18/2020
|
03/09/2020
|
Plans
|
10091
|
HIMaC
|
5112271
|
03/04/2020
|
03/18/2020
|
03/16/2020
|
Sprinkler Shops
|
10090
|
Restroom & Lobby Improvements
|
5112273
|
03/04/2020
|
03/18/2020
|
03/09/2020
|
Plans/Specifications
|
10089
|
Arroyo Vista Kitchen / Fire Alarm Renovation 2020
|
5112526
|
03/03/2020
|
03/17/2020
|
03/09/2020
|
Plans
|
10088
|
Hewitt Hall Basement Buildout
|
5112312
|
03/03/2020
|
03/17/2020
|
03/12/2020
|
Draft Detail Project Program
|
10087
|
2019-20 SCIP B72,B72A, B & C
|
5112475
|
03/02/2020
|
03/16/2020
|
03/04/2020
|
Plans
|
10086
|
HIMaC
|
5112271
|
03/02/2020
|
03/16/2020
|
03/06/2020
|
Shop Dwg/Materials
|
10085
|
SC19/20 Berk Hall office renovation
|
5112499
|
03/02/2020
|
03/16/2020
|
03/02/2020
|
Plans
|
10084
|
Water Main Line Upgrades - PRS Demo
|
5112303
|
02/28/2020
|
03/13/2020
|
03/03/2020
|
Plans/Specifications
|
10083
|
2nd Floor Renovation
|
5112468
|
02/28/2020
|
03/13/2020
|
03/03/2020
|
|
10082
|
SC19/20 Berk Hall Office Renovation
|
5112499
|
02/28/2020
|
03/13/2020
|
03/03/2020
|
|
10081
|
Steinhaus Basement Environmental Chamber
|
5112457
|
02/25/2020
|
03/10/2020
|
03/03/2020
|
|
10080
|
Exterior Stairwell Coatings
|
5112482
|
02/25/2020
|
03/10/2020
|
03/06/2020
|
Plans/Specifications
|
10079
|
UPS Replacement
|
5112531
|
02/25/2020
|
03/10/2020
|
03/02/2020
|
|
10078
|
Restroom & Lobby Improvements Faculty Enhancement Funds
|
5112273
|
02/25/2020
|
03/10/2020
|
03/02/2020
|
Fire Alarm Submittal
|
10077
|
Gondolin ADA Conversion
|
5112540
|
02/25/2020
|
03/10/2020
|
03/02/2020
|
Plans
|
10076
|
Social Sciences Lab Park & Plaza Level Restroom Renovation
|
5112273
|
02/24/2020
|
03/09/2020
|
03/02/2020
|
Plans/Specifications
|
10075
|
La Mirada Renovation
|
5112473
|
02/21/2020
|
03/06/2020
|
02/27/2020
|
Plans
|
10074
|
Building Safety Mitigation
|
5112277
|
02/21/2020
|
03/06/2020
|
02/27/2020
|
|
10073
|
HIMaC
|
5112271
|
02/20/2020
|
03/05/2020
|
02/27/2020
|
Plans
|
10072
|
Install Direct Fired Boiler 2 - Electrical Disconnect
|
5109999
|
02/19/2020
|
03/04/2020
|
02/19/2020
|
Specifications
|
10071
|
1st Floor Human Biology and Human Performance Renovation
|
5112203
|
02/18/2020
|
03/03/2020
|
02/20/2020
|
Plans/Specifications/EH&S Redlines
|
10070
|
Krieger Hall 100B & HIB 2001A Film & Media Renovation
|
5112501
|
02/18/2020
|
03/03/2020
|
02/24/2020
|
Plans
|
10069
|
SC19/20 Berk Hall Office Renovation
|
5112499
|
02/18/2020
|
03/03/2020
|
02/24/2020
|
|
10068
|
SEC at SL 5th Floor
|
5110290
|
02/18/2020
|
03/03/2020
|
02/26/2020
|
|
10067
|
SST 5th Floor Renovation
|
5112550
|
02/13/2020
|
02/27/2020
|
02/20/2020
|
Plans
|
10066
|
HIMaC
|
5112271
|
02/13/2020
|
02/27/2020
|
03/06/2020
|
Plans/Specifications
|
10065
|
ELF 205/209 Renovation
|
5112414
|
02/13/2020
|
02/27/2020
|
02/19/2020
|
Plans/Specifications
|
10064
|
DM Accessibility Accommodations - NS1 - 1413 Lab
|
5112188
|
02/13/2020
|
02/27/2020
|
02/19/2020
|
Plans/Specifications
|
10063
|
SBSG Level-G, Neuro Sci Lab Renovation
|
5112497
|
02/13/2020
|
02/27/2020
|
02/19/2020
|
|
10062
|
SST 5th Floor Renovation
|
5112495
|
02/12/2020
|
02/26/2020
|
02/13/2020
|
Plans
|
10061
|
Social Ecology 1 Rm 212F
|
322434
|
02/12/2020
|
02/26/2020
|
02/13/2020
|
|
10060
|
2019-20 SCIP B72, B72A, B & C
|
5112475
|
02/10/2020
|
02/24/2020
|
02/19/2020
|
Plans
|
10059
|
Gondolin ADA Conversion
|
5112540
|
02/07/2020
|
02/21/2020
|
02/13/2020
|
Plans
|
10058
|
GF 18-19 Below Grade Waterproofing Maintenance
|
5112449
|
02/07/2020
|
02/21/2020
|
02/12/2020
|
|
10057
|
Al Irwin Academic Center Reno
|
5112480
|
02/07/2020
|
02/21/2020
|
02/07/2020
|
Plans/Specifications
|
10056
|
2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation
|
5112285
|
02/06/2020
|
02/20/2020
|
02/07/2020
|
|
10055
|
Irvine Hall 264 Renovation
|
5112539
|
02/06/2020
|
02/20/2020
|
02/06/2020
|
Plans
|
10054
|
DM 2017-2018 Black Start Generator and PowerMAX Phase 2
|
5112169
|
02/04/2020
|
02/18/2020
|
02/05/2020
|
Plans/Specifications
|
10053
|
MPAA 443 Alcove
|
305914
|
02/04/2020
|
02/18/2020
|
02/04/2020
|
Plans
|
10052
|
GNRF Chilled Water Grooved Fitting Replacement
|
null
|
02/04/2020
|
02/18/2020
|
02/05/2020
|
|
10051
|
HIMaC
|
5112271
|
02/03/2020
|
02/17/2020
|
02/05/2020
|
|
10050
|
SST 5th Floor Renovation
|
5112495
|
02/03/2020
|
02/17/2020
|
02/07/2020
|
Plans
|
10049
|
SST 5th Floor Renovation
|
5112495
|
01/30/2020
|
02/13/2020
|
02/06/2020
|
Plans
|
10048
|
La Mirada Renovation
|
5112473
|
01/30/2020
|
02/13/2020
|
02/04/2020
|
Plans
|
10047
|
2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation
|
5112285
|
01/29/2020
|
02/12/2020
|
01/30/2020
|
|
10046
|
Aldrich Hall Building Enhancement - Phase-2/2nd floor public space
|
5112374
|
01/28/2020
|
02/11/2020
|
02/04/2020
|
Plans
|
10045
|
SBSG
|
324565
|
01/27/2020
|
02/10/2020
|
01/27/2020
|
|
10044
|
2nd Floor Renovation
|
5112468
|
01/24/2020
|
02/07/2020
|
02/04/2020
|
|
10043
|
DM 2017-2018 Black Start Generator and PowerMAX Phase 2
|
5112169
|
01/23/2020
|
02/06/2020
|
01/30/2020
|
Plans/Specifications
|
10042
|
SBSG Level-G, Neuro Sci Lab Renovation
|
5112497
|
01/22/2020
|
02/05/2020
|
01/30/2020
|
|
10041
|
HIMaC
|
5112271
|
01/22/2020
|
02/05/2020
|
01/29/2020
|
Plans
|
10040
|
HIMaC
|
5112271
|
01/13/2020
|
01/27/2020
|
01/29/2020
|
Plans/Specifications
|
10039
|
Al Irwin Academic Center Reno
|
5112480
|
01/13/2020
|
01/27/2020
|
01/15/2020
|
Plans/Specifications
|
10038
|
Tierney House Fire Alarm Project
|
5112434
|
01/13/2020
|
01/27/2020
|
01/14/2020
|
Plans/Specifications
|
10037
|
Stem Cell Research Center - Helios Infrastructure
|
5112452
|
01/08/2020
|
01/22/2020
|
01/27/2020
|
|
10036
|
Engineering Faculty Research Labs
|
5112353
|
01/07/2020
|
01/21/2020
|
01/30/2020
|
Plans
|
10035
|
SEC at SL 5th Floor
|
5110290
|
01/07/2020
|
01/21/2020
|
01/14/2020
|
|
10034
|
1st Floor Active Learning Classroom Renovation (Phase 3)
|
5112203
|
01/06/2020
|
01/20/2020
|
01/10/2020
|
Plans
|
10033
|
DM Accessibility Accommodations - NS1-1413 Upgrade
|
5112188
|
01/06/2020
|
01/20/2020
|
01/09/2020
|
Plans
|
10032
|
DM 2017-2018 Black Start Generator and PowerMAX Phase 2
|
5112169
|
01/06/2020
|
01/20/2020
|
01/09/2020
|
Plans/Specifications
|
10031
|
SC 4th Floor W. Wing Office Renovation
|
5112440
|
01/02/2020
|
01/16/2020
|
01/07/2020
|
|
10030
|
SBSG Level-G, Neuro Sci Lab Renovation
|
5112497
|
01/02/2020
|
01/16/2020
|
01/07/2020
|
|
10029
|
DM 2018-19 Electrical System Emergency Circuit Improvements
|
5112299
|
12/18/2019
|
01/01/2020
|
12/18/2019
|
Plans/Specifications
|
10028
|
SEC at SL 2nd + 5th Floor Renovation
|
5110290
|
12/16/2019
|
12/30/2019
|
12/18/2019
|
Plans
|
10027
|
Crown Castle Verizon Wireless Sites - Nodes 8 and 9
|
5112294
|
12/16/2019
|
12/30/2019
|
12/16/2019
|
Plans
|
10026
|
ELF 205 / 209 Renovation
|
5112414
|
12/12/2019
|
12/26/2019
|
12/19/2019
|
Plans/Specifications
|
10025
|
HIMaC
|
5112271
|
12/12/2019
|
12/26/2019
|
02/04/2020
|
Plans
|
10024
|
Al Irwin Academic Center Reno
|
5112480
|
12/11/2019
|
12/25/2019
|
12/13/2019
|
Plans
|
10023
|
5th Floor North Labs Renovation
|
5112281
|
12/11/2019
|
12/25/2019
|
12/18/2019
|
Plans/EH&S Redlines
|
10022
|
Engineering Gateway 3324 Lab Renovation
|
5112282
|
12/11/2019
|
12/25/2019
|
12/11/2019
|
Plans/Cutsheets
|
10021
|
Hewitt Hall Basement Buildout
|
5112312
|
12/11/2019
|
12/25/2019
|
12/17/2019
|
Draft Detail Project Program
|
10020
|
Campus Village Building Exterior Upgrades
|
5112524
|
12/10/2019
|
12/24/2019
|
12/13/2019
|
Plans
|
10019
|
Steinhaus Basement Environmental Chambers
|
5112457
|
12/10/2019
|
12/24/2019
|
12/13/2019
|
|
10018
|
Beckman Laser Institute Biochemistry Facility Renovation (Project name was changed after SCIP was aw
|
5112185
|
12/09/2019
|
12/23/2019
|
12/13/2019
|
Plans
|
10017
|
HIMaC
|
5112271
|
12/09/2019
|
12/23/2019
|
12/11/2019
|
Shop Dwg/Materials
|
10016
|
Stem Cell Research Center - Helios Infrastructure
|
5112452
|
12/05/2019
|
12/19/2019
|
12/13/2019
|
|
10015
|
HIMAC
|
5112271
|
12/05/2019
|
12/19/2019
|
12/05/2019
|
|
10014
|
SC 4th Floor W. Wing Office Renovation
|
5112440
|
12/03/2019
|
12/17/2019
|
12/13/2019
|
|
10013
|
Rowland Hall Corridor - Repair Insulation
|
5112509
|
12/02/2019
|
12/16/2019
|
12/02/2019
|
Plans/Specifications
|
10012
|
La Mirada Renovation
|
5112473
|
11/27/2019
|
12/11/2019
|
12/11/2019
|
Plans
|
10011
|
EG 2nd Floor MAC Renovation
|
5112315
|
11/26/2019
|
12/10/2019
|
12/05/2019
|
Plans
|
10010
|
Verano Commons Renovation
|
5112247
|
11/26/2019
|
12/10/2019
|
12/10/2019
|
Plans
|
10009
|
GNRF Chilled Water Grooved Fitting Replacement
|
5112545
|
11/26/2019
|
12/10/2019
|
11/26/2019
|
|
10008
|
CRII 3 Gateway Study Center Lighting
|
5112357
|
11/25/2019
|
12/09/2019
|
12/05/2019
|
Plans
|
10007
|
EEG Renovation
|
5112455
|
11/25/2019
|
12/09/2019
|
12/05/2019
|
|
10006
|
McGaugh 4439 Local Exhaust Ventilation
|
5112456
|
11/22/2019
|
12/06/2019
|
12/05/2019
|
Specifications
|
10005
|
HIMaC
|
5112271
|
11/19/2019
|
12/03/2019
|
11/21/2019
|
Shop Dwg/Materials
|
10004
|
2018-19 SCIP 1st Floor Classroom
|
5112332
|
11/19/2019
|
12/03/2019
|
11/20/2019
|
Plans
|
10003
|
SEC at SL 2nd + 5th Floor Renovation
|
5110290
|
11/19/2019
|
12/03/2019
|
12/05/2019
|
Plans
|
10002
|
Bison Avenue Pedestrian Improvements
|
5112383
|
11/18/2019
|
12/02/2019
|
12/02/2019
|
Plans
|
10001
|
Engineering Hall Glacios Cryo TEM and JEOL TEM Installations
|
5112385
|
11/15/2019
|
11/29/2019
|
12/10/2019
|
Plans
|
10000
|
SCIP 2018-2019 ELF 134 Lab Renovation
|
5112276
|
11/15/2019
|
11/29/2019
|
12/02/2019
|
Plans/Specifications
|
9999
|
Aldrich Hall Building Enhancement - Phase-2/2nd Floor Public Space
|
5112374
|
11/15/2019
|
11/29/2019
|
11/19/2019
|
Plans
|
9998
|
1st Floor Human Biology and Human Performance Renovation
|
5112203
|
11/14/2019
|
11/28/2019
|
11/19/2019
|
Plans/Specifications/EH&S Redlines
|
9997
|
MIND Renovation MS1 109
|
5112428
|
11/14/2019
|
11/28/2019
|
11/15/2019
|
Plans
|
9996
|
Al Irwin Academic Center Reno
|
5112480
|
11/12/2019
|
11/26/2019
|
11/15/2019
|
Plans
|
9995
|
Mesa Court Lago Fire Sprinkler Flood
|
5112514
|
11/07/2019
|
11/21/2019
|
11/15/2019
|
|
9994
|
Mesa Court Ondas Emergency Water Mitigation
|
5112514
|
11/07/2019
|
11/21/2019
|
11/15/2019
|
|
9993
|
HIMaC
|
5112271
|
11/06/2019
|
11/20/2019
|
11/15/2019
|
Plans/Specifications
|
9992
|
SEC at SL 2nd + 5th Floor Renovation
|
5110290
|
11/05/2019
|
11/19/2019
|
11/13/2019
|
Plans
|
9991
|
SSL 4th Floor Human Subject Lab
|
5112058
|
11/04/2019
|
11/18/2019
|
11/19/2019
|
|
9990
|
Fire Life Safety Improvement
|
998611
|
10/30/2019
|
11/13/2019
|
|
OTHER: FLS-Rowland Hall_Conformed G-Sheets R RCP Sheets
|
9989
|
2018-19 SCIP Labs B66, B70, B85 & B93
|
5112295
|
10/30/2019
|
11/13/2019
|
11/04/2019
|
Plans
|
9988
|
Exit Route Improvements - SCIP 17/18
|
5112168
|
10/29/2019
|
11/12/2019
|
11/06/2019
|
Plans
|
9987
|
MIND Renovation MS1 109
|
5112428
|
10/29/2019
|
11/12/2019
|
11/04/2019
|
Plans
|
9986
|
Tierney House Fire Alarm Project
|
5112434
|
10/28/2019
|
11/11/2019
|
10/31/2019
|
Plans/Specifications
|
9985
|
Aldrich Hall Building Enhancement - Phase-2/2nd Floor Public Space
|
5112374
|
10/28/2019
|
11/11/2019
|
10/31/2019
|
Plans
|
9984
|
EEG Renovation
|
5112455
|
10/28/2019
|
11/11/2019
|
10/31/2019
|
|
9983
|
Renovation
|
320987
|
10/23/2019
|
11/06/2019
|
10/24/2019
|
|
9982
|
2017-18 SCIP Sculpture Studio Dust Collector and Lighting Replacement
|
5112156
|
10/23/2019
|
11/06/2019
|
10/24/2019
|
Plans
|
9981
|
EG 2nd Floor MAC Renovation
|
5112315
|
10/23/2019
|
11/06/2019
|
10/24/2019
|
Plans
|
9980
|
ELF 205/209 Renovation
|
5112414
|
10/23/2019
|
11/06/2019
|
10/24/2019
|
Plans
|
9979
|
Renovation
|
321132
|
10/23/2019
|
11/06/2019
|
10/24/2019
|
|
9978
|
CRII 3 Gateway Study Center Lighting
|
5112357
|
10/22/2019
|
11/05/2019
|
10/24/2019
|
Plans
|
9977
|
ELF 205/209 Renovation
|
5112414
|
10/21/2019
|
11/04/2019
|
10/31/2019
|
Plans
|
9976
|
EG 2nd Floor MAC Renovation
|
5112315
|
10/21/2019
|
11/04/2019
|
10/21/2019
|
Plans
|
9975
|
EG 2nd Floor MAC Renovation
|
5112315
|
10/18/2019
|
11/01/2019
|
10/18/2019
|
Plans
|
9974
|
Faculty Enhancement Funds - Shuttle Safety
|
5112435
|
10/18/2019
|
11/01/2019
|
10/21/2019
|
Plans/EH&S Redlines
|
9973
|
2018-19 SCIP Labs B66, B70, B85 & B93
|
5112295
|
10/17/2019
|
10/31/2019
|
10/21/2019
|
Plans
|
9972
|
Bren Hall Flood Response 2019
|
5112521
|
10/17/2019
|
10/31/2019
|
10/18/2019
|
Plans, Specifications
|
9971
|
HIMaC
|
5112271
|
10/17/2019
|
10/31/2019
|
11/06/2019
|
Plans
|
9970
|
ISEB
|
999239
|
10/15/2019
|
10/29/2019
|
10/15/2019
|
RFI: ISEB_RFI-364 Laser Signage Info required for Rough-in
|
9969
|
DM 18 / 19 SSPA, SSBA, SE2 SSLH Fire Alarm Panel
|
5112370
|
10/14/2019
|
10/28/2019
|
10/15/2019
|
Addendum
|
9968
|
Student Center Building A Roof Repairs
|
5112436
|
10/14/2019
|
10/28/2019
|
10/17/2019
|
|
9967
|
2018-19 SCIP SSPB 2nd Floor Linguistic Lab Renovation
|
5112287
|
10/14/2019
|
10/28/2019
|
10/14/2019
|
Plans
|
9966
|
SSL 3rd Floor Cog Sci Lab Renovation
|
5112286
|
10/11/2019
|
10/25/2019
|
10/18/2019
|
Plans
|
9965
|
Bison Avenue Pedestrian Improvements
|
5112383
|
10/11/2019
|
10/25/2019
|
10/17/2019
|
Plans
|
9964
|
Middle Earth, Bucklebury HVAC Replacement
|
5112367
|
10/09/2019
|
10/23/2019
|
10/14/2019
|
CRANE LIFT PLAN
|
9963
|
SCIP 2018-2019 ELF 134 Lab Renovation
|
5112276
|
10/08/2019
|
10/22/2019
|
10/17/2019
|
Plans/Specifications
|
9962
|
2018-19 SCIP Labs B66, B70, B85 & B93
|
5112295
|
10/03/2019
|
10/17/2019
|
10/04/2019
|
Plans
|
9961
|
2018-19 SCIP -- SE-2 1st Floor Lab 1360 Renovation
|
5112285
|
10/03/2019
|
10/17/2019
|
10/04/2019
|
|
9960
|
HIMaC
|
5112271
|
10/02/2019
|
10/16/2019
|
10/15/2019
|
Plans/Specifications
|
9959
|
Restroom & Lobby Improvements - ELF Corridor
|
5112273
|
10/02/2019
|
10/16/2019
|
10/04/2019
|
Plans/Specifications
|
9958
|
Aldrich Hall Building Enhancement - Phase 2/2nd Floor Public Space
|
5112374
|
10/01/2019
|
10/15/2019
|
10/04/2019
|
Plans
|
9957
|
2018-19 SCIP Calit2 TEMPR Properties Facility Renovation
|
5110353
|
09/27/2019
|
10/11/2019
|
10/04/2019
|
Plans/Specifications
|
9956
|
SEC at SL 2nd + 5th Floor Renovation
|
5110290
|
09/24/2019
|
10/08/2019
|
09/30/2019
|
Plans
|
9955
|
Major Building Maintenance
|
5112289
|
09/24/2019
|
10/08/2019
|
09/25/2019
|
Addendum (Submittal)
|
9954
|
SBSG Renovation
|
316480
|
09/20/2019
|
10/04/2019
|
09/20/2019
|
Plans
|
9953
|
Engineering Gateway 3324 Lab Renovation
|
5112282
|
09/20/2019
|
10/04/2019
|
09/30/2019
|
Plans/Cutsheets
|
9952
|
SC Bldg-G West Wing Office Entry Renovation
|
5112440
|
09/19/2019
|
10/03/2019
|
09/30/2019
|
|
9951
|
E-Tech Wireless Enhancement for Sculpture Studios
|
5112510
|
09/19/2019
|
10/03/2019
|
09/20/2019
|
|
9950
|
Renovation
|
5113417, 318744
|
09/19/2019
|
10/03/2019
|
09/20/2019
|
|
9949
|
Building 55 Major Building Maintenance
|
5112289
|
09/18/2019
|
10/02/2019
|
09/20/2019
|
Plans
|
9948
|
MIND Renovation MS1 109
|
5112428
|
09/16/2019
|
09/30/2019
|
09/23/2019
|
Plans
|
9947
|
Faculty Enhancement Funds - Shuttle Safety
|
5112435
|
09/16/2019
|
09/30/2019
|
09/23/2019
|
Plans
|
9946
|
Aldrich Hall / Bookstore Pathway
|
5112447
|
09/16/2019
|
09/30/2019
|
09/20/2019
|
Plans
|
9945
|
SSL 3rd Floor Cog Sci Lab Renovation
|
5112286
|
09/13/2019
|
09/27/2019
|
09/20/2019
|
Plans
|
9944
|
MSTB 1st Floor, OEOD Office Expansion
|
5112280
|
09/13/2019
|
09/27/2019
|
09/20/2019
|
Plans
|
9943
|
SF-13 Coil Replacement
|
5112469
|
09/10/2019
|
09/24/2019
|
09/10/2019
|
Specifications
|
9942
|
2017-18 SCIP Sculpture Studio Dust Collector and Lighting Replacement
|
5112156
|
09/06/2019
|
09/20/2019
|
09/10/2019
|
Plans
|
9941
|
Restroom & Lobby Improvements-ELF Corridor
|
5112273
|
09/04/2019
|
09/18/2019
|
09/10/2019
|
Plans,Specifications
|
9940
|
Building 55 (UCIMC)
|
5112289
|
09/03/2019
|
09/17/2019
|
09/06/2019
|
Plans, Final Review
|
9939
|
5 Year Title 19 Certification
|
5112401
|
09/03/2019
|
09/17/2019
|
09/03/2019
|
Final Review-Approved for Contracts
|
9938
|
ARC
|
5112403
|
09/03/2019
|
09/17/2019
|
09/03/2019
|
Final Review-Approved for Contracts
|
9937
|
1st Floor Human Biology and Human Performance Renovation
|
5112203
|
08/30/2019
|
09/13/2019
|
09/10/2019
|
Plans/Specifications
|
9936
|
5th Floor North Labs Renovation
|
5112281
|
08/30/2019
|
09/13/2019
|
09/10/2019
|
Plans
|
9935
|
SCIP 2018-2019 ELF 134 Lab Renovation
|
5112276
|
08/28/2019
|
09/11/2019
|
09/10/2019
|
Plans/Specifications
|
9934
|
Aldrich Hall 4th and 5th Floor Renovation - Phase 4
|
5112002
|
08/27/2019
|
09/10/2019
|
08/27/2019
|
Plans
|
9933
|
PD Communications Room Cooling
|
5112444
|
08/22/2019
|
09/05/2019
|
08/26/2019
|
Plans
|
9932
|
HIMaC
|
5112271
|
08/22/2019
|
09/05/2019
|
09/04/2019
|
Plans
|
9931
|
Palo Verde Emergency Water Repair Bldg 1300
|
5112453
|
08/22/2019
|
09/05/2019
|
08/22/2019
|
|
9930
|
Bison Avenue Pedestrian Safety Improvements
|
5112383
|
08/22/2019
|
09/05/2019
|
08/26/2019
|
Plans
|
9929
|
Middle Earth Raise Valve Box
|
5112454
|
08/20/2019
|
09/03/2019
|
08/22/2019
|
Plans
|
9928
|
3 & 4 Floor Renovation
|
5112336
|
08/19/2019
|
09/02/2019
|
08/20/2019
|
Plans
|
9927
|
SCIP Undergraduate Teaching Lab
|
5112340
|
08/19/2019
|
09/02/2019
|
08/19/2019
|
|
9926
|
HIMaC
|
5112271
|
08/16/2019
|
08/30/2019
|
08/26/2019
|
Plans/Specifications
|
9925
|
Sculpture Ceramics Studio Renovation
|
5112331
|
08/16/2019
|
08/30/2019
|
08/26/2019
|
Plans
|
9924
|
Restroom & Lobby Improvements Faculty Enhancement Funds
|
5112273
|
08/15/2019
|
08/29/2019
|
08/20/2019
|
Plans/Specifications
|
9923
|
Parking Structure LED & Wireless Mesh Network
|
5109444
|
08/13/2019
|
08/27/2019
|
08/20/2019
|
Plans
|
9922
|
Redesign and Install Kitchen Exhaust Hood for Catering - Student Center
|
5112292
|
08/12/2019
|
08/26/2019
|
|
Plans/Specifications/EH&S Redlines
|
9921
|
EG 2nd Floor MAC Renovation
|
5112315
|
08/12/2019
|
08/26/2019
|
08/13/2019
|
Plans/Specifications
|
9920
|
Renovation
|
305913
|
08/12/2019
|
08/26/2019
|
08/13/2019
|
|
9919
|
MSTB 1st Floor, OEOD Office Expansion
|
5112280
|
08/08/2019
|
08/22/2019
|
08/13/2019
|
Plans
|
9918
|
HIMaC
|
5112271
|
08/07/2019
|
08/21/2019
|
08/13/2019
|
Plans/Specifications
|
9917
|
Middle Earth Emergency Water Line Break
|
5112246
|
08/07/2019
|
08/21/2019
|
08/09/2019
|
|
9916
|
Building 55 Major Building Maintenance
|
5112289
|
08/06/2019
|
08/20/2019
|
09/04/2019
|
VOID Plans
|
9915
|
Restroom & Lobby Improvements - ELF Corridor
|
5112273
|
08/06/2019
|
08/20/2019
|
08/06/2019
|
Plans
|
9914
|
SC Bldg-G West Wing Office Entry Renovation
|
5112440
|
07/31/2019
|
08/14/2019
|
08/06/2019
|
|
9913
|
Renovation
|
315113
|
07/30/2019
|
08/13/2019
|
07/30/2019
|
Plans
|
9912
|
DM 2017-2018 ELF Exhaust Safety Upgrade
|
5112166
|
07/29/2019
|
08/12/2019
|
07/31/2019
|
Plans/Specifications
|
9911
|
DM 2017-2018 Black Start Generator and PowerMAX Phase 2
|
5112169
|
07/29/2019
|
08/12/2019
|
07/29/2019
|
Plans
|
9910
|
Renovation
|
315188
|
07/26/2019
|
08/09/2019
|
07/29/2019
|
Plans
|
9909
|
Restroom & Lobby Improvements Faculty Enhancement Funds
|
5112273
|
07/25/2019
|
08/08/2019
|
07/31/2019
|
Plans
|
9908
|
2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation
|
5112285
|
07/25/2019
|
08/08/2019
|
07/25/2019
|
Plans
|
9907
|
MSTB 1st Floor, OEOD Office Expansion
|
5112280
|
07/24/2019
|
08/07/2019
|
07/31/2019
|
Plans
|
9906
|
State Funded Re-Roof Multiple Buildings
|
5110248
|
07/23/2019
|
08/06/2019
|
07/31/2019
|
Plans/Previous set w/ comments
|
9905
|
SC Bldg-G West Wing Office Entry Renovation
|
5112440
|
07/22/2019
|
08/05/2019
|
07/29/2019
|
|
9904
|
2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation
|
5112285
|
07/22/2019
|
08/05/2019
|
07/25/2019
|
Plans
|
9903
|
Student Center Crystal Cove Auditorium Renovation
|
5112344
|
07/17/2019
|
07/31/2019
|
07/18/2019
|
Plans
|
9902
|
Building 55 Major Building Maintenance
|
5112289
|
07/16/2019
|
07/30/2019
|
|
Plans
|
9901
|
Building 55 Major Building Maintenance
|
5112289
|
07/16/2019
|
07/30/2019
|
07/18/2019
|
Plans
|
9900
|
HIMaC
|
5112271
|
07/16/2019
|
07/30/2019
|
07/18/2019
|
Plans
|
9899
|
Crown Castle Wireless Sites - UCI Outdoor DAS - MPS
|
5112294
|
07/15/2019
|
07/29/2019
|
07/18/2019
|
Plans
|
9898
|
Crown Castle Verizon Wireless Sites - UCI Outdoor DAS - ECPS Building
|
5112294
|
07/15/2019
|
07/29/2019
|
07/18/2019
|
Plans
|
9897
|
SCIP Lab Renovation for Med Sci C&D
|
5112284
|
07/11/2019
|
07/25/2019
|
07/24/2019
|
|
9896
|
Engineering Faculty Research Labs
|
5112353
|
07/11/2019
|
07/25/2019
|
07/24/2019
|
Plans
|
9895
|
Sculpture Ceramics Studio Renovation
|
5112331
|
07/11/2019
|
07/25/2019
|
07/24/2019
|
Plans
|
9894
|
2018-19 SCIP 1st Floor Classroom
|
5112332
|
07/10/2019
|
07/24/2019
|
07/12/2019
|
Submittal
|
9893
|
McGaugh AHU-3 Interior Drywall Repair
|
5112458
|
07/08/2019
|
07/22/2019
|
07/08/2019
|
|
9892
|
5th Floor North Labs Renovation
|
5112281
|
07/08/2019
|
07/22/2019
|
07/11/2019
|
Plans
|
9891
|
Hammer Throw Cage Relocation
|
5112342
|
07/08/2019
|
07/22/2019
|
07/11/2019
|
Plans
|
9890
|
Human Biology Testing and Human Performance Lab
|
5112203
|
07/03/2019
|
07/17/2019
|
07/11/2019
|
Plans
|
9889
|
MSTB 1st Floor, OEOD Office Expansion
|
5112280
|
07/03/2019
|
07/17/2019
|
07/11/2019
|
Plans
|
9888
|
2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation
|
5112285
|
06/27/2019
|
07/11/2019
|
07/08/2019
|
Plans/Specifications/EH&S Redlines
|
9887
|
Construct HIMaC
|
5112271
|
06/26/2019
|
07/10/2019
|
06/28/2019
|
Plans
|
9886
|
301 and 302 Office Renovation
|
5112310
|
06/25/2019
|
07/09/2019
|
06/26/2019
|
Plans
|
9885
|
5112308 Sprague 351-362B Supplemental Cooling
|
5112308
|
06/24/2019
|
07/08/2019
|
06/25/2019
|
|
9884
|
5112308 Sprague 351-362B Supplemental Cooling
|
5112308
|
06/21/2019
|
07/05/2019
|
06/25/2019
|
|
9883
|
Middle Earth Housing Office Replace Fire Alarm System
|
5112296
|
06/21/2019
|
07/05/2019
|
06/25/2019
|
Plans
|
9882
|
3 & 4 Floor Renovation
|
5112336
|
06/18/2019
|
07/02/2019
|
06/19/2019
|
Plans
|
9881
|
Middle Earth Housing Office Replace Fire Alarm System
|
5112296
|
06/18/2019
|
07/02/2019
|
06/20/2019
|
Plans/Specifications
|
9880
|
SCIP 2018-2019 ELF 134 Lab Renovation
|
5112276
|
06/17/2019
|
07/01/2019
|
06/26/2019
|
Plans
|
9879
|
Med Sci B176 Cooling
|
5112363
|
06/17/2019
|
07/01/2019
|
06/17/2019
|
|
9878
|
DM 18/19 SSPA, SSBA, SE2 SSLH Fire Alarm Panel
|
5112370
|
06/17/2019
|
07/01/2019
|
06/17/2019
|
Specifications
|
9877
|
CRII-2 Palo Verde/Middle Earth Pedestrian Bridge
|
5112253
|
06/14/2019
|
06/28/2019
|
06/24/2019
|
Plans
|
9876
|
Engineering Faculty Research Labs
|
5112353
|
06/12/2019
|
06/26/2019
|
06/18/2019
|
Plans
|
9875
|
Chilled Water Coil Replacement
|
5112174
|
06/10/2019
|
06/24/2019
|
06/10/2019
|
Specifications
|
9874
|
Sculpture Ceramics Studio Renovation
|
5112331
|
06/10/2019
|
06/24/2019
|
06/10/2019
|
Plans
|
9873
|
E-Tech Wireless Enhancement for Lecture Halls
|
5112411
|
06/10/2019
|
06/24/2019
|
06/10/2019
|
|
9872
|
ARC Exterior Lighting
|
5110387
|
06/07/2019
|
06/21/2019
|
06/10/2019
|
Plans/Specifications
|
9871
|
Fire Life Safety Improvement
|
998611
|
06/06/2019
|
06/20/2019
|
06/11/2019
|
Submittal
|
9870
|
Interdisciplinary Science & Engineering Building (ISEB)
|
999239
|
06/06/2019
|
06/20/2019
|
06/07/2019
|
RFI
|
9869
|
Hammer Throw Cage Relocation
|
5112342
|
06/06/2019
|
06/20/2019
|
06/06/2019
|
Plans
|
9868
|
E-Tech Wireless Enhancement for Libraries
|
5112426
|
06/06/2019
|
06/20/2019
|
06/06/2019
|
|
9867
|
Rams 2019
|
5112442
|
06/06/2019
|
06/20/2019
|
06/06/2019
|
Specifications
|
9866
|
SBSG 1st Floor Lobby Student Affairs Security Renovation
|
5112341
|
06/06/2019
|
06/20/2019
|
06/10/2019
|
Plans
|
9865
|
Fire Life Safety Improvement
|
998611
|
06/04/2019
|
06/18/2019
|
|
Submittal
|
9864
|
Calit2 2421 Renovation
|
5112279
|
06/04/2019
|
06/18/2019
|
06/05/2019
|
Plans/Specifications
|
9863
|
Redesign and Install Kitchen Exhaust Hood for Catering - Student Center
|
5112292
|
06/03/2019
|
06/17/2019
|
06/19/2019
|
Plans
|
9862
|
ICS I 4th Floor Renovation
|
5112256
|
06/03/2019
|
06/17/2019
|
06/04/2019
|
Plans
|
9861
|
Calit2 2421 Renovation
|
5112279
|
05/31/2019
|
06/14/2019
|
05/31/2019
|
Plans/Specifications
|
9860
|
EG 2nd Floor MAC Renovation
|
5112315
|
05/31/2019
|
06/14/2019
|
05/31/2019
|
Plans/Specifications
|
9859
|
Fire Life Safety Improvement
|
998611
|
05/30/2019
|
06/13/2019
|
06/05/2019
|
Submittal
|
9858
|
CRII-3B 2018-2019 Med Surge 2 Re-Roof
|
5112382
|
05/29/2019
|
06/12/2019
|
05/30/2019
|
Plans
|
9857
|
Renovation
|
316132
|
05/22/2019
|
06/05/2019
|
05/22/2019
|
|
9856
|
Coat Repair Tower and Piping
|
5112305
|
05/22/2019
|
06/05/2019
|
05/23/2019
|
|
9855
|
ISEB
|
999239
|
05/20/2019
|
06/03/2019
|
05/22/2019
|
RFI
|
9854
|
Calit2 2421 Renovation
|
5112279
|
05/16/2019
|
05/30/2019
|
06/10/2019
|
Plans/Specifications
|
9853
|
CRII-3B 2017 Roof Repairs
|
5112003
|
05/16/2019
|
05/30/2019
|
05/17/2019
|
|
9852
|
Crown Castle Verizon Wireless Sites -- Nodes 8 and 9
|
5112294
|
05/14/2019
|
05/28/2019
|
05/17/2019
|
Plans
|
9851
|
ICS I 4th Floor Renovation
|
5112256
|
05/10/2019
|
05/24/2019
|
05/14/2019
|
Plans
|
9850
|
EG 2nd Floor MAC Renovation
|
5112315
|
05/10/2019
|
05/24/2019
|
05/14/2019
|
Plans/Specifications
|
9849
|
2018-19 SCIP 1st Floor Classroom
|
5112332
|
05/08/2019
|
05/22/2019
|
05/09/2019
|
Plans
|
9848
|
2018-19 SCIP SSPB 2nd Floor
|
5112287
|
05/08/2019
|
05/22/2019
|
05/09/2019
|
Plans
|
9847
|
(FEF) Engineering Faculty Research Labs
|
5112353
|
05/06/2019
|
05/20/2019
|
05/14/2019
|
Plans
|
9846
|
Engineering Gateway 2101 Lab Renovation
|
5112325
|
05/03/2019
|
05/17/2019
|
05/03/2019
|
Plans/Specifications
|
9845
|
Palo Verde Fire, Unit 3110
|
5112431
|
05/03/2019
|
05/17/2019
|
05/03/2019
|
Plans (Scope of Work)
|
9844
|
Engineering Gateway 2101 Lab Renovation
|
5112325
|
05/02/2019
|
05/16/2019
|
05/03/2019
|
Plans/Specifications
|
9843
|
3 & 4 Floor Renovation
|
5112336
|
05/02/2019
|
05/16/2019
|
05/06/2019
|
Plans
|
9842
|
Irvine Hall 2019 VC Renovation
|
5112392
|
05/02/2019
|
05/16/2019
|
05/02/2019
|
|
9841
|
2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation
|
5112285
|
04/30/2019
|
05/14/2019
|
05/02/2019
|
Plans/Specifications/EH&S Redlines
|
9840
|
Engineering Gateway 2101 Lab Renovation
|
5112325
|
04/30/2019
|
05/14/2019
|
05/03/2019
|
Plans/Specifications
|
9839
|
Calit2 2421 Renovation
|
5112279
|
04/30/2019
|
05/14/2019
|
05/03/2019
|
Plans
|
9838
|
Student Center Pipe Insulation Replacement
|
5112124
|
04/30/2019
|
05/14/2019
|
04/30/2019
|
Plans/Specifications
|
9837
|
Irvine Hall 2019 VC Renovation
|
5112392
|
04/29/2019
|
05/13/2019
|
05/02/2019
|
|
9836
|
Aldrich Hall Building Enhancement - Phase-1/1st Floor Public Space
|
5112374
|
04/26/2019
|
05/10/2019
|
05/01/2019
|
Plans
|
9835
|
Kitchen Renovations
|
5112405
|
04/25/2019
|
05/09/2019
|
04/29/2019
|
Plans
|
9834
|
Engineering Tower 509 Lab Renovation
|
5112324
|
04/25/2019
|
05/09/2019
|
04/29/2019
|
Plans
|
9833
|
Engineering Tower 509 Lab Renovation
|
5112324
|
04/24/2019
|
05/08/2019
|
04/24/2019
|
Plans
|
9832
|
Engineering Faculty Research Labs
|
5112353
|
04/22/2019
|
05/06/2019
|
04/29/2019
|
Plans: Demolition of Interior Works
|
9831
|
EDU 3rd Floor Renovation Dean's Admin
|
5112334
|
04/19/2019
|
05/03/2019
|
04/29/2019
|
Plans
|
9830
|
Engineering Gateway 3324 Lab Renovation
|
5112282
|
04/18/2019
|
05/02/2019
|
|
Plans/Specifications
|
9829
|
Engineering Gateway 2101 Lab Renovation
|
5112325
|
04/17/2019
|
05/01/2019
|
04/22/2019
|
Plans
|
9828
|
Kitchen Renovations
|
5112405
|
04/16/2019
|
04/30/2019
|
04/29/2019
|
Plans
|
9827
|
ICS I 4th Floor Renovation
|
5112256
|
04/16/2019
|
04/30/2019
|
04/29/2019
|
Plans
|
9826
|
Aldrich Hall Building Enhancement - Phase-1/1st Floor Public Space
|
5112374
|
04/16/2019
|
04/30/2019
|
04/23/2019
|
Plans
|
9825
|
CRII-3B 2018-2019 Med Surge 2 Re-Roof
|
5112382
|
04/15/2019
|
04/29/2019
|
04/17/2019
|
Plans/Specifications
|
9824
|
Humanities Hall and Social Sciences Building
|
5112349
|
04/11/2019
|
04/25/2019
|
04/15/2019
|
Plans
|
9823
|
Engineering Gateway 2101 Lab Renovation
|
5112325
|
04/11/2019
|
04/25/2019
|
04/22/2019
|
Plans
|
9822
|
Student Center Lighting Phase 2
|
5109987
|
04/10/2019
|
04/24/2019
|
04/16/2019
|
Plans
|
9821
|
Engineering Tower 509 Lab Renovation
|
5112324
|
04/10/2019
|
04/24/2019
|
04/22/2019
|
Plans/Specifications
|
9820
|
2018-19 SCIP 1st Floor Classroom
|
5112332
|
04/09/2019
|
04/23/2019
|
04/15/2019
|
Plans
|
9819
|
Natural Science 1 MBCx
|
5110233
|
04/09/2019
|
04/23/2019
|
04/09/2019
|
Specifications
|
9818
|
Aquatics Facility Reconfiguration
|
5112159
|
04/08/2019
|
04/22/2019
|
04/11/2019
|
Plans/EH&S Redlines
|
9817
|
Beckman Laser Institute R106, R110, R112 & R132 Renovation
|
5112185
|
04/08/2019
|
04/22/2019
|
04/15/2019
|
Plans/Specifications/EH&S Redlines
|
9816
|
DM 18/19 SSPA, SSBA, SE2 SSLH Fire Alarm Panel
|
5112370
|
04/08/2019
|
04/22/2019
|
04/15/2019
|
Specifications
|
9815
|
2017-18 SCIP Public Service Building 2nd Floor Reno
|
5112147
|
04/08/2019
|
04/22/2019
|
04/15/2019
|
Plans
|
9814
|
EG 3327A Renovation
|
5112265
|
04/08/2019
|
04/22/2019
|
04/15/2019
|
Plans/Specifications
|
9813
|
2018-19 SCIP SSPB 2nd Floor
|
5112287
|
04/05/2019
|
04/19/2019
|
04/10/2019
|
Plans/Specifications
|
9812
|
2017-18 SCIP Sculpture Studio Dust Collector and Lighting Replacement
|
5112156
|
04/05/2019
|
04/19/2019
|
04/10/2019
|
Plans/Specifications
|
9811
|
301 and 302 Office Renovation
|
5112310
|
04/04/2019
|
04/18/2019
|
04/08/2019
|
Plans/EH&S Redlines
|
9810
|
DM 2018-19 Water Main Line Upgrades
|
5112303
|
04/04/2019
|
04/18/2019
|
04/10/2019
|
Plans/Specifications
|
9809
|
DM 2018-19 Water Main Line Upgrades
|
5112303
|
04/03/2019
|
04/17/2019
|
04/10/2019
|
Plans/Specifications
|
9808
|
Student Center Lighting Phase 2
|
5109987
|
04/03/2019
|
04/17/2019
|
04/09/2019
|
Plans
|
9807
|
Middle Earth HVAC Replacement
|
5112367
|
04/02/2019
|
04/16/2019
|
04/03/2019
|
Plans
|
9806
|
3 & 4 Floor Renovation
|
5112336
|
04/01/2019
|
04/15/2019
|
04/08/2019
|
Plans
|
9805
|
EDU 3rd floor Renovation Dean's admin
|
5112334
|
04/01/2019
|
04/15/2019
|
04/09/2019
|
Plans
|
9804
|
Track Resurfacing
|
5112343
|
03/28/2019
|
04/11/2019
|
04/03/2019
|
Plans
|
9803
|
HH and SSL Classroom Renovations
|
5112349
|
03/27/2019
|
04/10/2019
|
04/03/2019
|
Plans
|
9802
|
EG 2nd Floor MAC Renovation
|
5112315
|
03/27/2019
|
04/10/2019
|
04/01/2019
|
Plans
|
9801
|
Palo Verde Apartment Renovation
|
5112373
|
03/27/2019
|
04/10/2019
|
04/01/2019
|
Plans
|
9800
|
3 & 4 Floor Renovation
|
5112336
|
03/27/2019
|
04/10/2019
|
04/08/2019
|
Plans
|
9799
|
SCIP Rowland Labs B66, B70, B85, B93
|
5112295
|
03/26/2019
|
04/09/2019
|
04/01/2019
|
Plans
|
9798
|
Middle Earth HVAC Replacement
|
5112367
|
03/25/2019
|
04/08/2019
|
04/01/2019
|
Plans
|
9797
|
301 and 302 Office Renovation
|
5112310
|
03/25/2019
|
04/08/2019
|
03/27/2019
|
Plans
|
9796
|
DM 2018-19 Water Main Line Upgrades
|
5112303
|
03/22/2019
|
04/05/2019
|
03/26/2019
|
Plans/Specifications
|
9795
|
Building 55 Major Building Maintenance
|
5112289
|
03/22/2019
|
04/05/2019
|
03/27/2019
|
Plans
|
9794
|
Renovation Office and Lab space
|
5112283
|
03/22/2019
|
04/05/2019
|
03/26/2019
|
Floor Abatement and painting
|
9793
|
DM 2017-2018 Black Start Generator and PowerMax Phase 2
|
5112169
|
03/21/2019
|
04/04/2019
|
03/26/2019
|
Plans/Specifications
|
9792
|
DM 2017-2018 Black Start Generator and PowerMAX Phase 2
|
5112169
|
03/21/2019
|
04/04/2019
|
03/26/2019
|
Plans/Specifications
|
9791
|
SCIP Rowland Labs B66, B70, B85, B93
|
5112295
|
03/18/2019
|
04/01/2019
|
03/22/2019
|
Plans
|
9790
|
CRII-3B 2017 Roof Repairs
|
5112003
|
03/18/2019
|
04/01/2019
|
03/20/2019
|
Plans / Specifications
|
9789
|
Natural Science 1 MBCx
|
5110233
|
03/18/2019
|
04/01/2019
|
03/18/2019
|
Specifications
|
9788
|
Calit2 2421 Renovation
|
5112279
|
03/14/2019
|
03/28/2019
|
04/08/2019
|
Plans
|
9787
|
Engineering Gateway 3324 Lab Renovation
|
5112282
|
03/13/2019
|
03/27/2019
|
|
Plans, Specifications
|
9786
|
2018-19 SCIP -- SE-2 1st Floor Lab 1360 Renovation
|
5112285
|
03/13/2019
|
03/27/2019
|
03/21/2019
|
Plans
|
9785
|
AIRB 3rd Floor Renovation-Population Health
|
5112335
|
03/11/2019
|
03/25/2019
|
03/18/2019
|
100% Review
|
9784
|
Aldrich Hall Building Enhancement-Phase-1 /1st floor Public space
|
5112374
|
03/11/2019
|
03/25/2019
|
03/18/2019
|
Plans
|
9783
|
ISEB
|
999239
|
03/11/2019
|
03/25/2019
|
|
Submittal
|
9782
|
Interdiscuplinary Science & Engineering Building
|
999239
|
03/11/2019
|
03/25/2019
|
|
Submittal
|
9781
|
Humanities Instructional Building
|
5112339
|
03/11/2018
|
03/25/2019
|
03/14/2019
|
Plans, Final Review
|
9780
|
Student Center Door Access Controls - Phase I
|
5112138
|
03/07/2019
|
03/14/2019
|
03/08/2019
|
Plans
|
9779
|
SCIP 2018-19 HIB Automatic Door Operator Installation
|
5112339
|
03/07/2019
|
03/14/2019
|
|
Plans
|
9778
|
SCIP Rowland Labs B66, B70, B85, B93
|
5112295
|
03/05/2019
|
03/12/2019
|
03/08/2019
|
Plans
|
9777
|
ICS I 4th Floor Renovation
|
5112256
|
03/05/2019
|
03/12/2019
|
03/08/2019
|
Plans
|
9776
|
CRII-3B 2018-2019 Med Surge 2 Re-roof
|
5112382
|
03/04/2019
|
03/11/2019
|
03/08/2019
|
Plans, Specifications
|
9775
|
Engineering Tower 509 Lab Renovation
|
5112324
|
03/04/2019
|
03/11/2019
|
03/06/2019
|
Plans
|
9774
|
FEF Humanities Hall Classroom Renovations
|
5112349
|
03/04/2019
|
03/11/2019
|
03/05/2019
|
Plans
|
9773
|
2018-19 SCIP 1st Floor Classroom
|
5112332
|
03/04/2019
|
03/11/2019
|
03/04/2019
|
Plans, Specifications
|
9772
|
(FEF) Engineering Faculty Research Labs
|
5112353
|
03/04/2019
|
03/11/2019
|
03/14/2019
|
Plans
|
9771
|
Interdisciplinary Science & Engineering Buildings (ISEB)
|
999239
|
03/01/2019
|
03/08/2019
|
|
Other: ISEB_CP-9 Interior Build Out Dwgs (203-056-416)
|
9770
|
AIRB 3rd floor Renovation - Population Health
|
5112335
|
02/28/2019
|
03/07/2019
|
03/05/2019
|
Plans
|
9769
|
UCI Applied Innovation - Final Pricing / Agency Submittal
|
OC#13918
|
02/28/2019
|
03/07/2019
|
|
UCI Applied Innovation - Final Pricing / Agency Submittal
|
9768
|
UCI Applied Innovation
|
OC#13918
|
02/27/2019
|
03/06/2019
|
|
UCI Applied Innovation
|
9767
|
SCIP Rowland Labs B66, B70, B85, B93
|
5112295
|
02/25/2019
|
03/04/2019
|
02/26/2019
|
Plans
|
9766
|
Interdisciplinary Science & Engineering Building
|
999239
|
02/21/2019
|
02/28/2019
|
|
RFI: Design RFI 098 washing Davits
|
9765
|
SCIP 2018-19 HIB Automatic Door Operator Installation
|
5112339
|
02/21/2019
|
02/28/2019
|
02/25/2019
|
Plans, Specifications
|
9764
|
Anteater Track Stadium Resurfacing
|
5112343
|
02/21/2019
|
02/28/2019
|
02/25/2019
|
Plans, Specifications
|
9763
|
Remediate Sycamore Tree Infestation- Tree Planting Phase 5
|
5109992
|
02/21/2019
|
02/28/2019
|
02/25/2019
|
Plans, Specifications
|
9762
|
Verano Unit 6 Planters and Drains
|
5112350
|
02/21/2019
|
02/28/2019
|
03/06/2019
|
Plans
|
9761
|
Engineering Gateway 3324 Lab Renovation
|
5112282
|
02/19/2019
|
02/26/2019
|
02/25/2019
|
Plans
|
9760
|
Interdisciplinary Science & Engineering Building
|
999239
|
02/15/2019
|
02/22/2019
|
|
Submittal: ISEB- 01 3100.041 Work Plan for Fire Hydrant Install
|
9759
|
SCIP Rowland Labs B66, B70, B85, B93
|
5112295
|
02/15/2019
|
02/22/2019
|
02/26/2019
|
Plans
|
9758
|
Small CAP - lab renovation Med Sci C&D
|
5112284
|
02/14/2019
|
02/21/2019
|
|
Plans, Approval for Contracts
|
9757
|
DM 2018-19 Electrical System Emergency Circuit Improvements
|
5112299
|
02/13/2019
|
02/20/2019
|
|
Plans, Specifications
|
9756
|
ISEB
|
999239
|
02/12/2019
|
02/19/2019
|
|
Submittal11 5300.006. 1-ISEB_Lab Equipments- Laser Curtains
|
9755
|
SCIP 18/19: SoL Dean's suite office renovation - EDU 1st floor
|
5112338/997217
|
02/12/2019
|
02/19/2019
|
02/21/2019
|
Final Review
|
9754
|
AH 4th and 5th floor renovation - PHASE-3
|
5112002
|
02/12/2019
|
02/19/2019
|
02/20/2019
|
Final Review
|
9753
|
Replace Campus Emergency Phones
|
5112148
|
02/11/2019
|
02/18/2019
|
02/21/2019
|
Plans, Final Review
|
9752
|
SEP 2016 Natural Science 2 MBCx
|
5112212
|
02/11/2019
|
02/18/2019
|
02/12/2019
|
Plans, Approval for Contratcs
|
9751
|
CalIT2 Room 4500 Fiber Data
|
5112371
|
02/11/2019
|
02/18/2019
|
02/12/2019
|
Plans
|
9750
|
McGaugh 4104 Freezer Farm Cooling
|
5112313
|
02/11/2019
|
02/18/2019
|
02/11/2019
|
Plans
|
9749
|
Small Cap - Humanities Hall 178 Renovation
|
5112150
|
02/08/2019
|
02/15/2019
|
02/11/2019
|
Plans
|
9748
|
Croul Hall Bathroom Build-out
|
5112105
|
02/08/2019
|
02/15/2019
|
02/13/2019
|
Plans, Specifications
|
9747
|
AH 4th and 5th floor renovation - PHASE-3
|
5112002
|
02/08/2019
|
02/15/2019
|
02/11/2019
|
Plans, Final Review
|
9746
|
Engineering Tower 509 Lab Renovation
|
5112324
|
02/07/2019
|
02/21/2019
|
02/11/2019
|
Plans
|
9745
|
DM 18/19 Irrigation System Upgrade
|
5112270
|
02/05/2019
|
02/12/2019
|
02/05/2019
|
Specifications
|
9744
|
CRII-3B 2017-2018 Roof Repairs
|
5112003
|
02/04/2019
|
02/11/2019
|
02/05/2019
|
Plans
|
9743
|
DM 2018-19 Engineering Tower Concrete Crack
|
5112362
|
02/04/2019
|
02/11/2019
|
02/05/2019
|
Plans
|
9742
|
Rowland Hall Service Level Corridor
|
5112295
|
02/04/2019
|
02/11/2019
|
02/05/2019
|
Plans
|
9741
|
SCIP 2018-19 HIB Automatic Door Operator Installation
|
5112339
|
02/01/2019
|
02/08/2019
|
02/05/2019
|
Plans, Specifications
|
9740
|
Beckman Laser Institute R106, R110, R112 & R132 Renovation
|
5112185
|
01/29/2019
|
02/05/2019
|
02/05/2019
|
Plans, Specifications, EH&S Redlines
|
9739
|
Engineering Gateway
|
5112282
|
01/29/2019
|
02/05/2019
|
01/31/2019
|
Plans
|
9738
|
Student Center Door Access Controls - Phase I
|
5112138
|
01/28/2019
|
02/04/2019
|
01/30/2019
|
Plans, Specifications, EH&S Redlines
|
9737
|
Interdisciplinary Science & Engineering Building
|
999239
|
01/28/2019
|
02/04/2019
|
|
Submittal: ISEB_33 1100.039_Site Water Distribution (635-653-293)
|
9736
|
Interdisciplinary Science & Engineering Building
|
999239
|
01/28/2019
|
02/04/2019
|
|
Submittal: ISEB_11 5300.006 Lab Equip - Laser Curtains (227-079-730)
|
9735
|
Interdisciplinary Science & Engineering Building
|
999239
|
01/28/2019
|
02/04/2019
|
|
RFI: RFI-100 Emergency gas Shut-off Valve Location (Session 541-999-384)
|
9734
|
EGDC Piping Modification
|
5112380
|
01/24/2019
|
01/31/2019
|
01/29/2019
|
Plans, Specifications
|
9733
|
Crown Castle Verizon Wireless Sites
|
5112294
|
01/24/2019
|
01/31/2019
|
01/29/2019
|
Plans
|
9732
|
McGaugh Hall 4336 Equipment Cooling
|
5112309
|
01/23/2019
|
01/30/2019
|
01/23/2019
|
Plans, 100% Review
|
9731
|
2018-19 SCIP 1st Floor Classroom
|
5112332
|
01/23/2019
|
01/30/2019
|
01/29/2019
|
Plans
|
9730
|
Rowland Hall B66, B70, B85, B66 Phase 1
|
5112295
|
01/22/2019
|
01/29/2019
|
01/23/2019
|
Plans
|
9729
|
SCIP 18/19: SoL Dean's suite office renovation - EDU 1st floor
|
5112338/997217
|
01/22/2019
|
01/29/2019
|
01/30/2019
|
Plans, 100% Review
|
9728
|
ISEB
|
999239
|
01/18/2019
|
01/25/2019
|
01/25/2019
|
Submittal: ISEB_Lab Equipments- Bio Safety, Fume Hood
|
9727
|
Small Cap - Humanities Hall 178 Renovation
|
5112150
|
01/18/2019
|
01/25/2019
|
01/29/2019
|
Plans
|
9726
|
HIB Automatic Door Operator Installation
|
5112339
|
01/17/2019
|
01/24/2019
|
01/18/2019
|
Plans
|
9725
|
Sm Cap 2017 - CalIT2 TEMPR Properties Facility Renovation
|
5110353
|
01/17/2019
|
01/24/2019
|
01/23/2019
|
Plans
|
9724
|
Med Surge II 301 and 302 Office Renovation
|
5112310
|
01/17/2019
|
01/24/2019
|
01/18/2019
|
Plans-Schematic
|
9723
|
ET 924 Lab Renovation
|
5112249
|
01/16/2019
|
01/23/2019
|
01/18/2019
|
Plans
|
9722
|
Verano Structural Assessment 1-3
|
5112297
|
01/15/2019
|
01/22/2019
|
01/18/2019
|
Plans
|
9721
|
DM 2017-2018 Black Start Generator and PowerMAX Phase 2
|
5112169
|
01/15/2019
|
01/22/2019
|
01/18/2019
|
Plans, Specifications, & EH&S Redlines
|
9720
|
SSL 3rd floor renovation Lab Ste 308
|
5112153
|
01/10/2019
|
01/17/2019
|
|
Plans
|
9719
|
Rowland Hall B66, B70, B85, B66 Phase 1
|
5112295
|
01/08/2019
|
01/15/2019
|
01/23/2019
|
Plans, Final Review
|
9718
|
Replace McGaugh Process Water Control Valve
|
5112364
|
01/08/2019
|
01/15/2019
|
01/11/2019
|
100% Review
|
9717
|
Student Center Lighting Phase 2
|
5109987
|
01/08/2019
|
01/15/2019
|
01/11/2019
|
Plans
|
9716
|
SCIP Sculpture Ceramic Studio Renovation, Phase I: Kiln Exhaust
|
5112331
|
01/07/2019
|
01/14/2019
|
01/15/2019
|
Plans, Specifications
|
9715
|
Calit2 2421 Renovation
|
5112279
|
01/07/2019
|
01/14/2019
|
01/14/2019
|
Plans
|
9714
|
Parking Structure LED & Wireless Mesh Network
|
5109444
|
12/19/2018
|
01/02/2019
|
12/20/2018
|
Plans
|
9713
|
FMB Project Services Renovation
|
5112262
|
12/19/2018
|
01/02/2019
|
12/20/2018
|
Plans
|
9712
|
State Funded Re-roof Multiple Buildings
|
5110248
|
12/19/2018
|
12/26/2018
|
12/20/2018
|
Plans, Previous set w/ comments
|
9711
|
Rowland Hall Service Level Corridor
|
5112295
|
12/18/2018
|
01/01/2018
|
12/19/2018
|
Plans
|
9710
|
Beckman Laser Institute
|
5112185
|
12/18/2018
|
01/01/2018
|
01/21/2019
|
Plans, Specifications
|
9709
|
Croul Hall Classroom Build-out B002
|
5112162
|
12/17/2018
|
12/31/2018
|
01/08/2019
|
Plans
|
9708
|
Natural Sciences 1 Flood Remediation
|
5112354
|
12/17/2018
|
12/31/2018
|
12/18/2018
|
Plans
|
9707
|
DM 2017-2018 Black Start Generator and PowerMAX Phase 2
|
5112169
|
12/14/2018
|
12/21/2018
|
12/18/2018
|
Plans, Specifications, EH&S Redlines
|
9706
|
Humanities Hall Classroom Renovations
|
5112349
|
12/13/2018
|
12/20/2018
|
12/18/2018
|
Plans, Specifications
|
9705
|
DM-2017-2018-Fall Protection Measures
|
5112175
|
12/12/2018
|
12/26/2018
|
12/14/2018
|
Plans
|
9704
|
Croul Hall Bathroom Build-out
|
5112105
|
12/11/2018
|
12/18/2018
|
12/14/2018
|
Plans, Specifications
|
9703
|
ISEB
|
999239
|
12/11/2018
|
12/18/2018
|
|
Other: ISEB - CP - 08 MEP & Laboratory Set-up (347-640-055) IDP-02
|
9702
|
CRII-3A HIB Forensic Investigation
|
5112186
|
12/10/2018
|
12/17/2018
|
12/11/2018
|
Plans, Speicifcations
|
9701
|
Middle Earth Expansion
|
996298
|
12/10/2018
|
12/17/2018
|
|
Other: Middle Earth Expansion CP-4 Drawings - Record Set
|
9700
|
Rowland Hall Service Level Corridor
|
5112295
|
12/10/2018
|
12/17/2018
|
12/11/2018
|
Plans
|
9699
|
1034 Renovation
|
300775
|
12/10/2018
|
12/17/2018
|
12/11/2018
|
Plans
|
9698
|
3059 Renovation
|
296912
|
12/10/2018
|
12/17/2018
|
12/11/2018
|
Plans
|
9697
|
AH 1st floor Ste 16o Renovation
|
5112255
|
12/10/2018
|
12/17/2018
|
12/14/2018
|
Plans
|
9696
|
UCI Applied Innovation 17301.08
|
OC#13918
|
12/10/2018
|
12/17/2018
|
|
UCI Applied Innovation 17301.08
|
9695
|
Croul Hall Classroom Build-out B002
|
5112162
|
12/07/2018
|
12/14/2018
|
12/11/2018
|
Plans, Specifications, EH&S Redlines
|
9694
|
AH 5th floor room 509 VAV Box replacement
|
5112361
|
12/06/2018
|
12/13/2018
|
12/10/2018
|
Plans
|
9693
|
Middle Earth Housing Office Replace Fire Alarm System
|
5112296
|
12/04/2018
|
12/11/2018
|
12/05/2018
|
Plans
|
9692
|
ISEB
|
999239
|
12/03/2018
|
12/10/2018
|
|
Other
|
9691
|
Fire Life Safety Improvement
|
998611
|
12/03/2018
|
12/10/2018
|
12/04/2018
|
Submittal
|
9690
|
SC North Lobby Stair railing replacement
|
5112220
|
11/30/2018
|
12/07/2018
|
12/05/2018
|
Final Review
|
9689
|
Grounds Replace Irrigation Valves
|
5112196
|
11/29/2018
|
12/06/2018
|
11/29/2018
|
Plans, Specifications
|
9688
|
Rowland Hall Service Level Corridor
|
5112295
|
11/27/2018
|
12/04/2018
|
12/05/2018
|
Plans
|
9687
|
Middle Earth Housing Office Replace Fire Alarm System
|
5112296
|
11/27/2018
|
12/04/2018
|
11/30/2018
|
Plans
|
9686
|
Croul Hall Classroom Build-out B002
|
5112162
|
11/27/2018
|
12/04/2018
|
11/30/2018
|
Plans, Specifications
|
9685
|
Croul Hall Classroom Build-out B002
|
5112162
|
11/26/2018
|
12/03/2018
|
12/03/2018
|
Plans, Specifications
|
9684
|
Croul Hall Bathroom Build-out
|
51122105
|
11/26/2018
|
12/03/2018
|
12/03/2018
|
Plans, Specifications
|
9683
|
SC North Lobby Stair railing replacement
|
5112220
|
11/26/2018
|
12/03/2018
|
11/30/2018
|
Plans, Final Review
|
9682
|
Replace AH-2
|
5112133
|
11/20/2018
|
11/27/2018
|
11/26/2018
|
Addendum
|
9681
|
235 Renovation
|
299745
|
11/19/2018
|
11/26/2018
|
11/19/2018
|
Plans
|
9680
|
Reines Hall Air Compressor
|
5112223
|
11/19/2018
|
11/26/2018
|
11/19/2018
|
Final Review
|
9679
|
Croul Hall Classroom Build-out B002
|
5112162
|
11/16/2018
|
11/23/2018
|
11/19/2018
|
Plans, Specifications
|
9678
|
SC North Lobby Stair railing replacement
|
5112220
|
11/15/2018
|
11/22/2018
|
11/19/2018
|
Plans
|
9677
|
AH 1st floor Ste 16o Renovation
|
5112255
|
11/15/2018
|
11/22/2018
|
11/27/2018
|
Plans
|
9676
|
SCIP 18/19: Berk Hall office renovation - Phase-2
|
5112200
|
11/14/2018
|
11/21/2018
|
11/19/2018
|
Plans
|
9675
|
CRII-2 2015 High Hazard Laboratories
|
5110063
|
11/09/2018
|
11/23/2018
|
11/19/2018
|
Plans, Specifications
|
9674
|
UCI Applied Innovation - Revised Prelim Pricing
|
OC#13918
|
11/14/2018
|
11/21/2018
|
|
UCI Applied Innovation
|
9673
|
DM 2017-2018 ELF Exhaust Safety Upgrade
|
5112166
|
01/23/2019
|
01/30/2019
|
01/30/2019
|
Plans, Specifications
|
9672
|
Student Center Door Access Controls - Phhase I
|
5112138
|
11/06/2018
|
11/13/2018
|
11/19/2018
|
Plans, Specifications
|
9671
|
CRII-2 Palo Verde/Middle Earth Pedestrian Bridge
|
5112253
|
11/06/2018
|
11/13/2018
|
11/19/2018
|
Plans, Specification
|
9670
|
2018-19 SCIP Lab Renovation for Med Sci D & C
|
5112284
|
11/06/2018
|
11/13/2018
|
11/06/2018
|
Plans, Specification
|
9669
|
SC 2018 Steinhaus Hall 429 Lab Renovation
|
5112155
|
11/05/2018
|
11/12/2018
|
11/19/2018
|
Plans, Specifications via project folder
|
9668
|
2018-19 SCIP Lab Renovation for Med Sci D & C
|
5112284
|
11/05/2018
|
11/12/2018
|
11/07/2018
|
Plans, Specifications
|
9667
|
Middle Earth Housing Office Replace Fire Alarm System
|
5112296
|
10/30/2018
|
11/06/2018
|
11/07/2018
|
Plans
|
9666
|
CRII-3A HIB Forensic Investigation
|
5112186
|
10/29/2018
|
11/05/2018
|
11/07/2018
|
Plans
|
9665
|
AH 1st floor Ste 16o Renovation
|
5112255
|
10/26/2018
|
11/02/2018
|
11/05/2018
|
Plans
|
9664
|
DM 2017-2018 ELF Exhaust Safety Upgrade
|
5112166
|
10/26/2018
|
11/02/2018
|
11/08/2018
|
Plans
|
9663
|
AH 4th and 5th floor renovation - PHASE 2
|
5112002
|
10/26/2018
|
11/02/2018
|
10/29/2018
|
Final Review
|
9662
|
FMB Project Services Renovation
|
5112262
|
10/25/2018
|
11/01/2018
|
10/29/2018
|
Plans
|
9661
|
Engineering Gateway 3327A Renovation
|
5112265
|
10/25/2018
|
11/01/2018
|
10/29/2018
|
Plans
|
9660
|
SC North Lobby Stair railing replacement
|
5112220
|
10/22/2018
|
10/29/2018
|
10/24/2018
|
Plans
|
9659
|
Central Plant thru Utility Tunnel to Engineering Gateway
|
5112317
|
10/17/2018
|
10/24/2018
|
10/17/2018
|
Plans, Specifications
|
9658
|
SC 2018 Steinhaus Hall 429 Lab Renovation- EARLY DEMO
|
5112155
|
10/17/2018
|
10/24/2018
|
|
Plans, Specifications via project folder
|
9657
|
ARC - HBO Shoot Cable Pull
|
5112330
|
10/15/2018
|
10/22/2018
|
10/17/2018
|
Plans, Specifications
|
9656
|
SC 2018 Steinhaus Hall 429 Lab Renovation- EARLY DEMO
|
5112155
|
10/11/2018
|
10/18/2018
|
10/11/2018
|
Plans, Specifications via project folder
|
9655
|
DCE Cable Pull - University Extension D Room 119
|
5112323
|
10/10/2018
|
10/17/2018
|
10/10/2018
|
Plans, Specifications
|
9654
|
Interdisciplinary Science & Engineering Building
|
999239
|
10/09/2018
|
10/16/2018
|
|
ISEB_Revised OCFA Dwgs w Response (https://studio.bluebeam.com/join.html?ID=293-506-204)
|
9653
|
AH 4th and 5th floor renovation-PHASE 2
|
5112002
|
10/05/2018
|
10/12/2018
|
10/24/2018
|
100% Review
|
9652
|
Engineering Hall Lab 3140 Renovation
|
5112163
|
10/05/2018
|
10/12/2018
|
|
Submittal
|
9651
|
Traffic Signals
|
5112245
|
10/04/2018
|
10/11/2018
|
10/09/2018
|
Plans
|
9650
|
Traffic Signals
|
5112244
|
10/04/2018
|
10/11/2018
|
10/09/2018
|
Plans
|
9649
|
FMB Project Services Renovation
|
5112262
|
10/04/2018
|
10/11/2018
|
10/08/2018
|
Plans
|
9648
|
ET 924 Abatement
|
5112249
|
10/03/2018
|
10/10/2018
|
10/04/2018
|
Specifications
|
9647
|
AH 1st floor Ste 16o Renovation
|
5112255
|
10/03/2018
|
10/10/2018
|
10/08/2018
|
Plans
|
9646
|
2017 Black Start Generator and PowerMAX Phase 2
|
5112169
|
10/02/2018
|
10/09/2018
|
10/08/2018
|
Plans, Specifications
|
9645
|
Middle Earth Housing Office replace Fire Alarm System
|
5112296
|
10/02/2018
|
10/09/2018
|
10/11/2018
|
Plans
|
9644
|
Student Center Lighting Phase 2
|
5109987
|
09/26/2018
|
10/03/2018
|
10/04/2018
|
Plans
|
9643
|
Engineering Gateway 3327A Renovation
|
5112265
|
09/26/2018
|
10/03/2018
|
10/15/2018
|
Plans
|
9642
|
Student Center Door Access Controls - Phase I
|
5112138
|
09/24/2018
|
10/01/2018
|
09/26/2018
|
Plans
|
9641
|
Interdisciplinary Science & Engineering Building
|
999239
|
09/21/2018
|
09/28/2018
|
|
Submittal: 01 3233.014 ISEB Air Quality Wind Study-Final Report
|
9640
|
Major Building Maintenance
|
5112079/5112080
|
09/21/2018
|
09/28/2018
|
10/04/2018
|
Plans, Addendum
|
9639
|
AH 4th and 5th floor renovation
|
5112002
|
09/20/2018
|
09/27/2018
|
09/26/2018
|
100% Review
|
9638
|
Mesa Court Field, near corner of University & Campus
|
5112227
|
09/19/2018
|
09/25/2018
|
09/19/2018
|
Plans, Specifications
|
9637
|
SC North Lobby Stair railing replacement
|
5112220
|
09/17/2018
|
09/24/2018
|
09/21/2018
|
Plans
|
9636
|
Middle Earth Housing Office/Bucklebury
|
5112296
|
09/13/2018
|
09/20/2018
|
09/17/2018
|
Plans
|
9635
|
Replace Campus Emergency Phones
|
5112148
|
09/13/2018
|
09/20/2018
|
09/17/2018
|
Final Review
|
9634
|
UCI Applied Innovation
|
OC#13918
|
09/11/2018
|
09/18/2018
|
|
UCI Applied Innovation
|
9632
|
Student Center Door Access Controls - Phase I
|
5112138
|
09/10/2018
|
09/17/2018
|
09/10/2018
|
Plans
|
9631
|
AH 4th and 5th floor renovation - PHASE 2
|
5112002
|
09/07/2018
|
09/21/2018
|
09/10/2018
|
Plans, 100% Review
|
9630
|
Small Cap-Hummanities Hall 178 Renovation
|
5112150
|
09/05/2018
|
09/19/2018
|
09/17/2018
|
Plans
|
9629
|
Exterior Lighting at ring Mall ICS to reines
|
5112181
|
09/05/2018
|
09/19/2018
|
09/10/2018
|
Plans
|
9628
|
Renewal Elevator
|
5110001
|
09/06/2018
|
09/20/2018
|
09/11/2018
|
Plans
|
9627
|
Barclay Electric Service
|
5112231
|
08/30/2018
|
09/13/2018
|
09/06/2018
|
Plans, Specifications
|
9626
|
Barclay Electric Service
|
5112231
|
08/30/2018
|
09/13/2018
|
|
Plans, Specifications
|
9625
|
241
|
296562
|
08/28/2018
|
09/11/2018
|
08/28/2018
|
Plans
|
9624
|
ARC Kitchen Remodel
|
5110263
|
08/28/2018
|
09/11/2018
|
08/28/2018
|
Submittal 070000 Firestopping
|
9623
|
CRII-2 Palo Verde/Middle Earth Pedestrian Bridge
|
5112253
|
08/28/2018
|
09/11/2018
|
08/30/2018
|
Plans, Specifications
|
9622
|
Classroom & Office Building
|
990016
|
08/27/2018
|
09/10/2018
|
|
Other: NFPA 72
|
9621
|
Classroom & Office Building
|
990016
|
08/27/2018
|
09/10/2018
|
|
Other: NFPA 13
|
9620
|
Law Building - First Floor Renovation
|
5112151
|
08/27/2018
|
09/10/2018
|
08/27/2018
|
Other: Evac location prroofs
|
9619
|
UCI Applied Innovation
|
OC#13918
|
08/22/2018
|
09/05/2018
|
|
UCI Applied Innovation
|
9618
|
Engineering Gateway 3327A Renovation
|
5112265
|
08/23/2018
|
09/06/2018
|
09/05/2018
|
Plans
|
9617
|
AH 4th and 5th floor renovation - PHASE 2
|
5112002
|
08/21/2018
|
09/04/2018
|
09/05/2018
|
Plans, 100% Review
|
9616
|
Bio Sci 3 First Floor Renovatioon - Phase 1
|
5112203
|
08/16/2018
|
08/30/2018
|
08/20/2018
|
Plans
|
9615
|
ARC Kitchen Remodel
|
5110263
|
08/15/2018
|
08/29/2018
|
08/16/2018
|
Plans-Shop Drawings, Specifications-Product Data
|
9614
|
OCTA Bus Stop Walkway
|
5112227
|
08/15/2018
|
08/29/2018
|
08/20/2018
|
Plans, Specifications
|
9613
|
Fire Life Safety Improvements
|
998611
|
08/14/2018
|
08/28/2018
|
08/15/2018
|
Other: Fire Sprinkler Replacement (SL Reines) MOP
|
9612
|
Fire Life Safety Improvements
|
998611
|
08/14/2018
|
08/28/2018
|
08/15/2018
|
Other: Charging New Fire Sprinkler Using Existing Fire Hose MOP
|
9611
|
Fire Life Safety Improvements
|
998611
|
08/14/2018
|
08/28/2018
|
08/15/2018
|
Other: ICS2, Physical Science Lecture & Classroom MOP
|
9610
|
AH 4th and 5th floor renovation
|
5112002
|
08/14/2018
|
08/28/2018
|
08/20/2018
|
Plans, 100% Review, Final Review
|
9609
|
Verizon Wirelesss Mesa Parking Structure Upgrade
|
5112142
|
08/09/2018
|
08/23/2018
|
08/10/2018
|
Plans
|
9608
|
AH 4th and 5th floor renovation
|
5112002
|
08/08/2018
|
08/22/2018
|
08/10/2018
|
100% Review, Final Review, Approval Stamp
|
9607
|
SC 2018 Steinhaus Hall 429 Lab Renovation
|
5112155
|
08/07/2018
|
08/21/2018
|
|
Plans, Specifications via Project Folder
|
9605
|
Engineering Tower
|
5112134
|
08/06/2018
|
08/20/2018
|
08/06/2018
|
Plans
|
9604
|
Barclay Electric Service
|
5112231
|
08/06/2018
|
08/20/2018
|
|
Plans
|
9603
|
Traffic Signals
|
5112244
|
08/06/2018
|
08/20/2018
|
08/06/2018
|
Plans
|
9602
|
Traffic Signals
|
5112245
|
08/06/2018
|
08/20/2018
|
08/06/2018
|
Plans
|
9601
|
Verizon Wireless Mesa Parking Structure Upgrade
|
5112142
|
08/03/2018
|
08/17/2018
|
08/06/2018
|
Plans
|
9600
|
Interdiciplinary Science & Engineering Building
|
999239
|
08/03/2018
|
08/17/2018
|
08/06/2018
|
Other: ISEB-OCFA Dwgs (650-385-760)
|
9599
|
Engineering Hall
|
5112163
|
08/02/2018
|
08/16/2018
|
|
Plans
|
9598
|
ARC Kitchen Remodel
|
5110263
|
08/03/2018
|
08/17/2018
|
08/20/2018
|
Plans
|
9597
|
AVC Renovation
|
300271
|
08/01/2018
|
08/15/2018
|
08/01/2018
|
Plans
|
9596
|
Traffic Signals
|
5112244
|
08/01/2018
|
08/15/2018
|
08/01/2018
|
Plans, Specifications
|
9595
|
Phoenix Grille Tile
|
5112251
|
07/30/2018
|
08/13/2018
|
07/30/2018
|
Plans
|
9594
|
DM 2017 - Fall Protection Measures
|
5112175
|
07/30/2018
|
|
07/30/2018
|
Specifications
|
9593
|
Interdisciplinary Science & Engineering Building
|
999239
|
07/30/2018
|
08/13/2018
|
08/15/2018
|
Other: ISEB_CP-3 Tunnel Extn. Design Specifications (694-004-319)
|
9592
|
Interdisciplinary Science & Engineering Building
|
999239
|
07/30/2018
|
08/13/2018
|
08/08/2018
|
Submittal: ISEB_33 1100.011 CP-2 Site Water Districbution
|
9591
|
AH 4th and 5th floor renovation
|
5112002
|
07/26/2018
|
08/09/2018
|
07/31/2018
|
Plans
|
9590
|
Bio Sci 3 First Floor Renovation - Phase 1
|
5112203
|
07/26/2018
|
08/09/2018
|
07/30/2018
|
Plans
|
9589
|
Replace Chilled Water Coils
|
5112174
|
07/26/2018
|
08/09/2018
|
07/27/2018
|
|
9588
|
Elevator Renovation
|
5112219
|
07/24/2018
|
08/07/2018
|
07/30/2018
|
Specifications
|
9587
|
Interdisciplinary Science & Engineering Building
|
999239
|
07/23/2018
|
08/06/2018
|
|
Other: ISEB-G-Sheets pkg. (120-303-330)
|
9586
|
Interdisciplinary Science & Engineering Building
|
999239
|
07/23/2018
|
08/06/2018
|
08/08/2018
|
Other: ISEB_CP-3 Tunnel Extension Design Dwg Pkg (694-004-319)
|
9585
|
ET 924 Lab Renovation
|
5112249
|
07/23/2018
|
08/06/2018
|
07/24/2018
|
Plans
|
9584
|
Interdisciplinary Science & Engineering Building
|
999239
|
07/23/2018
|
08/06/2018
|
|
Other: ISEB_Design Development Dwg Pkg(350-981-518)
|
9583
|
Middle Earth Expansion
|
996298
|
07/20/2018
|
08/03/2018
|
|
Other: PACKAGE 4 - INTERIORS, MEP & SITE BACKCHECK SUBMITTAL - FRO
|
9582
|
Middle Earth Expansion
|
996298
|
07/20/2018
|
08/03/2018
|
|
Other: PACKAGE 4 - FIRE ALARM DRAWINGS - FRO
|
9581
|
Classroom & Office Building
|
990016
|
07/20/2018
|
08/03/2018
|
|
Other: SI-20 FRO
|
9580
|
Fire Life Safety Improvement
|
998611
|
07/20/2018
|
08/03/2018
|
08/09/2018
|
Other: FLS-McGaugh Hall Vivarium - Audible Device Solution
|
9579
|
Fire Life Safety Improvement
|
998611
|
07/20/2018
|
08/03/2018
|
07/31/2018
|
Submittal: FLS-Rowland Hall Asbestos Work Plan (Revised)
|
9578
|
Verano Pedestrian Pathway Improvement
|
5112180
|
07/19/2018
|
08/02/2018
|
07/19/2018
|
Plans
|
9577
|
Croul Hall Basement Restroom Build-out
|
5112105
|
07/19/2018
|
08/02/2018
|
07/19/2018
|
Plans
|
9576
|
ET 924 Lab Renovation
|
5112249
|
07/19/2018
|
08/02/2018
|
07/19/2018
|
Plans
|
9575
|
2017-18 SCIP Public ServiceBuilding 2nd floor Reno
|
5112147
|
07/12/2018
|
|
07/12/2018
|
Plans
|
9574
|
Classroom & Office Building
|
990016
|
07/11/2018
|
07/25/2018
|
07/17/2018
|
Submittal 28 31 11 - 5159 - 6 - Fire Alarm Shop Drawings Field Changes
|
9573
|
Classroom & Office Building
|
990016
|
07/10/2018
|
07/24/2018
|
|
Submittal 28 31 11 - 5159 - 5 Fire Alarm Shop Drawings Field Changes
|
9572
|
Berk Hall Distance Learning Center
|
5112260
|
07/10/2018
|
07/24/2018
|
07/11/2018
|
Plans
|
9571
|
TES Tank Ladder replacement
|
5110323
|
07/09/2018
|
07/23/2018
|
07/10/2018
|
Plans
|
9570
|
DM 2017-18 ELF Exhaust safety Upgrade
|
5112166
|
07/09/2018
|
07/23/2018
|
07/10/2018
|
Plans
|
9569
|
2017-18 SCIP Public Service Building 2nd Floor Reno
|
5112147
|
07/09/2018
|
07/23/2018
|
07/09/2018
|
Plans & EH&S Redlines
|
9568
|
Fire Life Improvement
|
998611
|
07/06/2018
|
07/20/2018
|
07/16/2018
|
Submittal: FLS-Submittal-Fire Alarm System-Addl.Equipment PD (133-192-030)
|
9567
|
Fire Life Safety Improvemenr
|
998611
|
07/06/2018
|
07/20/2018
|
07/16/2018
|
Submittal: FLS_Site Water Distrubution Details & Material (ELF)
|
9566
|
AH 4th and 5th Floor Renovation
|
5112002
|
07/06/2018
|
07/20/2018
|
07/11/2018
|
Plans,100% Review
|
9565
|
MSTB Surface Parking Lot
|
999514
|
06/29/2018
|
07/13/2018
|
07/03/2018
|
Other: MSTB Parking_Water Quality Management Plan
|
9564
|
Interdisciplinary Science & Engineering Building (ISEB)
|
999239
|
06/29/2018
|
07/13/2018
|
07/03/2018
|
RFI-045_Storm Water Mitigation BMP
|
9563
|
ET 924 Lab Renovation
|
5112249
|
06/28/2018
|
07/12/2018
|
06/28/2018
|
Plans
|
9562
|
ICS E-Tech Cabling
|
5112252
|
06/26/2018
|
07/10/2018
|
06/26/2018
|
Specifications
|
9561
|
Med Ed Security
|
5112216
|
06/26/2018
|
07/10/2018
|
06/28/2018
|
|
9560
|
Verano Pedestrian Pathway Improvement
|
5112180
|
06/26/2018
|
07/10/2018
|
06/28/2018
|
|
9559
|
Classroom & Office Building
|
990016
|
06/25/2018
|
07/09/2018
|
|
Submittal 28 31 11 - 5159 - 4 Fire Alarm Shop Drawings Field Changes
|
9558
|
Crould Hall Basement Restroom Build-out
|
5112105
|
06/21/2018
|
07/05/2018
|
06/26/2018
|
Plans
|
9557
|
AH 4th and 5th floor renovation
|
5112002
|
06/21/2018
|
07/05/2018
|
06/26/2018
|
|
9556
|
Drama Building No. 715
|
5112158
|
06/20/2018
|
07/04/2018
|
06/26/2018
|
Plans
|
9555
|
TES Tank Ladder replacement
|
5110323
|
06/19/2018
|
07/03/2018
|
07/10/2018
|
Plans
|
9554
|
Engineering Gateway
|
5112110
|
06/08/2018
|
06/22/2018
|
06/18/2018
|
Plans, Specs and Redlines
|
9553
|
Fire Life Safety Improvement
|
998611
|
06/15/2018
|
06/29/2018
|
06/29/2018
|
Submittal: FLS-Rowland Hall Asbesto Work Plan
|
9552
|
Med Ed Security
|
5112216
|
06/15/2018
|
06/29/2018
|
06/18/2018
|
|
9551
|
2017-18 SCIP - IISBR Laboratory Expansion
|
5112161
|
06/14/2018
|
06/28/2018
|
06/14/2018
|
Plans & Specs
|
9549
|
DBH 2nd and 5th Floor renovations
|
5112146
|
06/13/2018
|
06/27/2018
|
06/19/2018
|
Plans
|
9548
|
2017-18 SCIP - IIBR Laboratory Expansion
|
5112161
|
06/13/2018
|
06/27/2018
|
06/19/2018
|
Plans & Specs
|
9547
|
CRSP - ICS to EGDC Fiber Install
|
5112239
|
06/13/2018
|
06/27/2018
|
06/13/2018
|
Plans & Specs
|
9546
|
Small Cap 14/15 McGaugh Hall Lab 4311 Renovation
|
5109824
|
06/13/2018
|
06/27/2018
|
06/18/2018
|
|
9545
|
ARC Kitchen Remodel
|
5110263
|
06/11/2018
|
06/25/2018
|
06/14/2018
|
Plans & Specs
|
9544
|
2017-18 SCIP Public Service Building 2nd Floor Reno
|
5112147
|
06/11/2018
|
06/25/2018
|
06/12/2018
|
Plans
|
9543
|
Fire Life Safety Improvement
|
998611
|
06/08/2018
|
06/22/2018
|
06/11/2018
|
Other: ICS-2_G-Sheets
|
9542
|
Fire Life Safety Improvement
|
998611
|
06/08/2018
|
06/22/2018
|
06/11/2018
|
Other: FLS-Phy Sci Class G-Sheets (021-315-954)
|
9541
|
Fire Life Safety Improvement
|
998611
|
06/08/2018
|
06/22/2018
|
06/11/2018
|
Other: Phy Sci Lecture G-Sheets (428-685-607)
|
9540
|
Major Building Maintenance
|
5112079
|
06/07/2018
|
|
06/07/2018
|
Addendum
|
9539
|
CRII University Widening Storm Drain Sleeve
|
5112263
|
06/06/2018
|
06/20/2018
|
06/06/2018
|
Plans
|
9538
|
Croul Hall Classroom Build-out B002
|
5112162
|
06/05/2018
|
06/19/2018
|
|
Plans
|
9537
|
2017-18 SCIP AIRB 2nd Flr, Ste 2000 Reno
|
5112149
|
06/04/2018
|
|
06/05/2018
|
|
9536
|
2017-18 SCIP - IISBR Lab Expansion
|
5112161
|
06/04/2018
|
06/18/2018
|
06/11/2018
|
Plans & Specs
|
9535
|
SCPS Concrete Damage
|
5112257
|
06/04/2018
|
06/18/2018
|
06/04/2018
|
Plans
|
9534
|
Ram's Harscape Improvements
|
5112250
|
05/31/2018
|
06/14/2018
|
06/01/2018
|
Plans
|
9533
|
Croul Hall Classroom Build-out
|
5112162
|
05/30/2018
|
06/13/2018
|
06/01/2018
|
Plans
|
9532
|
Engineering Gateway
|
5112110
|
05/29/2018
|
06/12/2018
|
05/30/2018
|
Plans & Spectifications
|
9531
|
ELF Pony compressor Dryer
|
5112242
|
05/29/2018
|
06/12/2018
|
05/29/2018
|
Specifications
|
9530
|
Fire Life Safety Improvement
|
998611
|
05/25/2018
|
06/08/2018
|
05/25/2018
|
Other: Reines Hall FP Water Distribution Dwgs
|
9529
|
Fire Life Safety Improvement
|
998611
|
05/25/2018
|
06/08/2018
|
05/25/2018
|
Other: Engg Gateway Water Distribution Plan
|
9528
|
TES Tank Ladder replacement
|
5110323
|
05/25/2018
|
06/08/2018
|
05/30/2018
|
Plans
|
9527
|
ARC Kitchen Remodel
|
5110263
|
05/24/2018
|
06/07/2018
|
05/31/2018
|
Plan & Specs - 5110263/07
|
9526
|
Engineering Hall Lab 3140 Renovation
|
5112163
|
05/23/2018
|
06/06/2018
|
05/24/2018
|
Plans & Specs
|
9525
|
Croul Hall Basement Restroom Build-out
|
5112015
|
05/23/2018
|
06/06/2018
|
05/29/2018
|
Plans
|
9524
|
Fire Life Safety Improvement
|
998611
|
05/22/2018
|
06/05/2018
|
|
Other: Reines Hall G Sheet & Architectual Ceiling Plans (623-377-796)
|
9523
|
Aldrich Hall Replace AH-2
|
5112133
|
05/17/2018
|
05/31/2018
|
05/22/2018
|
Plans
|
9522
|
Croul Hall Classroom Build-out B002
|
5112162
|
05/14/2018
|
05/28/2018
|
05/18/2018
|
Plans
|
9521
|
2017-2018 SCIP - Humanities Hall Restrooms
|
5112160
|
05/10/2018
|
05/24/2018
|
05/10/2018
|
Plans & Specifications
|
9520
|
2017-2018 SCIP Lighting Lab Renovation @ Drama Room 148
|
5112158
|
05/11/2018
|
05/25/2018
|
05/15/2018
|
Plans
|
9519
|
DBH 2nd and 5th Floor Renovations
|
5112146
|
05/11/2018
|
05/25/2018
|
05/15/2018
|
Plans
|
9518
|
Engineering Hall Lab 3140 Renovation
|
5112163
|
05/10/2018
|
05/24/2018
|
05/10/2018
|
Plans and Specifications
|
9517
|
Classroom and Office Building
|
990016
|
05/10/2018
|
05/24/2018
|
05/11/2018
|
Other: FEC Location change at Level 3
|
9516
|
Replace Campus Emergency Phones
|
5112148
|
05/10/2018
|
05/24/2018
|
05/15/2018
|
|
9515
|
TES Tank Ladder replacement
|
5110323
|
05/09/2018
|
05/23/2018
|
05/15/2018
|
Plans
|
9514
|
Interdisciplinary Science & Engineering Building
|
999239
|
05/08/2018
|
05/22/2018
|
05/08/2018
|
Other: ISEB_CP-1 Temp Service Road Drawings & Specs_FINAL(871-523-834)
|
9513
|
Croul Hall Basement Restroom Build-out
|
5112105
|
05/08/2018
|
05/22/2018
|
05/09/2018
|
Plans
|
9512
|
CRII-3A ELF Exterior Wall Repair
|
5112107
|
05/04/2018
|
05/18/2018
|
05/04/2018
|
Plans & Specifications
|
9511
|
ADA Bathroom & Kitchen Conversion
|
5112201
|
05/02/2018
|
05/16/2018
|
05/03/2018
|
Plans
|
9510
|
Major Building Maintenance
|
5112079
|
05/01/2018
|
05/15/2018
|
05/03/2018
|
Addendum Submittal
|
9509
|
2017-2018 SCIP - Humanities Hall Restrooms
|
5112160
|
05/01/2018
|
05/15/2018
|
|
Plans and Specifications
|
9508
|
2017-2017 SCIP AIRB 2nd Flr, Ste 2000 Reno
|
5112149
|
05/01/2018
|
05/15/2018
|
|
Plans & Addendum
|
9507
|
Croul Hall Classroom Build-out B002
|
5112162
|
04/30/2018
|
05/14/2018
|
05/03/2018
|
Plans
|
9506
|
AH 4th and 5th floor renovation
|
5112002
|
04/27/2018
|
05/11/2018
|
|
Plans
|
9505
|
CRII - 2015 Step Lights - EH&S
|
5110206
|
04/26/2018
|
05/10/2018
|
04/27/2018
|
Specifications
|
9504
|
Paint Building Interiors, Arroyo Vista
|
5112187
|
04/26/2018
|
05/10/2018
|
04/26/2018
|
Plans and specifications
|
9503
|
AH 4th and 5th floor renovation
|
5112002
|
04/24/2018
|
05/08/2018
|
04/25/2018
|
Plans
|
9502
|
ADA Bathroom & Kitchen Conversion
|
5112201
|
04/24/2018
|
05/08/2018
|
|
Plans
|
9501
|
Classroom & Office Building
|
990016
|
04/23/2018
|
05/07/2018
|
|
Other: SI-15 - FRO
|
9500
|
Berk Hall 299 Renovation
|
5112145
|
04/19/2018
|
05/03/2018
|
04/19/2018
|
Plans
|
9499
|
2017-18 SCIP AIRB 2nd Floor, Ste 2000 Reno
|
5112149
|
04/19/2018
|
05/03/2018
|
04/19/2018
|
Plans, Specs & EH&S Redlines
|
9498
|
2017-2018 SCIP Lighting Lab Renovation @ Drama Room 148
|
5112158
|
04/20/2018
|
05/04/2018
|
04/23/2018
|
Plans
|
9497
|
Middle Earth Shower renovations
|
5112173
|
04/19/2018
|
05/03/2018
|
04/24/2018
|
Plans
|
9496
|
SBSG 2nd floor renovation
|
5112063
|
04/19/2018
|
05/03/2018
|
04/26/2018
|
Plans
|
9495
|
SSL 3rd floor renovation Lab Ste 308
|
5112153
|
04/19/2018
|
05/03/2018
|
04/26/2018
|
Plans
|
9494
|
SSL 4th floor renovation - ste 407+408
|
5112058
|
04/19/2018
|
05/03/2018
|
04/26/2018
|
Plans
|
9493
|
SC 2018 Steinhaus Hall 429 Lab Renovation
|
5112155
|
04/18/2018
|
05/02/2018
|
04/19/2018
|
Plans
|
9492
|
Re-roof Multiple Buildings
|
5110248
|
04/18/2018
|
05/02/2018
|
04/19/2018
|
Plans
|
9491
|
Re-rood Multiple Buildings
|
5110248
|
04/18/2018
|
05/02/2018
|
05/02/2018
|
Plans
|
9490
|
ARC Kitchen Remodel
|
5110263
|
04/18/2018
|
05/02/2018
|
04/27/2018
|
Plans
|
9489
|
Nelson Auditorium and Tamkin F108 renovation
|
5112152
|
04/17/2018
|
05/01/2018
|
04/19/2018
|
Plans
|
9488
|
Engineering Hall Lab 3140 Renovation
|
5112163
|
04/13/2018
|
04/27/2018
|
04/17/2018
|
Plans & Specs
|
9487
|
Berk Hall Renovation - 2nd floor Office Conversion
|
5112200
|
04/11/2018
|
04/25/2018
|
04/16/2018
|
Plans
|
9486
|
Major Building Maintenance
|
5112079
|
04/11/2018
|
04/25/2018
|
04/16/2018
|
Addendum
|
9485
|
Leasing Oversight Renovation
|
5112015
|
04/11/2018
|
04/25/2018
|
06/28/2018
|
Plans
|
9484
|
2017-18 SCIP - Humanities Hall Restrooms
|
5112160
|
04/10/2018
|
04/24/2018
|
04/12/2018
|
Plans & Specifications
|
9483
|
Middle Earth Shower Renovation
|
5112173
|
04/10/2018
|
04/24/2018
|
04/12/2018
|
Plans
|
9482
|
CRII-3R Replace Beckman AHU 1, 2, 3
|
5112127
|
04/10/2018
|
04/24/2018
|
04/10/2018
|
Plans
|
9481
|
Social Sciences Stairs & Campus Bridges
|
5110191
|
04/09/2018
|
04/23/2018
|
04/10/2018
|
Plans
|
9480
|
Fire Life Safety Improvement
|
998611
|
04/06/2018
|
04/20/2018
|
|
Other: FLS_Reines Hall FP Level 5 Dwgs & Calc. (Session 710-687-618)
|
9479
|
Middle Earth Expansion
|
996298
|
04/05/2018
|
04/19/2018
|
|
RFI 0188R1 - L1 Equipment Vault Lid Clarification
|
9478
|
Kitchen Renovation
|
5112172
|
04/05/2018
|
04/19/2018
|
04/06/2018
|
Plans
|
9477
|
Nelson Auditorium and Tamkin F108 renovation
|
5112152
|
04/05/2018
|
04/19/2018
|
04/10/2018
|
Plans
|
9476
|
Middle Earth Expansion
|
996298
|
04/04/2017
|
04/18/2018
|
|
OCFA Submittal
|
9475
|
Leasing Overisght Renovation
|
511 2015
|
04/04/2018
|
04/18/2018
|
04/16/2018
|
Plans
|
9474
|
SC Humanities Hall 178 Renovation
|
5112150
|
04/04/2018
|
04/18/2018
|
04/10/2018
|
Plans
|
9473
|
2017-18 SCIP AIRB 2nd Flr, Ste 2000 Reno
|
5112149
|
04/04/2018
|
04/18/2018
|
04/04/2018
|
Plans, Specifications & EH&S Redlines
|
9472
|
Classroom & Office Building
|
990016
|
04/03/2018
|
04/17/2018
|
|
Submittal 07 84 13 5551 - 0 - Supplemental Plumbing Fire Stopping 2 HR F & T
|
9471
|
Classroom & Office Building
|
990016
|
04/02/2018
|
04/16/2018
|
|
Submittal 21 10 00 - 5562 - 0 - Fire Protection Metraflex Loop
|
9470
|
Fire Life Safety Improvement
|
998611
|
03/29/2018
|
04/12/2018
|
|
Other: McGaw Fire Alarm 50% Dwgs (Session 931-929-725)
|
9469
|
Fire Life Safety Improvement
|
998611
|
03/29/2018
|
04/12/2018
|
|
Other: FLS_Reines Hall FP Level 4 Drwgs & Calc.
|
9468
|
Fire Life Safety Improvement
|
998611
|
03/29/2018
|
04/12/2018
|
|
RFI 007 Reines Sprinkler Drainage
|
9467
|
Fire Life Safety Improvement
|
998611
|
03/29/2018
|
04/12/2018
|
|
Other: Phy Sci Classroom Building (FA)_100DRAFT (Session 223-825-327)
|
9466
|
Fire Life Safety Improvement
|
998611
|
03/29/2018
|
04/12/2018
|
|
Other: Phy Sci Lecture Hall (FA)_100DRAFT (Session 416-512-114)
|
9465
|
Leasing Oversight Renovation
|
5112015
|
03/29/2018
|
04/12/2018
|
04/10/2018
|
Plans
|
9464
|
Middle Earth Quenya
|
5112201
|
03/29/2018
|
04/05/2018
|
04/03/2018
|
Plans
|
9463
|
Fire Life Safety Improvement
|
998611
|
03/26/2018
|
04/09/2018
|
03/27/2018
|
RFI 044_Fire Pump @ Reines Hall
|
9462
|
ARC Locker Room Tile Replacement
|
5112222
|
03/26/2018
|
04/09/2018
|
03/28/2018
|
Plan & Sepcifications
|
9461
|
Engineering Hall Lab 3140 Renovation
|
5112163
|
03/26/2018
|
04/09/2018
|
03/28/2018
|
Plans
|
9460
|
Kitchen Renovations
|
5112172
|
03/26/2018
|
04/09/2018
|
04/03/2018
|
Plans
|
9459
|
Small Cap School of Engineering - Engineering Gateway Lab Renovation 3327 A/B_(1101/1102)
|
5110098
|
03/23/2018
|
04/06/2018
|
03/28/2018
|
Plans
|
9458
|
Fire Life Safety Improvement
|
998611
|
03/23/2018
|
04/06/2018
|
|
Other: ICS 2 fire Alarm Dwgs_100DRAFT_032118
|
9457
|
Fire Life Safety Improvement
|
998611
|
03/23/2018
|
04/06/2018
|
|
RFI 005R1 Explosion Proof Smoke Detector
|
9456
|
Fire Life Safety Improvement
|
998611
|
03/23/2018
|
04/06/2018
|
|
RFI 006 Networking and Interfacing with EH&S
|
9455
|
Fire Life Safety Improvement
|
998611
|
03/22/2018
|
04/05/2018
|
|
Submittal 01 5000.01 Temp Fac & Controls_Laydown Fencing Access Plan
|
9454
|
Middle Earth Expansion
|
996298
|
03/22/2018
|
04/05/2018
|
|
Submittal 26 5100 - 001 Emergency Lighting Inverter System Product Data
|
9453
|
SSL 3rd Floor renovation Lam Ste 308
|
5112153
|
03/22/2018
|
04/05/2018
|
03/28/2018
|
Plans
|
9452
|
EH Renovate Room 1106, 1108, 1110, 1111, 1112
|
5110052
|
03/22/2018
|
04/05/2018
|
03/28/2018
|
Addendum
|
9451
|
Mesa Court Expansion - Gate Arms
|
996296
|
03/22/2018
|
04/05/2018
|
|
Other: Mesa Court Gate Arms
|
9450
|
CRII 2013 - Engineering Gateway Victaullic Fitting CWS
|
5110231
|
03/22/2018
|
04/05/2018
|
03/22/2018
|
Addendum
|
9449
|
Middle Earth Expansion
|
996298
|
03/21/2018
|
04/04/2018
|
03/22/2018
|
RFI 0304 - DPP Smoke Detector Requirements Clarification
|
9448
|
Middle Earth Expansion
|
996298
|
03/21/2018
|
04/04/2018
|
|
RFI 0343 - Grease Duct Through Level 2 Slab Firestop System Confirmation
|
9447
|
Middle Earth Expansion
|
996298
|
03/21/2018
|
04/04/2018
|
|
Other: Package 4 Fire Protection
|
9446
|
Classroom & Office Building
|
990016
|
03/21/2018
|
04/04/2018
|
|
Submittal 07 84 13 - 5543 - 0 - Supplemental Fire Protection Fire Stopping
|
9445
|
Classroom & Office Building
|
990016
|
03/21/2018
|
04/04/2018
|
03/21/2018
|
RFI_2540- Top of Wall UL for Shaft Walls
|
9443
|
Fire Life Safety Improvement
|
998611
|
03/21/2018
|
04/04/2018
|
|
Other: Reines Hall Building Design_100DRAFT_FA_03.19.18
|
9442
|
CRII-3 2017 Major Building Maintenance
|
5112079
|
03/21/2018
|
04/04/2018
|
|
|
9441
|
SSL 4th floor renovation - ste 407+408
|
5112058
|
03/20/2018
|
04/03/2018
|
04/04/2018
|
Plans
|
9440
|
SBSG 2nd floor renovation
|
5112063
|
03/20/2018
|
04/03/2018
|
03/22/2018
|
Plans
|
9439
|
DM 17-18 ELF Trip Hazards
|
5112225
|
03/20/2018
|
04/03/2018
|
03/21/2018
|
Plans & Specifications
|
9438
|
SEP 2016-17 Contemporary Arts RCx
|
5110297
|
03/19/2018
|
04/02/2018
|
03/20/2018
|
Other: diagram
|
9437
|
2017-18 SCIP-IISBR Laboratory Expansion
|
5112161
|
03/19/2018
|
04/02/2018
|
03/26/2018
|
Plans
|
9436
|
CRII-3R Replace Beckman AHU 1, 2, 3
|
5112127
|
03/19/2018
|
04/02/2018
|
03/19/2018
|
Plans, Specifications and EH&S Redlines
|
9435
|
Fire Life Safety Improvements
|
998611
|
03/16/2018
|
03/30/2018
|
03/26/2018
|
Other: - Reines Hall Standpipe FP Calcs. & Dwgs. For approval stamp.
|
9434
|
Middle Earth Expansion
|
996298
|
03/15/2018
|
03/29/2018
|
03/16/2018
|
Other: Package 4 Fire Alarm
|
9433
|
Gillespie Neuroscience MBCx
|
5110238
|
03/15/2018
|
03/29/2018
|
03/15/2018
|
Specifications
|
9432
|
CRII-2 2015 Rowland Hall construct Exhaust Ductwork Upgrade
|
5110345
|
03/15/2018
|
03/29/2018
|
03/15/2018
|
Specifications
|
9431
|
Fire Life Safety Improvements
|
998611
|
03/14/2018
|
03/28/2018
|
04/02/2018
|
Other: - Reines Hall 3rd Floor FP Calcs. & Dwgs.
|
9430
|
Classroom & Office Building
|
990016
|
03/14/2018
|
03/28/2018
|
03/21/2018
|
SI-15
|
9429
|
Classroom & Office Building
|
990016
|
03/14/2018
|
03/28/2018
|
03/14/2018
|
Submittal CP-5 Specifications
|
9428
|
Replace Campus Emergency Phones
|
5112148
|
03/14/2018
|
03/28/2018
|
03/19/2018
|
Plans
|
9427
|
CRII-2 2015 - Bonney Center Coating
|
5110337
|
03/13/2018
|
03/27/2018
|
03/14/2018
|
Specifications
|
9426
|
Classroom & Office Building
|
990016
|
03/13/2018
|
03/27/2018
|
03/16/2018
|
Submittal 28 31 11 - 5535 - 0 - Area of Refuge Phone
|
9425
|
Classroom & Office Building
|
990016
|
03/13/2018
|
03/27/2018
|
03/16/2018
|
Submittal 07 84 13 - 5523 - 0 - Piping Penetration Fire Stopping Supplemental
|
9424
|
Middle Earth Expansion
|
996298
|
03/13/2018
|
03/27/2018
|
03/16/2018
|
Submittal 07 2100 - 001 - A - Owes Corning Thermal Insulation
|
9423
|
Fire Life Safety Improvements
|
998611
|
03/12/2018
|
03/26/2018
|
|
Submittal 21 10 00.01.00 Water-based FP Material & Equipment PD w/Spec
|
9422
|
Fire Life Safety Improvements
|
998611
|
03/09/2018
|
03/23/2018
|
03/16/2018
|
Submittal 28 31 11.01 Digital Addressable FA Systems Equipment PD
|
9421
|
2017-18 SCIP - Humanities Hall Restrooms
|
5112160
|
03/09/2018
|
03/23/2018
|
03/15/2018
|
Plans
|
9420
|
Leasing Oversight Renovation
|
5112015
|
03/08/2018
|
03/22/2018
|
03/16/2018
|
Plans
|
9419
|
Fire Life Safety Improvements
|
998611
|
03/07/2018
|
03/21/2018
|
03/12/2018
|
Other: Bison Water Line connection Dwgs
|
9418
|
Fire Life Safety Improvements
|
998611
|
03/07/2018
|
03/21/2018
|
03/08/2018
|
Submittal Fire Alarm Upgrade - Comp & Info Sci 2
|
9417
|
Fire Life Satefy Imrpovements
|
998611
|
03/07/2018
|
03/21/2018
|
03/08/2018
|
Submittal Fire Alarm Upgrade - Physical Sci. Classroom Building
|
9416
|
Fire Life Safety Improvements
|
998611
|
03/07/2018
|
03/21/2018
|
03/08/2018
|
Submittal Fire Alarm Upgrade - Physical Sci. Lecture Hall
|
9415
|
Middle Earth Expansion
|
996298
|
03/05/2018
|
03/19/2018
|
|
RFI 0304 - DPP Smoke Detector Requirements Clarification
|
9414
|
Gross Hall MBCx
|
5110237
|
03/05/2018
|
03/19/2018
|
03/12/2018
|
Plans
|
9413
|
Berk Hall 299 Renovation
|
5112145
|
03/05/2018
|
03/19/2018
|
03/06/2018
|
Plans
|
9412
|
Nelson Auditorium and Tamkin F108 renovation
|
5112152
|
03/02/2018
|
03/16/2018
|
|
Plans
|
9411
|
Re-roof Multiple Buildings
|
5110248
|
03/02/2018
|
03/16/2018
|
03/07/2018
|
Plans
|
9410
|
DM 17/18 Replace Reheat Valves
|
5112184
|
03/02/2018
|
03/16/2018
|
03/02/2018
|
Plans and Specifications
|
9409
|
Middle Earth Expansion
|
996298
|
03/01/2018
|
03/15/2018
|
03/07/2018
|
RFI 0260 - FDC Inlet Pressure Clarification
|
9408
|
Classroom & Office Building
|
990016
|
03/01/2018
|
03/15/2018
|
03/06/2018
|
RFI_2462 R2 - Top of Wall Joint Clarification - Engineer Stamp
|
9407
|
Classroom & Office Building
|
990016
|
03/01/2018
|
03/15/2018
|
03/07/2018
|
Submittal 21 10 00 - 5521 - 0 - Supplemental Fire Protection Exposed Piping Reconfigurations
|
9406
|
2017-18 SCIP AIRB 2nd Flor, Ste 2000 Reno
|
5112149
|
03/01/2018
|
03/15/2018
|
03/05/2018
|
Plans, Specifications and EH&S Redlines
|
9405
|
Middle Earth Expansion
|
996298
|
02/27/2018
|
03/13/2018
|
03/07/2018
|
RFI 0259 - Fire Water Underground Lead-in Clarification
|
9404
|
Classroom & Office Building
|
990016
|
02/27/2018
|
03/13/2018
|
03/06/2018
|
Submittal 07 84 13 - 5514 - 0 - Supplemental Penetration Firestopping Electrical
|
9403
|
Middle Earth Expansion
|
996298
|
02/02/2018
|
02/16/2018
|
02/09/2018
|
Submittal - 90% Package 4 Interiors, MEP and Site Drawings Review (Kitchen Drawing)
|
9402
|
Middle Earth Expansion
|
996298
|
02/21/2018
|
03/07/2018
|
03/13/2018
|
Submittall 11 4000 - 013 - 0 - Halton Hoods Shop
|
9401
|
Social Science Plaza, Social Science Hall, Donald Bren Hall
|
5112113
|
02/20/2018
|
03/06/2018
|
02/21/2018
|
Plans and Specifications
|
9400
|
Classroom & Office Building
|
990016
|
02/16/2018
|
03/02/2018
|
|
Submittal 21 10 00 - 5502 - Fire Sprinkler Protection Drawings Field as Built
|
9399
|
Middle Earth Expansion
|
996298
|
02/16/2018
|
03/02/2018
|
03/07/2018
|
RFI 0188 - L1 Equipement Vault Lid Clarification
|
9398
|
Classroom & Office Building
|
990016
|
02/16/2018
|
03/02/2018
|
02/20/2018
|
RFI_2480 - Relocate Fire Water Hot Tap Confirmation
|
9397
|
CRII-2 2015 - Engineering Tower and Bonney Center Coatin
|
5110337
|
02/16/2018
|
03/02/2018
|
02/21/2018
|
Plans and Specifications
|
9396
|
CRII-2 2015 - Bonney Center Coating - Ext. Lights
|
5110337
|
02/16/2018
|
03/02/2018
|
02/21/2018
|
Plans and Specifications
|
9395
|
Classroom & Office Building
|
990016
|
02/15/2018
|
03/01/2018
|
02/27/2018
|
RFI_2484 - Pavilion Exterior Wall Type Confirmation
|
9394
|
Classroom & Office Building
|
990016
|
02/15/2018
|
03/01/2018
|
02/20/2018
|
Submittal 01 32 00 - 5510 - 0 - Revised Fence Plan
|
9393
|
Classroom & Office Building
|
990016
|
02/15/2018
|
03/01/2018
|
02/20/2018
|
RFI_2479 - Southern Fire Water Alteration
|
9392
|
Middle Earth Expansion
|
996298
|
02/15/2018
|
03/01/2018
|
03/05/2018
|
Submittal 21 1000 - 003 - 0 - Fir eProtection Material and Equipment
|
9391
|
Middle Earth Expansion
|
996298
|
02/15/2018
|
03/01/2018
|
|
Submittal 21 1000 - 002 - 0 - Basement Fire Sprinkler
|
9390
|
Classroom & Office Building
|
990016
|
02/15/2018
|
03/01/2018
|
02/20/2018
|
Submittal 09 54 26 - 5476 - 0 Wood Ceiling Project Data
|
9389
|
Classroom and Office Building
|
990016
|
02/15/2018
|
03/01/2018
|
02/20/2018
|
Submittal 12 61 00 -0 - Fixed Audience Seating Product Data
|
9388
|
Fire Life Safety Improvement
|
998611
|
02/15/2018
|
03/01/2018
|
|
Drawings & Calc
|
9387
|
Law Building
|
5112151
|
02/15/2018
|
03/01/2018
|
02/22/2018
|
Plans
|
9386
|
Fire Life Safety Improvements
|
998611
|
02/14/2018
|
02/28/2018
|
|
Other: Standpipe & Fire Alarm w hydrologic calcs
|
9385
|
Middle Earth Expansion
|
996298
|
02/14/2018
|
02/28/2018
|
|
90% Review Fire Alarm Drawings
|
9384
|
Middle Earth Expansion
|
996298
|
02/13/2018
|
02/27/2018
|
|
Submittal 28 3111 - 001 Fire Alarm System Basement Drawing
|
9383
|
Classroom & Office Building
|
990016
|
02/12/2018
|
02/26/2018
|
02/20/2018
|
RFI_2462 R1 - Top of Wall Joint Clarification - Engineer Stamp
|
9382
|
Middle Earth Expansion
|
996298
|
02/09/2018
|
02/23/2018
|
03/02/2018
|
RFI 0195 - Elevators 2-4 Guardrail and Counterweight HSS Clarification
|
9381
|
Middle Earth Expansion
|
996298
|
02/09/2018
|
02/23/2018
|
|
Submittal - Package 3 Skin & Elevator Drawings _FRO
|
9380
|
Berk Hall 299 Renovation
|
5112145
|
02/09/2018
|
02/23/2018
|
02/13/2018
|
Plans
|
9379
|
Middle Earth Expansion
|
996298
|
02/08/2018
|
02/22/2018
|
02/15/2018
|
Submittal 27 1500 -001 Basement Level DAS System Plan and Heat Map
|
9378
|
Engineering Lab Facility 134 Renovation
|
5112061
|
02/08/2018
|
02/22/2018
|
02/13/2018
|
Plans and Specifications
|
9377
|
Social Science Plaza B
|
null
|
02/08/2018
|
02/22/2018
|
02/13/2018
|
Other: Evac maps
|
9376
|
Social Sciences Plaza A
|
null
|
02/08/2018
|
02/22/2018
|
02/13/2018
|
Other: Evac Maps
|
9375
|
Mesa Court Fire Lane
|
5112128
|
02/08/2018
|
02/22/2018
|
02/07/2018
|
Specifications:
|
9374
|
Middle Earth Expansion
|
996298
|
02/06/2018
|
02/20/2018
|
02/14/2018
|
Submittal: 28 3111-002 Fire Alarm System Product Data
|
9373
|
Middle Erath Expansion
|
996298
|
02/06/2018
|
02/20/2018
|
02/08/2018
|
Other: UCI Middle Earth Fire Protection Report Backcheck
|
9372
|
Middle Earth Expansion
|
996298
|
02/06/2018
|
02/20/2018
|
|
Submittal: 90% Package 4 Inetriors, MEO and Site Drawings_Review (volume 1 & 2)
|
9371
|
ET 1st Floor Expansion
|
5110410
|
02/05/2018
|
02/19/2018
|
02/07/2018
|
Plans: Revised code sheet A110
|
9370
|
2017-18 SCIP AIRB 2nd Floor, Ste 2000 Reno
|
5112149
|
02/05/2018
|
02/19/2018
|
|
Plans:
|
9369
|
Social Science Stairs & Campus Bridges
|
5110191
|
01/30/2018
|
02/13/2018
|
01/31/2018
|
Plans:
|
9368
|
Classroom & Office Building
|
990016
|
01/30/2018
|
02/13/2018
|
02/06/2018
|
RFI: RFI_2469-Fireproofing Truss end inside the wall
|
9367
|
Classroom & Office Building
|
990016
|
01/30/2018
|
02/13/2018
|
02/05/2018
|
Submittal: 01 32 00-5475-0-AHU and 4 roof Pick Work Plan
|
9366
|
Student Center Phase 3 Coil Relacement (AH 1 & 2)
|
5112124
|
01/29/2018
|
02/12/2018
|
01/30/2018
|
Plans, Specifications
|
9364
|
Verano Electrical Vehicle Charging
|
5110404
|
01/29/2018
|
02/12/2018
|
01/30/2018
|
Plans:
|
9363
|
Law Library Seminar Renovation
|
5112151
|
01/26/2018
|
02/09/2018
|
01/31/2018
|
100% Review
|
9362
|
Classroom & Office Building
|
990016
|
01/25/2018
|
02/08/2018
|
01/29/2018
|
Submittal: 28 31 11-5473-Fire Alarm Drawing Field Changes
|
9361
|
Classroom & Office Building
|
990016
|
01/25/2018
|
02/08/2018
|
01/29/2018
|
RFI: 2444-Elevator Shaft Wall Revisions with added Tube Steel
|
9360
|
Classroom & Office Building
|
990016
|
01/25/2018
|
02/08/2018
|
01/31/2018
|
RFI: 2462-Top of Wall Joint Clarification
|
9359
|
Primary Electrical Improvement Step-4
|
990513
|
01/23/2018
|
02/06/2018
|
01/23/2018
|
Other: Transfer of Capitol project to Facilities" Doc
|
9358
|
ICS-1 MBCx
|
5109947
|
01/24/2018
|
02/07/2018
|
01/24/2018
|
Specifications:
|
9357
|
Primary Electrical Improvement Step-4
|
990513
|
01/23/2018
|
02/06/2018
|
01/23/2018
|
Other: Beneficial Occupancy Certificate for Sign Off
|
9356
|
SBSG 2nd floor Renovation
|
5112063
|
01/19/2018
|
02/02/2018
|
01/25/2018
|
Plans
|
9355
|
SSL 3rd Floor Renovation Lab Ste 308
|
5112153
|
01/19/2018
|
02/02/2018
|
01/26/2018
|
Plans:
|
9354
|
SSL 4th Floor renovation-ste 404 + 408
|
5112058
|
01/19/2018
|
02/02/2018
|
01/24/2018
|
Plans:
|
9353
|
Fire Life Safety Improvements
|
998611
|
01/19/2018
|
02/02/2018
|
|
Other: Prelim Project Schedule
|
9352
|
Primary Electrical Improvement Step-4
|
990513
|
01/19/2018
|
02/02/2018
|
|
Other: ANOC 28R Remove ? 12kV Cable & Replace (revised)
|
9351
|
State Fund Re-roof multiple buildings
|
5110248
|
01/18/2018
|
02/01/2018
|
01/22/2018
|
Plans: Demo & Renovation
|
9350
|
School of Business 5400 Renovation
|
5112131
|
01/18/2018
|
02/01/2018
|
01/22/2018
|
Approval & Final Review
|
9349
|
CRII-2 2015-Engineering Tower and Boney Center Coating
|
5110337
|
01/18/2018
|
02/01/2018
|
01/22/2018
|
Plans
|
9348
|
Middle Earth Expansion
|
996298
|
01/16/2018
|
01/30/2018
|
01/16/2018
|
Submittal: Package 3 Skin & Elevator Drawings 2nd backcheck Review
|
9347
|
UCI Student Housing PHIV
|
2971-6
|
01/16/2018
|
01/30/2018
|
|
Plans:
|
9346
|
Primary Electrical Improvement Step-4
|
990513
|
01/16/2018
|
01/30/2018
|
01/18/2018
|
Other:ANOC for remove 12kV Cable Replace (45 Nights)
|
9345
|
Primary Electrical Imporvement Step-4
|
990513
|
01/16/2018
|
01/30/2018
|
|
Submittal:
|
9344
|
SEP 2016 Campuswide Insulation Upgrade
|
5110255
|
01/16/2018
|
01/30/2018
|
01/18/2018
|
Specifications:
|
9343
|
ICS-1 MBCx
|
5109947
|
01/08/2018
|
01/22/2018
|
01/16/2018
|
Specifications
|
9342
|
Beckman Laser Institute
|
5112127
|
01/09/2018
|
01/23/2018
|
01/11/2018
|
Plans, Specifications
|
9341
|
Verizon Highlanders 66' FAUX Water Tank
|
null
|
01/09/2018
|
01/23/2018
|
01/11/2018
|
Other: Drawings
|
9340
|
Student Service Roms 1222, 1224 & 1226 Sound Baord Test Results
|
18W001995
|
01/09/2018
|
01/23/2018
|
01/11/2018
|
Other: Drawings & accoustical sound board test results
|
9339
|
Speith Hall Roof Replacement
|
110029
|
01/09/2018
|
01/23/2018
|
01/11/2018
|
Other: Aerial Photo of laydown area
|
9338
|
SOM First Floor Fit-Out
|
954041
|
01/09/2018
|
01/23/2018
|
|
Submittal: Joint Sealant
|
9337
|
Classroom & Office Building
|
990016
|
01/05/2018
|
01/19/2018
|
01/11/2018
|
RFI: _2436-Cast Iron Pipe Deck Penetration Fire Rating Clarification
|
9336
|
McGaugh Hall
|
5110359
|
01/04/2018
|
01/18/2018
|
01/16/2018
|
Plans, Specifications
|
9335
|
Reines Hall MBCx
|
5109588
|
01/04/2018
|
01/18/2018
|
01/08/2018
|
See attachment , section 01 1000
|
9334
|
N/A-Open Lot Situated between Bison-California -Health Sciences
|
5110396
|
01/04/2018
|
01/18/2018
|
01/11/2018
|
Plans
|
9333
|
Natural Sciences 1
|
5110233
|
01/04/2018
|
01/18/2018
|
01/08/2018
|
Plans
|
9332
|
Life Science 1450B-M Office Conversation
|
957408
|
01/04/2018
|
01/18/2018
|
01/04/2018
|
Submittal 3: Fire Alarm Drawing & Product
|
9331
|
SOM Trailer Expansion
|
954043
|
01/04/2018
|
01/18/2018
|
|
Plans
|
9330
|
Boyd Deep Canyon
|
950515
|
01/04/2018
|
01/18/2018
|
01/11/2018
|
Other: 100% DD Set Review
|
9329
|
Trailer Expansion
|
954043
|
01/04/2018
|
01/18/2018
|
01/04/2018
|
Other: State Approved Modular Building Drawings
|
9328
|
SOM Trailer Expansion -Ramp Drawings
|
95043
|
01/04/2018
|
01/18/2018
|
01/04/2018
|
Other: SOM Trailer Expansion -Ramp Drawings
|
9327
|
Sweeny Granite Mountain
|
950525
|
01/04/2018
|
01/18/2018
|
|
Other: 100% DD Set Review
|
9326
|
SOM Trailer Expansion
|
954043
|
01/04/2018
|
01/18/2018
|
01/04/2018
|
Other: Fire Alarm Submittals-Back Check
|
9325
|
Classroom & Office Building
|
990016
|
01/04/2018
|
01/18/2018
|
01/11/2018
|
Submittal: 07 81 00-5454-0-Applied FireProofing Drawing
|
9324
|
Classroom & Office Building
|
990016
|
01/04/2018
|
01/18/2018
|
01/11/2018
|
Submittal: 07 54 00-5469-0- NET-LMN-Supplemental Roofing Product Data
|
9323
|
Middle Earth Expansion
|
996298
|
01/04/2018
|
01/18/2018
|
01/16/2018
|
RFI: 0139-Knox Box Location Clarification
|
9322
|
Middel Earth Expansion
|
996298
|
01/04/2018
|
01/18/2018
|
01/11/2018
|
RFI: 0169 Basement & Level 1 Fire Protection Hub Drains Confirmation
|
9321
|
Middle Earth Expansion
|
996298
|
01/04/2018
|
01/18/2018
|
01/11/2018
|
Submittal: 21 1000-001- Fire Protection Deck Inserts
|
9320
|
UCR MRB1
|
950528
|
01/04/2018
|
01/18/2018
|
01/09/2018
|
Submittal: Fire Access Plan
|
9319
|
UCR MRB1
|
950528
|
01/04/2018
|
01/18/2018
|
01/11/2018
|
RFI: 0543-Purge Button Location
|
9318
|
UCR MRB1
|
950528
|
01/04/2018
|
01/18/2018
|
01/11/2018
|
Submittal: 0003-10 44 13-01
|
9317
|
UCR MRB1
|
950528
|
01/04/2018
|
01/18/2018
|
01/11/2018
|
Submittal: 0008-07 84 43-0- Joint Firestopping -Product Data (Stuff and Spray)
|
9316
|
UCR MRB1
|
950528
|
01/04/2018
|
01/18/2018
|
01/11/2018
|
RFI: 0542-Fire Penetration Label Location
|
9315
|
State Funded Re-Roof Multiple Buildings
|
5110248
|
12/21/2017
|
01/04/2018
|
12/22/2018
|
Plan review
|
9314
|
Middle Earth Expansion
|
996298
|
12/21/2017
|
01/04/2018
|
12/21/2017
|
Submittal: Package 3 Skin & Elevator Drawings_Backcheck Review
|
9313
|
CRII-2 2015 Med Sci C Major Building Maintenance
|
5109723
|
12/20/2017
|
01/03/2018
|
|
Addendum :
|
9312
|
Classroom & Office Building
|
990016
|
12/19/2017
|
01/02/2018
|
12/21/2017
|
Other: Specifications 07 8100 Applied Fireproofing
|
9311
|
Animal Cage Bedding Disposal Upgrade
|
5110359
|
12/18/2017
|
01/01/2017
|
12/20/2017
|
Plans, Specifications
|
9310
|
Social Ecology I
|
5110358
|
12/18/2017
|
01/01/2017
|
12/19/2017
|
Plans:
|
9309
|
Classroom & Office Building
|
990016
|
12/15/2017
|
12/29/2017
|
12/29/2017
|
Submittal: 07 81 00-533-0-Applied Fireproofing
|
9308
|
Classroom & Office Building
|
990016
|
12/15/2017
|
12/29/2017
|
|
RFI: RFI_2410-Cast Iron Bands in Concrete Fire Stopping Clarification
|
9307
|
Classroom & Office Building
|
90016
|
12/15/2017
|
12/29/2017
|
12/29/2017
|
Submittal: 07 84 13-5452-0-Supplemental Penetration Firestopping Plumbing
|
9306
|
Classroom & Office Building
|
990016
|
12/15/2017
|
12/29/2017
|
12/19/2017
|
RFI: _2365 R1-Top of Full -Height CMU Wall
|
9305
|
EH1106,1108,1111,1112 Renovation
|
5110052
|
12/15/2017
|
12/29/2017
|
12/21/2017
|
Plans:
|
9304
|
CC Play yard Renovation
|
5112122
|
12/15/2017
|
12/29/2017
|
12/15/2017
|
Final Review:
|
9303
|
Gross Hall MBCx
|
5110237
|
12/15/2017
|
12/29/2017
|
12/15/2017
|
Plans:
|
9302
|
Social Sciences Plaza Stairs and Bridge Pod A, Pod B and Pod C
|
5110191
|
12/15/2017
|
12/29/2017
|
12/19/2017
|
Plans:
|
9301
|
School Of Business 5400 Renovation
|
5112131
|
12/14/2017
|
12/28/2017
|
12/15/2017
|
Plans
|
9300
|
Student Center Phase 3 Coil Replacement (AH 1 & 2)
|
5112124
|
12/14/2017
|
12/28/2017
|
12/14/2017
|
Plans/Specifications
|
9299
|
Roof Repairs
|
5112164
|
12/13/2017
|
12/27/2017
|
12/19/2017
|
Plans
|
9298
|
Middle Earth Expansion
|
996298
|
12/12/2017
|
12/26/2017
|
12/12/2017
|
Submittal: Package 3 Skin & Elevator Drawings (Comment Matrix)
|
9297
|
CRII 2015 McGaugh Hall Door Hold- open Hardware
|
5110064
|
12/12/2017
|
12/26/2017
|
12/13/2017
|
Plans
|
9296
|
Classroom & Office Building
|
990016
|
12/12/2017
|
12/26/2017
|
12/14/2017
|
Submittal: Submittal 01 32 00 - 5449 - 0 - Humanities Guard Rail Ramp and Stairs Work Plan
|
9295
|
UCR MRB1
|
950528
|
12/05/2017
|
12/19/2017
|
12/21/2017
|
Other: Bulletin II
|
9294
|
MRI REPLACEMENT
|
5110138
|
12/11/2017
|
12/25/2017
|
12/14/2017
|
Plans
|
9293
|
UCR MRB1
|
950528
|
12/11/2017
|
12/25/2017
|
12/12/2017
|
Submittal: Submittal Package 0005 - 07 84 - 43 - 1 - Joint Firestopping - Edge of Slab Fire Safing Assembly
|
9292
|
SOM Research Building - Fume Hoods
|
957506
|
12/11/2017
|
12/25/2017
|
|
Other: Record Drawings
|
9291
|
SOM First Floor Fit-Out
|
954041
|
12/11/2017
|
12/25/2017
|
|
Submittal: 21 09 00 Wet Fire protection
|
9290
|
Geology Rooms 2261 & 2265 Door Add Docs
|
18W002686
|
12/11/2017
|
12/25/2017
|
01/16/2018
|
Other: Geology Rooms 2261 & 2265 Door Add Docs Drawings
|
9289
|
Life Science 1450B-M Office Conversion
|
957408
|
12/11/2017
|
12/25/2017
|
12/14/2017
|
RFI: Insert / Submittal: Pending / Other: 100% CD Review
|
9288
|
SL5-HUB - The Well - Sprinkler and Alarm Update
|
WO #W005528
|
12/11/2017
|
12/25/2017
|
01/16/2018
|
Other: Daart Sprinkler Drawings
|
9287
|
Sprague Hall MBCx
|
5110239
|
12/08/2017
|
12/22/2017
|
12/11/2017
|
Plans/Specifications
|
9286
|
Engineering Hall MBCx
|
5110235
|
12/08/2017
|
12/22/2017
|
12/11/2017
|
Plans/Specifications
|
9285
|
UCR MRB1
|
950528
|
12/07/2017
|
12/21/2017
|
12/12/2017
|
Submittal: 0001-1044 16-0 Fire Extinguisher Product Data & Schedule
|
9284
|
Children's Center Play-yard renovation
|
5112122
|
12/07/2017
|
12/21/2017
|
12/12/2017
|
Plans
|
9283
|
Anteater Sports Field Antenna Installation
|
51102094
|
12/07/2017
|
12/21/2017
|
12/11/2017
|
Plans
|
9282
|
UCR MRB1
|
950528
|
12/06/2017
|
12/20/2017
|
12/07/2017
|
Submittal:
|
9281
|
UCR MRB1
|
950528
|
12/06/2017
|
12/20/2017
|
12/12/2017
|
Submittal:
|
9280
|
Middle Earth Expansion
|
996298
|
12/06/2017
|
12/20/2017
|
12/06/2017
|
Other:
|
9279
|
BSL-3 Research Suite and Lab
|
954040
|
12/06/2017
|
12/20/2017
|
12/07/2017
|
Other:
|
9278
|
Boyce Hall Vivarium Restoration 11/27/17
|
950536
|
12/06/2017
|
12/20/2017
|
01/04/2018
|
Other:
|
9277
|
UCR MRB1
|
950528
|
12/06/2017
|
12/20/2017
|
12/12/2017
|
Submittal:
|
9276
|
UCR MRB1
|
950528
|
12/05/2017
|
12/19/2017
|
12/12/2017
|
Submittal:
|
9275
|
UCR MRB1
|
950528
|
12/05/2017
|
12/19/2017
|
12/12/2017
|
Submittal:
|
9274
|
Classroom & Office Building
|
990016
|
12/05/2017
|
12/19/2017
|
12/07/2017
|
RFI
|
9273
|
Middle Earth Expansion
|
996298
|
12/04/2017
|
12/18/2017
|
|
Other:
|
9272
|
Classroom & Office Building
|
990016
|
12/04/2017
|
12/18/2017
|
|
Other:
|
9271
|
UCR MRB1
|
950528
|
11/30/2017
|
12/14/2017
|
|
Submittal:
|
9270
|
UCR MRB1
|
950528
|
11/30/2017
|
12/14/2017
|
12/12/2017
|
Submittal:
|
9269
|
UCR MRB1
|
950528
|
11/30/2017
|
12/14/2017
|
|
Submittal:
|
9268
|
UCR MRB1
|
950528
|
11/30/2017
|
12/14/2017
|
|
Submittal:
|
9267
|
Classroom & Office Building
|
990016
|
11/29/2017
|
12/13/2017
|
11/29/2017
|
Other:
|
9266
|
CRII 2013- Engineering Gateway Victaullic Fittings CWS
|
5110231
|
11/28/2017
|
12/12/2017
|
11/30/2017
|
Addendum
|
9265
|
MRI REPLACEMENT
|
5110138
|
11/28/2017
|
12/12/2017
|
12/05/2017
|
Plans
|
9264
|
Leasing Oversight Renovation
|
5112015
|
11/28/2017
|
12/12/2017
|
11/28/2017
|
Plans
|
9263
|
Classroom & Office Building
|
990016
|
11/27/2017
|
12/11/2017
|
11/29/2017
|
RFI
|
9262
|
Small Cap 2107 - SE1 Psychology Lab Renovation
|
5110358
|
11/27/2017
|
12/11/2017
|
12/05/2017
|
Plans
|
9261
|
Primary Electrical Improvement Step-4
|
990513
|
11/27/2017
|
12/11/2017
|
11/30/2017
|
Other
|
9260
|
Leasing Oversight Renovation
|
5112015
|
11/27/2017
|
12/11/2017
|
11/30/2017
|
Plans
|
9259
|
Natural Science 1 MBCx
|
5110233
|
11/27/2017
|
12/11/2017
|
11/28/2017
|
Plans/Specifications
|
9258
|
ICS-1 MBCx
|
5109947
|
11/27/2017
|
12/11/2017
|
12/28/2017
|
Specifications
|
9257
|
Animal Cage Bedding Disposal Upgrade
|
5110359
|
11/27/2017
|
12/11/2017
|
11/28/2017
|
Plans/Specifications
|
9256
|
Bison Ave. Surface Parking Lot
|
5110396
|
11/27/2017
|
12/11/2017
|
12/11/2017
|
Plans
|
9255
|
CRII 2013 - Engineering Gateway Victaullic Fittings CWS
|
5110231
|
11/21/2017
|
12/05/2017
|
11/28/2017
|
Addendum
|
9254
|
Middle Earth Expansion
|
996298
|
11/21/2017
|
12/05/2017
|
12/06/2017
|
Submittal:
|
9253
|
Classroom & Office Building
|
990016
|
11/21/2017
|
12/05/2017
|
11/29/2017
|
Submittal:
|
9252
|
Classroom & Office Building
|
990016
|
11/20/2017
|
12/04/2017
|
11/21/2017
|
Submittal:
|
9251
|
UCR MRB1
|
950528
|
11/20/2017
|
12/04/2017
|
11/21/2017
|
Submittal:
|
9250
|
HUB-Habit Grill Leasehold
|
110080
|
11/20/2017
|
12/04/2017
|
11/30/2017
|
Submittal:
|
9249
|
SOM Trailer Expansion
|
954043
|
11/20/2017
|
12/04/2017
|
11/21/2017
|
Submittal:
|
9248
|
Speith Hall Tenant Improvements
|
957403
|
11/20/2017
|
12/04/2017
|
12/07/2017
|
Other:
|
9247
|
SOM Trailer Expansion
|
954043
|
11/20/2017
|
12/04/2017
|
11/21/2017
|
Submittal:
|
9246
|
California Museum of Photography HVAC Replacement
|
950565
|
11/20/2017
|
12/04/2017
|
11/30/2017
|
Other:
|
9245
|
CRII 2015 McGaugh Hall Door Hold-open Hardware
|
5110064
|
11/17/2017
|
12/01/2017
|
11/28/2017
|
Plans
|
9244
|
Middle Earth Expansion
|
996298
|
11/07/2017
|
11/21/2017
|
11/16/2017
|
Submittal:
|
9243
|
Habit Grill Leasehold
|
110080
|
11/15/2017
|
11/29/2017
|
11/15/2017
|
Other:
|
9242
|
Classroom & Office Building
|
990016
|
11/13/2017
|
11/27/2017
|
11/20/2017
|
RFI
|
9241
|
Classroom & Office Building
|
990016
|
11/13/2017
|
11/27/2017
|
11/20/2017
|
Submittal:
|
9240
|
UCR MRB1
|
950528
|
11/09/2017
|
11/23/2017
|
11/21/2017
|
RFI:
|
9239
|
UCR MRB1
|
950528
|
11/09/2017
|
11/23/2017
|
11/21/2017
|
Submittal:
|
9238
|
UCR MRB1
|
950528
|
11/09/2017
|
11/23/2017
|
11/21/2017
|
Submittal:
|
9237
|
Middle Earth Expansion
|
996298
|
11/09/2017
|
11/23/2017
|
11/20/2017
|
Submittal:
|
9236
|
Middle Earth Expansion
|
996298
|
11/09/2017
|
11/23/2017
|
11/20/2017
|
Other:
|
9235
|
Classroom & Office Building
|
990016
|
11/08/2017
|
11/22/2017
|
11/08/2017
|
Submittal: 07 54 13-5221-1-MCN-LMN-Penetration Firestopping Electrical
|
9234
|
SOM - R First Floor Fit Out
|
954041
|
11/08/2017
|
11/22/2017
|
11/08/2017
|
Other:
|
9233
|
UCR MRB1
|
950528
|
11/08/2017
|
11/22/2017
|
11/08/2017
|
Submittal:
|
9232
|
SOM Trailer Expansion
|
954043
|
11/08/2017
|
11/22/2017
|
11/21/2017
|
Other:
|
9231
|
UCR MRB1
|
950528
|
11/08/2017
|
11/22/2017
|
11/09/2017
|
Submittal:
|
9230
|
UCR MRB1
|
950528
|
11/08/2017
|
11/22/2017
|
11/09/2017
|
Submittal:
|
9229
|
UCR MRB1
|
950528
|
11/08/2017
|
11/22/2017
|
11/09/2017
|
Submittal:
|
9228
|
UCR MRB1
|
950528
|
11/08/2017
|
11/22/2017
|
11/09/2017
|
Submittal:
|
9227
|
UCR MRB1
|
950528
|
11/06/2017
|
11/20/2017
|
11/08/2017
|
OTHER:
|
9226
|
McGaugh Hall MBCx
|
5110236
|
11/06/2017
|
11/20/2017
|
11/06/2017
|
Plans/Specifications
|
9225
|
Gillespie Neuroscience MBCx
|
5110238
|
11/06/2017
|
11/20/2017
|
11/08/2017
|
Specifications
|
9224
|
Natural Science 1 MBCx
|
5110233
|
11/06/2017
|
11/20/2017
|
11/14/2017
|
Plans/Specifications
|
9223
|
Sprague Hall MBCx
|
5110239
|
11/06/2017
|
11/20/2017
|
11/06/2017
|
Plans/Specifications
|
9222
|
Biological Science 3 MBCx
|
5110234
|
11/06/2017
|
11/20/2017
|
11/06/2017
|
Plans/Specifications
|
9221
|
Engineering Hall MBCx
|
5110235
|
11/06/2017
|
11/20/2017
|
11/08/2017
|
Plans/Specifications
|
9220
|
Gross Hall MBCx
|
5110237
|
11/06/2017
|
11/20/2017
|
11/06/2017
|
Plans/Specifications
|
9219
|
CRII-3B Replace Beckman AHU 1, 2 & 3
|
5112127
|
11/03/2017
|
11/17/2017
|
11/14/2017
|
Plans
|
9218
|
UCR MRB1
|
950528
|
09/25/2017
|
10/09/2017
|
10/03/2017
|
RFI: 0386-Atrium Stair Fire Sprinkler
|
9217
|
Classroom & Office Building
|
990016
|
11/01/2017
|
11/15/2017
|
11/08/2017
|
Submittal:
|
9216
|
Transportation & Distribution Services PSB - Floor 2, Room 0200
|
5112064
|
11/01/2017
|
11/15/2017
|
11/08/2017
|
Specifications
|
9215
|
CRII 2015 McGaugh Hall Door Hold-open Hardware
|
5110064
|
11/01/2017
|
11/15/2017
|
11/06/2017
|
Plans
|
9214
|
Middle Earth Expansion
|
996298
|
11/01/2017
|
11/15/2017
|
11/21/2017
|
Submittal:
|
9213
|
Middle Earth Expansion
|
996298
|
11/01/2017
|
11/15/2017
|
11/21/2017
|
Submittal:
|
9212
|
Anteater Sports Field Antenna Installation
|
5112094
|
11/01/2017
|
11/15/2017
|
11/03/2017
|
Plans
|
9211
|
Classroom & Office Building
|
990016
|
10/31/2017
|
11/14/2017
|
|
Other:
|
9210
|
Classroom & Office Building
|
990016
|
10/31/2017
|
11/14/2017
|
|
Submittal:
|
9209
|
Chapman Hall Roof Replacement
|
957400
|
10/30/2017
|
11/13/2017
|
11/08/2017
|
Other:
|
9208
|
Classroom & Office Building
|
990016
|
10/30/2017
|
11/13/2017
|
11/07/2017
|
Submittal:
|
9207
|
Habit Grill Leasehold
|
110080
|
10/30/2017
|
11/13/2017
|
11/08/2017
|
Other:
|
9206
|
Transportation & Distribution Services PSB - Floor 2, Room 0200
|
5112064
|
10/30/2017
|
11/13/2017
|
11/08/2017
|
Specifications
|
9205
|
Local Exhaust Ventilation CRII-2015
|
5110060
|
10/30/2017
|
11/13/2017
|
11/06/2017
|
Plans
|
9204
|
Bourns Off Rm. A0128 Reno (Facilities Services)
|
18W005020
|
10/30/2017
|
11/13/2017
|
11/08/2017
|
Other:
|
9203
|
Boyce Hall 4440 Growth Room
|
957381
|
10/30/2017
|
11/13/2017
|
11/02/2017
|
Other:
|
9202
|
Bourns Hall Fire Alarm System Replacement
|
112003
|
10/30/2017
|
11/13/2017
|
11/08/2017
|
Other:
|
9201
|
UCR MRB1
|
950528
|
10/30/2017
|
11/13/2017
|
11/08/2017
|
Submittal:
|
9200
|
Fire Alarm Replacements
|
5112098
|
10/27/2017
|
11/10/2017
|
|
Plans:
|
9199
|
Classroom & Office Building
|
990016
|
10/26/2017
|
11/09/2017
|
|
Other: G-100A Site Fire Access Plan FRO
|
9198
|
Classroom & Office Building
|
990016
|
10/26/2017
|
11/09/2017
|
|
Submittal: 09 21 16-5375-0- MCN-LMN-Gypsum Board Shaft Wall Assemblies
|
9197
|
AH Ste. 559 Renovation
|
5112092
|
10/26/2017
|
11/09/2017
|
11/06/2017
|
Plans
|
9196
|
Anima Cage BeddingDisposal Upgrade
|
5110359
|
10/26/2017
|
11/09/2017
|
|
Plans, Specifications
|
9195
|
MRI Replacement
|
5110138
|
10/26/2017
|
11/09/2017
|
|
Plans:
|
9194
|
UCR MRB1
|
950528
|
10/25/2017
|
11/08/2017
|
11/01/2017
|
Submittal: Package 0001-07 81 00 -0- Applied Fireproofing-PD and SD
|
9193
|
UCR MRB1
|
950528
|
10/25/2017
|
11/08/2017
|
11/01/2017
|
Submittal: package 0001-07 81 00-0-Applied Fireproffing -PD and SD
|
9192
|
UCR MRB1
|
950528
|
10/25/2017
|
11/08/2017
|
11/01/2017
|
Submittal: package 0001-32 14 10-0-Truncated Dome PD
|
9191
|
UCR MRB1
|
950528
|
10/25/2017
|
11/08/2017
|
11/01/2017
|
Submittal: Submittal Package 0001-07 84 43-0-Joint Firestopping-Product data
|
9190
|
Classroom & Office Building
|
990016
|
10/25/2017
|
11/08/2017
|
10/25/2017
|
Other: SI-14 Reclaimed Water Revision
|
9189
|
CRII 2013-Engineering gateway Victaullic Fittings CWS
|
5110231
|
10/24/2017
|
11/07/2017
|
10/25/2017
|
Addendum:
|
9188
|
Engineering gateway Atomizer Lab for EVCP
|
5110008
|
10/23/2017
|
11/06/2017
|
10/25/2017
|
Plans, Specifications
|
9187
|
Primary Electrical Improvement Step-4
|
990513
|
10/23/2017
|
11/06/2017
|
11/02/2017
|
RFI: 128 South Substation FACP Connection
|
9186
|
Classroom & Office Building
|
990016
|
10/23/2017
|
11/06/2017
|
10/31/2017
|
Submittal: Submittal: 06 10 53-5378-0-NET-LMN-Fire Treated Plywood Product data
|
9185
|
Classroom & Office Building
|
990016
|
10/23/2017
|
11/06/2017
|
11/07/2017
|
Submittal: Submittal 06 16 00-5377-0-Sheathing Product data
|
9184
|
Middle Earth Expansion
|
996298
|
10/23/2017
|
11/06/2017
|
10/23/2017
|
Other: CP-2 100% Review with 90%
|
9183
|
Psychology Vivarium Renovation
|
957383
|
10/23/2017
|
11/06/2017
|
11/08/2017
|
Other: Record Drawing
|
9182
|
Leasing Oversight Renovation
|
5112015
|
10/19/2017
|
11/02/2017
|
|
Plans:
|
9181
|
Classroom & Office Building
|
990016
|
10/18/2017
|
11/01/2017
|
10/25/2017
|
Submittal: 26 13 00-5282-1- Shop Drawings for PV System
|
9180
|
UCR MRB1
|
950528
|
10/17/2017
|
10/31/2017
|
11/01/2017
|
Submittal: Package 0001-07 84 43-0- Joint FireStopping-Product Data
|
9179
|
Classroom & Office Building
|
990016
|
10/17/2017
|
10/31/2017
|
10/25/2017
|
Submittal: 07 84 13-5362-0-NET-LMN-Penetration Fire Stopping Plumbing
|
9178
|
Classroom & Office Building
|
990016
|
10/17/2017
|
10/31/2017
|
10/31/2017
|
Submittal: 07 54 00-5343-0- MCN-LMN-Roofing Product Data
|
9177
|
Classroom & Office Building
|
990016
|
10/17/2017
|
10/31/2017
|
10/31/2017
|
Submittal: 09 29 00-5370-0-MCN-LMN-Interior Gypsum Board Product
|
9176
|
Classroom & Office Building
|
990016
|
10/17/2017
|
10/31/2017
|
10/25/2017
|
Submittal: 05 16 00-5376-0-NET-LMN_DCI-Sure-Board Product Data
|
9175
|
Interdisciplinary Science & Engineering Bldg
|
999239
|
10/16/2017
|
10/30/2017
|
10/19/2017
|
Other:D P P (Pre-Final)
|
9174
|
ARC Kitchen Remodel
|
5110263
|
10/16/2017
|
10/30/2017
|
10/25/2017
|
Plans:
|
9173
|
UCR MRB1
|
950528
|
10/16/2017
|
10/30/2017
|
10/26/2017
|
Other: Bulletin 10 drawings
|
9172
|
Arts Building Access Control
|
957387
|
10/16/2017
|
10/30/2017
|
10/18/2017
|
Other :Resubmittal (Bid Set)
|
9171
|
UCR MRB1
|
950528
|
10/16/2017
|
10/30/2017
|
10/19/2017
|
Submittal: 0001-06 10 53-1-Miscellaneous Carpentry-Fire
|
9170
|
UC Path Solar Support
|
957417
|
10/16/2017
|
10/30/2017
|
10/18/2017
|
Submittal: UC Path Solar Support
|
9169
|
UCR MRB1
|
950528
|
10/16/2017
|
10/30/2017
|
10/19/2017
|
Submittal: Submittal Package 0004-09 21 16.23-0- Gypsum Board Shaft Wall Assemblies-Product Data-NP
|
9168
|
UCI_Student Housing-Phase4A-Parking Structure
|
150358
|
10/16/2017
|
10/30/2017
|
|
Plans:
|
9167
|
UCI-Student Housing-Phase 4A-Parking Structure
|
150358
|
10/16/2017
|
10/30/2017
|
|
Plans
|
9166
|
Engineering Laboratory Facility (ELF)
|
5112062
|
10/16/2017
|
10/30/2017
|
10/18/2017
|
Plans
|
9165
|
Central Plant Cooling Tower Reclaimed Water Pipeline
|
5110012
|
10/13/2017
|
10/27/2017
|
10/18/2017
|
Plans
|
9164
|
Classroom & Office Building
|
990016
|
10/11/2017
|
10/25/2017
|
|
CP-5 Architectural Plans FRO
|
9163
|
UCR MRB1
|
950528
|
10/10/2017
|
10/10/2017
|
10/10/2017
|
Review Fire Smoke Dampers
|
9162
|
Classroom & Office Building
|
990016
|
10/09/2017
|
10/23/2017
|
10/17/2017
|
RFI_2320-Level 3 Panic Hardware
|
9161
|
Boyd Deep Canyon
|
950515
|
10/09/2017
|
10/23/2017
|
10/09/2017
|
Primary Plan Review
|
9160
|
Sweeny Granite Mountain
|
950525
|
10/09/2017
|
10/23/2017
|
10/09/2017
|
Primary plan review
|
9159
|
UCI-Student Housing-Phase 4A-Parking Structure
|
150358
|
10/09/2017
|
10/23/2017
|
|
Plans
|
9158
|
UCR MRB1
|
950528
|
10/09/2017
|
10/23/2017
|
10/10/2017
|
0004-07 84 43-0 Joint Firestopping-Elevator
|
9157
|
Classroom & Office Building
|
990016
|
10/05/2017
|
10/19/2017
|
10/09/2017
|
CP-5 Architectural Plans-Final
|
9156
|
Financial Aid Front Office Renovation
|
5110302
|
10/04/2017
|
10/18/2017
|
10/06/2017
|
Plans
|
9155
|
UCR MRB1
|
950528
|
10/04/2017
|
10/18/2017
|
10/05/2017
|
DP-5 Café 65% Progress Set (7 sheets total)
|
9154
|
UCI-Student Housing Phase 4A- Building A
|
150358
|
10/04/2017
|
10/18/2017
|
|
Plans
|
9153
|
Primary Electrical Improvement Step-4
|
990513
|
10/03/2017
|
10/18/2017
|
10/10/2017
|
South Substation FACP Connection
|
9152
|
Geology #449 Lab Renovation
|
110059
|
10/03/2017
|
10/17/2017
|
10/05/2017
|
UCR
|
9151
|
UCR MRB1
|
950528
|
10/03/2017
|
10/17/2017
|
|
Plans
|
9150
|
UCR MRB1
|
950528
|
10/03/2017
|
10/17/2017
|
10/23/2017
|
Plans
|
9149
|
SOM First Floor Fit-Out
|
954041
|
10/03/2017
|
10/17/2017
|
|
UCR
|
9148
|
UCI-Student Housing-Phase 4A-Parking Structure
|
1500358
|
10/03/2017
|
10/17/2017
|
|
Plans
|
9147
|
UCI-Student Housing-Phase 4A-Building A
|
150358
|
10/03/2017
|
10/17/2017
|
|
Final Review
|
9146
|
Zot Wheels Expantion
|
5112103
|
09/28/2017
|
10/12/2017
|
10/05/2017
|
Plans
|
9145
|
UCR Boyce Vivarium
|
950536
|
09/28/2017
|
09/28/2017
|
09/28/2017
|
Plans
|
9144
|
Engineering Hall 3131 Renovation-Tissue Culture Room
|
5112051
|
09/28/2017
|
10/12/2017
|
10/06/2017
|
Plans
|
9143
|
UCR Chronic Taco
|
CPMS 3353
|
09/28/2017
|
10/12/2017
|
09/28/2017
|
UCR
|
9142
|
Uci Student Housing Phase 4A- Building A
|
150358
|
09/28/2017
|
10/12/2017
|
|
Plans
|
9141
|
UCI-Student Housing-Phase 4A-Building A and Parking
|
150358
|
09/27/2017
|
10/11/2017
|
|
Plans
|
9140
|
ULB 202 Research Lab Renovation
|
110056
|
09/25/2017
|
10/09/2017
|
09/28/2017
|
Revised set
|
9139
|
CNAS Boyce Hall 5478 Growth Room
|
110062
|
09/25/2017
|
10/09/2017
|
09/28/2017
|
Revised Set
|
9138
|
Arts Building Access Control
|
957387
|
09/25/2017
|
10/09/2017
|
09/28/2017
|
Arts Building Access Control-100% CD's
|
9137
|
SOM Trailer Expantion
|
954043
|
09/25/2017
|
10/09/2017
|
10/10/2017
|
100% Modular Building Drawings
|
9136
|
UCR MBR1
|
950528
|
09/25/2017
|
10/09/2017
|
09/28/2017
|
0006-26 05 00-0-DAS Product Data
|
9135
|
HUB-Habit Grill Leasehold
|
110080
|
09/25/2017
|
10/09/2017
|
09/28/2017
|
Fire Suppression System (Marked up & Set Corrected Set)
|
9134
|
UCR MRB1
|
950528
|
09/25/2017
|
10/09/2017
|
09/28/2017
|
0003-14 21 00-0-Electric Traction & Hydraulic
|
9133
|
UCR MRB1
|
950528
|
09/25/2017
|
10/09/2017
|
09/28/2017
|
0003-07 84 13-0-Mechanical Penetration Fire Stopping
|
9132
|
UCR MBR1
|
950528
|
09/25/2017
|
10/09/2017
|
09/28/2017
|
Review of Plumbing Penetration Fire Stopping
|
9131
|
Classroom & Office Building
|
990016
|
09/22/2017
|
10/06/2017
|
09/27/2017
|
Submittal 27 17 00-5186-1-UCI-Shop Drawings for 800 MHZ Communications.
|
9130
|
Financial Aid Front Office Renovation
|
5110302
|
09/22/2017
|
10/06/2017
|
09/25/2017
|
Plans
|
9129
|
Middle Earth Expantion
|
996298
|
09/22/2017
|
10/06/2017
|
10/05/2017
|
Package 2 Structural & Early MEP-Specs.
|
9128
|
Middle Earth Expantion
|
996298
|
09/22/2017
|
10/06/2017
|
10/10/2017
|
UCI Middle Earth Fire Protection Report
|
9127
|
Classroom & Ofice Building
|
990016
|
09/22/2017
|
10/06/2017
|
09/27/2017
|
RFI_2301-fire Rating For Door B310
|
9126
|
Oban addressable fire alarm
|
956361
|
09/21/2017
|
10/05/2017
|
09/21/2017
|
Certificate of ocupancy
|
9125
|
Middle Earth Expantion
|
996298
|
09/21/2017
|
10/05/2017
|
10/04/2017
|
90% CP-2 drawings review with 50%
|
9124
|
Middle Earth Expantion
|
996298
|
09/21/2017
|
10/05/2017
|
09/21/2017
|
Submittal-Package 1 Demolution & Site Utilities Specifications RESUBMITTAL
|
9123
|
Sm Cap 2017-Crawford Field Irrigation
|
5110370
|
09/21/2017
|
10/05/2017
|
09/22/2017
|
Plans
|
9122
|
Replace TES tank Ladder and paint
|
5110323
|
09/21/2017
|
10/05/2017
|
09/25/2017
|
Plans
|
9121
|
UCI MRB1
|
950528
|
09/19/2017
|
10/03/2017
|
09/21/2017
|
Review of Electrical Fire Stopping Details
|
9120
|
UCR MRB1
|
950528
|
09/19/2017
|
10/03/2017
|
09/19/2017
|
0003-14 21 00-0-Electric Traction & Hydraulic
|
9119
|
Major Building Maintinece
|
5109723
|
09/18/2017
|
10/02/2017
|
09/22/2017
|
Plans
|
9118
|
Sprague Hall MBCx
|
5110239
|
09/18/2017
|
10/02/2017
|
09/22/2017
|
Plans
|
9117
|
Gross Hall MBCx
|
5110237
|
09/18/2017
|
10/02/2017
|
09/22/2017
|
Plans
|
9116
|
MCGaugh Hall MBCx
|
5110236
|
09/18/2017
|
10/02/2017
|
09/21/2017
|
Plans
|
9115
|
Engineering Hall MBCx
|
5110235
|
09/18/2017
|
10/02/2017
|
09/21/2017
|
Plans
|
9114
|
Natural Science 1 MBCx
|
510233
|
10/02/2017
|
|
09/21/2017
|
Plans
|
9113
|
ICS-1
|
5109947
|
09/18/2017
|
10/02/2017
|
09/21/2017
|
Final Review
|
9112
|
Biological Science 3 MBCx
|
5110234
|
09/18/2017
|
10/02/2017
|
09/21/2017
|
Plans
|
9111
|
Gillespie Neuroscience MBC'x
|
5110238
|
09/18/2017
|
10/02/2017
|
09/21/2017
|
Plans
|
9110
|
Remediate Sycamore Tree Infestation-Tree Planting Phase 4
|
5109992
|
09/18/2017
|
10/02/2017
|
09/21/2017
|
Plans
|
9109
|
Peith Hall Tenant Improvements
|
957403
|
09/18/2017
|
10/02/2017
|
09/21/2017
|
100% Drawings (1 set)
|
9108
|
Hibachi-San
|
CP0000310
|
09/18/2017
|
10/02/2017
|
09/20/2017
|
100% CD Plan Rview Set
|
9107
|
Chapman Hall roof Replacement
|
957400
|
09/18/2017
|
10/02/2017
|
09/21/2017
|
90% CD Review
|
9106
|
Batchelor Hall-Buildings System Renewal
|
950464
|
09/18/2017
|
10/02/2017
|
10/05/2017
|
Specification Binder
|
9105
|
Classroom & Office Building
|
990016
|
09/15/2017
|
09/29/2017
|
09/19/2017
|
Submittal 087111-5275-0-MCN-LMN-Finish Hardware Submittal and Product Data
|
9104
|
UCI-Student Housing-Phase 4A Building A and Parking
|
150358
|
09/15/2017
|
09/29/2017
|
|
A new Student Housing
|
9103
|
Leasing Oversight Renovation
|
5112015
|
09/14/2017
|
09/28/2017
|
09/26/2017
|
Plans
|
9102
|
UCI-Student Housing-Phase 4A-Building A and Parking
|
150358
|
09/14/2017
|
09/28/2017
|
|
Final Review
|
9101
|
5 Year Certification Repairs
|
5112036
|
09/14/2017
|
09/28/2017
|
09/14/2017
|
Plans
|
9100
|
Classroom & Office Building
|
990016
|
09/13/2017
|
09/27/2017
|
09/18/2017
|
Revised CP-5 Architectural Plans
|
9099
|
Classroom & Office Building
|
990016
|
09/13/2017
|
09/27/2017
|
|
SI-10 FRO
|
9098
|
UCI-Student Housing-Phase 4A-Parking Structure
|
150358
|
09/13/2017
|
09/27/2017
|
|
Plans
|
9097
|
UCI-Student Housing-Phase 4A-Building A and Parking
|
150358
|
09/13/2017
|
09/27/2017
|
|
Plans
|
9096
|
Core Fiber Phase 3
|
5112120
|
09/13/2017
|
09/27/2017
|
09/13/2017
|
Plans
|
9095
|
Renewal Elevator
|
5110001
|
09/13/2017
|
09/27/2017
|
09/13/2017
|
Specifications
|
9094
|
Middle Earth Expantion
|
996298
|
09/12/2017
|
09/26/2017
|
09/20/2017
|
RFI 0028R1-Brandywine Fire Access and Pereira Road Modifications
|
9093
|
Middle Earth Expantion
|
996298
|
09/12/2017
|
09/26/2017
|
09/21/2017
|
Middle Earth Expantion Room Numbering
|
9092
|
UCI-Student Housing-Phase 4A-Building A and Parking
|
150358
|
09/12/2017
|
09/26/2017
|
|
Final Review
|
9091
|
UCI-Student Housing-Phase 4A-Parking Structure
|
150358
|
09/12/2017
|
09/26/2017
|
|
Plans
|
9090
|
Anteater sports Field Antenna Installation
|
5112094
|
09/11/2017
|
09/25/2017
|
09/12/2017
|
Plans
|
9089
|
UCI- Student Housing-Phase 4A-Building A and Parking
|
150358
|
09/11/2017
|
09/25/2017
|
|
Final Review
|
9088
|
Classroom & Office Building
|
990016
|
09/11/2017
|
09/25/2017
|
09/19/2017
|
SI-7
|
9087
|
SOM Trailer Expantion
|
954043
|
09/11/2017
|
09/25/2017
|
09/14/2017
|
UCR
|
9086
|
HIBACHI-SAN
|
CPMS 3310
|
09/11/2017
|
09/25/2017
|
09/14/2017
|
UCR
|
9085
|
Psychology Vivarium Renovation
|
957383
|
09/11/2017
|
09/25/2017
|
09/28/2017
|
UCR
|
9084
|
HUB-Habit Grill Leasehold
|
110080
|
09/11/2017
|
09/25/2017
|
10/10/2017
|
UCR
|
9083
|
HUB-Habit Grill Leasehold
|
110080
|
09/11/2017
|
09/25/2017
|
09/14/2017
|
UCR
|
9082
|
Gas Cabinet Installation
|
5112056
|
09/08/2017
|
09/22/2017
|
09/18/2017
|
Plans
|
9081
|
Rowland Hall to CS1 Fiber Replacement
|
5112119
|
09/08/2017
|
09/22/2017
|
09/13/2017
|
Plans
|
9080
|
Middle Earth Expantion
|
996298
|
09/07/2017
|
09/21/2017
|
09/12/2017
|
Submittal-Package 1 Demolition & Site Utilitites Specifications Resubmittal
|
9079
|
Classroom & Office Building
|
990016
|
09/07/2017
|
09/21/2017
|
09/18/2017
|
Submittal 08 11 13-5264-0-MCN-LMN-Hollow Metal Doors Frames Interior Alum Frames
|
9078
|
Social Ecology Research Space Renovation
|
510357
|
09/07/2017
|
09/21/2017
|
|
Plans
|
9077
|
Debbie Miyake
|
150358
|
09/07/2017
|
09/21/2017
|
|
Final Review
|
9076
|
Small Cap 2107-SE1 Psychology Lab Renovation
|
5110358
|
09/07/2017
|
09/21/2017
|
09/11/2017
|
Plans
|
9075
|
CRII-2 2015-Bonney Center Coating
|
5110337
|
09/07/2017
|
09/21/2017
|
09/07/2017
|
Plans
|
9074
|
UCI-Student Hosing-Phase 4A-Building A and Parking
|
150358
|
09/05/2017
|
09/19/2017
|
|
UCI-Student Hosing-Phase 4A-Building A and Parking
|
9073
|
Primary Electrical Improvement Step-4
|
990513
|
09/01/2017
|
09/15/2017
|
09/18/2017
|
ANOC #24_Electrical Shut-Down @ UNEX, ARC & Bus-Charge Station
|
9072
|
UCI-Student Housing-Phase 4A-Building A and Parking
|
150358
|
09/01/2017
|
09/15/2017
|
|
A new Student Housing
|
9071
|
UCI-Student Housing-Phase 4A-Building A and Parking
|
150358
|
09/29/2017
|
09/12/2017
|
|
Specifications
|
9070
|
Anteater Sports Field antenna Installation
|
5112094
|
08/31/2017
|
09/14/2017
|
09/06/2017
|
Plans
|
9069
|
Middle Earth Expantion
|
996298
|
08/31/2017
|
09/14/2017
|
09/07/2017
|
50% CP-2 drawings review
|
9068
|
Oban Addressable Fire Alarm
|
956361
|
08/31/2017
|
09/14/2017
|
08/31/2017
|
Other: Fire Stoppig Detail
|
9067
|
UCI-Student Housing-Phase 4A-Building A and Parking
|
150358
|
08/31/2017
|
09/14/2017
|
|
A new Student Housing
|
9066
|
UCI-Student Housing-Phase 4A-Parking Structure
|
150358
|
08/31/2017
|
09/14/2017
|
|
Plans
|
9065
|
Classroom & Office Building
|
990016
|
08/31/2017
|
09/14/2017
|
08/31/2017
|
SI-10
|
9064
|
Classroom & Office Building
|
990016
|
08/31/2017
|
09/14/2017
|
08/31/2017
|
RFI_2267R1-Confirmation of Standpipe Hose Connection Location
|
9063
|
UCI-Stident Housing-Phase 4A-Building A and Parking
|
150358
|
08/31/2017
|
09/14/2017
|
|
Final Review
|
9062
|
UCR MRB1
|
950528
|
08/30/2017
|
09/13/2017
|
09/14/2017
|
Bulleting 9 , drawings specs & narratives
|
9061
|
UCR MRB1
|
950528
|
08/30/2017
|
09/13/2017
|
|
0001-07 8413-01- Plumbing Penetration Fire Stopping
|
9060
|
Classroom & Office Building
|
990016
|
08/30/2017
|
09/13/2017
|
10/30/2017
|
SI-9 Site Fire Access Plan
|
9059
|
Oban Addressable Fire Alarm
|
956361
|
08/30/2017
|
09/13/2017
|
08/30/2017
|
Oban Addressable Fire Alarm
|
9058
|
SOM Research Building 1ST Floor Buidout
|
954041
|
08/30/2017
|
09/13/2017
|
08/30/2017
|
Architect Bid Revision for Review
|
9057
|
Plan Review
|
110056
|
08/30/2017
|
09/13/2017
|
08/30/2017
|
Plans Review
|
9056
|
UCR MRB1
|
950528
|
08/30/2017
|
09/13/2017
|
09/13/2017
|
0001-28-31-00-03-Fire Alarm Product Data
|
9055
|
UCR MRB1
|
950528
|
08/30/2017
|
09/13/2017
|
08/30/2017
|
Submiittal 0005-26-05-00-0-Fire Rated Putty Pads
|
9054
|
5 Years Certification
|
5112038
|
08/28/2017
|
09/11/2017
|
08/29/2017
|
Plans
|
9053
|
Classroom & Office Building
|
990016
|
08/25/2017
|
09/08/2017
|
08/29/2017
|
RFI_2269-L2 and L3 Deck Operating and FSD Enclosure Clarification
|
9052
|
ULB 202 Research Lab Renovation
|
110056
|
08/24/2017
|
09/07/2017
|
08/24/2017
|
Submittal: Fire Alarm Data System Sensor, Fire Alarm Drawings
|
9051
|
Classroom & Office Building
|
990016
|
08/24/2017
|
09/07/2017
|
08/29/2017
|
Submittal 21 10 00-5259-1-Fire Sprinkler Protection
|
9050
|
UCR MBR 1
|
950528
|
08/24/2017
|
09/07/2017
|
09/20/2017
|
UCR MRB1
|
9049
|
Gillespie Neuroscience MBCx
|
5110238
|
08/24/2017
|
09/07/2017
|
08/24/2017
|
Plans
|
9047
|
UCR MRB1
|
950528
|
08/22/2017
|
09/05/2017
|
08/24/2017
|
Submittal: 0001-28 31 00-03 Fire Alarm Shop Drawings
|
9046
|
UCR MRB1
|
950528
|
08/22/2017
|
09/05/2017
|
08/30/2017
|
Submittal: 0001-21 10 00-03-Fire Protection Product Data & Calcs
|
9045
|
UCR MRB1
|
950528
|
08/22/2017
|
09/05/2017
|
08/30/2017
|
Submittal: 0001-21 10-03 Fire Protection Shop Drawings
|
9044
|
UCR MRB1
|
950528
|
08/22/2017
|
09/05/2017
|
08/22/2017
|
Other: Consolidated set of FM Stamped drawings
|
9043
|
Verano Deck & Stairs
|
5110350
|
08/22/2017
|
09/05/2017
|
08/23/2017
|
Plans
|
9042
|
CRII 2013- Engineering Gateway Victaullic Fitting CWS
|
5110231
|
08/22/2017
|
09/05/2017
|
08/23/2017
|
Plans
|
9041
|
AV Building 1056 Floor Repair
|
5112101
|
08/21/2017
|
09/04/2017
|
08/21/2017
|
Plans
|
9040
|
Small Cap 14/15 McGaugh Hall Lab 4311 Renovation
|
5109824
|
08/21/2017
|
09/04/2017
|
08/22/2017
|
Plans
|
9039
|
UCR MRB1
|
950528
|
08/21/2017
|
09/04/2017
|
09/14/2017
|
Rwview of DP6 100% Drawings, back check against DP6 95%
|
9038
|
Classroom & Buldings
|
990016
|
08/18/2017
|
09/01/2017
|
08/29/2017
|
RFI_2272-Lecture Hall Suspended Ceiling Fire Sprinkler Clarification
|
9037
|
Classroom & Office Building
|
990016
|
08/18/2017
|
09/01/2017
|
08/24/2017
|
RFI_Exteriour Stairway and Ramp Protection Clarification
|
9036
|
UCR MRB1
|
950528
|
08/17/2017
|
08/31/2017
|
08/17/2017
|
0002-28-31-00-1 Fire Alarm Product Data
|
9035
|
Review Fire Alarm Devices
|
950528
|
08/17/2017
|
08/31/2017
|
08/17/2017
|
Fire alrm devices submittal
|
9034
|
Batchelor Hall Infrastructure Upgrades
|
950464
|
08/17/2017
|
08/31/2017
|
08/31/2017
|
UCR Plans
|
9033
|
Classroom & Office Building
|
990016
|
08/17/2017
|
08/31/2017
|
08/22/2017
|
RFI 2267-Conformation of Standpipe Hose Connection Locations
|
9032
|
Boyce Hall Vivarium Restoration-Fire Sprinkler
|
950536
|
08/17/2017
|
08/31/2017
|
09/18/2017
|
UCR Plans
|
9031
|
UCR MRB1
|
950528
|
08/17/2017
|
08/31/2017
|
08/17/2017
|
UCR MRB1
|
9030
|
Arts Building Access Control
|
957387
|
08/17/2017
|
08/31/2017
|
08/24/2017
|
UCR plans
|
9029
|
Bourns Hall Lab Renewal - CD 100%
|
950534
|
08/10/2017
|
08/24/2017
|
08/17/2017
|
Other: Conformed Set for Construction
|
9028
|
Social Ecology Research Space Renovation
|
5110357
|
08/14/2017
|
08/28/2017
|
08/16/2017
|
Plans
|
9027
|
Middle Earth Expantion
|
996298
|
08/11/2017
|
08/25/2017
|
08/24/2017
|
RFI 0028 Brandywine Fire Access and Pereira Road Modifications
|
9026
|
Natural Science 1 MBCx
|
5110233
|
08/11/2017
|
08/25/2017
|
08/11/2017
|
Specifications
|
9025
|
Classroom & Office Building
|
990016
|
08/10/2017
|
08/24/2017
|
08/17/2017
|
Submittal 26 1300-5282-Photovoltaic Shop Drawings
|
9024
|
Middle Earth Expantion
|
996298
|
08/10/2017
|
08/24/2017
|
08/10/2017
|
Submittal 02 8200-0002-0- Procedure 5 Transite Abatement Notification
|
9023
|
Leasing Oversight Renovation
|
5112015
|
08/10/2017
|
08/24/2017
|
08/14/2017
|
Plans
|
9022
|
Children's center Structural repair
|
5110350
|
08/09/2017
|
08/23/2017
|
08/10/2017
|
Plans
|
9021
|
Engineering hall MBCx
|
5110235
|
08/09/2017
|
08/23/2017
|
08/11/2017
|
Specifications
|
9020
|
Biological Science 3 MBCx
|
5110234
|
08/09/2017
|
08/23/2017
|
08/11/2017
|
Specifications
|
9019
|
McGaugh Hall MBCx
|
5110236
|
08/09/2017
|
08/23/2017
|
08/11/2017
|
Specifications
|
9018
|
Gross Hall MBCx
|
5110237
|
08/09/2017
|
08/23/2017
|
08/11/2017
|
Specifications
|
9017
|
Sprague Hall MBCx
|
5110239
|
08/09/2017
|
08/23/2017
|
08/11/2017
|
Specifications
|
9016
|
ICS-1 MBCx
|
5109947
|
08/09/2017
|
08/23/2017
|
08/11/2017
|
Specifications
|
9015
|
Verano Electrical Vehicle Chargin
|
5110404
|
08/09/2017
|
08/23/2017
|
08/10/2017
|
Plans
|
9014
|
Verano Cross walk lights
|
5110413
|
08/09/2017
|
08/23/2017
|
08/10/2017
|
Plans
|
9013
|
Banning House / UNEX-B Renovation
|
5112097
|
08/08/2017
|
08/22/2017
|
08/09/2017
|
Plans
|
9012
|
SOM Trailer Expantion
|
954043
|
08/07/2017
|
08/21/2017
|
08/17/2017
|
100% CD Plans
|
9011
|
HUB catering Kitchen Equioment Relocation
|
CPMS-3327
|
08/04/2017
|
08/18/2017
|
08/04/2017
|
Plans and Cutsheets
|
9010
|
Small Cap 2017 Bren Hall 2nd Floor ISG Group Renovation.
|
5110367
|
08/03/2017
|
08/17/2017
|
08/03/2017
|
Plans
|
9009
|
Verano Deck & Stairs
|
5110350
|
08/03/2017
|
08/17/2017
|
08/07/2017
|
Plans
|
9008
|
Eyewash shower scope
|
5110061
|
08/03/2017
|
08/17/2017
|
08/07/2017
|
Plans
|
9007
|
UCR MRB 1
|
950528
|
08/03/2017
|
08/17/2017
|
08/03/2017
|
Review of Elevator submittal
|
9006
|
Classroom & Class Lab Upgrade Project-UCR
|
950562
|
08/28/2017
|
08/03/2017
|
|
100% CD Review
|
9005
|
Social Ecology Research and Space Renovation
|
5110357
|
08/02/2017
|
08/16/2017
|
08/07/2017
|
Plans, Specifications
|
9004
|
CRII - 2015 Step Lights - New Building
|
5110206
|
08/02/2017
|
08/16/2017
|
08/07/2017
|
Specifications
|
9003
|
Classroom & Office Building
|
990016
|
08/02/2017
|
08/16/2017
|
|
170802_CP-5 MEPT Drawings-FRO
|
9002
|
Middle Earth Expantion
|
996298
|
08/02/2017
|
08/16/2017
|
08/10/2017
|
Submittal 01 5000-002-A-Site Logistics Plan-Resubmittal
|
9001
|
Classroom & Office Building
|
990016
|
08/01/2017
|
08/15/2017
|
08/02/2017
|
RFI_2245-Knox Box and Fire Annunciator Location
|
9000
|
Middle Earth Expantion
|
996298
|
08/01/2017
|
08/15/2017
|
08/10/2017
|
Submittal-Package 1 Demolition & Site Utilities Specifications
|
8999
|
Sm Cap 2017-CalIT2 TEMPR properties Facility Renovation
|
5110353
|
07/31/2017
|
08/14/2017
|
07/31/2017
|
Plans
|
8998
|
Primary Electrical Improvement Step-4
|
990513
|
07/31/2017
|
08/14/2017
|
08/02/2017
|
Submittal 07 8413.01.02A-Exterior Wall penetration Firestopping System w/BC
|
8997
|
ULB 202 Renovation - Fire Sprinkler
|
110056
|
07/27/2017
|
08/10/2017
|
08/24/2017
|
Other: Submittal 17 (1set) and conformed set of plans (2sets) and specs (1 set)
|
8996
|
Fmri - Fire Sprinker
|
950548
|
07/26/2017
|
08/09/2017
|
08/10/2017
|
Other: Conformed Set for Construction
|
8995
|
Small Cap 2017 Bren Hall 2nd Floor ISG Group Renovation
|
5110367
|
07/27/2017
|
08/10/2017
|
07/28/2017
|
Plans
|
8994
|
CRII - 2015 - Replace Fire Alarms; Multiple Buildings
|
5109528
|
07/27/2017
|
08/10/2017
|
07/28/2017
|
Plans
|
8993
|
Life Sciences 1450-M Office Conversation
|
957408
|
07/26/2017
|
08/09/2017
|
07/27/2017
|
Submittal
|
8992
|
Conformed Set for Construction
|
950536
|
07/26/2017
|
08/09/2017
|
07/27/2017
|
Other: Conformed Set for Construction
|
8991
|
Surge Mathematics Admin. Suite #202-213 - Submittal Fire Sprinker
|
110038
|
07/26/2017
|
08/09/2017
|
08/09/2017
|
Submittal: Submittal Fire Sprinkler
|
8990
|
Leasing Oversight Renovation
|
5112015
|
07/26/2017
|
08/09/2017
|
07/28/2017
|
Plans
|
8989
|
Middle Earth Expansion
|
996298
|
07/26/2017
|
08/09/2017
|
07/26/2017
|
Submittal - Package 1 Demolition and Site Utilities Drawings - FRO
|
8988
|
Middle Earth Expansion
|
996298
|
07/26/2017
|
08/09/2017
|
07/26/2017
|
Submittal - Package Demolition and Site Utilities Drawings - Civil Revisions
|
8987
|
UCR MRB1
|
950528
|
07/25/2017
|
08/08/2017
|
08/10/2017
|
Submittal: 0001-28 31 00 - 1 - Fire Alarm Shop Drawings
|
8986
|
UCR MRBI
|
950528
|
07/25/2017
|
08/08/2017
|
08/11/2017
|
Other: Bulletin 8 Drawings & Narrative
|
8985
|
UCI - Student Housing - Phase 4A - Parking Structure
|
150358
|
07/25/2017
|
08/08/2017
|
08/21/2017
|
Plans
|
8984
|
Classroom and Office Building
|
990016
|
07/25/2017
|
08/08/2017
|
08/02/2017
|
Submittal: 07 54 13 - 5215 - 1 - NET - LMN - Penetration Firestopping HVAC
|
8982
|
Classroom & OfficeBuilding
|
990016
|
07/24/2017
|
08/07/2017
|
07/25/2017
|
Submittal: G-100 A Site Fire Access Plan
|
8981
|
Middle Earth Expansion
|
996298
|
07/24/2017
|
08/07/2017
|
08/02/2017
|
Submittal: Submittal 01 5000-005-0- Pippin Commons Emergency Egrees Routes
|
8980
|
I & Q Corridor Vestibule-UCR
|
110040
|
07/24/2017
|
08/07/2017
|
08/10/2017
|
Other: 100% CD Plans
|
8979
|
Geology Lab Room 449 renovation-UCR
|
110059
|
07/24/2017
|
08/07/2017
|
|
Other: 100 % CD Plans
|
8978
|
Barn Project Phases 1&2 -UCR
|
950493
|
07/24/2017
|
08/07/2017
|
08/02/2017
|
Other: 100% DD Drawings
|
8977
|
SOM Trailer Expansion Project-UCR
|
954043
|
07/24/2017
|
08/07/2017
|
07/27/2017
|
Other: 100% CD Plans (New Trailer Installation & Site Construction
|
8976
|
The Habit Burger Grill-UCR
|
00003299
|
07/24/2017
|
08/07/2017
|
07/27/2017
|
Other: For Information only. Only Fire Sprinkler System plans found at present time
|
8975
|
Bourns Hall Fire Alarm System Replacement-UCR
|
112003
|
07/24/2017
|
08/07/2017
|
08/10/2017
|
Other: 90% CD Review
|
8974
|
I & Q Corridor Vestibule-UCR
|
110040
|
07/24/2017
|
08/07/2017
|
08/10/2017
|
Other: 100% CD Plans
|
8973
|
Chapman Hall Roof Replacement-UCR
|
957400
|
07/24/2017
|
08/07/2017
|
07/27/2017
|
Other: Preliminary Contruction Drawings & Specifications for review
|
8972
|
Boyle Hall Vivarium Restoration-UCR
|
950536
|
07/24/2017
|
08/07/2017
|
07/27/2017
|
Other: Conformed Set For Contruction
|
8971
|
Anteater Recreation Center
|
5112094
|
07/21/2017
|
08/04/2017
|
07/27/2017
|
Plans
|
8970
|
Local Exhaust Ventilation
|
5110060
|
07/21/2017
|
08/04/2017
|
07/25/2017
|
Plans
|
8969
|
Classroom and Office Building
|
990016
|
07/20/2017
|
08/03/2017
|
07/24/2017
|
Submittal 08 3113 Product Data for Plumbing Access Doors
|
8968
|
Bullentin 1-7 Drawings
|
950528
|
07/11/2017
|
07/25/2017
|
07/20/2017
|
Other: Bullentin Drawings - 7 Only
|
8967
|
Elena Blackwell
|
5110061
|
07/20/2017
|
08/03/2017
|
|
Plans
|
8966
|
Classroom and Office
|
990016
|
07/19/2017
|
08/02/2017
|
08/24/2017
|
Submittal 21 10 00 - 5259 - 0 - Fire Sprinkler Protection Drawings and Calculations
|
8965
|
Classroom & Office Building
|
990016
|
07/19/2017
|
08/02/2017
|
08/02/2017
|
Submittal 21 10 00 -5256 - 0 - Weld Certificate and Viking Procedures
|
8964
|
Classroom & Office Building
|
990016
|
07/19/2017
|
08/02/2017
|
07/19/2017
|
Submittal 01 32 00 - 5231 - 0 - Inner Ring Road Site Utilities Work Plan
|
8963
|
Primary Electrical Improvement Step 4
|
990513
|
07/18/2017
|
08/01/2017
|
07/24/2017
|
SUBMITTAL: 07 8413.01.02-Exterior Wall Penetration Fire Stopping System
|
8962
|
CR II - 2015 Replace Fire Alarms; Multiple Buildings
|
5109528
|
07/17/2017
|
07/31/2017
|
07/20/2017
|
Plans, EH&S Redlines
|
8961
|
Drew Hetch
|
CP00003310
|
07/17/2017
|
07/31/2017
|
07/27/2017
|
Other: 100% CD Plans
|
8960
|
The Habit Burger Grill
|
CP00003299
|
07/17/2017
|
07/31/2017
|
07/27/2017
|
Other: 100% CD Plans
|
8959
|
ULB 202 Renovation
|
110056
|
07/11/2017
|
07/25/2017
|
07/27/2017
|
Other: Submittal: 17 (1set) and conformed Set of Plans (2 sets) and Specs (1set)
|
8958
|
Boyce Hall Rm 5478
|
110062
|
07/17/2017
|
07/31/2017
|
07/27/2017
|
Other: Conformed Set for Construction Drawings
|
8957
|
Boyce Hall 4440 Growth Room
|
957381
|
07/17/2017
|
07/31/2017
|
07/27/2017
|
Other: Conformed Set for Construction Drawings
|
8956
|
Research Building
|
5110351
|
07/14/2017
|
07/28/2017
|
07/17/2017
|
Plans
|
8955
|
Primary Electrical Improvement
|
990513
|
07/14/2017
|
07/28/2017
|
07/17/2017
|
Submittal: 28 3100.02A - Fire Alarm Drawings W/ Backcheck
|
8954
|
Leasing Oversight Renovation
|
5112015
|
07/14/2017
|
07/28/2017
|
07/24/2017
|
Plans
|
8953
|
SOM Research 1st floor build out
|
954041
|
07/11/2017
|
07/25/2017
|
07/20/2017
|
OTHER: 100% CD Plans (2 sets) and Specifications (1 set)
|
8952
|
UCR MRB1
|
950528
|
07/13/2017
|
07/27/2017
|
07/20/2017
|
Other: DP3 IFC Specifications (UPDATED)
|
8950
|
UCR MRB1
|
950528
|
07/11/2017
|
07/25/2017
|
10/05/2017
|
Other: Bulletin 1-7 Drawings
|
8949
|
SST 4th Floor Renovation
|
5110352
|
07/13/2017
|
07/27/2017
|
07/14/2017
|
Plans, Specifications
|
8948
|
ET 1st Floor/ Breezeway enclosure
|
5109840
|
07/13/2017
|
07/27/2017
|
07/14/2017
|
Plans
|
8947
|
Cyber Café Shade Structure
|
5112069
|
07/13/2017
|
07/27/2017
|
07/14/2017
|
Plans
|
8946
|
UCR MRB1
|
950528
|
07/07/2017
|
07/21/2017
|
07/07/2017
|
OTHER: DP6-95% (Full Set)
|
8945
|
Rowland Hall 533, 537, 539
|
5110409
|
07/12/2017
|
07/26/2017
|
07/13/2017
|
Plans
|
8944
|
Classroom and Office Building
|
990016
|
07/12/2017
|
07/26/2017
|
07/12/2017
|
Submittal: Submittal 01 32 00 - 5234 - 0 - Outer ring road site utilities work plan
|
8943
|
Electric Bus Lift Pad
|
5110349
|
07/11/2017
|
07/25/2017
|
07/13/2017
|
Plans
|
8942
|
UCR MRB1
|
950528
|
07/11/2017
|
07/25/2017
|
07/11/2017
|
Other: DP3 IFC A2.3, A2.4, G1.0
|
8941
|
Engineering Hall 3131 Renovation -Tissue Culture Room
|
5112051
|
07/11/2017
|
07/25/2017
|
07/11/2017
|
Plans EH&S Redlines
|
8940
|
Pierce Hall Building Renovation
|
950511-950532
|
07/11/2017
|
07/25/2017
|
07/20/2017
|
Other: 85% DD Plans (Set 2 Volumes)
|
8939
|
UCR MRB1
|
950528
|
07/11/2017
|
07/25/2017
|
10/24/2017
|
Other: Fire Protection Drawings w/ TS1SC Comments
|
8938
|
UCR MRB1
|
950528
|
07/11/2017
|
07/25/2017
|
07/11/2017
|
Submittal: 0005-21 10 00-1 Fire Suppression -Product Data, Shop Dwgs & Calcs
|
8937
|
UCR MRB1
|
950528
|
07/11/2017
|
07/25/2017
|
08/01/2017
|
Submittal: 0005-21 10 00-1 Fire Suppression-Product Data, Shop Dwgs & Calcs
|
8936
|
Lots 30 & 32 Solar Project
|
957421
|
07/11/2017
|
07/25/2017
|
07/13/2017
|
Submittal: Fire Alarm Drawings : One (1) set for lot 30 & One (1) Set for lot 32
|
8935
|
Oban Adderessable Fire Alarm
|
956361
|
07/11/2017
|
07/25/2017
|
07/13/2017
|
Submittal: Fire Alarm Draings & Booklets (1 Set)
|
8934
|
SOM Trailer Expansion
|
954043
|
07/11/2017
|
07/25/2017
|
07/20/2017
|
Other: 100% CD Plans (2 sets) and Specifications (1 set)
|
8933
|
UCR MRB1
|
950528
|
07/11/2017
|
07/25/2017
|
|
Other: Fire Protection Drawings w/ FM Comments
|
8932
|
UCR MRB1
|
950528
|
07/11/2017
|
07/25/2017
|
|
Other: Fire Protection Drawing w/ TK1SC Comments
|
8931
|
Sm Cap 2017 - Cal1T2 TEMPR Properties Facility Renovation
|
5110353
|
07/10/2017
|
07/24/2017
|
07/10/2017
|
Plans
|
8930
|
eh Renovate Room 1106, 1108, 1110, 1111, 1112
|
5110052
|
07/10/2017
|
07/24/2017
|
|
Plans
|
8929
|
Middle Earth Expansion
|
996298
|
07/10/2017
|
07/24/2017
|
07/10/2017
|
Submittal:Package 1 Demolition and Site Utilities Drawings - Resubmittal
|
8928
|
EG Victaulic Fittings CWS
|
5110321
|
07/10/2017
|
07/24/2017
|
07/14/2017
|
Plans
|
8927
|
Classroom & Building
|
990016
|
07/06/2017
|
07/20/2017
|
07/10/2017
|
Submittal 283111-5159-2-Fire alarm Shop Drawings
|
8926
|
Classroom & Office Building
|
990016
|
07/06/2017
|
07/20/2017
|
07/10/2017
|
Submittal 23 33 00 - 5201 - 0 - Product Data for Combination Fire Smoke Dampers
|
8925
|
Rowland Hall 533, 537, 539
|
5110409
|
07/05/2017
|
07/19/2017
|
|
Plans
|
8924
|
EH Renovate Room 1106, 1108, 1110, 1111, 1112
|
5110052
|
07/05/2017
|
07/19/2017
|
|
Plans
|
8923
|
Rowland Hall 533, 537, 539
|
5110409
|
07/05/2017
|
07/19/2017
|
|
Plans
|
8922
|
Classroom & Office Building
|
990016
|
07/05/2017
|
07/19/2017
|
07/10/2017
|
Submittal 21 10 00-5197-1-NET-ALV-Supplemental Product Data for Blue Bangers
|
8921
|
Engineering Gateway
|
5110008
|
06/30/2017
|
07/14/2017
|
|
Plans
|
8920
|
Classroom & Office Building
|
990016
|
06/30/2017
|
07/14/2017
|
07/24/2017
|
SI-5 Drawings
|
8919
|
UCR MRB-1
|
950528
|
06/23/2017
|
07/07/2017
|
07/11/2017
|
Submittal: Pumbing - Fire Prevention/Firestop submitting
|
8918
|
UCR MRB-1
|
950528
|
06/23/2017
|
07/07/2017
|
07/20/2017
|
Submittal: 95% CO - DP6 Plan Submittal
|
8917
|
UCR Boyce Hall - TI
|
110061
|
06/26/2017
|
07/10/2017
|
08/24/2017
|
Submittal: Fire Sprinker as builts for COFO signoff
|
8916
|
Classroom & Office Building
|
990016
|
06/29/2017
|
07/13/2017
|
07/10/2017
|
CP-5 Architectural/MEP Plans Resubmittal
|
8915
|
Classrooms & Office Building
|
990016
|
06/30/2017
|
07/14/2017
|
07/10/2017
|
Submittal 14 21 00-5122-0- Shop Drawings for Kone Elevators
|
8914
|
Classrooms & Office Buildings
|
990016
|
06/30/2017
|
07/14/2017
|
07/06/2017
|
Submittal 28 31 11-5196-1- Fire Alarm Product Data
|
8913
|
MRB-1 UCR
|
0005
|
06/29/2017
|
07/13/2017
|
06/29/2017
|
DP 3 IFC
|
8912
|
MRB-1 UCR
|
0004
|
06/29/2017
|
07/13/2017
|
06/29/2017
|
Temp. standpipe drawings
|
8911
|
MRB-1 UCR
|
0003
|
06/22/2017
|
07/06/2017
|
06/29/2017
|
Elevator Shop Drawings
|
8910
|
MSRB-1 UCR
|
0002
|
06/22/2017
|
07/06/2017
|
|
Specification DP3
|
8909
|
Engineering Hall 3131Renovation - Tissue Culture Room
|
5112051
|
06/29/2017
|
07/13/2017
|
06/30/2017
|
Plans, specifications, EH&S Redlines
|
8908
|
Classroom & Office Building
|
990016
|
06/29/2017
|
07/13/2017
|
07/10/2017
|
RFI_2205-DAS Signal Strength Clarification
|
8907
|
Classroom & Office Building
|
990016
|
06/29/2017
|
07/13/2017
|
06/29/2017
|
CP-5 MEP Plans Rsubmittal
|
8906
|
Replace Boilers
|
5109724
|
06/28/2017
|
07/12/2017
|
|
Plans
|
8905
|
Middle Earth Expansion
|
996298
|
06/27/2017
|
07/11/2017
|
07/06/2017
|
Submittal - Package 1 Demolition & Site Utilities Drawing
|
8904
|
Classroom & Office Building
|
990016
|
06/27/2017
|
07/11/2017
|
07/06/2017
|
RFI: RFI_2155R1 - Fire Sprinkler Above Drive Aisle
|
8903
|
Rowland Hall Room 533, 537, 539
|
5110409
|
06/27/2017
|
07/11/2017
|
06/28/2017
|
Plans
|
8902
|
Submittal 07 54 13-5215-0-Penetration Firestopping HVAC
|
990016
|
06/26/2017
|
07/10/2017
|
07/06/2017
|
Submittal 07 54 13-5215-0-Penetration Firestopping HVAC
|
8901
|
Classroom & Office Building
|
990016
|
06/26/2017
|
07/10/2017
|
07/06/2017
|
Submittal 07 54 13-5221-0-Penetration Firestopping Electrical
|
8900
|
Central Plant Direct-Fired Boiler Replacement - Asbestos Abatement
|
5109724
|
06/26/2017
|
07/10/2017
|
06/28/2017
|
Revised Proposal
|
8899
|
null
|
IR PR34651 2405
|
06/26/2017
|
07/10/2017
|
06/26/2017
|
Plans
|
8898
|
Small Cap 2017-Social Science Tower 220AB Smart Classroom Renovation
|
5110355
|
06/22/2017
|
07/06/2017
|
06/26/2017
|
Plans
|
8897
|
MRB-1
|
0001
|
06/12/2017
|
06/26/2017
|
06/22/2017
|
Submittal DP3 CD 95%
|
8896
|
Research Building
|
5110351
|
06/22/2017
|
07/06/2017
|
06/27/2017
|
Plans
|
8895
|
Small Cap 2017 Bren Hall 2nd Floor ISG Group Renovation
|
5110367
|
06/21/2017
|
07/05/2017
|
06/26/2017
|
Plans
|
8894
|
ELF Structural Fix
|
5109820
|
06/21/2017
|
07/05/2017
|
06/27/2017
|
Plans
|
8893
|
Structural Assessment and Repairs
|
5110149
|
06/21/2017
|
07/05/2017
|
06/27/2017
|
Plans
|
8892
|
Eyewash shower scope
|
5110061
|
06/21/2017
|
07/05/2017
|
06/26/2017
|
Plans
|
8891
|
CR II-2015-Replace Fire Alarms; Multiple Buildings
|
5109528
|
06/21/2017
|
07/05/2017
|
06/28/2017
|
Plans
|
8890
|
SST 4TH Floor Renovation
|
5110352
|
06/21/2017
|
07/05/2017
|
06/27/2017
|
Plans
|
8889
|
Clasroom & Office Building
|
990016
|
06/20/2017
|
07/04/2017
|
06/22/2017
|
RFI_2192-FSD Placement Clarification
|
8888
|
Middle Earth Expansion
|
996298
|
06/19/2017
|
07/03/2017
|
06/22/2017
|
Submittal 01 5000-002- Site Logistics Plan-Resubmittal
|
8887
|
Classroom & Office Building
|
990016
|
06/19/2017
|
07/03/2017
|
06/22/2017
|
Submittal 21 10 00-5197-0- Suplimental Product Data for Blue Bangers
|
8886
|
Local Exhaust Ventilation CRII-2015
|
5110060
|
06/19/2017
|
07/03/2017
|
06/22/2017
|
Plans
|
8885
|
ELF Structural Fix
|
5109820
|
06/19/2017
|
07/03/2017
|
06/19/2017
|
Plans
|
8884
|
Social Sciences Stairs & Campus Bridges
|
5510191
|
06/16/2017
|
06/30/2017
|
06/19/2017
|
Plans
|
8883
|
ADA Bathroom & Kitchen Conversion
|
5110380
|
06/16/2017
|
06/30/2017
|
06/20/2017
|
Plans
|
8882
|
Transportation & Distribution Services PSB-Floor2, Room 0200
|
5112064
|
06/15/2017
|
06/29/2017
|
06/22/2017
|
Specifications
|
8881
|
Middle Earth Expantion
|
996298
|
06/14/2017
|
06/28/2017
|
06/22/2017
|
Submittal 015000-002-Site Logistics Plan
|
8880
|
Middle Earth Expantion
|
996298
|
06/14/2017
|
06/28/2017
|
06/22/2017
|
Submittal 02 4116-001-Demolition & Abatement Information Submittal
|
8879
|
Classroom & Office Building
|
990016
|
06/14/2017
|
06/28/2017
|
06/22/2017
|
Submittal 07 84 13-5199-0-Electrical Penetration Fire Stopping Supplemental EZ Path
|
8878
|
Small Cap 14/15 McGaugh Hall Lab 4311 Renovation
|
5109824/9746440
|
06/13/2017
|
06/27/2017
|
06/19/2017
|
Plans
|
8877
|
Leasing Oversight Renovation
|
5112015
|
06/13/2017
|
06/27/2017
|
06/26/2017
|
Plans
|
8876
|
UCI-Student Housing-Phase 4A-Building A
|
150358
|
06/09/2017
|
06/23/2017
|
07/18/2017
|
Plans
|
8875
|
Submittal 28 31 11-5196-0-Fire Alarm Product Data
|
990016
|
06/08/2017
|
06/22/2017
|
06/12/2017
|
Submittal 28 31 11-5196-0-Fire Alarm Product Data
|
8874
|
Classroom & Office Building
|
990016
|
06/08/2017
|
06/22/2017
|
|
Submittal 0132 00-5146-1-CP-5 Service Level Electrical_Mechanical and Telecom Sheets
|
8873
|
UCI-Student Housing-Phase 4A-Fire Access Plan
|
150358
|
06/08/2017
|
06/22/2017
|
|
Plans
|
8872
|
Primary Electrical Improvement
|
990513
|
06/08/2017
|
06/22/2017
|
06/12/2017
|
ANOC 23-Replacement of UC 66-1xfmer
|
8871
|
Engineering Hall 3131 Renovation-Tissue Culture Room
|
5112051
|
06/08/2017
|
06/22/2017
|
06/12/2017
|
Plans
|
8870
|
Engineering Lab Facility Install Double-Door Between ELF134C and ELF140
|
5112062
|
06/08/2017
|
06/21/2017
|
|
Plans
|
8869
|
Engineering Lab Facility Install Double-Door Between ELF134C and ELF140
|
5112062
|
06/07/2017
|
06/21/2017
|
06/13/2017
|
Plans
|
8868
|
Engineering Gateway Atomizer Lab for EVCP
|
5110008
|
06/07/2017
|
06/19/2017
|
06/13/2017
|
Plans
|
8867
|
Social Sciences Stairs & Campus Bridges
|
5110191
|
06/06/2017
|
06/08/2017
|
06/12/2017
|
Plans
|
8866
|
Off-site facility security enhancement
|
5110277
|
06/05/2017
|
06/19/2017
|
06/12/2017
|
Plan check
|
8865
|
ET 1ST Floor expantion/Breezeway enclosure
|
5109840
|
06/05/2017
|
06/19/2017
|
06/22/2017
|
Plan check
|
8864
|
MRI facility at SBSG G-201
|
5510217
|
06/05/2017
|
06/05/2017
|
06/05/2017
|
Plans
|
8863
|
Classroom & Office Building
|
990016
|
06/02/2017
|
06/02/2017
|
06/12/2017
|
CP -5 Specification
|
8862
|
Small Cap 2017-Krieger Hall Office 300/330 Renovation
|
5110354
|
06/02/2017
|
06/02/2017
|
06/02/2017
|
Plans, EH&S Redlines
|
8861
|
Classrooms & Office Building
|
990016
|
06/02/2017
|
06/02/2017
|
06/02/2017
|
SI-6 Drawings
|
8859
|
Small Cap 2017 Bren Hall 2ND Floor ISG Group Renovation
|
5110367
|
06/02/2017
|
06/02/2017
|
06/07/2017
|
Plans
|
8858
|
UCI-Student Housing-Phase 4A-Building A
|
150358
|
06/02/2017
|
06/16/2017
|
06/09/2017
|
Plans
|
8857
|
Primary Electrical Improvement Step-4
|
990513
|
06/01/2017
|
06/15/2017
|
06/12/2017
|
Submittal 28 3100.02 (Fire alarm Drawings)
|
8856
|
UCI-Student Housing-Phase 4A-Parking Structure
|
150358
|
06/01/2017
|
06/15/2017
|
06/09/2017
|
Plans
|
8855
|
SST 4th Floor Renovation
|
5110352
|
05/31/2017
|
06/14/2017
|
06/02/2017
|
Plans
|
8854
|
Engineering Lab Facility 134 Renovation
|
5112061
|
05/31/2017
|
06/13/2017
|
|
Plans
|
8853
|
Classroom & Office Building
|
990016
|
05/30/2017
|
05/30/2017
|
06/07/2017
|
Submittal 27 17 00-5186-0- Shop Drawings for 800 MHZ Communications
|
8852
|
Engineering Lab Facility 134 Renovation
|
5112061
|
05/30/2017
|
06/13/2017
|
05/31/2017
|
Plans
|
8851
|
Classroom & Office Building
|
990016
|
05/26/2017
|
06/09/2017
|
06/08/2017
|
Submittal 28 31 11-5159-1- Fire Alarm Shop Drawings
|
8850
|
Campus Village Housing Office-Install Emergency Walkway Lights
|
5110113
|
05/25/2017
|
06/01/2017
|
|
Plans
|
8849
|
Classroom & Office Building
|
990016
|
05/22/2017
|
05/22/2017
|
05/25/2017
|
RFI_2155-Fire Sprinkler Above Drive Aisle
|
8848
|
CRII-2015 Step Lights-Pereira Phase 2
|
5110206
|
05/22/2017
|
06/05/2017
|
05/24/2017
|
Specifications
|
8847
|
Engineering Hall 3131 Renovation-Tissue Culture Room
|
5112051
|
05/19/2017
|
06/01/2017
|
05/22/2017
|
Plans
|
8846
|
Classroom & Office Building
|
990016
|
05/18/2017
|
05/18/2017
|
05/25/2017
|
Submittal 27 17 00 -5172-0 - Product Data for 800 MHZ Communications
|
8845
|
Classroom & Office Building
|
990016
|
05/18/2017
|
|
|
|
8844
|
CRII-2 2015 Replace Electrical TrancformerT-110
|
5110329/9932690
|
05/18/2017
|
06/01/2017
|
05/22/2017
|
Plans
|
8843
|
E. Campus Phase IV PS
|
20150358
|
05/18/2017
|
06/01/2017
|
|
Drawings 100% DD
|
8842
|
IH, SoM Dean's Ste Renovation
|
5110318
|
05/18/2017
|
06/01/2017
|
05/22/2017
|
Plans
|
8841
|
Lot-5 Resource Center Renovation
|
5110257
|
05/18/2017
|
06/01/2017
|
05/22/2017
|
Plans
|
8840
|
HVAC Renovation
|
5110045/230701
|
05/18/2017
|
06/01/2017
|
05/24/2017
|
Plans
|
8839
|
Childrens Center Structural Repair
|
5110350
|
05/17/2017
|
05/31/2017
|
05/18/2017
|
Plans
|
8838
|
Café Med Resource Center Renovation
|
5110344
|
05/17/2017
|
05/31/2017
|
05/22/2017
|
Plans
|
8837
|
Apartment Renovation
|
5112071
|
05/16/2017
|
05/17/2017
|
05/17/2017
|
Specification
|
8836
|
CY 2017 Engineering Gateway 2105 and 3108 Renovation
|
5110371
|
05/16/2017
|
05/16/2017
|
|
Plans
|
8835
|
Calssroom & Office Building
|
990016
|
05/15/2017
|
05/15/2017
|
05/17/2017
|
Submittal 28 31 11-5159-0 - Fire Alarm Shop Drawings
|
8834
|
Local Exhaust Ventilation CRII-2015
|
5110060
|
05/15/2017
|
05/16/2017
|
05/22/2017
|
Plans
|
8833
|
Classroom and Office Building
|
990016
|
05/15/2017
|
05/15/2017
|
05/17/2017
|
Submittal: Submittal 09 2900 - 5148 Product Data for Patching Humanities Basement Wall
|
8832
|
Primary Electrical Improvement Step-4
|
990513
|
05/15/2017
|
05/15/2017
|
05/23/2017
|
ANOC 22- East Substation Crane Plan
|
8831
|
Hewitt Hall Insectary HVAC Controls Renovation
|
5110356
|
05/15/2017
|
05/15/2017
|
05/15/2017
|
Plans
|
8830
|
Lot 1C Trees and Stumps Removal
|
5112025
|
05/15/2017
|
05/15/2017
|
05/15/2017
|
Plans
|
8829
|
Classroom & Office Building
|
990016
|
05/11/2017
|
05/11/2017
|
05/11/2017
|
CP-5 Architectural/MEP/AV/ Plans
|
8828
|
Small Cap 14/15 McGauhg Hall Lab 4311 Renovation
|
5109824/9746440
|
05/11/2017
|
05/25/2017
|
05/18/2017
|
Plans
|
8827
|
ET 1ST Floor Expention/Breezeway enclosure
|
5109840
|
05/10/2017
|
05/24/2017
|
05/22/2017
|
Plans
|
8826
|
Social Sciences Stairs & Campus Bridges
|
5110191
|
05/10/2017
|
05/12/2017
|
05/22/2017
|
Plans, Specifications
|
8824
|
Children's Center Strutural Repair
|
5110350
|
05/09/2017
|
05/23/2017
|
05/10/2017
|
Plans
|
8823
|
Sm Cap 2017-Crawford Field Irrigation
|
5110370
|
05/09/2017
|
05/12/2017
|
05/10/2017
|
Plans
|
8822
|
Security Panel Upgrade
|
5110157
|
05/08/2017
|
05/08/2017
|
05/10/2017
|
Plans
|
8821
|
CY 2017 Engineering
|
5110371
|
05/08/2017
|
05/09/2017
|
05/09/2017
|
Plans
|
8820
|
Local Exhaust Ventilation CRII-2015
|
5110060
|
05/05/2017
|
05/09/2017
|
05/10/2017
|
Plans
|
8819
|
Middle Earth Asphalt Repairs
|
5110240
|
05/05/2017
|
05/05/2017
|
05/09/2017
|
Specifications
|
8818
|
Middle Earth Housing Complex
|
5112031
|
05/03/2017
|
05/05/2017
|
05/05/2017
|
Plans
|
8817
|
Engineering Tower Plaza Bollards
|
5112044
|
05/04/2017
|
05/05/2017
|
05/05/2017
|
Plans
|
8816
|
Classroom & Office Building
|
990016
|
05/03/2017
|
05/03/2017
|
05/04/2017
|
RFI
|
8815
|
Hewitt Hall Insectary HVAC Controls Renovation
|
5110356
|
05/03/2017
|
05/10/2017
|
05/05/2017
|
Plans
|
8814
|
Sm Cap 2017-Crawford Field Irrigation
|
5110370
|
05/03/2017
|
05/08/2017
|
05/05/2017
|
Plans
|
8813
|
Local Exhaust Ventilation CRII-2015
|
5110060
|
05/03/2017
|
05/05/2017
|
05/09/2017
|
Plans
|
8812
|
CRII 2013 Robert Cohen Theatre & Dance Studio A/C Replacement
|
5109594
|
05/03/2017
|
05/15/2017
|
05/05/2017
|
Plans
|
8811
|
Research Building
|
5110351
|
05/02/2017
|
05/16/2017
|
05/05/2017
|
Plans
|
8810
|
Classroom & Office Building
|
990016
|
05/02/2017
|
05/02/2017
|
05/04/2017
|
RFI_2104-Updated Fire Suppperession Water Line
|
8809
|
Engineering Hall 3121 Renovation-Install Fume Hood
|
5112052
|
05/01/2017
|
05/15/2017
|
05/05/2017
|
Plans
|
8808
|
Security Panel Upgrade
|
5110157
|
05/01/2017
|
05/03/2017
|
05/10/2017
|
Plans
|
8807
|
Sm Cap 2017-CalIT2 TEMPR Properties Facility renovation
|
5110353
|
05/01/2017
|
05/05/2017
|
05/05/2017
|
Plans
|
8806
|
Roof Repair
|
5110366
|
05/01/2017
|
05/15/2017
|
05/05/2017
|
Specifications
|
8804
|
Mesa Court Concrete Repairs
|
5112055
|
05/01/2017
|
05/05/2017
|
05/03/2017
|
Specifications
|
8803
|
Eyewash shower scope
|
5110061
|
05/01/2017
|
05/01/2017
|
05/04/2017
|
Plans
|
8802
|
Small Cap 2017-Krieger Hall Office 300/330 Renovation
|
5110354
|
04/28/2017
|
05/12/2017
|
05/03/2017
|
Plans
|
8801
|
Small Cap 2017-Social Science Tower 220 AB Smart Classroom Renovation
|
5110355
|
04/28/2017
|
05/12/2017
|
05/02/2017
|
Plans
|
8800
|
RFI_2060R1-Knox Box Installation Detail
|
990016
|
04/26/2017
|
04/26/2017
|
05/01/2017
|
RFI_2060R1-Knox Box Installation Detail
|
8799
|
CRII-22015: Improve Laboratory Emergency Circuits
|
5110005/9929490
|
04/26/2017
|
05/10/2017
|
05/02/2017
|
Plans
|
8798
|
Bio Sci Plaza Improvements
|
990021
|
04/20/2017
|
04/20/2017
|
|
Other: Certificate of Substantial Completion
|
8797
|
Classroom & Offoce Building
|
990016
|
04/26/2017
|
04/25/2017
|
04/25/2017
|
RFI_2014-Updated Fire Suppersion Water Line
|
8795
|
Primary Electrical Improvement Step-4
|
990513
|
04/20/2017
|
04/20/2017
|
05/01/2017
|
Submittal 08 7111.01-Doors Hardware
|
8794
|
Classroom & Office Building
|
990016
|
04/19/2017
|
05/03/2017
|
04/19/2017
|
Submittal: CP-2 Specifications
|
8793
|
SS-2, 2nd floor renovation
|
5110388
|
04/19/2017
|
05/03/2017
|
04/21/2017
|
Plans
|
8792
|
SEP 2014 Reines MBCx-Chemistry AHU-1
|
5109588
|
04/19/2017
|
04/20/2017
|
|
Plans
|
8791
|
Los Trancos/East Peltason Signal
|
5112030
|
04/19/2017
|
05/03/2017
|
|
Plans
|
8790
|
SEP 2014 Reines MBCx
|
5109588
|
04/19/2017
|
04/20/2017
|
|
Plans
|
8789
|
Primary Electrical Improvement Step - 4
|
990513
|
04/18/2017
|
05/02/2017
|
04/26/2017
|
Other: ANOC 20 Main Substation Crane Plan - 4-27-17
|
8788
|
Arroyo Vista Kitchen Renovation
|
5112023
|
04/18/2017
|
04/21/2017
|
04/21/2017
|
Plans
|
8787
|
CRII-2 2015 Replace Electrical Transformer T-110
|
5110329
|
04/18/2017
|
05/01/2017
|
|
Plans/ Specifications
|
8786
|
Campus Village Housing Office-Install Emergency Walkway Lights
|
5110113
|
04/18/2017
|
04/26/2017
|
|
Plans
|
8785
|
Middle Earth Shower Renovations
|
5112031
|
04/18/2017
|
04/24/2017
|
04/20/2017
|
Plans
|
8784
|
CY 2017 Engineering Gateway
|
5110371
|
04/18/2017
|
04/19/2017
|
04/18/2017
|
Plans (3 Sets)
|
8783
|
Small Cap 14/15 McGaugh Hall Lab 4311 Renovation
|
5109824/9746440
|
04/17/2017
|
04/26/2017
|
|
Plans
|
8782
|
Arroyo Vista Kitchen Renovation
|
5112023
|
04/17/2017
|
04/21/2017
|
04/17/2017
|
Plans
|
8780
|
Primary Electrical Improvement Step-4
|
990513
|
04/14/2017
|
04/28/2017
|
04/18/2017
|
Submittal: 28 3100.01 - Fire Detection and Alarm Device
|
8779
|
ARC Document Solutions
|
6097800/150358
|
04/12/2017
|
04/26/2017
|
|
Attn: Dale Saunders with questions
|
8778
|
Classroom & Office Building
|
990016
|
04/11/2017
|
04/25/2017
|
05/04/2017
|
CP-5 Architectural/MEP/AV Plans
|
8777
|
Lot 36 Electric Bus Yard
|
5110267
|
04/11/2017
|
04/25/2017
|
04/11/2017
|
Relocate fire hydrant and FDC. Final Review, Approval Stamp, Approval for Contracts
|
8776
|
Palo Verde Accessible Pathway
|
5110347
|
04/11/2017
|
04/25/2017
|
04/11/2017
|
Construct ADA compliant walkway from PV Housing to California St. Relocate hydrant to back of planter. Final Review, Approval Stamp, Approval for Contracts
|
8775
|
Verano Place Pathway, Fire Lane & Slurry Repairs
|
5110402
|
04/11/2017
|
04/25/2017
|
04/17/2017
|
Specifications, Final Review, Approval for Contracts
|
8774
|
Rowland hall Room 533, 537, 539
|
5110409
|
04/07/2017
|
04/21/2017
|
04/13/2017
|
Tenant Improvement. Plans, Final Review, Approval for Contracts
|
8773
|
Pathway to Palo Verde Housing
|
5110076
|
04/07/2017
|
04/21/2017
|
04/10/2017
|
Construct concrete staircase and walkway from bike path intersecting Verano & Palo Verde. Plands, Final Review, Approval for Contracts
|
8772
|
Student Health II-Repair Broken Stone Panel
|
5112009
|
04/07/2017
|
04/21/2017
|
04/10/2017
|
Repair single Architectural Stone Panel with Injection of Cementitious Expoxy into the Surface crack for Adhesion to existing substrate. Specifications, 100% Review, Approval for Contracts
|
8771
|
MRI unit installation at SBSG G-201
|
5110217
|
04/06/2017
|
04/20/2017
|
04/07/2017
|
Plan Check.
|
8770
|
Parking Lot & Road Re-Surfacing
|
5110400
|
04/06/2017
|
04/20/2017
|
04/07/2017
|
Remove & Replace Asphalt at Lots 31, 32, & 34. Specifications, Final Review, Approval for Contracts
|
8769
|
CRII 2015 McGaugh Hall Door Hold-open Hardware
|
5110064
|
04/06/2017
|
04/20/2017
|
|
Pilot installation of two automatic door openers in McGaugh Hall Rooms 3113 and 3119. Specifications, 100% Review.
|
8768
|
Engineering Gateway Atomizer Lab for EVCP
|
5110008
|
04/06/2017
|
04/20/2017
|
04/07/2017
|
Install Electrica for Atomizer Power Supply. Plans, Specifications, Final Review, Comments & Corrctions, Approval Stamp, Approval for Contracts, Other: Arc Flas Study with Labels
|
8767
|
Primary Electrical Improvement Step-4
|
990513
|
04/05/2017
|
04/19/2017
|
04/06/2017
|
Other: Revised G002, G003, A103, E303, E304, E305, for Approval
|
8766
|
Palo Verde Accessible Pathway
|
5110347
|
04/05/2017
|
04/19/2017
|
04/06/2017
|
Construct ADA compliant walkway from PV Housing to California St. Relocate hydrant to back of planter.
|
8765
|
Engineering Tower 444 Renovation
|
5110053
|
04/05/2017
|
04/19/2017
|
04/07/2017
|
Fire Modification. Plans, Specifications, Final Review, Approval Stamp
|
8764
|
Pathway to Palo Verde Housing
|
5110076
|
04/05/2017
|
04/19/2017
|
04/06/2017
|
Construct concrete staircase and walkway from bike path intersecting Verano & Palo Verde. Plans, 100% Review, Approval Stamp
|
8763
|
Café Med Resource Center Renovation
|
5110344
|
04/04/2017
|
04/18/2017
|
04/06/2017
|
Plan Check. Plans, 100% Review
|
8762
|
Replace Boilers
|
5109724
|
04/04/2017
|
04/18/2017
|
04/06/2017
|
Replace boiler 3 and 4 with HTW generators. Plans, Final Review, Comments & Corrections, Approval Stamp, Approval for Contracts
|
8761
|
HVAC Renovation
|
5110045
|
04/04/2017
|
04/18/2017
|
04/06/2017
|
Retrofit AHU and controls. Plans, 100% Review, Comments & Corrections
|
8760
|
CRII-2 2015 Replace Electrical Transformer T-110
|
5110329/9932690
|
04/04/2017
|
04/18/2017
|
04/06/2017
|
Replace Transformer T-110. Plans, Specifications, Preliminary Review, Comments & Corrections
|
8752
|
Primary Electrical Improvement Step-4
|
990513
|
04/03/2017
|
04/17/2017
|
04/03/2017
|
Other: Switchgear Dwgs Pkg (except Marked-ups) sign-off.
|
8751
|
SEP 2014 Reines Hall MBCx
|
5109588
|
04/03/2017
|
04/17/2017
|
04/03/2017
|
Add FCUnits in two rooms. Plans, Approval Stamp
|
8750
|
SS-2, 2nd Floor Renovation
|
5110388
|
04/03/2017
|
04/17/2017
|
04/05/2017
|
Plan check. Final Review, Approval for Contracts
|
8749
|
Primary Electrical Improvement Step-4
|
990513
|
03/30/2017
|
04/13/2017
|
04/03/2017
|
Other: Advance Notice - South Substation Crane Plan
|
8748
|
ELF Structural Fix
|
51109820
|
03/28/2017
|
04/11/2017
|
04/05/2017
|
Crack repair around parapet wall of building and the vertical surface above the window/door glazing. Design steel structural system at window panels above double-doors. Located at north-east protion of the east wall. 1st Floor-North Elevation-Remove and reset (8) windows from a steel storefront and reset at a later date. Framing to be repaired as needed. Plans, 80% Review.
|
8747
|
Rowland Hall Tenant Improvement
|
5110409
|
03/28/2017
|
04/11/2017
|
03/29/2017
|
Tenant improvement of 5th level lab space in Rowland Hall, Room 537 & 539. Work entails renovation of existing lab space including mechanical systems, electrical, plumbing, wall, doors, flooring, finishes and fire Life Safety. Plans, 100% Review, Approval Stamp
|
8746
|
Classroom & Building Office
|
990016
|
03/27/2017
|
04/10/2017
|
04/07/2017
|
Submittal: Site Fire Acces Plan
|
8745
|
Classroom & Building Office
|
990016
|
03/27/2017
|
04/10/2017
|
03/27/2017
|
Submittal 01 32 00 - 5097 - 0 - Supplemental Instruction No. 01
|
8744
|
Classroom & Office Building
|
990016
|
03/27/2017
|
04/10/2017
|
03/27/2017
|
Submittal 01 32 00 - 5098 - 0 - Supplemental Instruction No. 02
|
8743
|
CRII 2013 - Engineering Gateway Victaullic Fittinh CWS
|
5110231
|
03/24/2017
|
04/07/2017
|
03/27/2017
|
Reroute CWS to exterior to the building.Plans, Specifications, Final Review
|
8742
|
Classroom & Office Building
|
990016
|
03/23/2017
|
04/06/2017
|
03/23/2017
|
SI-3 for CP-3
|
8741
|
Primary Electrical Improvement Step-4
|
990513
|
03/23/2017
|
04/06/2017
|
03/28/2017
|
Submittal 27 0500.01 Fire Stopping Products.
|
8740
|
Security Panel Upgrade
|
5110157
|
03/23/2017
|
04/06/2017
|
03/24/2017
|
Upgrade alarm panels and infrastructure. Approval stamp.
|
8739
|
Continuing Education University Extension Building D Paint
|
5112011
|
03/22/2017
|
04/05/2017
|
03/27/2017
|
Interior Painting of Walls, Ceiling Doors & Frames - Patch & Texture Included - for Buildings CE-3; CE-4; B; CE-5; CE-6. Specifications, Approval for Contracts
|
8738
|
ELF 116A Cooling
|
5110320
|
03/22/2017
|
04/05/2017
|
03/23/2017
|
Install split system for 116A. Specifications, 100% Review, Final Review, Approval for Contracts.
|
8737
|
Classroom & Office Building
|
990016
|
03/21/2017
|
04/04/2017
|
03/27/2017
|
Submittal 27 05 00 - 5078 - 0 - Product Data for Common Work Results For Communications. RFI 2027 R1 Service Level non-highway Electric Vehicles
|
8736
|
Classroom & Office Building
|
990016
|
03/21/2017
|
04/04/2017
|
03/23/2017
|
Submittal 27 05 00 - 5078 - 0 - Product Data for Common Work Results For Communications. RFI 2026 R1 Service Level Parking Garage
|
8735
|
Classroom & Office Building
|
990016
|
03/17/2017
|
03/31/2017
|
03/20/2017
|
RFI_2081 - Elevator Shaft Smoke Detector
|
8734
|
CalIT2 add humid to supply air
|
5110218
|
03/16/2017
|
03/30/2017
|
03/22/2017
|
Provide the addition of two new AHU humidifiers in AH-1 & AH-2, ductwork and associated reverse osmosis water treatment at rooftop. Plans, Approval Stamp
|
8733
|
Classroom & Office Building
|
990016
|
03/16/2017
|
03/30/2017
|
03/20/2017
|
Submittal 27 05 00 - 5078 - 0 - Product Data for Common Work Results For Communications
|
8732
|
Rowland Hall Construct Exhaust Ductwork Upgrade
|
5110345
|
03/15/2017
|
03/29/2017
|
03/20/2017
|
Replacing air valves for two fume hoods. Specifications, Final Review, Approval for Contracts
|
8731
|
Primary Electrical Improvement Step-4
|
990513
|
03/14/2017
|
03/28/2017
|
03/22/2017
|
Other: Step-4_DB Specifications (Div 02-33)
|
8730
|
Primary Electrical Improvement Step-4
|
990513
|
03/14/2017
|
03/28/2017
|
03/16/2017
|
RFI 077_South Substation Temporary Fencing Plan-G-003
|
8729
|
Classroom & Office Building
|
990016
|
03/13/2017
|
03/27/2017
|
03/13/2017
|
Submittal 21 10 00 - 5049 - 1 - Revised Product Data for Fire Protection For Sprinkler Systems. Submittal 01 3200 Humanities Hall Southeast Stair Fence Plan
|
8728
|
Classroom & Office Building
|
990016
|
03/09/2017
|
03/23/2017
|
03/16/2017
|
Submittal 33 11 10 - 5083 - 0 - Supplemental Product Data for Site Water Distribution Piping
|
8727
|
Small Cap 15/16 Engineering Gateway Lab Renovations
|
5110110
|
03/09/2017
|
03/23/2017
|
03/10/2017
|
Renovate lab space for new wind tunnel and fuel cell labs. Plans, Final Review, Approval Stamp, Approval for Contracts
|
8726
|
SEP 2014 Reines Hall MBCx
|
5109588
|
03/09/2017
|
03/23/2017
|
03/09/2017
|
AHU-1 & AHU-2 remove and replace HHW and CHW coils per MBCx. Plans, Approval Stamp
|
8725
|
CalIT2
|
5110218
|
03/09/2017
|
03/23/2017
|
03/10/2017
|
Provide the addition of two new AHU humidifiers in AH-1 & AH-2, ductwork and associated reverse osmosis treatment at rooftop. Plans, Approval Stamp
|
8724
|
IH, SoM Dean's Ste Renovation
|
5110318
|
03/09/2017
|
03/23/2017
|
03/10/2017
|
Plan Check. Plans, 100% Review.
|
8723
|
SC 15-16 Tamkin Hall E-Lighting & Nelson Auditorium Upgrade
|
5110101
|
03/08/2017
|
03/22/2017
|
03/09/2017
|
Addition of electrical outlets & recommisioning of lighting systems and finish upgrades in Nelson library. Addendum, Final Review, Other: Submittal Review
|
8722
|
CRII-2 2015: Improve Laboratory Emergency Circuits
|
5110005/9929490
|
03/07/2017
|
03/21/2017
|
03/20/2017
|
Evaluate and design new emergency circuits for Engineering Tower (ET) t meet the needs of the building occupants up to the capacity of the existing emergency generator. Plans, Specifications, 100% Review.
|
8721
|
CRII-2015 Step Lights - Pereira Phase 1
|
5110206
|
03/07/2017
|
03/21/2017
|
03/08/2017
|
Electrical work to replace step lights at various locations across campus with LED solutions. Specifications
|
8720
|
Replace Boilers
|
5109724
|
03/06/2017
|
03/20/2017
|
03/21/2017
|
Replace boiler 3 and 4 with HTw generators. Plans, 100% Review, Final Review, Comments & Corrections, Approval Stamp, Approval for Contracts
|
8719
|
IH, SoM Dean's Ste Renovation
|
5110318
|
03/07/2017
|
03/21/2017
|
03/08/2017
|
Plan Check. Plans, 100% Review
|
8718
|
Engineering Tower 444 Renovation
|
5110053
|
03/07/2017
|
03/21/2017
|
03/07/2017
|
See the attached Project Management Review Log. Plans, 100% Review, Final Review, Comments & Corrections, Approval Stamp
|
8717
|
INRF EF Replacement Design
|
5109358
|
03/06/2017
|
03/20/2017
|
03/10/2017
|
Balance the exhaust air-Relocated benches and repair paneling. Plans, 100% Review, Comments & Corrections
|
8716
|
Mesa Court Expansion
|
996296
|
03/06/2017
|
03/20/2017
|
03/06/2017
|
Fire Alarm Drawings Showing Candelas
|
8715
|
MRI unit installation at SBSG G-201
|
5110217
|
03/03/2017
|
03/17/2017
|
03/08/2017
|
Plan Check
|
8714
|
SS-2, 2nd floor renovation
|
5110388
|
03/03/2017
|
03/17/2017
|
03/07/2017
|
Plan check.
|
8713
|
SEP 2014 Reines Hall MBCx
|
5109588
|
03/03/2017
|
03/17/2017
|
03/09/2017
|
AHU-1 & AHU-2 remove and replace HHW and CHW coils per MBCx. Plans, Approval stamp
|
8712
|
ANSI Z9.5 Fume Hood Phase 2
|
5110295
|
03/02/2017
|
03/16/2017
|
03/09/2017
|
Attached. Plans, Final Review, Approval for Contracts
|
8711
|
Classroom & Office Building
|
990016
|
03/02/2017
|
03/16/2017
|
03/13/2017
|
Submittal 21 10 00 - 5049 - 1 - Revised Product Data for Fire Protection For Sprinkler Systems
|
8710
|
Classroom & Office Building
|
990016
|
03/02/2017
|
03/16/2017
|
03/15/2017
|
RFI_2059-Elevator Two Way Communication
|
8709
|
Classroom & Office Building
|
990016
|
03/02/2017
|
03/16/2017
|
03/13/2017
|
RFI_2061-Elevator Recall
|
8708
|
Primary Electrical Improvement Step-4
|
990513
|
02/28/2017
|
03/14/2017
|
03/13/2017
|
DP 2.4 Revised Switchgear Dwgs for approval.
|
8707
|
Classroom & Office Building
|
990016
|
02/28/2017
|
03/14/2017
|
03/08/2017
|
RFI_2060-Knox Box Installation Detail.
|
8706
|
MRI Replacement
|
5110138
|
02/27/2017
|
03/13/2017
|
03/08/2017
|
Prepare site to receive new MRI. Plans, Final Review, Approval for Contracts
|
8705
|
SEP 2014 Reines MBCx
|
5109588
|
02/27/2017
|
03/13/2017
|
03/07/2017
|
Provide and install new DDC controls on the Leibert Crac unit in Reines Hall 3171. Install exhaust system static pressure sensors to enable static pressure reset. Specifications, 100% Review
|
8704
|
Classroom and Office Building
|
990016
|
02/24/2017
|
03/03/2017
|
03/08/2017
|
Submittal 28 31 11 - 5043 - 0 - Alvine Response - Spots and Dots Shop Drawings
|
8703
|
Replace Roof
|
5109877
|
02/24/2017
|
03/10/2017
|
02/28/2017
|
Repair Roof Leaks. Final Review; Approval for Contracts
|
8702
|
Stucco Repairs
|
5110153
|
02/24/2017
|
03/02/2017
|
03/07/2017
|
Remove / replace damaged joint material around existing panels and seal all sides of existing bay doors. Panel access will be via swing gate. Final Review, Approval for Contracts
|
8701
|
SEP 2014 Reins MBCx
|
5109588
|
02/22/2017
|
03/08/2017
|
02/27/2017
|
Plans, Specifications
|
8700
|
Engineering Tower Suite 416 Renovation
|
5110059
|
02/22/2017
|
03/08/2017
|
02/27/2017
|
Specifications
|
8699
|
CRII-2 2015 Fall Hazard Protection
|
5110132
|
02/22/2017
|
03/01/2017
|
02/28/2017
|
Installs horizontal lifeline systems atop the domed roofs at Social Sciences Plaza A & B. Items #14 & 15 on attached Prioritied List. Plans, Specifications, Final Review, Approval for Contracts
|
8698
|
Classroom & Office Building
|
990016
|
02/21/2017
|
03/07/2017
|
03/08/2017
|
Submittal 01 32 00 - 5008 - 1 - Revised G Drawings (backcheck)
|
8697
|
2nd Graphic on TES Tank
|
5110309
|
02/21/2017
|
03/07/2017
|
02/27/2017
|
Plans
|
8696
|
Mesa Court Expansion
|
996296
|
02/21/2017
|
03/07/2017
|
02/21/2017
|
Fire Alarm As-Built dwgs (2-Full Size), & 1-CD
|
8695
|
IH, SoM Dean's Ste Renovation
|
5110318
|
02/21/2017
|
03/07/2017
|
|
Plans
|
8694
|
FM Sign Shop
|
9929290-9100
|
02/21/2017
|
03/07/2017
|
02/24/2017
|
Plans
|
8693
|
Construct ACC Pathway
|
5110301
|
02/21/2017
|
02/16/2017
|
02/22/2017
|
Plans, Specifications
|
8692
|
Local Exhaust Ventilation CRII-2015
|
5110060
|
02/21/2017
|
03/07/2017
|
03/07/2017
|
Plans
|
8691
|
Classroom and Office Building
|
990016
|
02/17/2017
|
03/03/2017
|
02/17/2017
|
CP-2 Drawings (FRO)
|
8690
|
SEP 2014 Reines MBCx
|
5109588
|
02/16/2017
|
03/02/2017
|
02/16/2017
|
Plans, Specifications
|
8689
|
CallT2 add humidifier to suply air
|
5110218
|
02/15/2017
|
03/01/2017
|
02/16/2017
|
Plans
|
8688
|
Small Cap 15/16 Engineering Gateway Lab Renovations
|
5110110
|
02/15/2017
|
02/24/2017
|
02/16/2017
|
Plans, Specifications
|
8687
|
CRII-2 2015: Improve Laboratory Emergency Circuits
|
5110005/9929490
|
02/14/2017
|
02/28/2017
|
02/16/2017
|
Plans, Specifications
|
8686
|
Replace Outside Air Damper
|
5112006
|
02/14/2017
|
02/28/2017
|
02/15/2017
|
Specifications
|
8685
|
Engineering Lecture Facility
|
5109331
|
02/13/2017
|
02/28/2017
|
02/14/2017
|
Plans
|
8684
|
Electric Bus Yard
|
5110267
|
02/13/2017
|
02/28/2017
|
02/14/2017
|
Plans
|
8683
|
MRI REPLACEMENT
|
5110138
|
02/10/2017
|
02/24/2017
|
02/27/2017
|
Plans
|
8682
|
CRII - 2015 Step Lights - Bridges
|
5110206
|
02/10/2017
|
02/24/2017
|
02/16/2017
|
Specifications
|
8681
|
CRII - 2013 - Engineering Gateway Victaullic Fitttings CWS
|
5110231
|
02/10/2017
|
02/24/2017
|
02/16/2017
|
Plans and Specifications
|
8680
|
ELF 121A Roof Investigation and Repair
|
5110395
|
02/09/2017
|
02/09/2017
|
02/09/2017
|
Specifications
|
8679
|
SEP MBCX DDC Upgrade
|
5109331
|
02/08/2017
|
02/15/2017
|
02/14/2017
|
Plans
|
8678
|
CR II - 2015 - Replace Fire Alarm; Public Services, UNEX C, Bison Admin Trailer
|
5110006
|
02/07/2017
|
02/09/2017
|
02/14/2017
|
Other: Shop Drawings and Submittal
|
8677
|
Classroom &Office Building
|
990016
|
02/07/2017
|
02/15/2017
|
02/15/2017
|
Submittal 21 10 00 - 5049 - 0 - Product Data for Fire Protection for Sprinkler Systems
|
8676
|
Bio Sci Plaza Improvements
|
990021
|
02/07/2017
|
02/15/2017
|
02/14/2017
|
Submittal 051R1 - Fire Extinguisher and Cabinet
|
8675
|
Classroom & Office Building
|
990016
|
02/07/2017
|
02/15/2017
|
02/14/2017
|
Submittal 01 32 00 - 5032 - 0 - Relocate Humanities South Stair
|
8674
|
Classroom & Office Building
|
990016
|
02/08/2017
|
02/15/2017
|
02/14/2017
|
Submittal: Submittal 01 32 00 - 5033 - 0 - Work Plan For New Humanities Ramp
|
8673
|
Fire Life Safety Improvements
|
998611
|
02/07/2017
|
02/21/2017
|
02/09/2017
|
Specs (Systems Criteria)
|
8672
|
Fire Life Safety Improvements
|
998611
|
02/07/2017
|
02/09/2017
|
02/09/2017
|
Sprinkler Densities (Resubmittal)
|
8671
|
CRII-2 2015 Repair Roadway at Grounds Department
|
5110304
|
02/03/2017
|
02/17/2017
|
02/08/2017
|
Plans & Specifications
|
8670
|
Bio Sci Plaza Improvements
|
990021
|
02/03/2017
|
02/03/2017
|
02/03/2017
|
Life Safety Systems Sticker for Knox Box
|
8669
|
Bio Sci Starbucks Kiosk
|
null
|
02/02/2017
|
|
|
Plans
|
8668
|
Electric Bus Yard
|
5110267
|
02/02/2017
|
02/09/2017
|
02/06/2017
|
Plans
|
8667
|
HIHP School of Social Ecology 1 - 1 Lab 126 Renovation
|
5110156
|
02/01/2017
|
02/03/2017
|
02/01/2017
|
Other: Crane Plan review
|
8666
|
Engineering Tower Suite 416 Renovation
|
5110059
|
01/31/2017
|
02/14/2017
|
02/08/2017
|
Specifications-FA Spec
|
8665
|
Women's Locker Room
|
5110374
|
01/30/2016
|
02/13/2016
|
02/01/2017
|
Plans & Specifications
|
8664
|
Small Cap School of Engineering-Engineering Gateway Lab Renovation 3327 A/B_(1101/1102)
|
5110098
|
01/27/2017
|
02/10/2017
|
01/30/2017
|
See the attached Project Management Review Log. Plans, 100% Review, Approval for Contracts
|
8663
|
CR II-2015-Replace Fire Alarms; Multiple Buildings
|
5109528
|
01/27/2017
|
02/10/2017
|
01/31/2017
|
Install a new fire alarm system in Building 901, and remove the existing system once the installation is approved. Additive alternate to provide new LED lighting in the Arena. Plans, Specifications, 100% Review, Approval for Contracts, Other: Spec 28 3111 Fire alarms
|
8661
|
Bio Sci Starbucks Kiosk
|
16-60
|
01/27/2017
|
02/10/2017
|
01/30/2017
|
T.I. Bio Sci Starbucks Kiosk SET #2
|
8660
|
Classroom & Office Building
|
990016
|
01/27/2017
|
02/10/2017
|
01/27/2017
|
CP-2 Package-Specs & Dwgs for Approval
|
8659
|
Primary Electrical Improvement Step-4
|
990513
|
01/27/2017
|
02/10/2017
|
02/14/2017
|
RFI 063 Connecting New Fire Alarm Devices to Existing FACP
|
8658
|
Engingeering Laboratory Facility-141 Lab Renovation
|
5110117
|
01/27/2017
|
02/10/2017
|
01/27/2017
|
See the attached-Project Management Review Log. Plans, 100% Review, Final Review, Comments & Corrections, Approval Stamp, Approval for Contracts
|
8657
|
INRF EF Replacement Design
|
5109358
|
01/25/2017
|
02/08/2017
|
01/27/2017
|
Balance the exhaust air-Relocated benches and repair paneling. Plans, 100% Review, Comments & Corrections
|
8656
|
Classroom & Office Building
|
990016
|
01/23/2017
|
02/06/2017
|
01/25/2017
|
CP-3 Package-Specs
|
8655
|
Classroom & Office Building
|
990016
|
01/23/2017
|
02/06/2017
|
01/23/2017
|
RFI 2009R1. RFI 2009R1-Classroom Net Floor Area
|
8654
|
CRII-2 2015: Improve Laboratory Emergency Circuits
|
5110005/9929490
|
01/23/2017
|
02/06/2017
|
01/27/2017
|
Evaluate and design new emergency circuits for Engineering Tower (ET) to meet the needs of the building occupants up to the capacity of the existing emergency generator. Plans.
|
8653
|
CR II -2015-Replace Fire Alarms; Public Services, UNEX C, Bison Admin Trailer
|
5110006
|
01/20/2017
|
02/03/2017
|
01/30/2017
|
Install a new fire alarm system in Building 515, and remove the existing system once the installation is approved. Other: Shop Drawings & Submittal
|
8652
|
Electric Bus Yard
|
5110267
|
01/19/2017
|
02/02/2017
|
01/23/2017
|
Install new charging stations for 20 electric buses. Relocate existing hydrant and Fire Dept Connection. Plans, 80% Review, Comments & Corrections
|
8651
|
Small Cap 15/16 Engineering Gateway Lab Renovations
|
5110110
|
01/19/2017
|
02/02/2017
|
01/23/2017
|
Renovate lab space for new wind tunnel and fuel cell labs. Plans, Specifications, Final Review, Comments & Corrections, Approval Stamp, Approval for Contracts
|
8650
|
Classroom & Office Building
|
990016
|
01/19/2017
|
02/02/2017
|
01/23/2017
|
CP-3 Package-Dwgs
|
8649
|
Rowland Hall Tenant Improvement
|
5110409
|
01/18/2017
|
02/01/2017
|
01/26/2017
|
Tenant improvement of 5th level lab space in Rowland Hall, Room 537 & 539. Work entails renovation of existing lab space including mechanical systems, electrical, plumbing, wall, doors, flooring, finishes and fire Life Safety. Plans, Preliminary Review, Comments & Corrections
|
8648
|
Engineering Laboratory Facility -141 Lab Renovation
|
5110117
|
01/18/2017
|
02/01/2017
|
01/23/2017
|
See the attached-Project Management Review Log. Plans, 100% Review, Final Review, Comments & Corrections, Approval Stamp
|
8647
|
Engineering Tower ET_444_Renovation
|
5110053
|
01/18/2017
|
02/01/2017
|
01/23/2017
|
See the attached Project Management Review Log. Plans, 100% Review, Final Review, Comments & Corrections, Approval Stamp
|
8646
|
Small Cap School of Engineering-Engineering Gateway Lab Renovation 3327 A/B_(1101/1102)
|
5110098
|
01/18/2017
|
02/01/2017
|
01/23/2017
|
See the attached Project Management Review Log. Plans, 100% Review, Approval for Contracts
|
8645
|
CR II-2015-Replace Fire Alarms; Multiple Buildings
|
5109528
|
01/17/2017
|
01/31/2017
|
01/30/2017
|
Install a new fire alarm system in Building 901, and remove the existing system once the installation is approved. Additive alternate to provide new LED lighting in the Arena. 80% Review, Comments & Corrections, Other: Submittal
|
8644
|
Lot-5 Resource Center Renovation
|
5110257
|
01/13/2017
|
01/27/2017
|
01/19/2017
|
Plan check on the Site plan. Plans, Final Review, Approval Stamp
|
8643
|
BSL-3
|
997493
|
01/12/2017
|
01/26/2017
|
01/12/2017
|
As-Builts (For Record Only)
|
8642
|
SEP 2015 MBCx-Campus Compressed Air
|
5109897
|
01/11/2017
|
01/25/2017
|
01/17/2017
|
See Attached. Specifications, Final Review, Approval for Contracts
|
8641
|
HIHP School of Social Ecology-1 Lab 126 Renovation
|
5110156
|
01/11/2017
|
01/25/2017
|
01/25/2017
|
Removes/Replaces to exhaust fans from roof servicing renovated lab. Plans, Final Review, Other: Crane Plan review
|
8640
|
Construct ACC Pathway
|
5110301
|
01/11/2017
|
01/25/2017
|
01/17/2017
|
Project constructs new pathway connecting ACC housing parking lot and Campus Drive near the intersection of Campus/Culver. Plans, Specifications, Final review, Approval for contracts
|
8639
|
Bio Sci Starbucks Kiosk
|
16-60
|
01/10/2017
|
01/24/2017
|
01/23/2017
|
T.I. drawings for Bio Sci Starbucks Kiosk
|
8638
|
Classroom & Office Building
|
990016
|
01/05/2017
|
01/19/2017
|
01/19/2017
|
CP-2 Package-Specs & Dwgs for Approval
|
8637
|
Classroom & Office Building
|
990016
|
01/05/2017
|
01/19/2017
|
01/05/2017
|
RFI_2026-Service Level Parking Garage
|
8636
|
Classroom & Office Building
|
990016
|
01/05/2017
|
01/19/2017
|
01/05/2017
|
RFI 2027-Service Level Non Highway Electric Vehicle
|
8635
|
Bio Sci Plaza Improvements
|
990021
|
12/16/2016
|
12/30/2016
|
12/19/2016
|
RFI 033R2 - Fire Penetration
|
8634
|
TEM Facilities
|
990013
|
12/16/2016
|
12/30/2016
|
12/19/2016
|
Submittal 087111.002 DSA Hardware for T1100, T1902A.
|
8633
|
SEP 2014 Reines MBCx
|
5109588
|
12/15/2016
|
12/29/2016
|
12/16/2016
|
Air Compressor-see attached spreadsheet for Consultant direction for scope. 100% Review
|
8632
|
CR II-2015-Replace Fire Alarms; Public Services, UNEX C, Bison Admin Trailer
|
5110006
|
12/14/2016
|
12/28/2016
|
12/19/2016
|
Revised Fire alarm Shop Drawings and Submittal. Approval Stamp, Other: submittal
|
8631
|
SEP 2016-Implement Fume Hood Hibernation Mode
|
5110346
|
12/14/2016
|
12/28/2016
|
12/19/2016
|
Replace Fume Hood Displays to allow for Hibernation Mode. Specifications, Final Review, Approval for Contracts
|
8630
|
Small Cap 2017-HIB 320 and 335B Office Renovation
|
5110361
|
12/13/2016
|
12/27/2016
|
12/13/2016
|
New demising walls with doors, rezoned electrical and mechanical systems, and new finishes throughout. Plans, 100% Review, Other: Specifications
|
8629
|
Small Cap 15/16 Engineering Gateway Lab Renovations
|
5110110
|
12/13/2016
|
12/27/2016
|
12/16/2016
|
Renovate lab space for new wind tunnel and fuel cell labs. Plans, 100% Review, Final Review, Comments & Corrections
|
8628
|
Major Building Renovation
|
5109723
|
12/13/2016
|
12/27/2016
|
12/20/2016
|
100% Delta 1 and Delta 2 Drawing Review. Plans, 100% Review, Comments & Corrections, Approval Stamp
|
8627
|
Construct ACC Pathway
|
5110301
|
12/12/2016
|
12/26/2016
|
12/16/2016
|
Project constructs new pathway connecting ACC housing parking lot and Campus Drive near the intersection of Campus/Culver. Plans, Specifications, Preliminary Review, Approval for Contracts
|
8626
|
MRI Replacement
|
5110138
|
12/12/2016
|
12/26/2016
|
12/15/2016
|
Prepare site to receive new MRI. Plans, 80% Review, Comments and Corrections
|
8625
|
Small Cap 2017-HIB 320 and 335B Office Renovation
|
5110361
|
12/08/2016
|
12/22/2016
|
12/08/2016
|
New demissing walls with doors, rezoned electrical and mechanical systems, and new finishes throughout. Plans, 90% Review, Other: Specifications
|
8624
|
Mesa Court Expansion
|
996296
|
12/08/2016
|
12/22/2016
|
12/08/2016
|
Fire Alarm Drawings Showing Candelas_FRO
|
8623
|
Engineering Laboratory Facility - 141 Lab Renovation
|
5110117
|
12/08/2016
|
12/22/2016
|
12/13/2016
|
See the attached - Project Management Review Log. Plans, 100% Review, Comments & Corrections, Approval Stamp
|
8622
|
Engineering Tower ET_444 Renovation
|
5110053
|
12/08/2016
|
12/22/2016
|
12/13/2016
|
See the attached_Project Management Review Log. Plans, Specifications, 100% Review, Comments & Corrections, Approval Stamp
|
8621
|
ELF Gas Monitoring and Local Exhaust Ventilation
|
5109861
|
12/08/2016
|
12/22/2016
|
12/15/2016
|
Install Lab exhaust system including ductwork filter housing exhaust fan and controls to serve fume hoods in rooms 108 and 135. Plans, 100% Review, Comments & Corrections, Approval Stamp
|
8620
|
Classroom & Office Building
|
990016
|
12/07/2016
|
12/21/2016
|
01/12/2017
|
Design Development Package
|
8619
|
Fire Life Safety Improvement
|
998611
|
12/07/2016
|
12/21/2016
|
12/14/2016
|
Pre-Bid Spec Review_Section 21 1000
|
8618
|
CRII-2 2015 Reliability for Research Equipment
|
5109973
|
12/07/2016
|
12/21/2016
|
12/12/2016
|
Feasibility Study for Individual UPS Systems for Ultra-low Freezers.
|
8617
|
Fire Life Safety Improvements
|
998611
|
12/06/2016
|
12/20/2016
|
12/16/2016
|
Sprinkler Densities
|
8616
|
Mesa Court Expansion
|
996296
|
12/06/2016
|
12/20/2016
|
12/06/2016
|
RFI 2908R1-Cloud Ceiling Extension Screens
|
8615
|
HIHP School of Social Ecology-1 Lab 126 Renovation
|
5110156
|
12/06/2016
|
12/20/2016
|
12/12/2016
|
Project renovates lab for high impact hire. Crane needed to add two new exhaust fans to the mechanical enclosure on the roof. Plans, Final Review, Other: Crane Plan review
|
8614
|
Mesa Court Expansion
|
996296
|
12/05/2016
|
12/19/2016
|
12/14/2016
|
RFI 2922-Revised FA Sequence of Operations.
|
8613
|
CR II-2015-Replace Fire Alarms; Public Services, UNEX C, Bison Admin Trailer
|
5110006
|
12/05/2016
|
12/19/2016
|
12/12/2016
|
Fire alarm Shop Drawings and Submittal-to include duct detectors, additional devices in new meeting rooms and a relocated annunciator panel. Plans, 100% Review, Approval Stamp, Other: Submittal
|
8612
|
Lot-5 Resource Center Renovation
|
5110257
|
12/02/2016
|
12/16/2016
|
12/08/2016
|
Plan check on the Site plan. Plans, 80% Review, Comments & Corrections
|
8611
|
Mesa Court Expansion
|
996296
|
12/02/2016
|
12/16/2016
|
12/06/2016
|
Sprinkler Densities
|
8610
|
Classroom & Office Building
|
990016
|
11/30/2016
|
12/14/2016
|
12/01/2016
|
RFI_2012 R1 - Occupancy For Rated Corridor
|
8609
|
Classroom & Office Building
|
990016
|
11/29/2016
|
12/13/2016
|
11/29/2016
|
Site Fencing Plan
|
8608
|
OIT Core Fiber Upgrade Phase 2
|
5110379
|
11/29/2016
|
12/13/2016
|
12/06/2016
|
Please see attached. Plans, Specifications (in scope), Final Review, Approval for Contracts
|
8607
|
Classroom & Office Building
|
990016
|
11/29/2016
|
12/13/2016
|
11/29/2016
|
Submittal 5001 - 01 32 00 - Parking Lot 7 Fencing, Demo and Grading Plan.
|
8606
|
Bio Sci Plaza Improvements
|
990021
|
11/29/2016
|
12/13/2016
|
12/05/2016
|
RFI 033R1-Fire Pentration Detail
|
8605
|
Anteater Stadium
|
5110228
|
11/28/2016
|
12/12/2016
|
11/28/2016
|
Relocate Hammer Cage. Plans, 100% Review, Approval for Contracts
|
8604
|
Engineering Gateway Atomizer Lab for EVCP
|
5110008
|
11/28/2016
|
12/05/2016
|
12/06/2016
|
Install Electrical for Atomizer Power Supplies; Plans, Preliminary Review, 80% Review, Comments and Corrections
|
8603
|
CR II - 2015 - Replace Fire Alarms; Public Services, UNEX C, Bison Admin Trailer
|
5110006
|
11/28/2016
|
12/12/2016
|
11/30/2016
|
Fire alarm Shop Drawings and Submittal; Plans, 100% Review, Approval Stamp, Other: Submittal
|
8602
|
Security Panel Upgrade
|
5110157
|
11/28/2016
|
11/30/2016
|
12/08/2016
|
Upgrade alarm panels and infrastructure. Plans, Specifications, 100% Review, Final Review, Approval Stamp
|
8601
|
CR II-2015-Replace Fire Alarms; Public Services, UNEX C, Bison Admin Trailer
|
5110006
|
11/28/2016
|
12/12/2016
|
11/29/2016
|
Addition of duct detectors to project scope in response to RFI 1. Plans, 100% Review, Other: Submittal-Duct Detectors
|
8600
|
Classroom & Office Building
|
990016
|
11/23/2016
|
12/07/2016
|
12/01/2016
|
CP-1. CP-1 Demolition, Grading, Access, Fencing & Erosion Package
|
8599
|
Classroom & Office Building
|
990016
|
11/22/2016
|
12/06/2016
|
12/06/2016
|
Submittal 5008 - G Sheets. Submittal 500 8 - G Sheets
|
8598
|
Classroom & Office Building
|
990016
|
11/22/2016
|
12/06/2016
|
12/01/2016
|
RFI 2009. RFI 2009 - Classroom Net Floor Area
|
8597
|
Primary Electrical Improvement Step-4
|
990513
|
11/22/2016
|
12/06/2016
|
12/02/2016
|
Other: Final 100% Switchgear Design Pkg.. Final 100% Switchgear Design Pkg with Backcheck
|
8596
|
Classroom & Office Building
|
990016
|
11/18/2016
|
12/02/2016
|
11/21/2016
|
RFI_2010-Electrical Room Wall Rating
|
8595
|
CRII-2 Rowland Hall Construct Exhaust Ductwork
|
5110345
|
11/18/2016
|
12/02/2016
|
11/18/2016
|
See the attached. Specifications, Final Review, Approval for Contracts
|
8594
|
Classroom & Office Building
|
990016
|
11/17/2016
|
12/01/2016
|
11/21/2016
|
RFI 2008. RFI 2011 - Roof Standpipe
|
8593
|
Classroom & Office Building
|
990016
|
11/17/2016
|
12/01/2016
|
|