Plan Review Log

Plan ID Project Name Project # Date Received Date Due Date Returned Description
10205 McGaugh Hall Bedding 10205 06/09/2020 06/23/2020 06/09/2020 Plans
10204 CTSA Instructional Space Renovations 5112437 06/05/2020 06/19/2020 06/17/2020 Plans
10203 ICS I 4th Floor Renovation 5112256 06/04/2020 06/18/2020 06/15/2020 Specifications
10202 EDU 2nd Floor Student Affair's Office Renovation 5112500 06/02/2020 06/16/2020    
10201 Bren Hall , 4th Flr, Reno 5112583 06/02/2020 06/16/2020 06/09/2020 Plans/Specifications
10200 Verano Unit 7 ADA Conversion 5112542 06/01/2020 06/15/2020 06/08/2020 Plans
10199 DM 2017-2018 Black Start Generator and PowerMAX Phase 2 5112169 06/03/2020 06/17/2020 06/03/2020  
10198 McGaugh Hall Bedding 5112590 05/27/2020 06/10/2020    
10197 SCIP Sculpture and Ceramic Studio Renovations, Phase 3 5112331 05/27/2020 06/10/2020 06/08/2020 Plans/Specifications
10196 Middle Earth Showers 2020 5112569 05/28/2020 06/11/2020 06/01/2020 Plans
10195 La Mirada Renovation 5112473 05/29/2020 06/12/2020 05/29/2020 Plans
10194 Parking Lot 36 Bus Fleet Expansion 5112562 05/27/2020 06/10/2020 06/03/2020 Plans
10193 MDEA Renovation 5112511 05/27/2020 06/10/2020   Plans/Specifications/EH&S Redlines
10192 ICS I 4th Floor Renovation 5112256 05/27/2020 06/10/2020 05/27/2020 Specifications
10191 McGaugh Hall Bedding 5112590 05/27/2020 06/10/2020   Plans
10190 SCIP 19/20 Studio 4 Classroom 101 Renovation 5112494 05/27/2020 06/10/2020 06/02/2020 Plans
10189 DM Accessibility Accommodations - Irvine Hall Restroom 245 5112188 - IH 05/27/2020 06/10/2020 06/02/2020 Plans/EH&S Redlines
10188 EDU 2nd Floor Student Affair's Office Renovation 5112500 05/26/2020 06/09/2020 06/02/2020  
10187 SCIP 19/20 Chem Lab Reno B42, 352, 552 5112441 05/26/2020 06/09/2020 06/01/2020 Plans
10186 ICS I 4th Floor Renovation 5112256 05/26/2020 06/09/2020 05/27/2020 Specifications
10185 SC-G 4th Floor Meeting Room Renovation 5112461 05/22/2020 06/05/2020 06/08/2020 Plans
10184 SCIP 19/20 Chem Lab Reno B42, 352, 552 5112441 05/21/2020 06/04/2020 06/01/2020 Plans
10183 Social Sciences Lab Park & Plaza Level Restroom Renovation 5112273 05/21/2020 06/04/2020 05/29/2020 Plans
10182 MIND Renovation MS1 109 5112428 05/20/2020 06/03/2020 05/29/2020 Plans
10181 DM Accessibility Accommodations - NS1 - 1413 Lab 5112188 05/20/2020 06/03/2020 06/03/2020 Plans/Specifications
10180 Verano Unit 7 ADA Conversion 5112542 05/19/2020 06/02/2020 05/28/2020 Plans
10179 Hydrogen Fueling Station 5112389 05/19/2020 06/02/2020 06/01/2020 Specifications
10178 2017-18 SCIP Replace Deteriorated Dust Collector and Light Fixture in Sculpture Studio 5112156 05/18/2020 06/01/2020 05/29/2020 Plans/Specifications
10177 ICS I 4th Floor Renovation 5112256 05/15/2020 05/29/2020 05/19/2020 Plans
10176 Engineering Faculty Research Lab: ET 142 5112353 05/18/2020 06/01/2020 05/27/2020 Plans
10175 ELF 205/209 Renovation 5112414 05/19/2020 06/02/2020 05/19/2020 Plans
10174 HIMaC 5112271 05/18/2020 06/01/2020 05/19/2020 FDC Shop Dwg
10173 ICS I 4th Floor Renovation 5112256 05/15/2020 05/29/2020 05/26/2020 Plans
10172 Classroom Renovation 5112481 05/14/2020 05/28/2020 05/18/2020 Plans
10171 Construct HIMaC2 5112271 05/14/2020 05/28/2020   Safety Operations
10170 HIB Philosophy Department Renovations 5112493 05/12/2020 05/26/2020 05/18/2020 Plans
10169 Student Center & Cross-Cultural Center Restroom Renovations 5112460 05/12/2020 05/26/2020 05/19/2020 Plans
10168 SC-G 4th Floor Meeting Room Renovation 5112461 05/14/2020 05/28/2020 05/14/2020 Plans
10167 HIMaC 5112271 05/11/2020 05/25/2020 05/15/2020 Mezzanine Fire Proofing
10166 ICS I 4th Floor Renovation 5112256 05/11/2020 05/25/2020 05/13/2020 Specifications
10165 HIMaC 5112271 05/07/2020 05/21/2020 05/14/2020 Plans (Shop Dwgs/Products)
10164 MS1 Room 109 Fire Alarm Shop Drawings 5112428 05/01/2020 05/15/2020 05/07/2020  
10163 Mesa Tower Mailroom Conversion 5112581 05/06/2020 05/20/2020 05/14/2020 Plans
10162 Campus Village Grad Housing Interior Renovation 5112584 05/06/2020 05/20/2020 05/14/2020 Plans
10161 1st Floor Active Learning Classroom Renovation 5112203 - Phase 3 05/05/2020 05/19/2020 05/13/2020 Plans/Specifications/EH&S Redlines
10160 Hydrogen Station -- California/Academy 5112389 05/01/2020 05/15/2020 05/06/2020 Plans/Specifications
10159 Med Sci B 274 Floor Sink null 05/04/2020 05/18/2020 05/12/2020 Plans
10158 McGaugh Hall Bedding 5112590 05/04/2020 05/18/2020 05/11/2020 Plans
10157 Middle Earth Showers 2020 5112569 05/04/2020 05/18/2020 05/11/2020 Plans
10156 Gross Hall Infusion Room 5112463 05/01/2020 05/15/2020 05/07/2020  
10155 ICS I 4th Floor Renovation 5112256 05/04/2020 05/18/2020 05/04/2020 Plans
10154 Small Cap - Humanities Hall 178 Renovation 5112150 04/30/2020 05/14/2020 05/05/2020 Plans
10153 ICS I 4th Floor Renovation 5112256 04/30/2020 05/14/2020 05/06/2020 Plans
10152 DM 2018-19 Metal Bridges Painting Treatment 5112304 04/27/2020 05/11/2020 05/04/2020 Plans/Specifications
10151 DM 2017-2018 Black Start Generator and PowerMAX Phase 2 5112169 04/30/2020 05/14/2020 05/01/2020 Plans
10150 SCIP 2018-19 HIB Automatic Door Operator Installation 5112339 04/23/2020 05/07/2020 05/04/2020 Plans
10149 HIB Philosophy Department Renovations 5112493 04/22/2020 05/06/2020 04/30/2020 Plans
10148 2019-20 SCIP B72, B72A, B & C 5112475 04/21/2020 05/05/2020 04/23/2020 Plans
10147 Irvine Hall 264 Renovation 5112539 04/22/2020 05/06/2020 04/28/2020 Specifications
10146 Med Sci D Major Building Maintenance 5112080 04/21/2020 05/05/2020 04/27/2020 Plans
10145 Parking Structure LED & Wireless Mesh Network 5109444 04/15/2020 04/29/2020 04/23/2020 Plans
10144 Med Sci B Major Building Maintenance 5112079 04/21/2020 05/05/2020 04/27/2020 Plans
10143 Arroyo Vista Kitchen / Fire Alarm Renovation 2020 5112526 04/20/2020 05/04/2020 04/27/2020 Plans
10142 MIND Renovation MS1 109 5112428 04/16/2020 04/30/2020 04/21/2020 Plans
10141 SC19/20 Berk Hall Office Renovation 5112499 04/17/2020 05/01/2020 04/23/2020  
10140 MDEA Renovation 5112511 04/16/2020 04/30/2020 04/23/2020 Plans/Specifications
10139 SCIP 2019-2020 Bio Sci 3 Basement Buildout 5112488 04/15/2020 04/29/2020 04/22/2020 Plans
10138 HIMaC 5112271 04/15/2020 04/29/2020 04/21/2020 Mezzanine Fire Proofing
10137 SC-G 4th Floor Meeting Room Renovation 5112461 04/15/2020 04/29/2020 04/21/2020 Plans
10136 Campus Village Grad Housing Interior Renovation 5112584 04/15/2020 04/29/2020 04/20/2020 Plans
10135 HIB Philosophy Department Renovations 5112501 04/14/2020 04/28/2020 04/20/2020 Plans
10134 Classroom Renovation 5112481 04/14/2020 04/28/2020 04/17/2020  
10133 SST 5th Floor Renovation 5112495 04/10/2020 04/24/2020   Plans/Specifications
10132 2019-20 SCIP B72, B72A, B & C 5112475 04/09/2020 04/23/2020 04/17/2020 Plans
10131 SCIP 19/20 Studio 4 Classroom 101 Renovation 5112494 04/08/2020 04/22/2020 04/16/2020 Plans
10130 DM Accessibility 17/18 -- Part 2 NS1 Lab 1413 5112188-NS1 - Part 2 04/08/2020 04/22/2020 04/15/2020 Plans
10129 DM Accessibility 17/18 -- Part 1 Irvine Hall 5112188-IH Part 1 04/08/2020 04/22/2020 04/15/2020 Plans
10128 HIMaC 5112271 04/08/2020 04/22/2020 04/13/2020 Sprinkler Shops, Rev3
10127 Engineering Faculty Research Labs: ET 142 5112353 04/07/2020 04/21/2020 04/14/2020 Plans
10126 Arroyo Vista Kitchen / Fire Alarm Renovation 2020 5112526 04/08/2020 04/22/2020 04/15/2020 Plans
10125 HIMaC 5112271 04/08/2020 04/22/2020 04/14/2020 Plans (Bulletin #2)
10124 EDU 2nd Floor Student Affair's Office Renovation 5112500 04/06/2020 04/20/2020 04/10/2020  
10123 Mesa Tower Mailroom Conversion 5112581 04/03/2020 04/17/2020 04/09/2020 Plans
10122 Building Safety Mitigation 5112277 04/02/2020 04/16/2020 04/08/2020  
10121 Restroom & Lobby Improvements - ELF Corridor 5112273 04/02/2020 04/16/2020 04/08/2020 Plans/Specifications
10120 HIMaC 5112271 04/01/2020 04/15/2020 04/08/2020 Plans
10119 HIMaC 5112271 04/01/2020 04/15/2020 04/06/2020 Sprinkler Shops
10118 2nd Floor Renovation 5112468 03/31/2020 04/14/2020 04/03/2020  
10117 ICS I 4th Floor Renovation 5112256 03/30/2020 04/13/2020 04/01/2020 Plans
10116 SCIP Sculpture and Ceramic Studio Renovations, Phase 3 5112331 03/24/2020 04/07/2020 03/26/2020 Plans/Specifications
10115 HIB Philosophy Department Renovations 5112493 03/24/2020 04/07/2020 03/31/2020 Plans
10114 Construct HIMaC2 5112271 03/24/2020 04/07/2020 04/01/2020 RFI #060
10113 Campus Village Grad Housing Interior Renovation 5112584 03/24/2020 04/07/2020 03/31/2020  
10112 San Joaquin Landfill 5112391 03/23/2020 04/06/2020 03/26/2020 Plans
10111 5112308 Sprague 351-362B Supplemental Cooling 5112308 03/17/2020 03/31/2020 04/07/2020  
10110 Restroom & Lobby Improvements - ELF Corridor 5112273 03/18/2020 04/01/2020 03/24/2020 Plans/Specifications
10109 Phoenix Grill Replace HVAC Package Unit 5112550 03/18/2020 04/01/2020 03/26/2020 Plans
10108 2nd Floor Renovation 5112468 03/16/2020 03/30/2020 03/30/2020  
10107 Building Safety Mitigation 5112277 03/13/2020 03/27/2020 03/23/2020  
10106 Steinhaus Basement Environmental Chambers 5112463 03/12/2020 03/26/2020 03/20/2020  
10105 HIMaC 5112271 03/11/2020 03/25/2020 03/18/2020 Shop Dwg/Materials
10104 SEC at SL 5th Floor 5110290 03/11/2020 03/25/2020 03/17/2020  
10103 Engineering Faculty Research Labs: ET 142 5112353 03/10/2020 03/24/2020   Plans
10102 Mesa Court Unit III Renovation 5112474 03/10/2020 03/24/2020 03/12/2020 Plans
10101 Containers at North Campus 5112536 03/09/2020 03/23/2020 03/12/2020 Plans
10100 Social Ecology 1 RM 206F Enlarge Room 333838 03/09/2020 03/23/2020 03/09/2020 Plans
10099 Student Center Building A Roof Repairs 5112436 03/09/2020 03/23/2020 03/12/2020  
10098 Gondolin ADA Conversion 5112540 03/09/2020 03/23/2020 03/12/2020 Plans
10097 Aldrich Hall Building Enhancement - Phase-2/2nd Floor Public Space 5112374 03/06/2020 03/20/2020 03/11/2020 Plans
10096 SC19/20 Berk Hall Office Renovation 5112499 03/05/2020 03/19/2020 03/11/2020  
10095 SST 5th Floor Renovation 5112495 03/05/2020 03/19/2020 03/10/2020 Plans
10094 SCIP 19/20 Chem Lab Reno B42, 352, 552 5112441 03/05/2020 03/19/2020 03/11/2020 Plans
10093 Verano Unit 7 ADA Conversion 5112542 03/04/2020 03/18/2020 03/09/2020 Plans
10092 Phoenix Grill Replace HVAC Package Unit 5112550 03/04/2020 03/18/2020 03/09/2020 Plans
10091 HIMaC 5112271 03/04/2020 03/18/2020 03/16/2020 Sprinkler Shops
10090 Restroom & Lobby Improvements 5112273 03/04/2020 03/18/2020 03/09/2020 Plans/Specifications
10089 Arroyo Vista Kitchen / Fire Alarm Renovation 2020 5112526 03/03/2020 03/17/2020 03/09/2020 Plans
10088 Hewitt Hall Basement Buildout 5112312 03/03/2020 03/17/2020 03/12/2020 Draft Detail Project Program
10087 2019-20 SCIP B72,B72A, B & C 5112475 03/02/2020 03/16/2020 03/04/2020 Plans
10086 HIMaC 5112271 03/02/2020 03/16/2020 03/06/2020 Shop Dwg/Materials
10085 SC19/20 Berk Hall office renovation 5112499 03/02/2020 03/16/2020 03/02/2020 Plans
10084 Water Main Line Upgrades - PRS Demo 5112303 02/28/2020 03/13/2020 03/03/2020 Plans/Specifications
10083 2nd Floor Renovation 5112468 02/28/2020 03/13/2020 03/03/2020  
10082 SC19/20 Berk Hall Office Renovation 5112499 02/28/2020 03/13/2020 03/03/2020  
10081 Steinhaus Basement Environmental Chamber 5112457 02/25/2020 03/10/2020 03/03/2020  
10080 Exterior Stairwell Coatings 5112482 02/25/2020 03/10/2020 03/06/2020 Plans/Specifications
10079 UPS Replacement 5112531 02/25/2020 03/10/2020 03/02/2020  
10078 Restroom & Lobby Improvements Faculty Enhancement Funds 5112273 02/25/2020 03/10/2020 03/02/2020 Fire Alarm Submittal
10077 Gondolin ADA Conversion 5112540 02/25/2020 03/10/2020 03/02/2020 Plans
10076 Social Sciences Lab Park & Plaza Level Restroom Renovation 5112273 02/24/2020 03/09/2020 03/02/2020 Plans/Specifications
10075 La Mirada Renovation 5112473 02/21/2020 03/06/2020 02/27/2020 Plans
10074 Building Safety Mitigation 5112277 02/21/2020 03/06/2020 02/27/2020  
10073 HIMaC 5112271 02/20/2020 03/05/2020 02/27/2020 Plans
10072 Install Direct Fired Boiler 2 - Electrical Disconnect 5109999 02/19/2020 03/04/2020 02/19/2020 Specifications
10071 1st Floor Human Biology and Human Performance Renovation 5112203 02/18/2020 03/03/2020 02/20/2020 Plans/Specifications/EH&S Redlines
10070 Krieger Hall 100B & HIB 2001A Film & Media Renovation 5112501 02/18/2020 03/03/2020 02/24/2020 Plans
10069 SC19/20 Berk Hall Office Renovation 5112499 02/18/2020 03/03/2020 02/24/2020  
10068 SEC at SL 5th Floor 5110290 02/18/2020 03/03/2020 02/26/2020  
10067 SST 5th Floor Renovation 5112550 02/13/2020 02/27/2020 02/20/2020 Plans
10066 HIMaC 5112271 02/13/2020 02/27/2020 03/06/2020 Plans/Specifications
10065 ELF 205/209 Renovation 5112414 02/13/2020 02/27/2020 02/19/2020 Plans/Specifications
10064 DM Accessibility Accommodations - NS1 - 1413 Lab 5112188 02/13/2020 02/27/2020 02/19/2020 Plans/Specifications
10063 SBSG Level-G, Neuro Sci Lab Renovation 5112497 02/13/2020 02/27/2020 02/19/2020  
10062 SST 5th Floor Renovation 5112495 02/12/2020 02/26/2020 02/13/2020 Plans
10061 Social Ecology 1 Rm 212F 322434 02/12/2020 02/26/2020 02/13/2020  
10060 2019-20 SCIP B72, B72A, B & C 5112475 02/10/2020 02/24/2020 02/19/2020 Plans
10059 Gondolin ADA Conversion 5112540 02/07/2020 02/21/2020 02/13/2020 Plans
10058 GF 18-19 Below Grade Waterproofing Maintenance 5112449 02/07/2020 02/21/2020 02/12/2020  
10057 Al Irwin Academic Center Reno 5112480 02/07/2020 02/21/2020 02/07/2020 Plans/Specifications
10056 2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation 5112285 02/06/2020 02/20/2020 02/07/2020  
10055 Irvine Hall 264 Renovation 5112539 02/06/2020 02/20/2020 02/06/2020 Plans
10054 DM 2017-2018 Black Start Generator and PowerMAX Phase 2 5112169 02/04/2020 02/18/2020 02/05/2020 Plans/Specifications
10053 MPAA 443 Alcove 305914 02/04/2020 02/18/2020 02/04/2020 Plans
10052 GNRF Chilled Water Grooved Fitting Replacement null 02/04/2020 02/18/2020 02/05/2020  
10051 HIMaC 5112271 02/03/2020 02/17/2020 02/05/2020  
10050 SST 5th Floor Renovation 5112495 02/03/2020 02/17/2020 02/07/2020 Plans
10049 SST 5th Floor Renovation 5112495 01/30/2020 02/13/2020 02/06/2020 Plans
10048 La Mirada Renovation 5112473 01/30/2020 02/13/2020 02/04/2020 Plans
10047 2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation 5112285 01/29/2020 02/12/2020 01/30/2020  
10046 Aldrich Hall Building Enhancement - Phase-2/2nd floor public space 5112374 01/28/2020 02/11/2020 02/04/2020 Plans
10045 SBSG 324565 01/27/2020 02/10/2020 01/27/2020  
10044 2nd Floor Renovation 5112468 01/24/2020 02/07/2020 02/04/2020  
10043 DM 2017-2018 Black Start Generator and PowerMAX Phase 2 5112169 01/23/2020 02/06/2020 01/30/2020 Plans/Specifications
10042 SBSG Level-G, Neuro Sci Lab Renovation 5112497 01/22/2020 02/05/2020 01/30/2020  
10041 HIMaC 5112271 01/22/2020 02/05/2020 01/29/2020 Plans
10040 HIMaC 5112271 01/13/2020 01/27/2020 01/29/2020 Plans/Specifications
10039 Al Irwin Academic Center Reno 5112480 01/13/2020 01/27/2020 01/15/2020 Plans/Specifications
10038 Tierney House Fire Alarm Project 5112434 01/13/2020 01/27/2020 01/14/2020 Plans/Specifications
10037 Stem Cell Research Center - Helios Infrastructure 5112452 01/08/2020 01/22/2020 01/27/2020  
10036 Engineering Faculty Research Labs 5112353 01/07/2020 01/21/2020 01/30/2020 Plans
10035 SEC at SL 5th Floor 5110290 01/07/2020 01/21/2020 01/14/2020  
10034 1st Floor Active Learning Classroom Renovation (Phase 3) 5112203 01/06/2020 01/20/2020 01/10/2020 Plans
10033 DM Accessibility Accommodations - NS1-1413 Upgrade 5112188 01/06/2020 01/20/2020 01/09/2020 Plans
10032 DM 2017-2018 Black Start Generator and PowerMAX Phase 2 5112169 01/06/2020 01/20/2020 01/09/2020 Plans/Specifications
10031 SC 4th Floor W. Wing Office Renovation 5112440 01/02/2020 01/16/2020 01/07/2020  
10030 SBSG Level-G, Neuro Sci Lab Renovation 5112497 01/02/2020 01/16/2020 01/07/2020  
10029 DM 2018-19 Electrical System Emergency Circuit Improvements 5112299 12/18/2019 01/01/2020 12/18/2019 Plans/Specifications
10028 SEC at SL 2nd + 5th Floor Renovation 5110290 12/16/2019 12/30/2019 12/18/2019 Plans
10027 Crown Castle Verizon Wireless Sites - Nodes 8 and 9 5112294 12/16/2019 12/30/2019 12/16/2019 Plans
10026 ELF 205 / 209 Renovation 5112414 12/12/2019 12/26/2019 12/19/2019 Plans/Specifications
10025 HIMaC 5112271 12/12/2019 12/26/2019 02/04/2020 Plans
10024 Al Irwin Academic Center Reno 5112480 12/11/2019 12/25/2019 12/13/2019 Plans
10023 5th Floor North Labs Renovation 5112281 12/11/2019 12/25/2019 12/18/2019 Plans/EH&S Redlines
10022 Engineering Gateway 3324 Lab Renovation 5112282 12/11/2019 12/25/2019 12/11/2019 Plans/Cutsheets
10021 Hewitt Hall Basement Buildout 5112312 12/11/2019 12/25/2019 12/17/2019 Draft Detail Project Program
10020 Campus Village Building Exterior Upgrades 5112524 12/10/2019 12/24/2019 12/13/2019 Plans
10019 Steinhaus Basement Environmental Chambers 5112457 12/10/2019 12/24/2019 12/13/2019  
10018 Beckman Laser Institute Biochemistry Facility Renovation (Project name was changed after SCIP was aw 5112185 12/09/2019 12/23/2019 12/13/2019 Plans
10017 HIMaC 5112271 12/09/2019 12/23/2019 12/11/2019 Shop Dwg/Materials
10016 Stem Cell Research Center - Helios Infrastructure 5112452 12/05/2019 12/19/2019 12/13/2019  
10015 HIMAC 5112271 12/05/2019 12/19/2019 12/05/2019  
10014 SC 4th Floor W. Wing Office Renovation 5112440 12/03/2019 12/17/2019 12/13/2019  
10013 Rowland Hall Corridor - Repair Insulation 5112509 12/02/2019 12/16/2019 12/02/2019 Plans/Specifications
10012 La Mirada Renovation 5112473 11/27/2019 12/11/2019 12/11/2019 Plans
10011 EG 2nd Floor MAC Renovation 5112315 11/26/2019 12/10/2019 12/05/2019 Plans
10010 Verano Commons Renovation 5112247 11/26/2019 12/10/2019 12/10/2019 Plans
10009 GNRF Chilled Water Grooved Fitting Replacement 5112545 11/26/2019 12/10/2019 11/26/2019  
10008 CRII 3 Gateway Study Center Lighting 5112357 11/25/2019 12/09/2019 12/05/2019 Plans
10007 EEG Renovation 5112455 11/25/2019 12/09/2019 12/05/2019  
10006 McGaugh 4439 Local Exhaust Ventilation 5112456 11/22/2019 12/06/2019 12/05/2019 Specifications
10005 HIMaC 5112271 11/19/2019 12/03/2019 11/21/2019 Shop Dwg/Materials
10004 2018-19 SCIP 1st Floor Classroom 5112332 11/19/2019 12/03/2019 11/20/2019 Plans
10003 SEC at SL 2nd + 5th Floor Renovation 5110290 11/19/2019 12/03/2019 12/05/2019 Plans
10002 Bison Avenue Pedestrian Improvements 5112383 11/18/2019 12/02/2019 12/02/2019 Plans
10001 Engineering Hall Glacios Cryo TEM and JEOL TEM Installations 5112385 11/15/2019 11/29/2019 12/10/2019 Plans
10000 SCIP 2018-2019 ELF 134 Lab Renovation 5112276 11/15/2019 11/29/2019 12/02/2019 Plans/Specifications
9999 Aldrich Hall Building Enhancement - Phase-2/2nd Floor Public Space 5112374 11/15/2019 11/29/2019 11/19/2019 Plans
9998 1st Floor Human Biology and Human Performance Renovation 5112203 11/14/2019 11/28/2019 11/19/2019 Plans/Specifications/EH&S Redlines
9997 MIND Renovation MS1 109 5112428 11/14/2019 11/28/2019 11/15/2019 Plans
9996 Al Irwin Academic Center Reno 5112480 11/12/2019 11/26/2019 11/15/2019 Plans
9995 Mesa Court Lago Fire Sprinkler Flood 5112514 11/07/2019 11/21/2019 11/15/2019  
9994 Mesa Court Ondas Emergency Water Mitigation 5112514 11/07/2019 11/21/2019 11/15/2019  
9993 HIMaC 5112271 11/06/2019 11/20/2019 11/15/2019 Plans/Specifications
9992 SEC at SL 2nd + 5th Floor Renovation 5110290 11/05/2019 11/19/2019 11/13/2019 Plans
9991 SSL 4th Floor Human Subject Lab 5112058 11/04/2019 11/18/2019 11/19/2019  
9990 Fire Life Safety Improvement 998611 10/30/2019 11/13/2019   OTHER: FLS-Rowland Hall_Conformed G-Sheets R RCP Sheets
9989 2018-19 SCIP Labs B66, B70, B85 & B93 5112295 10/30/2019 11/13/2019 11/04/2019 Plans
9988 Exit Route Improvements - SCIP 17/18 5112168 10/29/2019 11/12/2019 11/06/2019 Plans
9987 MIND Renovation MS1 109 5112428 10/29/2019 11/12/2019 11/04/2019 Plans
9986 Tierney House Fire Alarm Project 5112434 10/28/2019 11/11/2019 10/31/2019 Plans/Specifications
9985 Aldrich Hall Building Enhancement - Phase-2/2nd Floor Public Space 5112374 10/28/2019 11/11/2019 10/31/2019 Plans
9984 EEG Renovation 5112455 10/28/2019 11/11/2019 10/31/2019  
9983 Renovation 320987 10/23/2019 11/06/2019 10/24/2019  
9982 2017-18 SCIP Sculpture Studio Dust Collector and Lighting Replacement 5112156 10/23/2019 11/06/2019 10/24/2019 Plans
9981 EG 2nd Floor MAC Renovation 5112315 10/23/2019 11/06/2019 10/24/2019 Plans
9980 ELF 205/209 Renovation 5112414 10/23/2019 11/06/2019 10/24/2019 Plans
9979 Renovation 321132 10/23/2019 11/06/2019 10/24/2019  
9978 CRII 3 Gateway Study Center Lighting 5112357 10/22/2019 11/05/2019 10/24/2019 Plans
9977 ELF 205/209 Renovation 5112414 10/21/2019 11/04/2019 10/31/2019 Plans
9976 EG 2nd Floor MAC Renovation 5112315 10/21/2019 11/04/2019 10/21/2019 Plans
9975 EG 2nd Floor MAC Renovation 5112315 10/18/2019 11/01/2019 10/18/2019 Plans
9974 Faculty Enhancement Funds - Shuttle Safety 5112435 10/18/2019 11/01/2019 10/21/2019 Plans/EH&S Redlines
9973 2018-19 SCIP Labs B66, B70, B85 & B93 5112295 10/17/2019 10/31/2019 10/21/2019 Plans
9972 Bren Hall Flood Response 2019 5112521 10/17/2019 10/31/2019 10/18/2019 Plans, Specifications
9971 HIMaC 5112271 10/17/2019 10/31/2019 11/06/2019 Plans
9970 ISEB 999239 10/15/2019 10/29/2019 10/15/2019 RFI: ISEB_RFI-364 Laser Signage Info required for Rough-in
9969 DM 18 / 19 SSPA, SSBA, SE2 SSLH Fire Alarm Panel 5112370 10/14/2019 10/28/2019 10/15/2019 Addendum
9968 Student Center Building A Roof Repairs 5112436 10/14/2019 10/28/2019 10/17/2019  
9967 2018-19 SCIP SSPB 2nd Floor Linguistic Lab Renovation 5112287 10/14/2019 10/28/2019 10/14/2019 Plans
9966 SSL 3rd Floor Cog Sci Lab Renovation 5112286 10/11/2019 10/25/2019 10/18/2019 Plans
9965 Bison Avenue Pedestrian Improvements 5112383 10/11/2019 10/25/2019 10/17/2019 Plans
9964 Middle Earth, Bucklebury HVAC Replacement 5112367 10/09/2019 10/23/2019 10/14/2019 CRANE LIFT PLAN
9963 SCIP 2018-2019 ELF 134 Lab Renovation 5112276 10/08/2019 10/22/2019 10/17/2019 Plans/Specifications
9962 2018-19 SCIP Labs B66, B70, B85 & B93 5112295 10/03/2019 10/17/2019 10/04/2019 Plans
9961 2018-19 SCIP -- SE-2 1st Floor Lab 1360 Renovation 5112285 10/03/2019 10/17/2019 10/04/2019  
9960 HIMaC 5112271 10/02/2019 10/16/2019 10/15/2019 Plans/Specifications
9959 Restroom & Lobby Improvements - ELF Corridor 5112273 10/02/2019 10/16/2019 10/04/2019 Plans/Specifications
9958 Aldrich Hall Building Enhancement - Phase 2/2nd Floor Public Space 5112374 10/01/2019 10/15/2019 10/04/2019 Plans
9957 2018-19 SCIP Calit2 TEMPR Properties Facility Renovation 5110353 09/27/2019 10/11/2019 10/04/2019 Plans/Specifications
9956 SEC at SL 2nd + 5th Floor Renovation 5110290 09/24/2019 10/08/2019 09/30/2019 Plans
9955 Major Building Maintenance 5112289 09/24/2019 10/08/2019 09/25/2019 Addendum (Submittal)
9954 SBSG Renovation 316480 09/20/2019 10/04/2019 09/20/2019 Plans
9953 Engineering Gateway 3324 Lab Renovation 5112282 09/20/2019 10/04/2019 09/30/2019 Plans/Cutsheets
9952 SC Bldg-G West Wing Office Entry Renovation 5112440 09/19/2019 10/03/2019 09/30/2019  
9951 E-Tech Wireless Enhancement for Sculpture Studios 5112510 09/19/2019 10/03/2019 09/20/2019  
9950 Renovation 5113417, 318744 09/19/2019 10/03/2019 09/20/2019  
9949 Building 55 Major Building Maintenance 5112289 09/18/2019 10/02/2019 09/20/2019 Plans
9948 MIND Renovation MS1 109 5112428 09/16/2019 09/30/2019 09/23/2019 Plans
9947 Faculty Enhancement Funds - Shuttle Safety 5112435 09/16/2019 09/30/2019 09/23/2019 Plans
9946 Aldrich Hall / Bookstore Pathway 5112447 09/16/2019 09/30/2019 09/20/2019 Plans
9945 SSL 3rd Floor Cog Sci Lab Renovation 5112286 09/13/2019 09/27/2019 09/20/2019 Plans
9944 MSTB 1st Floor, OEOD Office Expansion 5112280 09/13/2019 09/27/2019 09/20/2019 Plans
9943 SF-13 Coil Replacement 5112469 09/10/2019 09/24/2019 09/10/2019 Specifications
9942 2017-18 SCIP Sculpture Studio Dust Collector and Lighting Replacement 5112156 09/06/2019 09/20/2019 09/10/2019 Plans
9941 Restroom & Lobby Improvements-ELF Corridor 5112273 09/04/2019 09/18/2019 09/10/2019 Plans,Specifications
9940 Building 55 (UCIMC) 5112289 09/03/2019 09/17/2019 09/06/2019 Plans, Final Review
9939 5 Year Title 19 Certification 5112401 09/03/2019 09/17/2019 09/03/2019 Final Review-Approved for Contracts
9938 ARC 5112403 09/03/2019 09/17/2019 09/03/2019 Final Review-Approved for Contracts
9937 1st Floor Human Biology and Human Performance Renovation 5112203 08/30/2019 09/13/2019 09/10/2019 Plans/Specifications
9936 5th Floor North Labs Renovation 5112281 08/30/2019 09/13/2019 09/10/2019 Plans
9935 SCIP 2018-2019 ELF 134 Lab Renovation 5112276 08/28/2019 09/11/2019 09/10/2019 Plans/Specifications
9934 Aldrich Hall 4th and 5th Floor Renovation - Phase 4 5112002 08/27/2019 09/10/2019 08/27/2019 Plans
9933 PD Communications Room Cooling 5112444 08/22/2019 09/05/2019 08/26/2019 Plans
9932 HIMaC 5112271 08/22/2019 09/05/2019 09/04/2019 Plans
9931 Palo Verde Emergency Water Repair Bldg 1300 5112453 08/22/2019 09/05/2019 08/22/2019  
9930 Bison Avenue Pedestrian Safety Improvements 5112383 08/22/2019 09/05/2019 08/26/2019 Plans
9929 Middle Earth Raise Valve Box 5112454 08/20/2019 09/03/2019 08/22/2019 Plans
9928 3 & 4 Floor Renovation 5112336 08/19/2019 09/02/2019 08/20/2019 Plans
9927 SCIP Undergraduate Teaching Lab 5112340 08/19/2019 09/02/2019 08/19/2019  
9926 HIMaC 5112271 08/16/2019 08/30/2019 08/26/2019 Plans/Specifications
9925 Sculpture Ceramics Studio Renovation 5112331 08/16/2019 08/30/2019 08/26/2019 Plans
9924 Restroom & Lobby Improvements Faculty Enhancement Funds 5112273 08/15/2019 08/29/2019 08/20/2019 Plans/Specifications
9923 Parking Structure LED & Wireless Mesh Network 5109444 08/13/2019 08/27/2019 08/20/2019 Plans
9922 Redesign and Install Kitchen Exhaust Hood for Catering - Student Center 5112292 08/12/2019 08/26/2019   Plans/Specifications/EH&S Redlines
9921 EG 2nd Floor MAC Renovation 5112315 08/12/2019 08/26/2019 08/13/2019 Plans/Specifications
9920 Renovation 305913 08/12/2019 08/26/2019 08/13/2019  
9919 MSTB 1st Floor, OEOD Office Expansion 5112280 08/08/2019 08/22/2019 08/13/2019 Plans
9918 HIMaC 5112271 08/07/2019 08/21/2019 08/13/2019 Plans/Specifications
9917 Middle Earth Emergency Water Line Break 5112246 08/07/2019 08/21/2019 08/09/2019  
9916 Building 55 Major Building Maintenance 5112289 08/06/2019 08/20/2019 09/04/2019 VOID Plans
9915 Restroom & Lobby Improvements - ELF Corridor 5112273 08/06/2019 08/20/2019 08/06/2019 Plans
9914 SC Bldg-G West Wing Office Entry Renovation 5112440 07/31/2019 08/14/2019 08/06/2019  
9913 Renovation 315113 07/30/2019 08/13/2019 07/30/2019 Plans
9912 DM 2017-2018 ELF Exhaust Safety Upgrade 5112166 07/29/2019 08/12/2019 07/31/2019 Plans/Specifications
9911 DM 2017-2018 Black Start Generator and PowerMAX Phase 2 5112169 07/29/2019 08/12/2019 07/29/2019 Plans
9910 Renovation 315188 07/26/2019 08/09/2019 07/29/2019 Plans
9909 Restroom & Lobby Improvements Faculty Enhancement Funds 5112273 07/25/2019 08/08/2019 07/31/2019 Plans
9908 2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation 5112285 07/25/2019 08/08/2019 07/25/2019 Plans
9907 MSTB 1st Floor, OEOD Office Expansion 5112280 07/24/2019 08/07/2019 07/31/2019 Plans
9906 State Funded Re-Roof Multiple Buildings 5110248 07/23/2019 08/06/2019 07/31/2019 Plans/Previous set w/ comments
9905 SC Bldg-G West Wing Office Entry Renovation 5112440 07/22/2019 08/05/2019 07/29/2019  
9904 2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation 5112285 07/22/2019 08/05/2019 07/25/2019 Plans
9903 Student Center Crystal Cove Auditorium Renovation 5112344 07/17/2019 07/31/2019 07/18/2019 Plans
9902 Building 55 Major Building Maintenance 5112289 07/16/2019 07/30/2019   Plans
9901 Building 55 Major Building Maintenance 5112289 07/16/2019 07/30/2019 07/18/2019 Plans
9900 HIMaC 5112271 07/16/2019 07/30/2019 07/18/2019 Plans
9899 Crown Castle Wireless Sites - UCI Outdoor DAS - MPS 5112294 07/15/2019 07/29/2019 07/18/2019 Plans
9898 Crown Castle Verizon Wireless Sites - UCI Outdoor DAS - ECPS Building 5112294 07/15/2019 07/29/2019 07/18/2019 Plans
9897 SCIP Lab Renovation for Med Sci C&D 5112284 07/11/2019 07/25/2019 07/24/2019  
9896 Engineering Faculty Research Labs 5112353 07/11/2019 07/25/2019 07/24/2019 Plans
9895 Sculpture Ceramics Studio Renovation 5112331 07/11/2019 07/25/2019 07/24/2019 Plans
9894 2018-19 SCIP 1st Floor Classroom 5112332 07/10/2019 07/24/2019 07/12/2019 Submittal
9893 McGaugh AHU-3 Interior Drywall Repair 5112458 07/08/2019 07/22/2019 07/08/2019  
9892 5th Floor North Labs Renovation 5112281 07/08/2019 07/22/2019 07/11/2019 Plans
9891 Hammer Throw Cage Relocation 5112342 07/08/2019 07/22/2019 07/11/2019 Plans
9890 Human Biology Testing and Human Performance Lab 5112203 07/03/2019 07/17/2019 07/11/2019 Plans
9889 MSTB 1st Floor, OEOD Office Expansion 5112280 07/03/2019 07/17/2019 07/11/2019 Plans
9888 2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation 5112285 06/27/2019 07/11/2019 07/08/2019 Plans/Specifications/EH&S Redlines
9887 Construct HIMaC 5112271 06/26/2019 07/10/2019 06/28/2019 Plans
9886 301 and 302 Office Renovation 5112310 06/25/2019 07/09/2019 06/26/2019 Plans
9885 5112308 Sprague 351-362B Supplemental Cooling 5112308 06/24/2019 07/08/2019 06/25/2019  
9884 5112308 Sprague 351-362B Supplemental Cooling 5112308 06/21/2019 07/05/2019 06/25/2019  
9883 Middle Earth Housing Office Replace Fire Alarm System 5112296 06/21/2019 07/05/2019 06/25/2019 Plans
9882 3 & 4 Floor Renovation 5112336 06/18/2019 07/02/2019 06/19/2019 Plans
9881 Middle Earth Housing Office Replace Fire Alarm System 5112296 06/18/2019 07/02/2019 06/20/2019 Plans/Specifications
9880 SCIP 2018-2019 ELF 134 Lab Renovation 5112276 06/17/2019 07/01/2019 06/26/2019 Plans
9879 Med Sci B176 Cooling 5112363 06/17/2019 07/01/2019 06/17/2019  
9878 DM 18/19 SSPA, SSBA, SE2 SSLH Fire Alarm Panel 5112370 06/17/2019 07/01/2019 06/17/2019 Specifications
9877 CRII-2 Palo Verde/Middle Earth Pedestrian Bridge 5112253 06/14/2019 06/28/2019 06/24/2019 Plans
9876 Engineering Faculty Research Labs 5112353 06/12/2019 06/26/2019 06/18/2019 Plans
9875 Chilled Water Coil Replacement 5112174 06/10/2019 06/24/2019 06/10/2019 Specifications
9874 Sculpture Ceramics Studio Renovation 5112331 06/10/2019 06/24/2019 06/10/2019 Plans
9873 E-Tech Wireless Enhancement for Lecture Halls 5112411 06/10/2019 06/24/2019 06/10/2019  
9872 ARC Exterior Lighting 5110387 06/07/2019 06/21/2019 06/10/2019 Plans/Specifications
9871 Fire Life Safety Improvement 998611 06/06/2019 06/20/2019 06/11/2019 Submittal
9870 Interdisciplinary Science & Engineering Building (ISEB) 999239 06/06/2019 06/20/2019 06/07/2019 RFI
9869 Hammer Throw Cage Relocation 5112342 06/06/2019 06/20/2019 06/06/2019 Plans
9868 E-Tech Wireless Enhancement for Libraries 5112426 06/06/2019 06/20/2019 06/06/2019  
9867 Rams 2019 5112442 06/06/2019 06/20/2019 06/06/2019 Specifications
9866 SBSG 1st Floor Lobby Student Affairs Security Renovation 5112341 06/06/2019 06/20/2019 06/10/2019 Plans
9865 Fire Life Safety Improvement 998611 06/04/2019 06/18/2019   Submittal
9864 Calit2 2421 Renovation 5112279 06/04/2019 06/18/2019 06/05/2019 Plans/Specifications
9863 Redesign and Install Kitchen Exhaust Hood for Catering - Student Center 5112292 06/03/2019 06/17/2019 06/19/2019 Plans
9862 ICS I 4th Floor Renovation 5112256 06/03/2019 06/17/2019 06/04/2019 Plans
9861 Calit2 2421 Renovation 5112279 05/31/2019 06/14/2019 05/31/2019 Plans/Specifications
9860 EG 2nd Floor MAC Renovation 5112315 05/31/2019 06/14/2019 05/31/2019 Plans/Specifications
9859 Fire Life Safety Improvement 998611 05/30/2019 06/13/2019 06/05/2019 Submittal
9858 CRII-3B 2018-2019 Med Surge 2 Re-Roof 5112382 05/29/2019 06/12/2019 05/30/2019 Plans
9857 Renovation 316132 05/22/2019 06/05/2019 05/22/2019  
9856 Coat Repair Tower and Piping 5112305 05/22/2019 06/05/2019 05/23/2019  
9855 ISEB 999239 05/20/2019 06/03/2019 05/22/2019 RFI
9854 Calit2 2421 Renovation 5112279 05/16/2019 05/30/2019 06/10/2019 Plans/Specifications
9853 CRII-3B 2017 Roof Repairs 5112003 05/16/2019 05/30/2019 05/17/2019  
9852 Crown Castle Verizon Wireless Sites -- Nodes 8 and 9 5112294 05/14/2019 05/28/2019 05/17/2019 Plans
9851 ICS I 4th Floor Renovation 5112256 05/10/2019 05/24/2019 05/14/2019 Plans
9850 EG 2nd Floor MAC Renovation 5112315 05/10/2019 05/24/2019 05/14/2019 Plans/Specifications
9849 2018-19 SCIP 1st Floor Classroom 5112332 05/08/2019 05/22/2019 05/09/2019 Plans
9848 2018-19 SCIP SSPB 2nd Floor 5112287 05/08/2019 05/22/2019 05/09/2019 Plans
9847 (FEF) Engineering Faculty Research Labs 5112353 05/06/2019 05/20/2019 05/14/2019 Plans
9846 Engineering Gateway 2101 Lab Renovation 5112325 05/03/2019 05/17/2019 05/03/2019 Plans/Specifications
9845 Palo Verde Fire, Unit 3110 5112431 05/03/2019 05/17/2019 05/03/2019 Plans (Scope of Work)
9844 Engineering Gateway 2101 Lab Renovation 5112325 05/02/2019 05/16/2019 05/03/2019 Plans/Specifications
9843 3 & 4 Floor Renovation 5112336 05/02/2019 05/16/2019 05/06/2019 Plans
9842 Irvine Hall 2019 VC Renovation 5112392 05/02/2019 05/16/2019 05/02/2019  
9841 2018-19 SCIP - SE-2 1st Floor Lab 1360 Renovation 5112285 04/30/2019 05/14/2019 05/02/2019 Plans/Specifications/EH&S Redlines
9840 Engineering Gateway 2101 Lab Renovation 5112325 04/30/2019 05/14/2019 05/03/2019 Plans/Specifications
9839 Calit2 2421 Renovation 5112279 04/30/2019 05/14/2019 05/03/2019 Plans
9838 Student Center Pipe Insulation Replacement 5112124 04/30/2019 05/14/2019 04/30/2019 Plans/Specifications
9837 Irvine Hall 2019 VC Renovation 5112392 04/29/2019 05/13/2019 05/02/2019  
9836 Aldrich Hall Building Enhancement - Phase-1/1st Floor Public Space 5112374 04/26/2019 05/10/2019 05/01/2019 Plans
9835 Kitchen Renovations 5112405 04/25/2019 05/09/2019 04/29/2019 Plans
9834 Engineering Tower 509 Lab Renovation 5112324 04/25/2019 05/09/2019 04/29/2019 Plans
9833 Engineering Tower 509 Lab Renovation 5112324 04/24/2019 05/08/2019 04/24/2019 Plans
9832 Engineering Faculty Research Labs 5112353 04/22/2019 05/06/2019 04/29/2019 Plans: Demolition of Interior Works
9831 EDU 3rd Floor Renovation Dean's Admin 5112334 04/19/2019 05/03/2019 04/29/2019 Plans
9830 Engineering Gateway 3324 Lab Renovation 5112282 04/18/2019 05/02/2019   Plans/Specifications
9829 Engineering Gateway 2101 Lab Renovation 5112325 04/17/2019 05/01/2019 04/22/2019 Plans
9828 Kitchen Renovations 5112405 04/16/2019 04/30/2019 04/29/2019 Plans
9827 ICS I 4th Floor Renovation 5112256 04/16/2019 04/30/2019 04/29/2019 Plans
9826 Aldrich Hall Building Enhancement - Phase-1/1st Floor Public Space 5112374 04/16/2019 04/30/2019 04/23/2019 Plans
9825 CRII-3B 2018-2019 Med Surge 2 Re-Roof 5112382 04/15/2019 04/29/2019 04/17/2019 Plans/Specifications
9824 Humanities Hall and Social Sciences Building 5112349 04/11/2019 04/25/2019 04/15/2019 Plans
9823 Engineering Gateway 2101 Lab Renovation 5112325 04/11/2019 04/25/2019 04/22/2019 Plans
9822 Student Center Lighting Phase 2 5109987 04/10/2019 04/24/2019 04/16/2019 Plans
9821 Engineering Tower 509 Lab Renovation 5112324 04/10/2019 04/24/2019 04/22/2019 Plans/Specifications
9820 2018-19 SCIP 1st Floor Classroom 5112332 04/09/2019 04/23/2019 04/15/2019 Plans
9819 Natural Science 1 MBCx 5110233 04/09/2019 04/23/2019 04/09/2019 Specifications
9818 Aquatics Facility Reconfiguration 5112159 04/08/2019 04/22/2019 04/11/2019 Plans/EH&S Redlines
9817 Beckman Laser Institute R106, R110, R112 & R132 Renovation 5112185 04/08/2019 04/22/2019 04/15/2019 Plans/Specifications/EH&S Redlines
9816 DM 18/19 SSPA, SSBA, SE2 SSLH Fire Alarm Panel 5112370 04/08/2019 04/22/2019 04/15/2019 Specifications
9815 2017-18 SCIP Public Service Building 2nd Floor Reno 5112147 04/08/2019 04/22/2019 04/15/2019 Plans
9814 EG 3327A Renovation 5112265 04/08/2019 04/22/2019 04/15/2019 Plans/Specifications
9813 2018-19 SCIP SSPB 2nd Floor 5112287 04/05/2019 04/19/2019 04/10/2019 Plans/Specifications
9812 2017-18 SCIP Sculpture Studio Dust Collector and Lighting Replacement 5112156 04/05/2019 04/19/2019 04/10/2019 Plans/Specifications
9811 301 and 302 Office Renovation 5112310 04/04/2019 04/18/2019 04/08/2019 Plans/EH&S Redlines
9810 DM 2018-19 Water Main Line Upgrades 5112303 04/04/2019 04/18/2019 04/10/2019 Plans/Specifications
9809 DM 2018-19 Water Main Line Upgrades 5112303 04/03/2019 04/17/2019 04/10/2019 Plans/Specifications
9808 Student Center Lighting Phase 2 5109987 04/03/2019 04/17/2019 04/09/2019 Plans
9807 Middle Earth HVAC Replacement 5112367 04/02/2019 04/16/2019 04/03/2019 Plans
9806 3 & 4 Floor Renovation 5112336 04/01/2019 04/15/2019 04/08/2019 Plans
9805 EDU 3rd floor Renovation Dean's admin 5112334 04/01/2019 04/15/2019 04/09/2019 Plans
9804 Track Resurfacing 5112343 03/28/2019 04/11/2019 04/03/2019 Plans
9803 HH and SSL Classroom Renovations 5112349 03/27/2019 04/10/2019 04/03/2019 Plans
9802 EG 2nd Floor MAC Renovation 5112315 03/27/2019 04/10/2019 04/01/2019 Plans
9801 Palo Verde Apartment Renovation 5112373 03/27/2019 04/10/2019 04/01/2019 Plans
9800 3 & 4 Floor Renovation 5112336 03/27/2019 04/10/2019 04/08/2019 Plans
9799 SCIP Rowland Labs B66, B70, B85, B93 5112295 03/26/2019 04/09/2019 04/01/2019 Plans
9798 Middle Earth HVAC Replacement 5112367 03/25/2019 04/08/2019 04/01/2019 Plans
9797 301 and 302 Office Renovation 5112310 03/25/2019 04/08/2019 03/27/2019 Plans
9796 DM 2018-19 Water Main Line Upgrades 5112303 03/22/2019 04/05/2019 03/26/2019 Plans/Specifications
9795 Building 55 Major Building Maintenance 5112289 03/22/2019 04/05/2019 03/27/2019 Plans
9794 Renovation Office and Lab space 5112283 03/22/2019 04/05/2019 03/26/2019 Floor Abatement and painting
9793 DM 2017-2018 Black Start Generator and PowerMax Phase 2 5112169 03/21/2019 04/04/2019 03/26/2019 Plans/Specifications
9792 DM 2017-2018 Black Start Generator and PowerMAX Phase 2 5112169 03/21/2019 04/04/2019 03/26/2019 Plans/Specifications
9791 SCIP Rowland Labs B66, B70, B85, B93 5112295 03/18/2019 04/01/2019 03/22/2019 Plans
9790 CRII-3B 2017 Roof Repairs 5112003 03/18/2019 04/01/2019 03/20/2019 Plans / Specifications
9789 Natural Science 1 MBCx 5110233 03/18/2019 04/01/2019 03/18/2019 Specifications
9788 Calit2 2421 Renovation 5112279 03/14/2019 03/28/2019 04/08/2019 Plans
9787 Engineering Gateway 3324 Lab Renovation 5112282 03/13/2019 03/27/2019   Plans, Specifications
9786 2018-19 SCIP -- SE-2 1st Floor Lab 1360 Renovation 5112285 03/13/2019 03/27/2019 03/21/2019 Plans
9785 AIRB 3rd Floor Renovation-Population Health 5112335 03/11/2019 03/25/2019 03/18/2019 100% Review
9784 Aldrich Hall Building Enhancement-Phase-1 /1st floor Public space 5112374 03/11/2019 03/25/2019 03/18/2019 Plans
9783 ISEB 999239 03/11/2019 03/25/2019   Submittal
9782 Interdiscuplinary Science & Engineering Building 999239 03/11/2019 03/25/2019   Submittal
9781 Humanities Instructional Building 5112339 03/11/2018 03/25/2019 03/14/2019 Plans, Final Review
9780 Student Center Door Access Controls - Phase I 5112138 03/07/2019 03/14/2019 03/08/2019 Plans
9779 SCIP 2018-19 HIB Automatic Door Operator Installation 5112339 03/07/2019 03/14/2019   Plans
9778 SCIP Rowland Labs B66, B70, B85, B93 5112295 03/05/2019 03/12/2019 03/08/2019 Plans
9777 ICS I 4th Floor Renovation 5112256 03/05/2019 03/12/2019 03/08/2019 Plans
9776 CRII-3B 2018-2019 Med Surge 2 Re-roof 5112382 03/04/2019 03/11/2019 03/08/2019 Plans, Specifications
9775 Engineering Tower 509 Lab Renovation 5112324 03/04/2019 03/11/2019 03/06/2019 Plans
9774 FEF Humanities Hall Classroom Renovations 5112349 03/04/2019 03/11/2019 03/05/2019 Plans
9773 2018-19 SCIP 1st Floor Classroom 5112332 03/04/2019 03/11/2019 03/04/2019 Plans, Specifications
9772 (FEF) Engineering Faculty Research Labs 5112353 03/04/2019 03/11/2019 03/14/2019 Plans
9771 Interdisciplinary Science & Engineering Buildings (ISEB) 999239 03/01/2019 03/08/2019   Other: ISEB_CP-9 Interior Build Out Dwgs (203-056-416)
9770 AIRB 3rd floor Renovation - Population Health 5112335 02/28/2019 03/07/2019 03/05/2019 Plans
9769 UCI Applied Innovation - Final Pricing / Agency Submittal OC#13918 02/28/2019 03/07/2019   UCI Applied Innovation - Final Pricing / Agency Submittal
9768 UCI Applied Innovation OC#13918 02/27/2019 03/06/2019   UCI Applied Innovation
9767 SCIP Rowland Labs B66, B70, B85, B93 5112295 02/25/2019 03/04/2019 02/26/2019 Plans
9766 Interdisciplinary Science & Engineering Building 999239 02/21/2019 02/28/2019   RFI: Design RFI 098 washing Davits
9765 SCIP 2018-19 HIB Automatic Door Operator Installation 5112339 02/21/2019 02/28/2019 02/25/2019 Plans, Specifications
9764 Anteater Track Stadium Resurfacing 5112343 02/21/2019 02/28/2019 02/25/2019 Plans, Specifications
9763 Remediate Sycamore Tree Infestation- Tree Planting Phase 5 5109992 02/21/2019 02/28/2019 02/25/2019 Plans, Specifications
9762 Verano Unit 6 Planters and Drains 5112350 02/21/2019 02/28/2019 03/06/2019 Plans
9761 Engineering Gateway 3324 Lab Renovation 5112282 02/19/2019 02/26/2019 02/25/2019 Plans
9760 Interdisciplinary Science & Engineering Building 999239 02/15/2019 02/22/2019   Submittal: ISEB- 01 3100.041 Work Plan for Fire Hydrant Install
9759 SCIP Rowland Labs B66, B70, B85, B93 5112295 02/15/2019 02/22/2019 02/26/2019 Plans
9758 Small CAP - lab renovation Med Sci C&D 5112284 02/14/2019 02/21/2019   Plans, Approval for Contracts
9757 DM 2018-19 Electrical System Emergency Circuit Improvements 5112299 02/13/2019 02/20/2019   Plans, Specifications
9756 ISEB 999239 02/12/2019 02/19/2019   Submittal11 5300.006. 1-ISEB_Lab Equipments- Laser Curtains
9755 SCIP 18/19: SoL Dean's suite office renovation - EDU 1st floor 5112338/997217 02/12/2019 02/19/2019 02/21/2019 Final Review
9754 AH 4th and 5th floor renovation - PHASE-3 5112002 02/12/2019 02/19/2019 02/20/2019 Final Review
9753 Replace Campus Emergency Phones 5112148 02/11/2019 02/18/2019 02/21/2019 Plans, Final Review
9752 SEP 2016 Natural Science 2 MBCx 5112212 02/11/2019 02/18/2019 02/12/2019 Plans, Approval for Contratcs
9751 CalIT2 Room 4500 Fiber Data 5112371 02/11/2019 02/18/2019 02/12/2019 Plans
9750 McGaugh 4104 Freezer Farm Cooling 5112313 02/11/2019 02/18/2019 02/11/2019 Plans
9749 Small Cap - Humanities Hall 178 Renovation 5112150 02/08/2019 02/15/2019 02/11/2019 Plans
9748 Croul Hall Bathroom Build-out 5112105 02/08/2019 02/15/2019 02/13/2019 Plans, Specifications
9747 AH 4th and 5th floor renovation - PHASE-3 5112002 02/08/2019 02/15/2019 02/11/2019 Plans, Final Review
9746 Engineering Tower 509 Lab Renovation 5112324 02/07/2019 02/21/2019 02/11/2019 Plans
9745 DM 18/19 Irrigation System Upgrade 5112270 02/05/2019 02/12/2019 02/05/2019 Specifications
9744 CRII-3B 2017-2018 Roof Repairs 5112003 02/04/2019 02/11/2019 02/05/2019 Plans
9743 DM 2018-19 Engineering Tower Concrete Crack 5112362 02/04/2019 02/11/2019 02/05/2019 Plans
9742 Rowland Hall Service Level Corridor 5112295 02/04/2019 02/11/2019 02/05/2019 Plans
9741 SCIP 2018-19 HIB Automatic Door Operator Installation 5112339 02/01/2019 02/08/2019 02/05/2019 Plans, Specifications
9740 Beckman Laser Institute R106, R110, R112 & R132 Renovation 5112185 01/29/2019 02/05/2019 02/05/2019 Plans, Specifications, EH&S Redlines
9739 Engineering Gateway 5112282 01/29/2019 02/05/2019 01/31/2019 Plans
9738 Student Center Door Access Controls - Phase I 5112138 01/28/2019 02/04/2019 01/30/2019 Plans, Specifications, EH&S Redlines
9737 Interdisciplinary Science & Engineering Building 999239 01/28/2019 02/04/2019   Submittal: ISEB_33 1100.039_Site Water Distribution (635-653-293)
9736 Interdisciplinary Science & Engineering Building 999239 01/28/2019 02/04/2019   Submittal: ISEB_11 5300.006 Lab Equip - Laser Curtains (227-079-730)
9735 Interdisciplinary Science & Engineering Building 999239 01/28/2019 02/04/2019   RFI: RFI-100 Emergency gas Shut-off Valve Location (Session 541-999-384)
9734 EGDC Piping Modification 5112380 01/24/2019 01/31/2019 01/29/2019 Plans, Specifications
9733 Crown Castle Verizon Wireless Sites 5112294 01/24/2019 01/31/2019 01/29/2019 Plans
9732 McGaugh Hall 4336 Equipment Cooling 5112309 01/23/2019 01/30/2019 01/23/2019 Plans, 100% Review
9731 2018-19 SCIP 1st Floor Classroom 5112332 01/23/2019 01/30/2019 01/29/2019 Plans
9730 Rowland Hall B66, B70, B85, B66 Phase 1 5112295 01/22/2019 01/29/2019 01/23/2019 Plans
9729 SCIP 18/19: SoL Dean's suite office renovation - EDU 1st floor 5112338/997217 01/22/2019 01/29/2019 01/30/2019 Plans, 100% Review
9728 ISEB 999239 01/18/2019 01/25/2019 01/25/2019 Submittal: ISEB_Lab Equipments- Bio Safety, Fume Hood
9727 Small Cap - Humanities Hall 178 Renovation 5112150 01/18/2019 01/25/2019 01/29/2019 Plans
9726 HIB Automatic Door Operator Installation 5112339 01/17/2019 01/24/2019 01/18/2019 Plans
9725 Sm Cap 2017 - CalIT2 TEMPR Properties Facility Renovation 5110353 01/17/2019 01/24/2019 01/23/2019 Plans
9724 Med Surge II 301 and 302 Office Renovation 5112310 01/17/2019 01/24/2019 01/18/2019 Plans-Schematic
9723 ET 924 Lab Renovation 5112249 01/16/2019 01/23/2019 01/18/2019 Plans
9722 Verano Structural Assessment 1-3 5112297 01/15/2019 01/22/2019 01/18/2019 Plans
9721 DM 2017-2018 Black Start Generator and PowerMAX Phase 2 5112169 01/15/2019 01/22/2019 01/18/2019 Plans, Specifications, & EH&S Redlines
9720 SSL 3rd floor renovation Lab Ste 308 5112153 01/10/2019 01/17/2019   Plans
9719 Rowland Hall B66, B70, B85, B66 Phase 1 5112295 01/08/2019 01/15/2019 01/23/2019 Plans, Final Review
9718 Replace McGaugh Process Water Control Valve 5112364 01/08/2019 01/15/2019 01/11/2019 100% Review
9717 Student Center Lighting Phase 2 5109987 01/08/2019 01/15/2019 01/11/2019 Plans
9716 SCIP Sculpture Ceramic Studio Renovation, Phase I: Kiln Exhaust 5112331 01/07/2019 01/14/2019 01/15/2019 Plans, Specifications
9715 Calit2 2421 Renovation 5112279 01/07/2019 01/14/2019 01/14/2019 Plans
9714 Parking Structure LED & Wireless Mesh Network 5109444 12/19/2018 01/02/2019 12/20/2018 Plans
9713 FMB Project Services Renovation 5112262 12/19/2018 01/02/2019 12/20/2018 Plans
9712 State Funded Re-roof Multiple Buildings 5110248 12/19/2018 12/26/2018 12/20/2018 Plans, Previous set w/ comments
9711 Rowland Hall Service Level Corridor 5112295 12/18/2018 01/01/2018 12/19/2018 Plans
9710 Beckman Laser Institute 5112185 12/18/2018 01/01/2018 01/21/2019 Plans, Specifications
9709 Croul Hall Classroom Build-out B002 5112162 12/17/2018 12/31/2018 01/08/2019 Plans
9708 Natural Sciences 1 Flood Remediation 5112354 12/17/2018 12/31/2018 12/18/2018 Plans
9707 DM 2017-2018 Black Start Generator and PowerMAX Phase 2 5112169 12/14/2018 12/21/2018 12/18/2018 Plans, Specifications, EH&S Redlines
9706 Humanities Hall Classroom Renovations 5112349 12/13/2018 12/20/2018 12/18/2018 Plans, Specifications
9705 DM-2017-2018-Fall Protection Measures 5112175 12/12/2018 12/26/2018 12/14/2018 Plans
9704 Croul Hall Bathroom Build-out 5112105 12/11/2018 12/18/2018 12/14/2018 Plans, Specifications
9703 ISEB 999239 12/11/2018 12/18/2018   Other: ISEB - CP - 08 MEP & Laboratory Set-up (347-640-055) IDP-02
9702 CRII-3A HIB Forensic Investigation 5112186 12/10/2018 12/17/2018 12/11/2018 Plans, Speicifcations
9701 Middle Earth Expansion 996298 12/10/2018 12/17/2018   Other: Middle Earth Expansion CP-4 Drawings - Record Set
9700 Rowland Hall Service Level Corridor 5112295 12/10/2018 12/17/2018 12/11/2018 Plans
9699 1034 Renovation 300775 12/10/2018 12/17/2018 12/11/2018 Plans
9698 3059 Renovation 296912 12/10/2018 12/17/2018 12/11/2018 Plans
9697 AH 1st floor Ste 16o Renovation 5112255 12/10/2018 12/17/2018 12/14/2018 Plans
9696 UCI Applied Innovation 17301.08 OC#13918 12/10/2018 12/17/2018   UCI Applied Innovation 17301.08
9695 Croul Hall Classroom Build-out B002 5112162 12/07/2018 12/14/2018 12/11/2018 Plans, Specifications, EH&S Redlines
9694 AH 5th floor room 509 VAV Box replacement 5112361 12/06/2018 12/13/2018 12/10/2018 Plans
9693 Middle Earth Housing Office Replace Fire Alarm System 5112296 12/04/2018 12/11/2018 12/05/2018 Plans
9692 ISEB 999239 12/03/2018 12/10/2018   Other
9691 Fire Life Safety Improvement 998611 12/03/2018 12/10/2018 12/04/2018 Submittal
9690 SC North Lobby Stair railing replacement 5112220 11/30/2018 12/07/2018 12/05/2018 Final Review
9689 Grounds Replace Irrigation Valves 5112196 11/29/2018 12/06/2018 11/29/2018 Plans, Specifications
9688 Rowland Hall Service Level Corridor 5112295 11/27/2018 12/04/2018 12/05/2018 Plans
9687 Middle Earth Housing Office Replace Fire Alarm System 5112296 11/27/2018 12/04/2018 11/30/2018 Plans
9686 Croul Hall Classroom Build-out B002 5112162 11/27/2018 12/04/2018 11/30/2018 Plans, Specifications
9685 Croul Hall Classroom Build-out B002 5112162 11/26/2018 12/03/2018 12/03/2018 Plans, Specifications
9684 Croul Hall Bathroom Build-out 51122105 11/26/2018 12/03/2018 12/03/2018 Plans, Specifications
9683 SC North Lobby Stair railing replacement 5112220 11/26/2018 12/03/2018 11/30/2018 Plans, Final Review
9682 Replace AH-2 5112133 11/20/2018 11/27/2018 11/26/2018 Addendum
9681 235 Renovation 299745 11/19/2018 11/26/2018 11/19/2018 Plans
9680 Reines Hall Air Compressor 5112223 11/19/2018 11/26/2018 11/19/2018 Final Review
9679 Croul Hall Classroom Build-out B002 5112162 11/16/2018 11/23/2018 11/19/2018 Plans, Specifications
9678 SC North Lobby Stair railing replacement 5112220 11/15/2018 11/22/2018 11/19/2018 Plans
9677 AH 1st floor Ste 16o Renovation 5112255 11/15/2018 11/22/2018 11/27/2018 Plans
9676 SCIP 18/19: Berk Hall office renovation - Phase-2 5112200 11/14/2018 11/21/2018 11/19/2018 Plans
9675 CRII-2 2015 High Hazard Laboratories 5110063 11/09/2018 11/23/2018 11/19/2018 Plans, Specifications
9674 UCI Applied Innovation - Revised Prelim Pricing OC#13918 11/14/2018 11/21/2018   UCI Applied Innovation
9673 DM 2017-2018 ELF Exhaust Safety Upgrade 5112166 01/23/2019 01/30/2019 01/30/2019 Plans, Specifications
9672 Student Center Door Access Controls - Phhase I 5112138 11/06/2018 11/13/2018 11/19/2018 Plans, Specifications
9671 CRII-2 Palo Verde/Middle Earth Pedestrian Bridge 5112253 11/06/2018 11/13/2018 11/19/2018 Plans, Specification
9670 2018-19 SCIP Lab Renovation for Med Sci D & C 5112284 11/06/2018 11/13/2018 11/06/2018 Plans, Specification
9669 SC 2018 Steinhaus Hall 429 Lab Renovation 5112155 11/05/2018 11/12/2018 11/19/2018 Plans, Specifications via project folder
9668 2018-19 SCIP Lab Renovation for Med Sci D & C 5112284 11/05/2018 11/12/2018 11/07/2018 Plans, Specifications
9667 Middle Earth Housing Office Replace Fire Alarm System 5112296 10/30/2018 11/06/2018 11/07/2018 Plans
9666 CRII-3A HIB Forensic Investigation 5112186 10/29/2018 11/05/2018 11/07/2018 Plans
9665 AH 1st floor Ste 16o Renovation 5112255 10/26/2018 11/02/2018 11/05/2018 Plans
9664 DM 2017-2018 ELF Exhaust Safety Upgrade 5112166 10/26/2018 11/02/2018 11/08/2018 Plans
9663 AH 4th and 5th floor renovation - PHASE 2 5112002 10/26/2018 11/02/2018 10/29/2018 Final Review
9662 FMB Project Services Renovation 5112262 10/25/2018 11/01/2018 10/29/2018 Plans
9661 Engineering Gateway 3327A Renovation 5112265 10/25/2018 11/01/2018 10/29/2018 Plans
9660 SC North Lobby Stair railing replacement 5112220 10/22/2018 10/29/2018 10/24/2018 Plans
9659 Central Plant thru Utility Tunnel to Engineering Gateway 5112317 10/17/2018 10/24/2018 10/17/2018 Plans, Specifications
9658 SC 2018 Steinhaus Hall 429 Lab Renovation- EARLY DEMO 5112155 10/17/2018 10/24/2018   Plans, Specifications via project folder
9657 ARC - HBO Shoot Cable Pull 5112330 10/15/2018 10/22/2018 10/17/2018 Plans, Specifications
9656 SC 2018 Steinhaus Hall 429 Lab Renovation- EARLY DEMO 5112155 10/11/2018 10/18/2018 10/11/2018 Plans, Specifications via project folder
9655 DCE Cable Pull - University Extension D Room 119 5112323 10/10/2018 10/17/2018 10/10/2018 Plans, Specifications
9654 Interdisciplinary Science & Engineering Building 999239 10/09/2018 10/16/2018   ISEB_Revised OCFA Dwgs w Response (https://studio.bluebeam.com/join.html?ID=293-506-204)
9653 AH 4th and 5th floor renovation-PHASE 2 5112002 10/05/2018 10/12/2018 10/24/2018 100% Review
9652 Engineering Hall Lab 3140 Renovation 5112163 10/05/2018 10/12/2018   Submittal
9651 Traffic Signals 5112245 10/04/2018 10/11/2018 10/09/2018 Plans
9650 Traffic Signals 5112244 10/04/2018 10/11/2018 10/09/2018 Plans
9649 FMB Project Services Renovation 5112262 10/04/2018 10/11/2018 10/08/2018 Plans
9648 ET 924 Abatement 5112249 10/03/2018 10/10/2018 10/04/2018 Specifications
9647 AH 1st floor Ste 16o Renovation 5112255 10/03/2018 10/10/2018 10/08/2018 Plans
9646 2017 Black Start Generator and PowerMAX Phase 2 5112169 10/02/2018 10/09/2018 10/08/2018 Plans, Specifications
9645 Middle Earth Housing Office replace Fire Alarm System 5112296 10/02/2018 10/09/2018 10/11/2018 Plans
9644 Student Center Lighting Phase 2 5109987 09/26/2018 10/03/2018 10/04/2018 Plans
9643 Engineering Gateway 3327A Renovation 5112265 09/26/2018 10/03/2018 10/15/2018 Plans
9642 Student Center Door Access Controls - Phase I 5112138 09/24/2018 10/01/2018 09/26/2018 Plans
9641 Interdisciplinary Science & Engineering Building 999239 09/21/2018 09/28/2018   Submittal: 01 3233.014 ISEB Air Quality Wind Study-Final Report
9640 Major Building Maintenance 5112079/5112080 09/21/2018 09/28/2018 10/04/2018 Plans, Addendum
9639 AH 4th and 5th floor renovation 5112002 09/20/2018 09/27/2018 09/26/2018 100% Review
9638 Mesa Court Field, near corner of University & Campus 5112227 09/19/2018 09/25/2018 09/19/2018 Plans, Specifications
9637 SC North Lobby Stair railing replacement 5112220 09/17/2018 09/24/2018 09/21/2018 Plans
9636 Middle Earth Housing Office/Bucklebury 5112296 09/13/2018 09/20/2018 09/17/2018 Plans
9635 Replace Campus Emergency Phones 5112148 09/13/2018 09/20/2018 09/17/2018 Final Review
9634 UCI Applied Innovation OC#13918 09/11/2018 09/18/2018   UCI Applied Innovation
9632 Student Center Door Access Controls - Phase I 5112138 09/10/2018 09/17/2018 09/10/2018 Plans
9631 AH 4th and 5th floor renovation - PHASE 2 5112002 09/07/2018 09/21/2018 09/10/2018 Plans, 100% Review
9630 Small Cap-Hummanities Hall 178 Renovation 5112150 09/05/2018 09/19/2018 09/17/2018 Plans
9629 Exterior Lighting at ring Mall ICS to reines 5112181 09/05/2018 09/19/2018 09/10/2018 Plans
9628 Renewal Elevator 5110001 09/06/2018 09/20/2018 09/11/2018 Plans
9627 Barclay Electric Service 5112231 08/30/2018 09/13/2018 09/06/2018 Plans, Specifications
9626 Barclay Electric Service 5112231 08/30/2018 09/13/2018   Plans, Specifications
9625 241 296562 08/28/2018 09/11/2018 08/28/2018 Plans
9624 ARC Kitchen Remodel 5110263 08/28/2018 09/11/2018 08/28/2018 Submittal 070000 Firestopping
9623 CRII-2 Palo Verde/Middle Earth Pedestrian Bridge 5112253 08/28/2018 09/11/2018 08/30/2018 Plans, Specifications
9622 Classroom & Office Building 990016 08/27/2018 09/10/2018   Other: NFPA 72
9621 Classroom & Office Building 990016 08/27/2018 09/10/2018   Other: NFPA 13
9620 Law Building - First Floor Renovation 5112151 08/27/2018 09/10/2018 08/27/2018 Other: Evac location prroofs
9619 UCI Applied Innovation OC#13918 08/22/2018 09/05/2018   UCI Applied Innovation
9618 Engineering Gateway 3327A Renovation 5112265 08/23/2018 09/06/2018 09/05/2018 Plans
9617 AH 4th and 5th floor renovation - PHASE 2 5112002 08/21/2018 09/04/2018 09/05/2018 Plans, 100% Review
9616 Bio Sci 3 First Floor Renovatioon - Phase 1 5112203 08/16/2018 08/30/2018 08/20/2018 Plans
9615 ARC Kitchen Remodel 5110263 08/15/2018 08/29/2018 08/16/2018 Plans-Shop Drawings, Specifications-Product Data
9614 OCTA Bus Stop Walkway 5112227 08/15/2018 08/29/2018 08/20/2018 Plans, Specifications
9613 Fire Life Safety Improvements 998611 08/14/2018 08/28/2018 08/15/2018 Other: Fire Sprinkler Replacement (SL Reines) MOP
9612 Fire Life Safety Improvements 998611 08/14/2018 08/28/2018 08/15/2018 Other: Charging New Fire Sprinkler Using Existing Fire Hose MOP
9611 Fire Life Safety Improvements 998611 08/14/2018 08/28/2018 08/15/2018 Other: ICS2, Physical Science Lecture & Classroom MOP
9610 AH 4th and 5th floor renovation 5112002 08/14/2018 08/28/2018 08/20/2018 Plans, 100% Review, Final Review
9609 Verizon Wirelesss Mesa Parking Structure Upgrade 5112142 08/09/2018 08/23/2018 08/10/2018 Plans
9608 AH 4th and 5th floor renovation 5112002 08/08/2018 08/22/2018 08/10/2018 100% Review, Final Review, Approval Stamp
9607 SC 2018 Steinhaus Hall 429 Lab Renovation 5112155 08/07/2018 08/21/2018   Plans, Specifications via Project Folder
9605 Engineering Tower 5112134 08/06/2018 08/20/2018 08/06/2018 Plans
9604 Barclay Electric Service 5112231 08/06/2018 08/20/2018   Plans
9603 Traffic Signals 5112244 08/06/2018 08/20/2018 08/06/2018 Plans
9602 Traffic Signals 5112245 08/06/2018 08/20/2018 08/06/2018 Plans
9601 Verizon Wireless Mesa Parking Structure Upgrade 5112142 08/03/2018 08/17/2018 08/06/2018 Plans
9600 Interdiciplinary Science & Engineering Building 999239 08/03/2018 08/17/2018 08/06/2018 Other: ISEB-OCFA Dwgs (650-385-760)
9599 Engineering Hall 5112163 08/02/2018 08/16/2018   Plans
9598 ARC Kitchen Remodel 5110263 08/03/2018 08/17/2018 08/20/2018 Plans
9597 AVC Renovation 300271 08/01/2018 08/15/2018 08/01/2018 Plans
9596 Traffic Signals 5112244 08/01/2018 08/15/2018 08/01/2018 Plans, Specifications
9595 Phoenix Grille Tile 5112251 07/30/2018 08/13/2018 07/30/2018 Plans
9594 DM 2017 - Fall Protection Measures 5112175 07/30/2018   07/30/2018 Specifications
9593 Interdisciplinary Science & Engineering Building 999239 07/30/2018 08/13/2018 08/15/2018 Other: ISEB_CP-3 Tunnel Extn. Design Specifications (694-004-319)
9592 Interdisciplinary Science & Engineering Building 999239 07/30/2018 08/13/2018 08/08/2018 Submittal: ISEB_33 1100.011 CP-2 Site Water Districbution
9591 AH 4th and 5th floor renovation 5112002 07/26/2018 08/09/2018 07/31/2018 Plans
9590 Bio Sci 3 First Floor Renovation - Phase 1 5112203 07/26/2018 08/09/2018 07/30/2018 Plans
9589 Replace Chilled Water Coils 5112174 07/26/2018 08/09/2018 07/27/2018  
9588 Elevator Renovation 5112219 07/24/2018 08/07/2018 07/30/2018 Specifications
9587 Interdisciplinary Science & Engineering Building 999239 07/23/2018 08/06/2018   Other: ISEB-G-Sheets pkg. (120-303-330)
9586 Interdisciplinary Science & Engineering Building 999239 07/23/2018 08/06/2018 08/08/2018 Other: ISEB_CP-3 Tunnel Extension Design Dwg Pkg (694-004-319)
9585 ET 924 Lab Renovation 5112249 07/23/2018 08/06/2018 07/24/2018 Plans
9584 Interdisciplinary Science & Engineering Building 999239 07/23/2018 08/06/2018   Other: ISEB_Design Development Dwg Pkg(350-981-518)
9583 Middle Earth Expansion 996298 07/20/2018 08/03/2018   Other: PACKAGE 4 - INTERIORS, MEP & SITE BACKCHECK SUBMITTAL - FRO
9582 Middle Earth Expansion 996298 07/20/2018 08/03/2018   Other: PACKAGE 4 - FIRE ALARM DRAWINGS - FRO
9581 Classroom & Office Building 990016 07/20/2018 08/03/2018   Other: SI-20 FRO
9580 Fire Life Safety Improvement 998611 07/20/2018 08/03/2018 08/09/2018 Other: FLS-McGaugh Hall Vivarium - Audible Device Solution
9579 Fire Life Safety Improvement 998611 07/20/2018 08/03/2018 07/31/2018 Submittal: FLS-Rowland Hall Asbestos Work Plan (Revised)
9578 Verano Pedestrian Pathway Improvement 5112180 07/19/2018 08/02/2018 07/19/2018 Plans
9577 Croul Hall Basement Restroom Build-out 5112105 07/19/2018 08/02/2018 07/19/2018 Plans
9576 ET 924 Lab Renovation 5112249 07/19/2018 08/02/2018 07/19/2018 Plans
9575 2017-18 SCIP Public ServiceBuilding 2nd floor Reno 5112147 07/12/2018   07/12/2018 Plans
9574 Classroom & Office Building 990016 07/11/2018 07/25/2018 07/17/2018 Submittal 28 31 11 - 5159 - 6 - Fire Alarm Shop Drawings Field Changes
9573 Classroom & Office Building 990016 07/10/2018 07/24/2018   Submittal 28 31 11 - 5159 - 5 Fire Alarm Shop Drawings Field Changes
9572 Berk Hall Distance Learning Center 5112260 07/10/2018 07/24/2018 07/11/2018 Plans
9571 TES Tank Ladder replacement 5110323 07/09/2018 07/23/2018 07/10/2018 Plans
9570 DM 2017-18 ELF Exhaust safety Upgrade 5112166 07/09/2018 07/23/2018 07/10/2018 Plans
9569 2017-18 SCIP Public Service Building 2nd Floor Reno 5112147 07/09/2018 07/23/2018 07/09/2018 Plans & EH&S Redlines
9568 Fire Life Improvement 998611 07/06/2018 07/20/2018 07/16/2018 Submittal: FLS-Submittal-Fire Alarm System-Addl.Equipment PD (133-192-030)
9567 Fire Life Safety Improvemenr 998611 07/06/2018 07/20/2018 07/16/2018 Submittal: FLS_Site Water Distrubution Details & Material (ELF)
9566 AH 4th and 5th Floor Renovation 5112002 07/06/2018 07/20/2018 07/11/2018 Plans,100% Review
9565 MSTB Surface Parking Lot 999514 06/29/2018 07/13/2018 07/03/2018 Other: MSTB Parking_Water Quality Management Plan
9564 Interdisciplinary Science & Engineering Building (ISEB) 999239 06/29/2018 07/13/2018 07/03/2018 RFI-045_Storm Water Mitigation BMP
9563 ET 924 Lab Renovation 5112249 06/28/2018 07/12/2018 06/28/2018 Plans
9562 ICS E-Tech Cabling 5112252 06/26/2018 07/10/2018 06/26/2018 Specifications
9561 Med Ed Security 5112216 06/26/2018 07/10/2018 06/28/2018  
9560 Verano Pedestrian Pathway Improvement 5112180 06/26/2018 07/10/2018 06/28/2018  
9559 Classroom & Office Building 990016 06/25/2018 07/09/2018   Submittal 28 31 11 - 5159 - 4 Fire Alarm Shop Drawings Field Changes
9558 Crould Hall Basement Restroom Build-out 5112105 06/21/2018 07/05/2018 06/26/2018 Plans
9557 AH 4th and 5th floor renovation 5112002 06/21/2018 07/05/2018 06/26/2018  
9556 Drama Building No. 715 5112158 06/20/2018 07/04/2018 06/26/2018 Plans
9555 TES Tank Ladder replacement 5110323 06/19/2018 07/03/2018 07/10/2018 Plans
9554 Engineering Gateway 5112110 06/08/2018 06/22/2018 06/18/2018 Plans, Specs and Redlines
9553 Fire Life Safety Improvement 998611 06/15/2018 06/29/2018 06/29/2018 Submittal: FLS-Rowland Hall Asbesto Work Plan
9552 Med Ed Security 5112216 06/15/2018 06/29/2018 06/18/2018  
9551 2017-18 SCIP - IISBR Laboratory Expansion 5112161 06/14/2018 06/28/2018 06/14/2018 Plans & Specs
9549 DBH 2nd and 5th Floor renovations 5112146 06/13/2018 06/27/2018 06/19/2018 Plans
9548 2017-18 SCIP - IIBR Laboratory Expansion 5112161 06/13/2018 06/27/2018 06/19/2018 Plans & Specs
9547 CRSP - ICS to EGDC Fiber Install 5112239 06/13/2018 06/27/2018 06/13/2018 Plans & Specs
9546 Small Cap 14/15 McGaugh Hall Lab 4311 Renovation 5109824 06/13/2018 06/27/2018 06/18/2018  
9545 ARC Kitchen Remodel 5110263 06/11/2018 06/25/2018 06/14/2018 Plans & Specs
9544 2017-18 SCIP Public Service Building 2nd Floor Reno 5112147 06/11/2018 06/25/2018 06/12/2018 Plans
9543 Fire Life Safety Improvement 998611 06/08/2018 06/22/2018 06/11/2018 Other: ICS-2_G-Sheets
9542 Fire Life Safety Improvement 998611 06/08/2018 06/22/2018 06/11/2018 Other: FLS-Phy Sci Class G-Sheets (021-315-954)
9541 Fire Life Safety Improvement 998611 06/08/2018 06/22/2018 06/11/2018 Other: Phy Sci Lecture G-Sheets (428-685-607)
9540 Major Building Maintenance 5112079 06/07/2018   06/07/2018 Addendum
9539 CRII University Widening Storm Drain Sleeve 5112263 06/06/2018 06/20/2018 06/06/2018 Plans
9538 Croul Hall Classroom Build-out B002 5112162 06/05/2018 06/19/2018   Plans
9537 2017-18 SCIP AIRB 2nd Flr, Ste 2000 Reno 5112149 06/04/2018   06/05/2018  
9536 2017-18 SCIP - IISBR Lab Expansion 5112161 06/04/2018 06/18/2018 06/11/2018 Plans & Specs
9535 SCPS Concrete Damage 5112257 06/04/2018 06/18/2018 06/04/2018 Plans
9534 Ram's Harscape Improvements 5112250 05/31/2018 06/14/2018 06/01/2018 Plans
9533 Croul Hall Classroom Build-out 5112162 05/30/2018 06/13/2018 06/01/2018 Plans
9532 Engineering Gateway 5112110 05/29/2018 06/12/2018 05/30/2018 Plans & Spectifications
9531 ELF Pony compressor Dryer 5112242 05/29/2018 06/12/2018 05/29/2018 Specifications
9530 Fire Life Safety Improvement 998611 05/25/2018 06/08/2018 05/25/2018 Other: Reines Hall FP Water Distribution Dwgs
9529 Fire Life Safety Improvement 998611 05/25/2018 06/08/2018 05/25/2018 Other: Engg Gateway Water Distribution Plan
9528 TES Tank Ladder replacement 5110323 05/25/2018 06/08/2018 05/30/2018 Plans
9527 ARC Kitchen Remodel 5110263 05/24/2018 06/07/2018 05/31/2018 Plan & Specs - 5110263/07
9526 Engineering Hall Lab 3140 Renovation 5112163 05/23/2018 06/06/2018 05/24/2018 Plans & Specs
9525 Croul Hall Basement Restroom Build-out 5112015 05/23/2018 06/06/2018 05/29/2018 Plans
9524 Fire Life Safety Improvement 998611 05/22/2018 06/05/2018   Other: Reines Hall G Sheet & Architectual Ceiling Plans (623-377-796)
9523 Aldrich Hall Replace AH-2 5112133 05/17/2018 05/31/2018 05/22/2018 Plans
9522 Croul Hall Classroom Build-out B002 5112162 05/14/2018 05/28/2018 05/18/2018 Plans
9521 2017-2018 SCIP - Humanities Hall Restrooms 5112160 05/10/2018 05/24/2018 05/10/2018 Plans & Specifications
9520 2017-2018 SCIP Lighting Lab Renovation @ Drama Room 148 5112158 05/11/2018 05/25/2018 05/15/2018 Plans
9519 DBH 2nd and 5th Floor Renovations 5112146 05/11/2018 05/25/2018 05/15/2018 Plans
9518 Engineering Hall Lab 3140 Renovation 5112163 05/10/2018 05/24/2018 05/10/2018 Plans and Specifications
9517 Classroom and Office Building 990016 05/10/2018 05/24/2018 05/11/2018 Other: FEC Location change at Level 3
9516 Replace Campus Emergency Phones 5112148 05/10/2018 05/24/2018 05/15/2018  
9515 TES Tank Ladder replacement 5110323 05/09/2018 05/23/2018 05/15/2018 Plans
9514 Interdisciplinary Science & Engineering Building 999239 05/08/2018 05/22/2018 05/08/2018 Other: ISEB_CP-1 Temp Service Road Drawings & Specs_FINAL(871-523-834)
9513 Croul Hall Basement Restroom Build-out 5112105 05/08/2018 05/22/2018 05/09/2018 Plans
9512 CRII-3A ELF Exterior Wall Repair 5112107 05/04/2018 05/18/2018 05/04/2018 Plans & Specifications
9511 ADA Bathroom & Kitchen Conversion 5112201 05/02/2018 05/16/2018 05/03/2018 Plans
9510 Major Building Maintenance 5112079 05/01/2018 05/15/2018 05/03/2018 Addendum Submittal
9509 2017-2018 SCIP - Humanities Hall Restrooms 5112160 05/01/2018 05/15/2018   Plans and Specifications
9508 2017-2017 SCIP AIRB 2nd Flr, Ste 2000 Reno 5112149 05/01/2018 05/15/2018   Plans & Addendum
9507 Croul Hall Classroom Build-out B002 5112162 04/30/2018 05/14/2018 05/03/2018 Plans
9506 AH 4th and 5th floor renovation 5112002 04/27/2018 05/11/2018   Plans
9505 CRII - 2015 Step Lights - EH&S 5110206 04/26/2018 05/10/2018 04/27/2018 Specifications
9504 Paint Building Interiors, Arroyo Vista 5112187 04/26/2018 05/10/2018 04/26/2018 Plans and specifications
9503 AH 4th and 5th floor renovation 5112002 04/24/2018 05/08/2018 04/25/2018 Plans
9502 ADA Bathroom & Kitchen Conversion 5112201 04/24/2018 05/08/2018   Plans
9501 Classroom & Office Building 990016 04/23/2018 05/07/2018   Other: SI-15 - FRO
9500 Berk Hall 299 Renovation 5112145 04/19/2018 05/03/2018 04/19/2018 Plans
9499 2017-18 SCIP AIRB 2nd Floor, Ste 2000 Reno 5112149 04/19/2018 05/03/2018 04/19/2018 Plans, Specs & EH&S Redlines
9498 2017-2018 SCIP Lighting Lab Renovation @ Drama Room 148 5112158 04/20/2018 05/04/2018 04/23/2018 Plans
9497 Middle Earth Shower renovations 5112173 04/19/2018 05/03/2018 04/24/2018 Plans
9496 SBSG 2nd floor renovation 5112063 04/19/2018 05/03/2018 04/26/2018 Plans
9495 SSL 3rd floor renovation Lab Ste 308 5112153 04/19/2018 05/03/2018 04/26/2018 Plans
9494 SSL 4th floor renovation - ste 407+408 5112058 04/19/2018 05/03/2018 04/26/2018 Plans
9493 SC 2018 Steinhaus Hall 429 Lab Renovation 5112155 04/18/2018 05/02/2018 04/19/2018 Plans
9492 Re-roof Multiple Buildings 5110248 04/18/2018 05/02/2018 04/19/2018 Plans
9491 Re-rood Multiple Buildings 5110248 04/18/2018 05/02/2018 05/02/2018 Plans
9490 ARC Kitchen Remodel 5110263 04/18/2018 05/02/2018 04/27/2018 Plans
9489 Nelson Auditorium and Tamkin F108 renovation 5112152 04/17/2018 05/01/2018 04/19/2018 Plans
9488 Engineering Hall Lab 3140 Renovation 5112163 04/13/2018 04/27/2018 04/17/2018 Plans & Specs
9487 Berk Hall Renovation - 2nd floor Office Conversion 5112200 04/11/2018 04/25/2018 04/16/2018 Plans
9486 Major Building Maintenance 5112079 04/11/2018 04/25/2018 04/16/2018 Addendum
9485 Leasing Oversight Renovation 5112015 04/11/2018 04/25/2018 06/28/2018 Plans
9484 2017-18 SCIP - Humanities Hall Restrooms 5112160 04/10/2018 04/24/2018 04/12/2018 Plans & Specifications
9483 Middle Earth Shower Renovation 5112173 04/10/2018 04/24/2018 04/12/2018 Plans
9482 CRII-3R Replace Beckman AHU 1, 2, 3 5112127 04/10/2018 04/24/2018 04/10/2018 Plans
9481 Social Sciences Stairs & Campus Bridges 5110191 04/09/2018 04/23/2018 04/10/2018 Plans
9480 Fire Life Safety Improvement 998611 04/06/2018 04/20/2018   Other: FLS_Reines Hall FP Level 5 Dwgs & Calc. (Session 710-687-618)
9479 Middle Earth Expansion 996298 04/05/2018 04/19/2018   RFI 0188R1 - L1 Equipment Vault Lid Clarification
9478 Kitchen Renovation 5112172 04/05/2018 04/19/2018 04/06/2018 Plans
9477 Nelson Auditorium and Tamkin F108 renovation 5112152 04/05/2018 04/19/2018 04/10/2018 Plans
9476 Middle Earth Expansion 996298 04/04/2017 04/18/2018   OCFA Submittal
9475 Leasing Overisght Renovation 511 2015 04/04/2018 04/18/2018 04/16/2018 Plans
9474 SC Humanities Hall 178 Renovation 5112150 04/04/2018 04/18/2018 04/10/2018 Plans
9473 2017-18 SCIP AIRB 2nd Flr, Ste 2000 Reno 5112149 04/04/2018 04/18/2018 04/04/2018 Plans, Specifications & EH&S Redlines
9472 Classroom & Office Building 990016 04/03/2018 04/17/2018   Submittal 07 84 13 5551 - 0 - Supplemental Plumbing Fire Stopping 2 HR F & T
9471 Classroom & Office Building 990016 04/02/2018 04/16/2018   Submittal 21 10 00 - 5562 - 0 - Fire Protection Metraflex Loop
9470 Fire Life Safety Improvement 998611 03/29/2018 04/12/2018   Other: McGaw Fire Alarm 50% Dwgs (Session 931-929-725)
9469 Fire Life Safety Improvement 998611 03/29/2018 04/12/2018   Other: FLS_Reines Hall FP Level 4 Drwgs & Calc.
9468 Fire Life Safety Improvement 998611 03/29/2018 04/12/2018   RFI 007 Reines Sprinkler Drainage
9467 Fire Life Safety Improvement 998611 03/29/2018 04/12/2018   Other: Phy Sci Classroom Building (FA)_100DRAFT (Session 223-825-327)
9466 Fire Life Safety Improvement 998611 03/29/2018 04/12/2018   Other: Phy Sci Lecture Hall (FA)_100DRAFT (Session 416-512-114)
9465 Leasing Oversight Renovation 5112015 03/29/2018 04/12/2018 04/10/2018 Plans
9464 Middle Earth Quenya 5112201 03/29/2018 04/05/2018 04/03/2018 Plans
9463 Fire Life Safety Improvement 998611 03/26/2018 04/09/2018 03/27/2018 RFI 044_Fire Pump @ Reines Hall
9462 ARC Locker Room Tile Replacement 5112222 03/26/2018 04/09/2018 03/28/2018 Plan & Sepcifications
9461 Engineering Hall Lab 3140 Renovation 5112163 03/26/2018 04/09/2018 03/28/2018 Plans
9460 Kitchen Renovations 5112172 03/26/2018 04/09/2018 04/03/2018 Plans
9459 Small Cap School of Engineering - Engineering Gateway Lab Renovation 3327 A/B_(1101/1102) 5110098 03/23/2018 04/06/2018 03/28/2018 Plans
9458 Fire Life Safety Improvement 998611 03/23/2018 04/06/2018   Other: ICS 2 fire Alarm Dwgs_100DRAFT_032118
9457 Fire Life Safety Improvement 998611 03/23/2018 04/06/2018   RFI 005R1 Explosion Proof Smoke Detector
9456 Fire Life Safety Improvement 998611 03/23/2018 04/06/2018   RFI 006 Networking and Interfacing with EH&S
9455 Fire Life Safety Improvement 998611 03/22/2018 04/05/2018   Submittal 01 5000.01 Temp Fac & Controls_Laydown Fencing Access Plan
9454 Middle Earth Expansion 996298 03/22/2018 04/05/2018   Submittal 26 5100 - 001 Emergency Lighting Inverter System Product Data
9453 SSL 3rd Floor renovation Lam Ste 308 5112153 03/22/2018 04/05/2018 03/28/2018 Plans
9452 EH Renovate Room 1106, 1108, 1110, 1111, 1112 5110052 03/22/2018 04/05/2018 03/28/2018 Addendum
9451 Mesa Court Expansion - Gate Arms 996296 03/22/2018 04/05/2018   Other: Mesa Court Gate Arms
9450 CRII 2013 - Engineering Gateway Victaullic Fitting CWS 5110231 03/22/2018 04/05/2018 03/22/2018 Addendum
9449 Middle Earth Expansion 996298 03/21/2018 04/04/2018 03/22/2018 RFI 0304 - DPP Smoke Detector Requirements Clarification
9448 Middle Earth Expansion 996298 03/21/2018 04/04/2018   RFI 0343 - Grease Duct Through Level 2 Slab Firestop System Confirmation
9447 Middle Earth Expansion 996298 03/21/2018 04/04/2018   Other: Package 4 Fire Protection
9446 Classroom & Office Building 990016 03/21/2018 04/04/2018   Submittal 07 84 13 - 5543 - 0 - Supplemental Fire Protection Fire Stopping
9445 Classroom & Office Building 990016 03/21/2018 04/04/2018 03/21/2018 RFI_2540- Top of Wall UL for Shaft Walls
9443 Fire Life Safety Improvement 998611 03/21/2018 04/04/2018   Other: Reines Hall Building Design_100DRAFT_FA_03.19.18
9442 CRII-3 2017 Major Building Maintenance 5112079 03/21/2018 04/04/2018    
9441 SSL 4th floor renovation - ste 407+408 5112058 03/20/2018 04/03/2018 04/04/2018 Plans
9440 SBSG 2nd floor renovation 5112063 03/20/2018 04/03/2018 03/22/2018 Plans
9439 DM 17-18 ELF Trip Hazards 5112225 03/20/2018 04/03/2018 03/21/2018 Plans & Specifications
9438 SEP 2016-17 Contemporary Arts RCx 5110297 03/19/2018 04/02/2018 03/20/2018 Other: diagram
9437 2017-18 SCIP-IISBR Laboratory Expansion 5112161 03/19/2018 04/02/2018 03/26/2018 Plans
9436 CRII-3R Replace Beckman AHU 1, 2, 3 5112127 03/19/2018 04/02/2018 03/19/2018 Plans, Specifications and EH&S Redlines
9435 Fire Life Safety Improvements 998611 03/16/2018 03/30/2018 03/26/2018 Other: - Reines Hall Standpipe FP Calcs. & Dwgs. For approval stamp.
9434 Middle Earth Expansion 996298 03/15/2018 03/29/2018 03/16/2018 Other: Package 4 Fire Alarm
9433 Gillespie Neuroscience MBCx 5110238 03/15/2018 03/29/2018 03/15/2018 Specifications
9432 CRII-2 2015 Rowland Hall construct Exhaust Ductwork Upgrade 5110345 03/15/2018 03/29/2018 03/15/2018 Specifications
9431 Fire Life Safety Improvements 998611 03/14/2018 03/28/2018 04/02/2018 Other: - Reines Hall 3rd Floor FP Calcs. & Dwgs.
9430 Classroom & Office Building 990016 03/14/2018 03/28/2018 03/21/2018 SI-15
9429 Classroom & Office Building 990016 03/14/2018 03/28/2018 03/14/2018 Submittal CP-5 Specifications
9428 Replace Campus Emergency Phones 5112148 03/14/2018 03/28/2018 03/19/2018 Plans
9427 CRII-2 2015 - Bonney Center Coating 5110337 03/13/2018 03/27/2018 03/14/2018 Specifications
9426 Classroom & Office Building 990016 03/13/2018 03/27/2018 03/16/2018 Submittal 28 31 11 - 5535 - 0 - Area of Refuge Phone
9425 Classroom & Office Building 990016 03/13/2018 03/27/2018 03/16/2018 Submittal 07 84 13 - 5523 - 0 - Piping Penetration Fire Stopping Supplemental
9424 Middle Earth Expansion 996298 03/13/2018 03/27/2018 03/16/2018 Submittal 07 2100 - 001 - A - Owes Corning Thermal Insulation
9423 Fire Life Safety Improvements 998611 03/12/2018 03/26/2018   Submittal 21 10 00.01.00 Water-based FP Material & Equipment PD w/Spec
9422 Fire Life Safety Improvements 998611 03/09/2018 03/23/2018 03/16/2018 Submittal 28 31 11.01 Digital Addressable FA Systems Equipment PD
9421 2017-18 SCIP - Humanities Hall Restrooms 5112160 03/09/2018 03/23/2018 03/15/2018 Plans
9420 Leasing Oversight Renovation 5112015 03/08/2018 03/22/2018 03/16/2018 Plans
9419 Fire Life Safety Improvements 998611 03/07/2018 03/21/2018 03/12/2018 Other: Bison Water Line connection Dwgs
9418 Fire Life Safety Improvements 998611 03/07/2018 03/21/2018 03/08/2018 Submittal Fire Alarm Upgrade - Comp & Info Sci 2
9417 Fire Life Satefy Imrpovements 998611 03/07/2018 03/21/2018 03/08/2018 Submittal Fire Alarm Upgrade - Physical Sci. Classroom Building
9416 Fire Life Safety Improvements 998611 03/07/2018 03/21/2018 03/08/2018 Submittal Fire Alarm Upgrade - Physical Sci. Lecture Hall
9415 Middle Earth Expansion 996298 03/05/2018 03/19/2018   RFI 0304 - DPP Smoke Detector Requirements Clarification
9414 Gross Hall MBCx 5110237 03/05/2018 03/19/2018 03/12/2018 Plans
9413 Berk Hall 299 Renovation 5112145 03/05/2018 03/19/2018 03/06/2018 Plans
9412 Nelson Auditorium and Tamkin F108 renovation 5112152 03/02/2018 03/16/2018   Plans
9411 Re-roof Multiple Buildings 5110248 03/02/2018 03/16/2018 03/07/2018 Plans
9410 DM 17/18 Replace Reheat Valves 5112184 03/02/2018 03/16/2018 03/02/2018 Plans and Specifications
9409 Middle Earth Expansion 996298 03/01/2018 03/15/2018 03/07/2018 RFI 0260 - FDC Inlet Pressure Clarification
9408 Classroom & Office Building 990016 03/01/2018 03/15/2018 03/06/2018 RFI_2462 R2 - Top of Wall Joint Clarification - Engineer Stamp
9407 Classroom & Office Building 990016 03/01/2018 03/15/2018 03/07/2018 Submittal 21 10 00 - 5521 - 0 - Supplemental Fire Protection Exposed Piping Reconfigurations
9406 2017-18 SCIP AIRB 2nd Flor, Ste 2000 Reno 5112149 03/01/2018 03/15/2018 03/05/2018 Plans, Specifications and EH&S Redlines
9405 Middle Earth Expansion 996298 02/27/2018 03/13/2018 03/07/2018 RFI 0259 - Fire Water Underground Lead-in Clarification
9404 Classroom & Office Building 990016 02/27/2018 03/13/2018 03/06/2018 Submittal 07 84 13 - 5514 - 0 - Supplemental Penetration Firestopping Electrical
9403 Middle Earth Expansion 996298 02/02/2018 02/16/2018 02/09/2018 Submittal - 90% Package 4 Interiors, MEP and Site Drawings Review (Kitchen Drawing)
9402 Middle Earth Expansion 996298 02/21/2018 03/07/2018 03/13/2018 Submittall 11 4000 - 013 - 0 - Halton Hoods Shop
9401 Social Science Plaza, Social Science Hall, Donald Bren Hall 5112113 02/20/2018 03/06/2018 02/21/2018 Plans and Specifications
9400 Classroom & Office Building 990016 02/16/2018 03/02/2018   Submittal 21 10 00 - 5502 - Fire Sprinkler Protection Drawings Field as Built
9399 Middle Earth Expansion 996298 02/16/2018 03/02/2018 03/07/2018 RFI 0188 - L1 Equipement Vault Lid Clarification
9398 Classroom & Office Building 990016 02/16/2018 03/02/2018 02/20/2018 RFI_2480 - Relocate Fire Water Hot Tap Confirmation
9397 CRII-2 2015 - Engineering Tower and Bonney Center Coatin 5110337 02/16/2018 03/02/2018 02/21/2018 Plans and Specifications
9396 CRII-2 2015 - Bonney Center Coating - Ext. Lights 5110337 02/16/2018 03/02/2018 02/21/2018 Plans and Specifications
9395 Classroom & Office Building 990016 02/15/2018 03/01/2018 02/27/2018 RFI_2484 - Pavilion Exterior Wall Type Confirmation
9394 Classroom & Office Building 990016 02/15/2018 03/01/2018 02/20/2018 Submittal 01 32 00 - 5510 - 0 - Revised Fence Plan
9393 Classroom & Office Building 990016 02/15/2018 03/01/2018 02/20/2018 RFI_2479 - Southern Fire Water Alteration
9392 Middle Earth Expansion 996298 02/15/2018 03/01/2018 03/05/2018 Submittal 21 1000 - 003 - 0 - Fir eProtection Material and Equipment
9391 Middle Earth Expansion 996298 02/15/2018 03/01/2018   Submittal 21 1000 - 002 - 0 - Basement Fire Sprinkler
9390 Classroom & Office Building 990016 02/15/2018 03/01/2018 02/20/2018 Submittal 09 54 26 - 5476 - 0 Wood Ceiling Project Data
9389 Classroom and Office Building 990016 02/15/2018 03/01/2018 02/20/2018 Submittal 12 61 00 -0 - Fixed Audience Seating Product Data
9388 Fire Life Safety Improvement 998611 02/15/2018 03/01/2018   Drawings & Calc
9387 Law Building 5112151 02/15/2018 03/01/2018 02/22/2018 Plans
9386 Fire Life Safety Improvements 998611 02/14/2018 02/28/2018   Other: Standpipe & Fire Alarm w hydrologic calcs
9385 Middle Earth Expansion 996298 02/14/2018 02/28/2018   90% Review Fire Alarm Drawings
9384 Middle Earth Expansion 996298 02/13/2018 02/27/2018   Submittal 28 3111 - 001 Fire Alarm System Basement Drawing
9383 Classroom & Office Building 990016 02/12/2018 02/26/2018 02/20/2018 RFI_2462 R1 - Top of Wall Joint Clarification - Engineer Stamp
9382 Middle Earth Expansion 996298 02/09/2018 02/23/2018 03/02/2018 RFI 0195 - Elevators 2-4 Guardrail and Counterweight HSS Clarification
9381 Middle Earth Expansion 996298 02/09/2018 02/23/2018   Submittal - Package 3 Skin & Elevator Drawings _FRO
9380 Berk Hall 299 Renovation 5112145 02/09/2018 02/23/2018 02/13/2018 Plans
9379 Middle Earth Expansion 996298 02/08/2018 02/22/2018 02/15/2018 Submittal 27 1500 -001 Basement Level DAS System Plan and Heat Map
9378 Engineering Lab Facility 134 Renovation 5112061 02/08/2018 02/22/2018 02/13/2018 Plans and Specifications
9377 Social Science Plaza B null 02/08/2018 02/22/2018 02/13/2018 Other: Evac maps
9376 Social Sciences Plaza A null 02/08/2018 02/22/2018 02/13/2018 Other: Evac Maps
9375 Mesa Court Fire Lane 5112128 02/08/2018 02/22/2018 02/07/2018 Specifications:
9374 Middle Earth Expansion 996298 02/06/2018 02/20/2018 02/14/2018 Submittal: 28 3111-002 Fire Alarm System Product Data
9373 Middle Erath Expansion 996298 02/06/2018 02/20/2018 02/08/2018 Other: UCI Middle Earth Fire Protection Report Backcheck
9372 Middle Earth Expansion 996298 02/06/2018 02/20/2018   Submittal: 90% Package 4 Inetriors, MEO and Site Drawings_Review (volume 1 & 2)
9371 ET 1st Floor Expansion 5110410 02/05/2018 02/19/2018 02/07/2018 Plans: Revised code sheet A110
9370 2017-18 SCIP AIRB 2nd Floor, Ste 2000 Reno 5112149 02/05/2018 02/19/2018   Plans:
9369 Social Science Stairs & Campus Bridges 5110191 01/30/2018 02/13/2018 01/31/2018 Plans:
9368 Classroom & Office Building 990016 01/30/2018 02/13/2018 02/06/2018 RFI: RFI_2469-Fireproofing Truss end inside the wall
9367 Classroom & Office Building 990016 01/30/2018 02/13/2018 02/05/2018 Submittal: 01 32 00-5475-0-AHU and 4 roof Pick Work Plan
9366 Student Center Phase 3 Coil Relacement (AH 1 & 2) 5112124 01/29/2018 02/12/2018 01/30/2018 Plans, Specifications
9364 Verano Electrical Vehicle Charging 5110404 01/29/2018 02/12/2018 01/30/2018 Plans:
9363 Law Library Seminar Renovation 5112151 01/26/2018 02/09/2018 01/31/2018 100% Review
9362 Classroom & Office Building 990016 01/25/2018 02/08/2018 01/29/2018 Submittal: 28 31 11-5473-Fire Alarm Drawing Field Changes
9361 Classroom & Office Building 990016 01/25/2018 02/08/2018 01/29/2018 RFI: 2444-Elevator Shaft Wall Revisions with added Tube Steel
9360 Classroom & Office Building 990016 01/25/2018 02/08/2018 01/31/2018 RFI: 2462-Top of Wall Joint Clarification
9359 Primary Electrical Improvement Step-4 990513 01/23/2018 02/06/2018 01/23/2018 Other: Transfer of Capitol project to Facilities" Doc
9358 ICS-1 MBCx 5109947 01/24/2018 02/07/2018 01/24/2018 Specifications:
9357 Primary Electrical Improvement Step-4 990513 01/23/2018 02/06/2018 01/23/2018 Other: Beneficial Occupancy Certificate for Sign Off
9356 SBSG 2nd floor Renovation 5112063 01/19/2018 02/02/2018 01/25/2018 Plans
9355 SSL 3rd Floor Renovation Lab Ste 308 5112153 01/19/2018 02/02/2018 01/26/2018 Plans:
9354 SSL 4th Floor renovation-ste 404 + 408 5112058 01/19/2018 02/02/2018 01/24/2018 Plans:
9353 Fire Life Safety Improvements 998611 01/19/2018 02/02/2018   Other: Prelim Project Schedule
9352 Primary Electrical Improvement Step-4 990513 01/19/2018 02/02/2018   Other: ANOC 28R Remove ? 12kV Cable & Replace (revised)
9351 State Fund Re-roof multiple buildings 5110248 01/18/2018 02/01/2018 01/22/2018 Plans: Demo & Renovation
9350 School of Business 5400 Renovation 5112131 01/18/2018 02/01/2018 01/22/2018 Approval & Final Review
9349 CRII-2 2015-Engineering Tower and Boney Center Coating 5110337 01/18/2018 02/01/2018 01/22/2018 Plans
9348 Middle Earth Expansion 996298 01/16/2018 01/30/2018 01/16/2018 Submittal: Package 3 Skin & Elevator Drawings 2nd backcheck Review
9347 UCI Student Housing PHIV 2971-6 01/16/2018 01/30/2018   Plans:
9346 Primary Electrical Improvement Step-4 990513 01/16/2018 01/30/2018 01/18/2018 Other:ANOC for remove 12kV Cable Replace (45 Nights)
9345 Primary Electrical Imporvement Step-4 990513 01/16/2018 01/30/2018   Submittal:
9344 SEP 2016 Campuswide Insulation Upgrade 5110255 01/16/2018 01/30/2018 01/18/2018 Specifications:
9343 ICS-1 MBCx 5109947 01/08/2018 01/22/2018 01/16/2018 Specifications
9342 Beckman Laser Institute 5112127 01/09/2018 01/23/2018 01/11/2018 Plans, Specifications
9341 Verizon Highlanders 66' FAUX Water Tank null 01/09/2018 01/23/2018 01/11/2018 Other: Drawings
9340 Student Service Roms 1222, 1224 & 1226 Sound Baord Test Results 18W001995 01/09/2018 01/23/2018 01/11/2018 Other: Drawings & accoustical sound board test results
9339 Speith Hall Roof Replacement 110029 01/09/2018 01/23/2018 01/11/2018 Other: Aerial Photo of laydown area
9338 SOM First Floor Fit-Out 954041 01/09/2018 01/23/2018   Submittal: Joint Sealant
9337 Classroom & Office Building 990016 01/05/2018 01/19/2018 01/11/2018 RFI: _2436-Cast Iron Pipe Deck Penetration Fire Rating Clarification
9336 McGaugh Hall 5110359 01/04/2018 01/18/2018 01/16/2018 Plans, Specifications
9335 Reines Hall MBCx 5109588 01/04/2018 01/18/2018 01/08/2018 See attachment , section 01 1000
9334 N/A-Open Lot Situated between Bison-California -Health Sciences 5110396 01/04/2018 01/18/2018 01/11/2018 Plans
9333 Natural Sciences 1 5110233 01/04/2018 01/18/2018 01/08/2018 Plans
9332 Life Science 1450B-M Office Conversation 957408 01/04/2018 01/18/2018 01/04/2018 Submittal 3: Fire Alarm Drawing & Product
9331 SOM Trailer Expansion 954043 01/04/2018 01/18/2018   Plans
9330 Boyd Deep Canyon 950515 01/04/2018 01/18/2018 01/11/2018 Other: 100% DD Set Review
9329 Trailer Expansion 954043 01/04/2018 01/18/2018 01/04/2018 Other: State Approved Modular Building Drawings
9328 SOM Trailer Expansion -Ramp Drawings 95043 01/04/2018 01/18/2018 01/04/2018 Other: SOM Trailer Expansion -Ramp Drawings
9327 Sweeny Granite Mountain 950525 01/04/2018 01/18/2018   Other: 100% DD Set Review
9326 SOM Trailer Expansion 954043 01/04/2018 01/18/2018 01/04/2018 Other: Fire Alarm Submittals-Back Check
9325 Classroom & Office Building 990016 01/04/2018 01/18/2018 01/11/2018 Submittal: 07 81 00-5454-0-Applied FireProofing Drawing
9324 Classroom & Office Building 990016 01/04/2018 01/18/2018 01/11/2018 Submittal: 07 54 00-5469-0- NET-LMN-Supplemental Roofing Product Data
9323 Middle Earth Expansion 996298 01/04/2018 01/18/2018 01/16/2018 RFI: 0139-Knox Box Location Clarification
9322 Middel Earth Expansion 996298 01/04/2018 01/18/2018 01/11/2018 RFI: 0169 Basement & Level 1 Fire Protection Hub Drains Confirmation
9321 Middle Earth Expansion 996298 01/04/2018 01/18/2018 01/11/2018 Submittal: 21 1000-001- Fire Protection Deck Inserts
9320 UCR MRB1 950528 01/04/2018 01/18/2018 01/09/2018 Submittal: Fire Access Plan
9319 UCR MRB1 950528 01/04/2018 01/18/2018 01/11/2018 RFI: 0543-Purge Button Location
9318 UCR MRB1 950528 01/04/2018 01/18/2018 01/11/2018 Submittal: 0003-10 44 13-01
9317 UCR MRB1 950528 01/04/2018 01/18/2018 01/11/2018 Submittal: 0008-07 84 43-0- Joint Firestopping -Product Data (Stuff and Spray)
9316 UCR MRB1 950528 01/04/2018 01/18/2018 01/11/2018 RFI: 0542-Fire Penetration Label Location
9315 State Funded Re-Roof Multiple Buildings 5110248 12/21/2017 01/04/2018 12/22/2018 Plan review
9314 Middle Earth Expansion 996298 12/21/2017 01/04/2018 12/21/2017 Submittal: Package 3 Skin & Elevator Drawings_Backcheck Review
9313 CRII-2 2015 Med Sci C Major Building Maintenance 5109723 12/20/2017 01/03/2018   Addendum :
9312 Classroom & Office Building 990016 12/19/2017 01/02/2018 12/21/2017 Other: Specifications 07 8100 Applied Fireproofing
9311 Animal Cage Bedding Disposal Upgrade 5110359 12/18/2017 01/01/2017 12/20/2017 Plans, Specifications
9310 Social Ecology I 5110358 12/18/2017 01/01/2017 12/19/2017 Plans:
9309 Classroom & Office Building 990016 12/15/2017 12/29/2017 12/29/2017 Submittal: 07 81 00-533-0-Applied Fireproofing
9308 Classroom & Office Building 990016 12/15/2017 12/29/2017   RFI: RFI_2410-Cast Iron Bands in Concrete Fire Stopping Clarification
9307 Classroom & Office Building 90016 12/15/2017 12/29/2017 12/29/2017 Submittal: 07 84 13-5452-0-Supplemental Penetration Firestopping Plumbing
9306 Classroom & Office Building 990016 12/15/2017 12/29/2017 12/19/2017 RFI: _2365 R1-Top of Full -Height CMU Wall
9305 EH1106,1108,1111,1112 Renovation 5110052 12/15/2017 12/29/2017 12/21/2017 Plans:
9304 CC Play yard Renovation 5112122 12/15/2017 12/29/2017 12/15/2017 Final Review:
9303 Gross Hall MBCx 5110237 12/15/2017 12/29/2017 12/15/2017 Plans:
9302 Social Sciences Plaza Stairs and Bridge Pod A, Pod B and Pod C 5110191 12/15/2017 12/29/2017 12/19/2017 Plans:
9301 School Of Business 5400 Renovation 5112131 12/14/2017 12/28/2017 12/15/2017 Plans
9300 Student Center Phase 3 Coil Replacement (AH 1 & 2) 5112124 12/14/2017 12/28/2017 12/14/2017 Plans/Specifications
9299 Roof Repairs 5112164 12/13/2017 12/27/2017 12/19/2017 Plans
9298 Middle Earth Expansion 996298 12/12/2017 12/26/2017 12/12/2017 Submittal: Package 3 Skin & Elevator Drawings (Comment Matrix)
9297 CRII 2015 McGaugh Hall Door Hold- open Hardware 5110064 12/12/2017 12/26/2017 12/13/2017 Plans
9296 Classroom & Office Building 990016 12/12/2017 12/26/2017 12/14/2017 Submittal: Submittal 01 32 00 - 5449 - 0 - Humanities Guard Rail Ramp and Stairs Work Plan
9295 UCR MRB1 950528 12/05/2017 12/19/2017 12/21/2017 Other: Bulletin II
9294 MRI REPLACEMENT 5110138 12/11/2017 12/25/2017 12/14/2017 Plans
9293 UCR MRB1 950528 12/11/2017 12/25/2017 12/12/2017 Submittal: Submittal Package 0005 - 07 84 - 43 - 1 - Joint Firestopping - Edge of Slab Fire Safing Assembly
9292 SOM Research Building - Fume Hoods 957506 12/11/2017 12/25/2017   Other: Record Drawings
9291 SOM First Floor Fit-Out 954041 12/11/2017 12/25/2017   Submittal: 21 09 00 Wet Fire protection
9290 Geology Rooms 2261 & 2265 Door Add Docs 18W002686 12/11/2017 12/25/2017 01/16/2018 Other: Geology Rooms 2261 & 2265 Door Add Docs Drawings
9289 Life Science 1450B-M Office Conversion 957408 12/11/2017 12/25/2017 12/14/2017 RFI: Insert / Submittal: Pending / Other: 100% CD Review
9288 SL5-HUB - The Well - Sprinkler and Alarm Update WO #W005528 12/11/2017 12/25/2017 01/16/2018 Other: Daart Sprinkler Drawings
9287 Sprague Hall MBCx 5110239 12/08/2017 12/22/2017 12/11/2017 Plans/Specifications
9286 Engineering Hall MBCx 5110235 12/08/2017 12/22/2017 12/11/2017 Plans/Specifications
9285 UCR MRB1 950528 12/07/2017 12/21/2017 12/12/2017 Submittal: 0001-1044 16-0 Fire Extinguisher Product Data & Schedule
9284 Children's Center Play-yard renovation 5112122 12/07/2017 12/21/2017 12/12/2017 Plans
9283 Anteater Sports Field Antenna Installation 51102094 12/07/2017 12/21/2017 12/11/2017 Plans
9282 UCR MRB1 950528 12/06/2017 12/20/2017 12/07/2017 Submittal:
9281 UCR MRB1 950528 12/06/2017 12/20/2017 12/12/2017 Submittal:
9280 Middle Earth Expansion 996298 12/06/2017 12/20/2017 12/06/2017 Other:
9279 BSL-3 Research Suite and Lab 954040 12/06/2017 12/20/2017 12/07/2017 Other:
9278 Boyce Hall Vivarium Restoration 11/27/17 950536 12/06/2017 12/20/2017 01/04/2018 Other:
9277 UCR MRB1 950528 12/06/2017 12/20/2017 12/12/2017 Submittal:
9276 UCR MRB1 950528 12/05/2017 12/19/2017 12/12/2017 Submittal:
9275 UCR MRB1 950528 12/05/2017 12/19/2017 12/12/2017 Submittal:
9274 Classroom & Office Building 990016 12/05/2017 12/19/2017 12/07/2017 RFI
9273 Middle Earth Expansion 996298 12/04/2017 12/18/2017   Other:
9272 Classroom & Office Building 990016 12/04/2017 12/18/2017   Other:
9271 UCR MRB1 950528 11/30/2017 12/14/2017   Submittal:
9270 UCR MRB1 950528 11/30/2017 12/14/2017 12/12/2017 Submittal:
9269 UCR MRB1 950528 11/30/2017 12/14/2017   Submittal:
9268 UCR MRB1 950528 11/30/2017 12/14/2017   Submittal:
9267 Classroom & Office Building 990016 11/29/2017 12/13/2017 11/29/2017 Other:
9266 CRII 2013- Engineering Gateway Victaullic Fittings CWS 5110231 11/28/2017 12/12/2017 11/30/2017 Addendum
9265 MRI REPLACEMENT 5110138 11/28/2017 12/12/2017 12/05/2017 Plans
9264 Leasing Oversight Renovation 5112015 11/28/2017 12/12/2017 11/28/2017 Plans
9263 Classroom & Office Building 990016 11/27/2017 12/11/2017 11/29/2017 RFI
9262 Small Cap 2107 - SE1 Psychology Lab Renovation 5110358 11/27/2017 12/11/2017 12/05/2017 Plans
9261 Primary Electrical Improvement Step-4 990513 11/27/2017 12/11/2017 11/30/2017 Other
9260 Leasing Oversight Renovation 5112015 11/27/2017 12/11/2017 11/30/2017 Plans
9259 Natural Science 1 MBCx 5110233 11/27/2017 12/11/2017 11/28/2017 Plans/Specifications
9258 ICS-1 MBCx 5109947 11/27/2017 12/11/2017 12/28/2017 Specifications
9257 Animal Cage Bedding Disposal Upgrade 5110359 11/27/2017 12/11/2017 11/28/2017 Plans/Specifications
9256 Bison Ave. Surface Parking Lot 5110396 11/27/2017 12/11/2017 12/11/2017 Plans
9255 CRII 2013 - Engineering Gateway Victaullic Fittings CWS 5110231 11/21/2017 12/05/2017 11/28/2017 Addendum
9254 Middle Earth Expansion 996298 11/21/2017 12/05/2017 12/06/2017 Submittal:
9253 Classroom & Office Building 990016 11/21/2017 12/05/2017 11/29/2017 Submittal:
9252 Classroom & Office Building 990016 11/20/2017 12/04/2017 11/21/2017 Submittal:
9251 UCR MRB1 950528 11/20/2017 12/04/2017 11/21/2017 Submittal:
9250 HUB-Habit Grill Leasehold 110080 11/20/2017 12/04/2017 11/30/2017 Submittal:
9249 SOM Trailer Expansion 954043 11/20/2017 12/04/2017 11/21/2017 Submittal:
9248 Speith Hall Tenant Improvements 957403 11/20/2017 12/04/2017 12/07/2017 Other:
9247 SOM Trailer Expansion 954043 11/20/2017 12/04/2017 11/21/2017 Submittal:
9246 California Museum of Photography HVAC Replacement 950565 11/20/2017 12/04/2017 11/30/2017 Other:
9245 CRII 2015 McGaugh Hall Door Hold-open Hardware 5110064 11/17/2017 12/01/2017 11/28/2017 Plans
9244 Middle Earth Expansion 996298 11/07/2017 11/21/2017 11/16/2017 Submittal:
9243 Habit Grill Leasehold 110080 11/15/2017 11/29/2017 11/15/2017 Other:
9242 Classroom & Office Building 990016 11/13/2017 11/27/2017 11/20/2017 RFI
9241 Classroom & Office Building 990016 11/13/2017 11/27/2017 11/20/2017 Submittal:
9240 UCR MRB1 950528 11/09/2017 11/23/2017 11/21/2017 RFI:
9239 UCR MRB1 950528 11/09/2017 11/23/2017 11/21/2017 Submittal:
9238 UCR MRB1 950528 11/09/2017 11/23/2017 11/21/2017 Submittal:
9237 Middle Earth Expansion 996298 11/09/2017 11/23/2017 11/20/2017 Submittal:
9236 Middle Earth Expansion 996298 11/09/2017 11/23/2017 11/20/2017 Other:
9235 Classroom & Office Building 990016 11/08/2017 11/22/2017 11/08/2017 Submittal: 07 54 13-5221-1-MCN-LMN-Penetration Firestopping Electrical
9234 SOM - R First Floor Fit Out 954041 11/08/2017 11/22/2017 11/08/2017 Other:
9233 UCR MRB1 950528 11/08/2017 11/22/2017 11/08/2017 Submittal:
9232 SOM Trailer Expansion 954043 11/08/2017 11/22/2017 11/21/2017 Other:
9231 UCR MRB1 950528 11/08/2017 11/22/2017 11/09/2017 Submittal:
9230 UCR MRB1 950528 11/08/2017 11/22/2017 11/09/2017 Submittal:
9229 UCR MRB1 950528 11/08/2017 11/22/2017 11/09/2017 Submittal:
9228 UCR MRB1 950528 11/08/2017 11/22/2017 11/09/2017 Submittal:
9227 UCR MRB1 950528 11/06/2017 11/20/2017 11/08/2017 OTHER:
9226 McGaugh Hall MBCx 5110236 11/06/2017 11/20/2017 11/06/2017 Plans/Specifications
9225 Gillespie Neuroscience MBCx 5110238 11/06/2017 11/20/2017 11/08/2017 Specifications
9224 Natural Science 1 MBCx 5110233 11/06/2017 11/20/2017 11/14/2017 Plans/Specifications
9223 Sprague Hall MBCx 5110239 11/06/2017 11/20/2017 11/06/2017 Plans/Specifications
9222 Biological Science 3 MBCx 5110234 11/06/2017 11/20/2017 11/06/2017 Plans/Specifications
9221 Engineering Hall MBCx 5110235 11/06/2017 11/20/2017 11/08/2017 Plans/Specifications
9220 Gross Hall MBCx 5110237 11/06/2017 11/20/2017 11/06/2017 Plans/Specifications
9219 CRII-3B Replace Beckman AHU 1, 2 & 3 5112127 11/03/2017 11/17/2017 11/14/2017 Plans
9218 UCR MRB1 950528 09/25/2017 10/09/2017 10/03/2017 RFI: 0386-Atrium Stair Fire Sprinkler
9217 Classroom & Office Building 990016 11/01/2017 11/15/2017 11/08/2017 Submittal:
9216 Transportation & Distribution Services PSB - Floor 2, Room 0200 5112064 11/01/2017 11/15/2017 11/08/2017 Specifications
9215 CRII 2015 McGaugh Hall Door Hold-open Hardware 5110064 11/01/2017 11/15/2017 11/06/2017 Plans
9214 Middle Earth Expansion 996298 11/01/2017 11/15/2017 11/21/2017 Submittal:
9213 Middle Earth Expansion 996298 11/01/2017 11/15/2017 11/21/2017 Submittal:
9212 Anteater Sports Field Antenna Installation 5112094 11/01/2017 11/15/2017 11/03/2017 Plans
9211 Classroom & Office Building 990016 10/31/2017 11/14/2017   Other:
9210 Classroom & Office Building 990016 10/31/2017 11/14/2017   Submittal:
9209 Chapman Hall Roof Replacement 957400 10/30/2017 11/13/2017 11/08/2017 Other:
9208 Classroom & Office Building 990016 10/30/2017 11/13/2017 11/07/2017 Submittal:
9207 Habit Grill Leasehold 110080 10/30/2017 11/13/2017 11/08/2017 Other:
9206 Transportation & Distribution Services PSB - Floor 2, Room 0200 5112064 10/30/2017 11/13/2017 11/08/2017 Specifications
9205 Local Exhaust Ventilation CRII-2015 5110060 10/30/2017 11/13/2017 11/06/2017 Plans
9204 Bourns Off Rm. A0128 Reno (Facilities Services) 18W005020 10/30/2017 11/13/2017 11/08/2017 Other:
9203 Boyce Hall 4440 Growth Room 957381 10/30/2017 11/13/2017 11/02/2017 Other:
9202 Bourns Hall Fire Alarm System Replacement 112003 10/30/2017 11/13/2017 11/08/2017 Other:
9201 UCR MRB1 950528 10/30/2017 11/13/2017 11/08/2017 Submittal:
9200 Fire Alarm Replacements 5112098 10/27/2017 11/10/2017   Plans:
9199 Classroom & Office Building 990016 10/26/2017 11/09/2017   Other: G-100A Site Fire Access Plan FRO
9198 Classroom & Office Building 990016 10/26/2017 11/09/2017   Submittal: 09 21 16-5375-0- MCN-LMN-Gypsum Board Shaft Wall Assemblies
9197 AH Ste. 559 Renovation 5112092 10/26/2017 11/09/2017 11/06/2017 Plans
9196 Anima Cage BeddingDisposal Upgrade 5110359 10/26/2017 11/09/2017   Plans, Specifications
9195 MRI Replacement 5110138 10/26/2017 11/09/2017   Plans:
9194 UCR MRB1 950528 10/25/2017 11/08/2017 11/01/2017 Submittal: Package 0001-07 81 00 -0- Applied Fireproofing-PD and SD
9193 UCR MRB1 950528 10/25/2017 11/08/2017 11/01/2017 Submittal: package 0001-07 81 00-0-Applied Fireproffing -PD and SD
9192 UCR MRB1 950528 10/25/2017 11/08/2017 11/01/2017 Submittal: package 0001-32 14 10-0-Truncated Dome PD
9191 UCR MRB1 950528 10/25/2017 11/08/2017 11/01/2017 Submittal: Submittal Package 0001-07 84 43-0-Joint Firestopping-Product data
9190 Classroom & Office Building 990016 10/25/2017 11/08/2017 10/25/2017 Other: SI-14 Reclaimed Water Revision
9189 CRII 2013-Engineering gateway Victaullic Fittings CWS 5110231 10/24/2017 11/07/2017 10/25/2017 Addendum:
9188 Engineering gateway Atomizer Lab for EVCP 5110008 10/23/2017 11/06/2017 10/25/2017 Plans, Specifications
9187 Primary Electrical Improvement Step-4 990513 10/23/2017 11/06/2017 11/02/2017 RFI: 128 South Substation FACP Connection
9186 Classroom & Office Building 990016 10/23/2017 11/06/2017 10/31/2017 Submittal: Submittal: 06 10 53-5378-0-NET-LMN-Fire Treated Plywood Product data
9185 Classroom & Office Building 990016 10/23/2017 11/06/2017 11/07/2017 Submittal: Submittal 06 16 00-5377-0-Sheathing Product data
9184 Middle Earth Expansion 996298 10/23/2017 11/06/2017 10/23/2017 Other: CP-2 100% Review with 90%
9183 Psychology Vivarium Renovation 957383 10/23/2017 11/06/2017 11/08/2017 Other: Record Drawing
9182 Leasing Oversight Renovation 5112015 10/19/2017 11/02/2017   Plans:
9181 Classroom & Office Building 990016 10/18/2017 11/01/2017 10/25/2017 Submittal: 26 13 00-5282-1- Shop Drawings for PV System
9180 UCR MRB1 950528 10/17/2017 10/31/2017 11/01/2017 Submittal: Package 0001-07 84 43-0- Joint FireStopping-Product Data
9179 Classroom & Office Building 990016 10/17/2017 10/31/2017 10/25/2017 Submittal: 07 84 13-5362-0-NET-LMN-Penetration Fire Stopping Plumbing
9178 Classroom & Office Building 990016 10/17/2017 10/31/2017 10/31/2017 Submittal: 07 54 00-5343-0- MCN-LMN-Roofing Product Data
9177 Classroom & Office Building 990016 10/17/2017 10/31/2017 10/31/2017 Submittal: 09 29 00-5370-0-MCN-LMN-Interior Gypsum Board Product
9176 Classroom & Office Building 990016 10/17/2017 10/31/2017 10/25/2017 Submittal: 05 16 00-5376-0-NET-LMN_DCI-Sure-Board Product Data
9175 Interdisciplinary Science & Engineering Bldg 999239 10/16/2017 10/30/2017 10/19/2017 Other:D P P (Pre-Final)
9174 ARC Kitchen Remodel 5110263 10/16/2017 10/30/2017 10/25/2017 Plans:
9173 UCR MRB1 950528 10/16/2017 10/30/2017 10/26/2017 Other: Bulletin 10 drawings
9172 Arts Building Access Control 957387 10/16/2017 10/30/2017 10/18/2017 Other :Resubmittal (Bid Set)
9171 UCR MRB1 950528 10/16/2017 10/30/2017 10/19/2017 Submittal: 0001-06 10 53-1-Miscellaneous Carpentry-Fire
9170 UC Path Solar Support 957417 10/16/2017 10/30/2017 10/18/2017 Submittal: UC Path Solar Support
9169 UCR MRB1 950528 10/16/2017 10/30/2017 10/19/2017 Submittal: Submittal Package 0004-09 21 16.23-0- Gypsum Board Shaft Wall Assemblies-Product Data-NP
9168 UCI_Student Housing-Phase4A-Parking Structure 150358 10/16/2017 10/30/2017   Plans:
9167 UCI-Student Housing-Phase 4A-Parking Structure 150358 10/16/2017 10/30/2017   Plans
9166 Engineering Laboratory Facility (ELF) 5112062 10/16/2017 10/30/2017 10/18/2017 Plans
9165 Central Plant Cooling Tower Reclaimed Water Pipeline 5110012 10/13/2017 10/27/2017 10/18/2017 Plans
9164 Classroom & Office Building 990016 10/11/2017 10/25/2017   CP-5 Architectural Plans FRO
9163 UCR MRB1 950528 10/10/2017 10/10/2017 10/10/2017 Review Fire Smoke Dampers
9162 Classroom & Office Building 990016 10/09/2017 10/23/2017 10/17/2017 RFI_2320-Level 3 Panic Hardware
9161 Boyd Deep Canyon 950515 10/09/2017 10/23/2017 10/09/2017 Primary Plan Review
9160 Sweeny Granite Mountain 950525 10/09/2017 10/23/2017 10/09/2017 Primary plan review
9159 UCI-Student Housing-Phase 4A-Parking Structure 150358 10/09/2017 10/23/2017   Plans
9158 UCR MRB1 950528 10/09/2017 10/23/2017 10/10/2017 0004-07 84 43-0 Joint Firestopping-Elevator
9157 Classroom & Office Building 990016 10/05/2017 10/19/2017 10/09/2017 CP-5 Architectural Plans-Final
9156 Financial Aid Front Office Renovation 5110302 10/04/2017 10/18/2017 10/06/2017 Plans
9155 UCR MRB1 950528 10/04/2017 10/18/2017 10/05/2017 DP-5 Café 65% Progress Set (7 sheets total)
9154 UCI-Student Housing Phase 4A- Building A 150358 10/04/2017 10/18/2017   Plans
9153 Primary Electrical Improvement Step-4 990513 10/03/2017 10/18/2017 10/10/2017 South Substation FACP Connection
9152 Geology #449 Lab Renovation 110059 10/03/2017 10/17/2017 10/05/2017 UCR
9151 UCR MRB1 950528 10/03/2017 10/17/2017   Plans
9150 UCR MRB1 950528 10/03/2017 10/17/2017 10/23/2017 Plans
9149 SOM First Floor Fit-Out 954041 10/03/2017 10/17/2017   UCR
9148 UCI-Student Housing-Phase 4A-Parking Structure 1500358 10/03/2017 10/17/2017   Plans
9147 UCI-Student Housing-Phase 4A-Building A 150358 10/03/2017 10/17/2017   Final Review
9146 Zot Wheels Expantion 5112103 09/28/2017 10/12/2017 10/05/2017 Plans
9145 UCR Boyce Vivarium 950536 09/28/2017 09/28/2017 09/28/2017 Plans
9144 Engineering Hall 3131 Renovation-Tissue Culture Room 5112051 09/28/2017 10/12/2017 10/06/2017 Plans
9143 UCR Chronic Taco CPMS 3353 09/28/2017 10/12/2017 09/28/2017 UCR
9142 Uci Student Housing Phase 4A- Building A 150358 09/28/2017 10/12/2017   Plans
9141 UCI-Student Housing-Phase 4A-Building A and Parking 150358 09/27/2017 10/11/2017   Plans
9140 ULB 202 Research Lab Renovation 110056 09/25/2017 10/09/2017 09/28/2017 Revised set
9139 CNAS Boyce Hall 5478 Growth Room 110062 09/25/2017 10/09/2017 09/28/2017 Revised Set
9138 Arts Building Access Control 957387 09/25/2017 10/09/2017 09/28/2017 Arts Building Access Control-100% CD's
9137 SOM Trailer Expantion 954043 09/25/2017 10/09/2017 10/10/2017 100% Modular Building Drawings
9136 UCR MBR1 950528 09/25/2017 10/09/2017 09/28/2017 0006-26 05 00-0-DAS Product Data
9135 HUB-Habit Grill Leasehold 110080 09/25/2017 10/09/2017 09/28/2017 Fire Suppression System (Marked up & Set Corrected Set)
9134 UCR MRB1 950528 09/25/2017 10/09/2017 09/28/2017 0003-14 21 00-0-Electric Traction & Hydraulic
9133 UCR MRB1 950528 09/25/2017 10/09/2017 09/28/2017 0003-07 84 13-0-Mechanical Penetration Fire Stopping
9132 UCR MBR1 950528 09/25/2017 10/09/2017 09/28/2017 Review of Plumbing Penetration Fire Stopping
9131 Classroom & Office Building 990016 09/22/2017 10/06/2017 09/27/2017 Submittal 27 17 00-5186-1-UCI-Shop Drawings for 800 MHZ Communications.
9130 Financial Aid Front Office Renovation 5110302 09/22/2017 10/06/2017 09/25/2017 Plans
9129 Middle Earth Expantion 996298 09/22/2017 10/06/2017 10/05/2017 Package 2 Structural & Early MEP-Specs.
9128 Middle Earth Expantion 996298 09/22/2017 10/06/2017 10/10/2017 UCI Middle Earth Fire Protection Report
9127 Classroom & Ofice Building 990016 09/22/2017 10/06/2017 09/27/2017 RFI_2301-fire Rating For Door B310
9126 Oban addressable fire alarm 956361 09/21/2017 10/05/2017 09/21/2017 Certificate of ocupancy
9125 Middle Earth Expantion 996298 09/21/2017 10/05/2017 10/04/2017 90% CP-2 drawings review with 50%
9124 Middle Earth Expantion 996298 09/21/2017 10/05/2017 09/21/2017 Submittal-Package 1 Demolution & Site Utilities Specifications RESUBMITTAL
9123 Sm Cap 2017-Crawford Field Irrigation 5110370 09/21/2017 10/05/2017 09/22/2017 Plans
9122 Replace TES tank Ladder and paint 5110323 09/21/2017 10/05/2017 09/25/2017 Plans
9121 UCI MRB1 950528 09/19/2017 10/03/2017 09/21/2017 Review of Electrical Fire Stopping Details
9120 UCR MRB1 950528 09/19/2017 10/03/2017 09/19/2017 0003-14 21 00-0-Electric Traction & Hydraulic
9119 Major Building Maintinece 5109723 09/18/2017 10/02/2017 09/22/2017 Plans
9118 Sprague Hall MBCx 5110239 09/18/2017 10/02/2017 09/22/2017 Plans
9117 Gross Hall MBCx 5110237 09/18/2017 10/02/2017 09/22/2017 Plans
9116 MCGaugh Hall MBCx 5110236 09/18/2017 10/02/2017 09/21/2017 Plans
9115 Engineering Hall MBCx 5110235 09/18/2017 10/02/2017 09/21/2017 Plans
9114 Natural Science 1 MBCx 510233 10/02/2017   09/21/2017 Plans
9113 ICS-1 5109947 09/18/2017 10/02/2017 09/21/2017 Final Review
9112 Biological Science 3 MBCx 5110234 09/18/2017 10/02/2017 09/21/2017 Plans
9111 Gillespie Neuroscience MBC'x 5110238 09/18/2017 10/02/2017 09/21/2017 Plans
9110 Remediate Sycamore Tree Infestation-Tree Planting Phase 4 5109992 09/18/2017 10/02/2017 09/21/2017 Plans
9109 Peith Hall Tenant Improvements 957403 09/18/2017 10/02/2017 09/21/2017 100% Drawings (1 set)
9108 Hibachi-San CP0000310 09/18/2017 10/02/2017 09/20/2017 100% CD Plan Rview Set
9107 Chapman Hall roof Replacement 957400 09/18/2017 10/02/2017 09/21/2017 90% CD Review
9106 Batchelor Hall-Buildings System Renewal 950464 09/18/2017 10/02/2017 10/05/2017 Specification Binder
9105 Classroom & Office Building 990016 09/15/2017 09/29/2017 09/19/2017 Submittal 087111-5275-0-MCN-LMN-Finish Hardware Submittal and Product Data
9104 UCI-Student Housing-Phase 4A Building A and Parking 150358 09/15/2017 09/29/2017   A new Student Housing
9103 Leasing Oversight Renovation 5112015 09/14/2017 09/28/2017 09/26/2017 Plans
9102 UCI-Student Housing-Phase 4A-Building A and Parking 150358 09/14/2017 09/28/2017   Final Review
9101 5 Year Certification Repairs 5112036 09/14/2017 09/28/2017 09/14/2017 Plans
9100 Classroom & Office Building 990016 09/13/2017 09/27/2017 09/18/2017 Revised CP-5 Architectural Plans
9099 Classroom & Office Building 990016 09/13/2017 09/27/2017   SI-10 FRO
9098 UCI-Student Housing-Phase 4A-Parking Structure 150358 09/13/2017 09/27/2017   Plans
9097 UCI-Student Housing-Phase 4A-Building A and Parking 150358 09/13/2017 09/27/2017   Plans
9096 Core Fiber Phase 3 5112120 09/13/2017 09/27/2017 09/13/2017 Plans
9095 Renewal Elevator 5110001 09/13/2017 09/27/2017 09/13/2017 Specifications
9094 Middle Earth Expantion 996298 09/12/2017 09/26/2017 09/20/2017 RFI 0028R1-Brandywine Fire Access and Pereira Road Modifications
9093 Middle Earth Expantion 996298 09/12/2017 09/26/2017 09/21/2017 Middle Earth Expantion Room Numbering
9092 UCI-Student Housing-Phase 4A-Building A and Parking 150358 09/12/2017 09/26/2017   Final Review
9091 UCI-Student Housing-Phase 4A-Parking Structure 150358 09/12/2017 09/26/2017   Plans
9090 Anteater sports Field Antenna Installation 5112094 09/11/2017 09/25/2017 09/12/2017 Plans
9089 UCI- Student Housing-Phase 4A-Building A and Parking 150358 09/11/2017 09/25/2017   Final Review
9088 Classroom & Office Building 990016 09/11/2017 09/25/2017 09/19/2017 SI-7
9087 SOM Trailer Expantion 954043 09/11/2017 09/25/2017 09/14/2017 UCR
9086 HIBACHI-SAN CPMS 3310 09/11/2017 09/25/2017 09/14/2017 UCR
9085 Psychology Vivarium Renovation 957383 09/11/2017 09/25/2017 09/28/2017 UCR
9084 HUB-Habit Grill Leasehold 110080 09/11/2017 09/25/2017 10/10/2017 UCR
9083 HUB-Habit Grill Leasehold 110080 09/11/2017 09/25/2017 09/14/2017 UCR
9082 Gas Cabinet Installation 5112056 09/08/2017 09/22/2017 09/18/2017 Plans
9081 Rowland Hall to CS1 Fiber Replacement 5112119 09/08/2017 09/22/2017 09/13/2017 Plans
9080 Middle Earth Expantion 996298 09/07/2017 09/21/2017 09/12/2017 Submittal-Package 1 Demolition & Site Utilitites Specifications Resubmittal
9079 Classroom & Office Building 990016 09/07/2017 09/21/2017 09/18/2017 Submittal 08 11 13-5264-0-MCN-LMN-Hollow Metal Doors Frames Interior Alum Frames
9078 Social Ecology Research Space Renovation 510357 09/07/2017 09/21/2017   Plans
9077 Debbie Miyake 150358 09/07/2017 09/21/2017   Final Review
9076 Small Cap 2107-SE1 Psychology Lab Renovation 5110358 09/07/2017 09/21/2017 09/11/2017 Plans
9075 CRII-2 2015-Bonney Center Coating 5110337 09/07/2017 09/21/2017 09/07/2017 Plans
9074 UCI-Student Hosing-Phase 4A-Building A and Parking 150358 09/05/2017 09/19/2017   UCI-Student Hosing-Phase 4A-Building A and Parking
9073 Primary Electrical Improvement Step-4 990513 09/01/2017 09/15/2017 09/18/2017 ANOC #24_Electrical Shut-Down @ UNEX, ARC & Bus-Charge Station
9072 UCI-Student Housing-Phase 4A-Building A and Parking 150358 09/01/2017 09/15/2017   A new Student Housing
9071 UCI-Student Housing-Phase 4A-Building A and Parking 150358 09/29/2017 09/12/2017   Specifications
9070 Anteater Sports Field antenna Installation 5112094 08/31/2017 09/14/2017 09/06/2017 Plans
9069 Middle Earth Expantion 996298 08/31/2017 09/14/2017 09/07/2017 50% CP-2 drawings review
9068 Oban Addressable Fire Alarm 956361 08/31/2017 09/14/2017 08/31/2017 Other: Fire Stoppig Detail
9067 UCI-Student Housing-Phase 4A-Building A and Parking 150358 08/31/2017 09/14/2017   A new Student Housing
9066 UCI-Student Housing-Phase 4A-Parking Structure 150358 08/31/2017 09/14/2017   Plans
9065 Classroom & Office Building 990016 08/31/2017 09/14/2017 08/31/2017 SI-10
9064 Classroom & Office Building 990016 08/31/2017 09/14/2017 08/31/2017 RFI_2267R1-Confirmation of Standpipe Hose Connection Location
9063 UCI-Stident Housing-Phase 4A-Building A and Parking 150358 08/31/2017 09/14/2017   Final Review
9062 UCR MRB1 950528 08/30/2017 09/13/2017 09/14/2017 Bulleting 9 , drawings specs & narratives
9061 UCR MRB1 950528 08/30/2017 09/13/2017   0001-07 8413-01- Plumbing Penetration Fire Stopping
9060 Classroom & Office Building 990016 08/30/2017 09/13/2017 10/30/2017 SI-9 Site Fire Access Plan
9059 Oban Addressable Fire Alarm 956361 08/30/2017 09/13/2017 08/30/2017 Oban Addressable Fire Alarm
9058 SOM Research Building 1ST Floor Buidout 954041 08/30/2017 09/13/2017 08/30/2017 Architect Bid Revision for Review
9057 Plan Review 110056 08/30/2017 09/13/2017 08/30/2017 Plans Review
9056 UCR MRB1 950528 08/30/2017 09/13/2017 09/13/2017 0001-28-31-00-03-Fire Alarm Product Data
9055 UCR MRB1 950528 08/30/2017 09/13/2017 08/30/2017 Submiittal 0005-26-05-00-0-Fire Rated Putty Pads
9054 5 Years Certification 5112038 08/28/2017 09/11/2017 08/29/2017 Plans
9053 Classroom & Office Building 990016 08/25/2017 09/08/2017 08/29/2017 RFI_2269-L2 and L3 Deck Operating and FSD Enclosure Clarification
9052 ULB 202 Research Lab Renovation 110056 08/24/2017 09/07/2017 08/24/2017 Submittal: Fire Alarm Data System Sensor, Fire Alarm Drawings
9051 Classroom & Office Building 990016 08/24/2017 09/07/2017 08/29/2017 Submittal 21 10 00-5259-1-Fire Sprinkler Protection
9050 UCR MBR 1 950528 08/24/2017 09/07/2017 09/20/2017 UCR MRB1
9049 Gillespie Neuroscience MBCx 5110238 08/24/2017 09/07/2017 08/24/2017 Plans
9047 UCR MRB1 950528 08/22/2017 09/05/2017 08/24/2017 Submittal: 0001-28 31 00-03 Fire Alarm Shop Drawings
9046 UCR MRB1 950528 08/22/2017 09/05/2017 08/30/2017 Submittal: 0001-21 10 00-03-Fire Protection Product Data & Calcs
9045 UCR MRB1 950528 08/22/2017 09/05/2017 08/30/2017 Submittal: 0001-21 10-03 Fire Protection Shop Drawings
9044 UCR MRB1 950528 08/22/2017 09/05/2017 08/22/2017 Other: Consolidated set of FM Stamped drawings
9043 Verano Deck & Stairs 5110350 08/22/2017 09/05/2017 08/23/2017 Plans
9042 CRII 2013- Engineering Gateway Victaullic Fitting CWS 5110231 08/22/2017 09/05/2017 08/23/2017 Plans
9041 AV Building 1056 Floor Repair 5112101 08/21/2017 09/04/2017 08/21/2017 Plans
9040 Small Cap 14/15 McGaugh Hall Lab 4311 Renovation 5109824 08/21/2017 09/04/2017 08/22/2017 Plans
9039 UCR MRB1 950528 08/21/2017 09/04/2017 09/14/2017 Rwview of DP6 100% Drawings, back check against DP6 95%
9038 Classroom & Buldings 990016 08/18/2017 09/01/2017 08/29/2017 RFI_2272-Lecture Hall Suspended Ceiling Fire Sprinkler Clarification
9037 Classroom & Office Building 990016 08/18/2017 09/01/2017 08/24/2017 RFI_Exteriour Stairway and Ramp Protection Clarification
9036 UCR MRB1 950528 08/17/2017 08/31/2017 08/17/2017 0002-28-31-00-1 Fire Alarm Product Data
9035 Review Fire Alarm Devices 950528 08/17/2017 08/31/2017 08/17/2017 Fire alrm devices submittal
9034 Batchelor Hall Infrastructure Upgrades 950464 08/17/2017 08/31/2017 08/31/2017 UCR Plans
9033 Classroom & Office Building 990016 08/17/2017 08/31/2017 08/22/2017 RFI 2267-Conformation of Standpipe Hose Connection Locations
9032 Boyce Hall Vivarium Restoration-Fire Sprinkler 950536 08/17/2017 08/31/2017 09/18/2017 UCR Plans
9031 UCR MRB1 950528 08/17/2017 08/31/2017 08/17/2017 UCR MRB1
9030 Arts Building Access Control 957387 08/17/2017 08/31/2017 08/24/2017 UCR plans
9029 Bourns Hall Lab Renewal - CD 100% 950534 08/10/2017 08/24/2017 08/17/2017 Other: Conformed Set for Construction
9028 Social Ecology Research Space Renovation 5110357 08/14/2017 08/28/2017 08/16/2017 Plans
9027 Middle Earth Expantion 996298 08/11/2017 08/25/2017 08/24/2017 RFI 0028 Brandywine Fire Access and Pereira Road Modifications
9026 Natural Science 1 MBCx 5110233 08/11/2017 08/25/2017 08/11/2017 Specifications
9025 Classroom & Office Building 990016 08/10/2017 08/24/2017 08/17/2017 Submittal 26 1300-5282-Photovoltaic Shop Drawings
9024 Middle Earth Expantion 996298 08/10/2017 08/24/2017 08/10/2017 Submittal 02 8200-0002-0- Procedure 5 Transite Abatement Notification
9023 Leasing Oversight Renovation 5112015 08/10/2017 08/24/2017 08/14/2017 Plans
9022 Children's center Structural repair 5110350 08/09/2017 08/23/2017 08/10/2017 Plans
9021 Engineering hall MBCx 5110235 08/09/2017 08/23/2017 08/11/2017 Specifications
9020 Biological Science 3 MBCx 5110234 08/09/2017 08/23/2017 08/11/2017 Specifications
9019 McGaugh Hall MBCx 5110236 08/09/2017 08/23/2017 08/11/2017 Specifications
9018 Gross Hall MBCx 5110237 08/09/2017 08/23/2017 08/11/2017 Specifications
9017 Sprague Hall MBCx 5110239 08/09/2017 08/23/2017 08/11/2017 Specifications
9016 ICS-1 MBCx 5109947 08/09/2017 08/23/2017 08/11/2017 Specifications
9015 Verano Electrical Vehicle Chargin 5110404 08/09/2017 08/23/2017 08/10/2017 Plans
9014 Verano Cross walk lights 5110413 08/09/2017 08/23/2017 08/10/2017 Plans
9013 Banning House / UNEX-B Renovation 5112097 08/08/2017 08/22/2017 08/09/2017 Plans
9012 SOM Trailer Expantion 954043 08/07/2017 08/21/2017 08/17/2017 100% CD Plans
9011 HUB catering Kitchen Equioment Relocation CPMS-3327 08/04/2017 08/18/2017 08/04/2017 Plans and Cutsheets
9010 Small Cap 2017 Bren Hall 2nd Floor ISG Group Renovation. 5110367 08/03/2017 08/17/2017 08/03/2017 Plans
9009 Verano Deck & Stairs 5110350 08/03/2017 08/17/2017 08/07/2017 Plans
9008 Eyewash shower scope 5110061 08/03/2017 08/17/2017 08/07/2017 Plans
9007 UCR MRB 1 950528 08/03/2017 08/17/2017 08/03/2017 Review of Elevator submittal
9006 Classroom & Class Lab Upgrade Project-UCR 950562 08/28/2017 08/03/2017   100% CD Review
9005 Social Ecology Research and Space Renovation 5110357 08/02/2017 08/16/2017 08/07/2017 Plans, Specifications
9004 CRII - 2015 Step Lights - New Building 5110206 08/02/2017 08/16/2017 08/07/2017 Specifications
9003 Classroom & Office Building 990016 08/02/2017 08/16/2017   170802_CP-5 MEPT Drawings-FRO
9002 Middle Earth Expantion 996298 08/02/2017 08/16/2017 08/10/2017 Submittal 01 5000-002-A-Site Logistics Plan-Resubmittal
9001 Classroom & Office Building 990016 08/01/2017 08/15/2017 08/02/2017 RFI_2245-Knox Box and Fire Annunciator Location
9000 Middle Earth Expantion 996298 08/01/2017 08/15/2017 08/10/2017 Submittal-Package 1 Demolition & Site Utilities Specifications
8999 Sm Cap 2017-CalIT2 TEMPR properties Facility Renovation 5110353 07/31/2017 08/14/2017 07/31/2017 Plans
8998 Primary Electrical Improvement Step-4 990513 07/31/2017 08/14/2017 08/02/2017 Submittal 07 8413.01.02A-Exterior Wall penetration Firestopping System w/BC
8997 ULB 202 Renovation - Fire Sprinkler 110056 07/27/2017 08/10/2017 08/24/2017 Other: Submittal 17 (1set) and conformed set of plans (2sets) and specs (1 set)
8996 Fmri - Fire Sprinker 950548 07/26/2017 08/09/2017 08/10/2017 Other: Conformed Set for Construction
8995 Small Cap 2017 Bren Hall 2nd Floor ISG Group Renovation 5110367 07/27/2017 08/10/2017 07/28/2017 Plans
8994 CRII - 2015 - Replace Fire Alarms; Multiple Buildings 5109528 07/27/2017 08/10/2017 07/28/2017 Plans
8993 Life Sciences 1450-M Office Conversation 957408 07/26/2017 08/09/2017 07/27/2017 Submittal
8992 Conformed Set for Construction 950536 07/26/2017 08/09/2017 07/27/2017 Other: Conformed Set for Construction
8991 Surge Mathematics Admin. Suite #202-213 - Submittal Fire Sprinker 110038 07/26/2017 08/09/2017 08/09/2017 Submittal: Submittal Fire Sprinkler
8990 Leasing Oversight Renovation 5112015 07/26/2017 08/09/2017 07/28/2017 Plans
8989 Middle Earth Expansion 996298 07/26/2017 08/09/2017 07/26/2017 Submittal - Package 1 Demolition and Site Utilities Drawings - FRO
8988 Middle Earth Expansion 996298 07/26/2017 08/09/2017 07/26/2017 Submittal - Package Demolition and Site Utilities Drawings - Civil Revisions
8987 UCR MRB1 950528 07/25/2017 08/08/2017 08/10/2017 Submittal: 0001-28 31 00 - 1 - Fire Alarm Shop Drawings
8986 UCR MRBI 950528 07/25/2017 08/08/2017 08/11/2017 Other: Bulletin 8 Drawings & Narrative
8985 UCI - Student Housing - Phase 4A - Parking Structure 150358 07/25/2017 08/08/2017 08/21/2017 Plans
8984 Classroom and Office Building 990016 07/25/2017 08/08/2017 08/02/2017 Submittal: 07 54 13 - 5215 - 1 - NET - LMN - Penetration Firestopping HVAC
8982 Classroom & OfficeBuilding 990016 07/24/2017 08/07/2017 07/25/2017 Submittal: G-100 A Site Fire Access Plan
8981 Middle Earth Expansion 996298 07/24/2017 08/07/2017 08/02/2017 Submittal: Submittal 01 5000-005-0- Pippin Commons Emergency Egrees Routes
8980 I & Q Corridor Vestibule-UCR 110040 07/24/2017 08/07/2017 08/10/2017 Other: 100% CD Plans
8979 Geology Lab Room 449 renovation-UCR 110059 07/24/2017 08/07/2017   Other: 100 % CD Plans
8978 Barn Project Phases 1&2 -UCR 950493 07/24/2017 08/07/2017 08/02/2017 Other: 100% DD Drawings
8977 SOM Trailer Expansion Project-UCR 954043 07/24/2017 08/07/2017 07/27/2017 Other: 100% CD Plans (New Trailer Installation & Site Construction
8976 The Habit Burger Grill-UCR 00003299 07/24/2017 08/07/2017 07/27/2017 Other: For Information only. Only Fire Sprinkler System plans found at present time
8975 Bourns Hall Fire Alarm System Replacement-UCR 112003 07/24/2017 08/07/2017 08/10/2017 Other: 90% CD Review
8974 I & Q Corridor Vestibule-UCR 110040 07/24/2017 08/07/2017 08/10/2017 Other: 100% CD Plans
8973 Chapman Hall Roof Replacement-UCR 957400 07/24/2017 08/07/2017 07/27/2017 Other: Preliminary Contruction Drawings & Specifications for review
8972 Boyle Hall Vivarium Restoration-UCR 950536 07/24/2017 08/07/2017 07/27/2017 Other: Conformed Set For Contruction
8971 Anteater Recreation Center 5112094 07/21/2017 08/04/2017 07/27/2017 Plans
8970 Local Exhaust Ventilation 5110060 07/21/2017 08/04/2017 07/25/2017 Plans
8969 Classroom and Office Building 990016 07/20/2017 08/03/2017 07/24/2017 Submittal 08 3113 Product Data for Plumbing Access Doors
8968 Bullentin 1-7 Drawings 950528 07/11/2017 07/25/2017 07/20/2017 Other: Bullentin Drawings - 7 Only
8967 Elena Blackwell 5110061 07/20/2017 08/03/2017   Plans
8966 Classroom and Office 990016 07/19/2017 08/02/2017 08/24/2017 Submittal 21 10 00 - 5259 - 0 - Fire Sprinkler Protection Drawings and Calculations
8965 Classroom & Office Building 990016 07/19/2017 08/02/2017 08/02/2017 Submittal 21 10 00 -5256 - 0 - Weld Certificate and Viking Procedures
8964 Classroom & Office Building 990016 07/19/2017 08/02/2017 07/19/2017 Submittal 01 32 00 - 5231 - 0 - Inner Ring Road Site Utilities Work Plan
8963 Primary Electrical Improvement Step 4 990513 07/18/2017 08/01/2017 07/24/2017 SUBMITTAL: 07 8413.01.02-Exterior Wall Penetration Fire Stopping System
8962 CR II - 2015 Replace Fire Alarms; Multiple Buildings 5109528 07/17/2017 07/31/2017 07/20/2017 Plans, EH&S Redlines
8961 Drew Hetch CP00003310 07/17/2017 07/31/2017 07/27/2017 Other: 100% CD Plans
8960 The Habit Burger Grill CP00003299 07/17/2017 07/31/2017 07/27/2017 Other: 100% CD Plans
8959 ULB 202 Renovation 110056 07/11/2017 07/25/2017 07/27/2017 Other: Submittal: 17 (1set) and conformed Set of Plans (2 sets) and Specs (1set)
8958 Boyce Hall Rm 5478 110062 07/17/2017 07/31/2017 07/27/2017 Other: Conformed Set for Construction Drawings
8957 Boyce Hall 4440 Growth Room 957381 07/17/2017 07/31/2017 07/27/2017 Other: Conformed Set for Construction Drawings
8956 Research Building 5110351 07/14/2017 07/28/2017 07/17/2017 Plans
8955 Primary Electrical Improvement 990513 07/14/2017 07/28/2017 07/17/2017 Submittal: 28 3100.02A - Fire Alarm Drawings W/ Backcheck
8954 Leasing Oversight Renovation 5112015 07/14/2017 07/28/2017 07/24/2017 Plans
8953 SOM Research 1st floor build out 954041 07/11/2017 07/25/2017 07/20/2017 OTHER: 100% CD Plans (2 sets) and Specifications (1 set)
8952 UCR MRB1 950528 07/13/2017 07/27/2017 07/20/2017 Other: DP3 IFC Specifications (UPDATED)
8950 UCR MRB1 950528 07/11/2017 07/25/2017 10/05/2017 Other: Bulletin 1-7 Drawings
8949 SST 4th Floor Renovation 5110352 07/13/2017 07/27/2017 07/14/2017 Plans, Specifications
8948 ET 1st Floor/ Breezeway enclosure 5109840 07/13/2017 07/27/2017 07/14/2017 Plans
8947 Cyber Café Shade Structure 5112069 07/13/2017 07/27/2017 07/14/2017 Plans
8946 UCR MRB1 950528 07/07/2017 07/21/2017 07/07/2017 OTHER: DP6-95% (Full Set)
8945 Rowland Hall 533, 537, 539 5110409 07/12/2017 07/26/2017 07/13/2017 Plans
8944 Classroom and Office Building 990016 07/12/2017 07/26/2017 07/12/2017 Submittal: Submittal 01 32 00 - 5234 - 0 - Outer ring road site utilities work plan
8943 Electric Bus Lift Pad 5110349 07/11/2017 07/25/2017 07/13/2017 Plans
8942 UCR MRB1 950528 07/11/2017 07/25/2017 07/11/2017 Other: DP3 IFC A2.3, A2.4, G1.0
8941 Engineering Hall 3131 Renovation -Tissue Culture Room 5112051 07/11/2017 07/25/2017 07/11/2017 Plans EH&S Redlines
8940 Pierce Hall Building Renovation 950511-950532 07/11/2017 07/25/2017 07/20/2017 Other: 85% DD Plans (Set 2 Volumes)
8939 UCR MRB1 950528 07/11/2017 07/25/2017 10/24/2017 Other: Fire Protection Drawings w/ TS1SC Comments
8938 UCR MRB1 950528 07/11/2017 07/25/2017 07/11/2017 Submittal: 0005-21 10 00-1 Fire Suppression -Product Data, Shop Dwgs & Calcs
8937 UCR MRB1 950528 07/11/2017 07/25/2017 08/01/2017 Submittal: 0005-21 10 00-1 Fire Suppression-Product Data, Shop Dwgs & Calcs
8936 Lots 30 & 32 Solar Project 957421 07/11/2017 07/25/2017 07/13/2017 Submittal: Fire Alarm Drawings : One (1) set for lot 30 & One (1) Set for lot 32
8935 Oban Adderessable Fire Alarm 956361 07/11/2017 07/25/2017 07/13/2017 Submittal: Fire Alarm Draings & Booklets (1 Set)
8934 SOM Trailer Expansion 954043 07/11/2017 07/25/2017 07/20/2017 Other: 100% CD Plans (2 sets) and Specifications (1 set)
8933 UCR MRB1 950528 07/11/2017 07/25/2017   Other: Fire Protection Drawings w/ FM Comments
8932 UCR MRB1 950528 07/11/2017 07/25/2017   Other: Fire Protection Drawing w/ TK1SC Comments
8931 Sm Cap 2017 - Cal1T2 TEMPR Properties Facility Renovation 5110353 07/10/2017 07/24/2017 07/10/2017 Plans
8930 eh Renovate Room 1106, 1108, 1110, 1111, 1112 5110052 07/10/2017 07/24/2017   Plans
8929 Middle Earth Expansion 996298 07/10/2017 07/24/2017 07/10/2017 Submittal:Package 1 Demolition and Site Utilities Drawings - Resubmittal
8928 EG Victaulic Fittings CWS 5110321 07/10/2017 07/24/2017 07/14/2017 Plans
8927 Classroom & Building 990016 07/06/2017 07/20/2017 07/10/2017 Submittal 283111-5159-2-Fire alarm Shop Drawings
8926 Classroom & Office Building 990016 07/06/2017 07/20/2017 07/10/2017 Submittal 23 33 00 - 5201 - 0 - Product Data for Combination Fire Smoke Dampers
8925 Rowland Hall 533, 537, 539 5110409 07/05/2017 07/19/2017   Plans
8924 EH Renovate Room 1106, 1108, 1110, 1111, 1112 5110052 07/05/2017 07/19/2017   Plans
8923 Rowland Hall 533, 537, 539 5110409 07/05/2017 07/19/2017   Plans
8922 Classroom & Office Building 990016 07/05/2017 07/19/2017 07/10/2017 Submittal 21 10 00-5197-1-NET-ALV-Supplemental Product Data for Blue Bangers
8921 Engineering Gateway 5110008 06/30/2017 07/14/2017   Plans
8920 Classroom & Office Building 990016 06/30/2017 07/14/2017 07/24/2017 SI-5 Drawings
8919 UCR MRB-1 950528 06/23/2017 07/07/2017 07/11/2017 Submittal: Pumbing - Fire Prevention/Firestop submitting
8918 UCR MRB-1 950528 06/23/2017 07/07/2017 07/20/2017 Submittal: 95% CO - DP6 Plan Submittal
8917 UCR Boyce Hall - TI 110061 06/26/2017 07/10/2017 08/24/2017 Submittal: Fire Sprinker as builts for COFO signoff
8916 Classroom & Office Building 990016 06/29/2017 07/13/2017 07/10/2017 CP-5 Architectural/MEP Plans Resubmittal
8915 Classrooms & Office Building 990016 06/30/2017 07/14/2017 07/10/2017 Submittal 14 21 00-5122-0- Shop Drawings for Kone Elevators
8914 Classrooms & Office Buildings 990016 06/30/2017 07/14/2017 07/06/2017 Submittal 28 31 11-5196-1- Fire Alarm Product Data
8913 MRB-1 UCR 0005 06/29/2017 07/13/2017 06/29/2017 DP 3 IFC
8912 MRB-1 UCR 0004 06/29/2017 07/13/2017 06/29/2017 Temp. standpipe drawings
8911 MRB-1 UCR 0003 06/22/2017 07/06/2017 06/29/2017 Elevator Shop Drawings
8910 MSRB-1 UCR 0002 06/22/2017 07/06/2017   Specification DP3
8909 Engineering Hall 3131Renovation - Tissue Culture Room 5112051 06/29/2017 07/13/2017 06/30/2017 Plans, specifications, EH&S Redlines
8908 Classroom & Office Building 990016 06/29/2017 07/13/2017 07/10/2017 RFI_2205-DAS Signal Strength Clarification
8907 Classroom & Office Building 990016 06/29/2017 07/13/2017 06/29/2017 CP-5 MEP Plans Rsubmittal
8906 Replace Boilers 5109724 06/28/2017 07/12/2017   Plans
8905 Middle Earth Expansion 996298 06/27/2017 07/11/2017 07/06/2017 Submittal - Package 1 Demolition & Site Utilities Drawing
8904 Classroom & Office Building 990016 06/27/2017 07/11/2017 07/06/2017 RFI: RFI_2155R1 - Fire Sprinkler Above Drive Aisle
8903 Rowland Hall Room 533, 537, 539 5110409 06/27/2017 07/11/2017 06/28/2017 Plans
8902 Submittal 07 54 13-5215-0-Penetration Firestopping HVAC 990016 06/26/2017 07/10/2017 07/06/2017 Submittal 07 54 13-5215-0-Penetration Firestopping HVAC
8901 Classroom & Office Building 990016 06/26/2017 07/10/2017 07/06/2017 Submittal 07 54 13-5221-0-Penetration Firestopping Electrical
8900 Central Plant Direct-Fired Boiler Replacement - Asbestos Abatement 5109724 06/26/2017 07/10/2017 06/28/2017 Revised Proposal
8899 null IR PR34651 2405 06/26/2017 07/10/2017 06/26/2017 Plans
8898 Small Cap 2017-Social Science Tower 220AB Smart Classroom Renovation 5110355 06/22/2017 07/06/2017 06/26/2017 Plans
8897 MRB-1 0001 06/12/2017 06/26/2017 06/22/2017 Submittal DP3 CD 95%
8896 Research Building 5110351 06/22/2017 07/06/2017 06/27/2017 Plans
8895 Small Cap 2017 Bren Hall 2nd Floor ISG Group Renovation 5110367 06/21/2017 07/05/2017 06/26/2017 Plans
8894 ELF Structural Fix 5109820 06/21/2017 07/05/2017 06/27/2017 Plans
8893 Structural Assessment and Repairs 5110149 06/21/2017 07/05/2017 06/27/2017 Plans
8892 Eyewash shower scope 5110061 06/21/2017 07/05/2017 06/26/2017 Plans
8891 CR II-2015-Replace Fire Alarms; Multiple Buildings 5109528 06/21/2017 07/05/2017 06/28/2017 Plans
8890 SST 4TH Floor Renovation 5110352 06/21/2017 07/05/2017 06/27/2017 Plans
8889 Clasroom & Office Building 990016 06/20/2017 07/04/2017 06/22/2017 RFI_2192-FSD Placement Clarification
8888 Middle Earth Expansion 996298 06/19/2017 07/03/2017 06/22/2017 Submittal 01 5000-002- Site Logistics Plan-Resubmittal
8887 Classroom & Office Building 990016 06/19/2017 07/03/2017 06/22/2017 Submittal 21 10 00-5197-0- Suplimental Product Data for Blue Bangers
8886 Local Exhaust Ventilation CRII-2015 5110060 06/19/2017 07/03/2017 06/22/2017 Plans
8885 ELF Structural Fix 5109820 06/19/2017 07/03/2017 06/19/2017 Plans
8884 Social Sciences Stairs & Campus Bridges 5510191 06/16/2017 06/30/2017 06/19/2017 Plans
8883 ADA Bathroom & Kitchen Conversion 5110380 06/16/2017 06/30/2017 06/20/2017 Plans
8882 Transportation & Distribution Services PSB-Floor2, Room 0200 5112064 06/15/2017 06/29/2017 06/22/2017 Specifications
8881 Middle Earth Expantion 996298 06/14/2017 06/28/2017 06/22/2017 Submittal 015000-002-Site Logistics Plan
8880 Middle Earth Expantion 996298 06/14/2017 06/28/2017 06/22/2017 Submittal 02 4116-001-Demolition & Abatement Information Submittal
8879 Classroom & Office Building 990016 06/14/2017 06/28/2017 06/22/2017 Submittal 07 84 13-5199-0-Electrical Penetration Fire Stopping Supplemental EZ Path
8878 Small Cap 14/15 McGaugh Hall Lab 4311 Renovation 5109824/9746440 06/13/2017 06/27/2017 06/19/2017 Plans
8877 Leasing Oversight Renovation 5112015 06/13/2017 06/27/2017 06/26/2017 Plans
8876 UCI-Student Housing-Phase 4A-Building A 150358 06/09/2017 06/23/2017 07/18/2017 Plans
8875 Submittal 28 31 11-5196-0-Fire Alarm Product Data 990016 06/08/2017 06/22/2017 06/12/2017 Submittal 28 31 11-5196-0-Fire Alarm Product Data
8874 Classroom & Office Building 990016 06/08/2017 06/22/2017   Submittal 0132 00-5146-1-CP-5 Service Level Electrical_Mechanical and Telecom Sheets
8873 UCI-Student Housing-Phase 4A-Fire Access Plan 150358 06/08/2017 06/22/2017   Plans
8872 Primary Electrical Improvement 990513 06/08/2017 06/22/2017 06/12/2017 ANOC 23-Replacement of UC 66-1xfmer
8871 Engineering Hall 3131 Renovation-Tissue Culture Room 5112051 06/08/2017 06/22/2017 06/12/2017 Plans
8870 Engineering Lab Facility Install Double-Door Between ELF134C and ELF140 5112062 06/08/2017 06/21/2017   Plans
8869 Engineering Lab Facility Install Double-Door Between ELF134C and ELF140 5112062 06/07/2017 06/21/2017 06/13/2017 Plans
8868 Engineering Gateway Atomizer Lab for EVCP 5110008 06/07/2017 06/19/2017 06/13/2017 Plans
8867 Social Sciences Stairs & Campus Bridges 5110191 06/06/2017 06/08/2017 06/12/2017 Plans
8866 Off-site facility security enhancement 5110277 06/05/2017 06/19/2017 06/12/2017 Plan check
8865 ET 1ST Floor expantion/Breezeway enclosure 5109840 06/05/2017 06/19/2017 06/22/2017 Plan check
8864 MRI facility at SBSG G-201 5510217 06/05/2017 06/05/2017 06/05/2017 Plans
8863 Classroom & Office Building 990016 06/02/2017 06/02/2017 06/12/2017 CP -5 Specification
8862 Small Cap 2017-Krieger Hall Office 300/330 Renovation 5110354 06/02/2017 06/02/2017 06/02/2017 Plans, EH&S Redlines
8861 Classrooms & Office Building 990016 06/02/2017 06/02/2017 06/02/2017 SI-6 Drawings
8859 Small Cap 2017 Bren Hall 2ND Floor ISG Group Renovation 5110367 06/02/2017 06/02/2017 06/07/2017 Plans
8858 UCI-Student Housing-Phase 4A-Building A 150358 06/02/2017 06/16/2017 06/09/2017 Plans
8857 Primary Electrical Improvement Step-4 990513 06/01/2017 06/15/2017 06/12/2017 Submittal 28 3100.02 (Fire alarm Drawings)
8856 UCI-Student Housing-Phase 4A-Parking Structure 150358 06/01/2017 06/15/2017 06/09/2017 Plans
8855 SST 4th Floor Renovation 5110352 05/31/2017 06/14/2017 06/02/2017 Plans
8854 Engineering Lab Facility 134 Renovation 5112061 05/31/2017 06/13/2017   Plans
8853 Classroom & Office Building 990016 05/30/2017 05/30/2017 06/07/2017 Submittal 27 17 00-5186-0- Shop Drawings for 800 MHZ Communications
8852 Engineering Lab Facility 134 Renovation 5112061 05/30/2017 06/13/2017 05/31/2017 Plans
8851 Classroom & Office Building 990016 05/26/2017 06/09/2017 06/08/2017 Submittal 28 31 11-5159-1- Fire Alarm Shop Drawings
8850 Campus Village Housing Office-Install Emergency Walkway Lights 5110113 05/25/2017 06/01/2017   Plans
8849 Classroom & Office Building 990016 05/22/2017 05/22/2017 05/25/2017 RFI_2155-Fire Sprinkler Above Drive Aisle
8848 CRII-2015 Step Lights-Pereira Phase 2 5110206 05/22/2017 06/05/2017 05/24/2017 Specifications
8847 Engineering Hall 3131 Renovation-Tissue Culture Room 5112051 05/19/2017 06/01/2017 05/22/2017 Plans
8846 Classroom & Office Building 990016 05/18/2017 05/18/2017 05/25/2017 Submittal 27 17 00 -5172-0 - Product Data for 800 MHZ Communications
8845 Classroom & Office Building 990016 05/18/2017      
8844 CRII-2 2015 Replace Electrical TrancformerT-110 5110329/9932690 05/18/2017 06/01/2017 05/22/2017 Plans
8843 E. Campus Phase IV PS 20150358 05/18/2017 06/01/2017   Drawings 100% DD
8842 IH, SoM Dean's Ste Renovation 5110318 05/18/2017 06/01/2017 05/22/2017 Plans
8841 Lot-5 Resource Center Renovation 5110257 05/18/2017 06/01/2017 05/22/2017 Plans
8840 HVAC Renovation 5110045/230701 05/18/2017 06/01/2017 05/24/2017 Plans
8839 Childrens Center Structural Repair 5110350 05/17/2017 05/31/2017 05/18/2017 Plans
8838 Café Med Resource Center Renovation 5110344 05/17/2017 05/31/2017 05/22/2017 Plans
8837 Apartment Renovation 5112071 05/16/2017 05/17/2017 05/17/2017 Specification
8836 CY 2017 Engineering Gateway 2105 and 3108 Renovation 5110371 05/16/2017 05/16/2017   Plans
8835 Calssroom & Office Building 990016 05/15/2017 05/15/2017 05/17/2017 Submittal 28 31 11-5159-0 - Fire Alarm Shop Drawings
8834 Local Exhaust Ventilation CRII-2015 5110060 05/15/2017 05/16/2017 05/22/2017 Plans
8833 Classroom and Office Building 990016 05/15/2017 05/15/2017 05/17/2017 Submittal: Submittal 09 2900 - 5148 Product Data for Patching Humanities Basement Wall
8832 Primary Electrical Improvement Step-4 990513 05/15/2017 05/15/2017 05/23/2017 ANOC 22- East Substation Crane Plan
8831 Hewitt Hall Insectary HVAC Controls Renovation 5110356 05/15/2017 05/15/2017 05/15/2017 Plans
8830 Lot 1C Trees and Stumps Removal 5112025 05/15/2017 05/15/2017 05/15/2017 Plans
8829 Classroom & Office Building 990016 05/11/2017 05/11/2017 05/11/2017 CP-5 Architectural/MEP/AV/ Plans
8828 Small Cap 14/15 McGauhg Hall Lab 4311 Renovation 5109824/9746440 05/11/2017 05/25/2017 05/18/2017 Plans
8827 ET 1ST Floor Expention/Breezeway enclosure 5109840 05/10/2017 05/24/2017 05/22/2017 Plans
8826 Social Sciences Stairs & Campus Bridges 5110191 05/10/2017 05/12/2017 05/22/2017 Plans, Specifications
8824 Children's Center Strutural Repair 5110350 05/09/2017 05/23/2017 05/10/2017 Plans
8823 Sm Cap 2017-Crawford Field Irrigation 5110370 05/09/2017 05/12/2017 05/10/2017 Plans
8822 Security Panel Upgrade 5110157 05/08/2017 05/08/2017 05/10/2017 Plans
8821 CY 2017 Engineering 5110371 05/08/2017 05/09/2017 05/09/2017 Plans
8820 Local Exhaust Ventilation CRII-2015 5110060 05/05/2017 05/09/2017 05/10/2017 Plans
8819 Middle Earth Asphalt Repairs 5110240 05/05/2017 05/05/2017 05/09/2017 Specifications
8818 Middle Earth Housing Complex 5112031 05/03/2017 05/05/2017 05/05/2017 Plans
8817 Engineering Tower Plaza Bollards 5112044 05/04/2017 05/05/2017 05/05/2017 Plans
8816 Classroom & Office Building 990016 05/03/2017 05/03/2017 05/04/2017 RFI
8815 Hewitt Hall Insectary HVAC Controls Renovation 5110356 05/03/2017 05/10/2017 05/05/2017 Plans
8814 Sm Cap 2017-Crawford Field Irrigation 5110370 05/03/2017 05/08/2017 05/05/2017 Plans
8813 Local Exhaust Ventilation CRII-2015 5110060 05/03/2017 05/05/2017 05/09/2017 Plans
8812 CRII 2013 Robert Cohen Theatre & Dance Studio A/C Replacement 5109594 05/03/2017 05/15/2017 05/05/2017 Plans
8811 Research Building 5110351 05/02/2017 05/16/2017 05/05/2017 Plans
8810 Classroom & Office Building 990016 05/02/2017 05/02/2017 05/04/2017 RFI_2104-Updated Fire Suppperession Water Line
8809 Engineering Hall 3121 Renovation-Install Fume Hood 5112052 05/01/2017 05/15/2017 05/05/2017 Plans
8808 Security Panel Upgrade 5110157 05/01/2017 05/03/2017 05/10/2017 Plans
8807 Sm Cap 2017-CalIT2 TEMPR Properties Facility renovation 5110353 05/01/2017 05/05/2017 05/05/2017 Plans
8806 Roof Repair 5110366 05/01/2017 05/15/2017 05/05/2017 Specifications
8804 Mesa Court Concrete Repairs 5112055 05/01/2017 05/05/2017 05/03/2017 Specifications
8803 Eyewash shower scope 5110061 05/01/2017 05/01/2017 05/04/2017 Plans
8802 Small Cap 2017-Krieger Hall Office 300/330 Renovation 5110354 04/28/2017 05/12/2017 05/03/2017 Plans
8801 Small Cap 2017-Social Science Tower 220 AB Smart Classroom Renovation 5110355 04/28/2017 05/12/2017 05/02/2017 Plans
8800 RFI_2060R1-Knox Box Installation Detail 990016 04/26/2017 04/26/2017 05/01/2017 RFI_2060R1-Knox Box Installation Detail
8799 CRII-22015: Improve Laboratory Emergency Circuits 5110005/9929490 04/26/2017 05/10/2017 05/02/2017 Plans
8798 Bio Sci Plaza Improvements 990021 04/20/2017 04/20/2017   Other: Certificate of Substantial Completion
8797 Classroom & Offoce Building 990016 04/26/2017 04/25/2017 04/25/2017 RFI_2014-Updated Fire Suppersion Water Line
8795 Primary Electrical Improvement Step-4 990513 04/20/2017 04/20/2017 05/01/2017 Submittal 08 7111.01-Doors Hardware
8794 Classroom & Office Building 990016 04/19/2017 05/03/2017 04/19/2017 Submittal: CP-2 Specifications
8793 SS-2, 2nd floor renovation 5110388 04/19/2017 05/03/2017 04/21/2017 Plans
8792 SEP 2014 Reines MBCx-Chemistry AHU-1 5109588 04/19/2017 04/20/2017   Plans
8791 Los Trancos/East Peltason Signal 5112030 04/19/2017 05/03/2017   Plans
8790 SEP 2014 Reines MBCx 5109588 04/19/2017 04/20/2017   Plans
8789 Primary Electrical Improvement Step - 4 990513 04/18/2017 05/02/2017 04/26/2017 Other: ANOC 20 Main Substation Crane Plan - 4-27-17
8788 Arroyo Vista Kitchen Renovation 5112023 04/18/2017 04/21/2017 04/21/2017 Plans
8787 CRII-2 2015 Replace Electrical Transformer T-110 5110329 04/18/2017 05/01/2017   Plans/ Specifications
8786 Campus Village Housing Office-Install Emergency Walkway Lights 5110113 04/18/2017 04/26/2017   Plans
8785 Middle Earth Shower Renovations 5112031 04/18/2017 04/24/2017 04/20/2017 Plans
8784 CY 2017 Engineering Gateway 5110371 04/18/2017 04/19/2017 04/18/2017 Plans (3 Sets)
8783 Small Cap 14/15 McGaugh Hall Lab 4311 Renovation 5109824/9746440 04/17/2017 04/26/2017   Plans
8782 Arroyo Vista Kitchen Renovation 5112023 04/17/2017 04/21/2017 04/17/2017 Plans
8780 Primary Electrical Improvement Step-4 990513 04/14/2017 04/28/2017 04/18/2017 Submittal: 28 3100.01 - Fire Detection and Alarm Device
8779 ARC Document Solutions 6097800/150358 04/12/2017 04/26/2017   Attn: Dale Saunders with questions
8778 Classroom & Office Building 990016 04/11/2017 04/25/2017 05/04/2017 CP-5 Architectural/MEP/AV Plans
8777 Lot 36 Electric Bus Yard 5110267 04/11/2017 04/25/2017 04/11/2017 Relocate fire hydrant and FDC. Final Review, Approval Stamp, Approval for Contracts
8776 Palo Verde Accessible Pathway 5110347 04/11/2017 04/25/2017 04/11/2017 Construct ADA compliant walkway from PV Housing to California St. Relocate hydrant to back of planter. Final Review, Approval Stamp, Approval for Contracts
8775 Verano Place Pathway, Fire Lane & Slurry Repairs 5110402 04/11/2017 04/25/2017 04/17/2017 Specifications, Final Review, Approval for Contracts
8774 Rowland hall Room 533, 537, 539 5110409 04/07/2017 04/21/2017 04/13/2017 Tenant Improvement. Plans, Final Review, Approval for Contracts
8773 Pathway to Palo Verde Housing 5110076 04/07/2017 04/21/2017 04/10/2017 Construct concrete staircase and walkway from bike path intersecting Verano & Palo Verde. Plands, Final Review, Approval for Contracts
8772 Student Health II-Repair Broken Stone Panel 5112009 04/07/2017 04/21/2017 04/10/2017 Repair single Architectural Stone Panel with Injection of Cementitious Expoxy into the Surface crack for Adhesion to existing substrate. Specifications, 100% Review, Approval for Contracts
8771 MRI unit installation at SBSG G-201 5110217 04/06/2017 04/20/2017 04/07/2017 Plan Check.
8770 Parking Lot & Road Re-Surfacing 5110400 04/06/2017 04/20/2017 04/07/2017 Remove & Replace Asphalt at Lots 31, 32, & 34. Specifications, Final Review, Approval for Contracts
8769 CRII 2015 McGaugh Hall Door Hold-open Hardware 5110064 04/06/2017 04/20/2017   Pilot installation of two automatic door openers in McGaugh Hall Rooms 3113 and 3119. Specifications, 100% Review.
8768 Engineering Gateway Atomizer Lab for EVCP 5110008 04/06/2017 04/20/2017 04/07/2017 Install Electrica for Atomizer Power Supply. Plans, Specifications, Final Review, Comments & Corrctions, Approval Stamp, Approval for Contracts, Other: Arc Flas Study with Labels
8767 Primary Electrical Improvement Step-4 990513 04/05/2017 04/19/2017 04/06/2017 Other: Revised G002, G003, A103, E303, E304, E305, for Approval
8766 Palo Verde Accessible Pathway 5110347 04/05/2017 04/19/2017 04/06/2017 Construct ADA compliant walkway from PV Housing to California St. Relocate hydrant to back of planter.
8765 Engineering Tower 444 Renovation 5110053 04/05/2017 04/19/2017 04/07/2017 Fire Modification. Plans, Specifications, Final Review, Approval Stamp
8764 Pathway to Palo Verde Housing 5110076 04/05/2017 04/19/2017 04/06/2017 Construct concrete staircase and walkway from bike path intersecting Verano & Palo Verde. Plans, 100% Review, Approval Stamp
8763 Café Med Resource Center Renovation 5110344 04/04/2017 04/18/2017 04/06/2017 Plan Check. Plans, 100% Review
8762 Replace Boilers 5109724 04/04/2017 04/18/2017 04/06/2017 Replace boiler 3 and 4 with HTW generators. Plans, Final Review, Comments & Corrections, Approval Stamp, Approval for Contracts
8761 HVAC Renovation 5110045 04/04/2017 04/18/2017 04/06/2017 Retrofit AHU and controls. Plans, 100% Review, Comments & Corrections
8760 CRII-2 2015 Replace Electrical Transformer T-110 5110329/9932690 04/04/2017 04/18/2017 04/06/2017 Replace Transformer T-110. Plans, Specifications, Preliminary Review, Comments & Corrections
8752 Primary Electrical Improvement Step-4 990513 04/03/2017 04/17/2017 04/03/2017 Other: Switchgear Dwgs Pkg (except Marked-ups) sign-off.
8751 SEP 2014 Reines Hall MBCx 5109588 04/03/2017 04/17/2017 04/03/2017 Add FCUnits in two rooms. Plans, Approval Stamp
8750 SS-2, 2nd Floor Renovation 5110388 04/03/2017 04/17/2017 04/05/2017 Plan check. Final Review, Approval for Contracts
8749 Primary Electrical Improvement Step-4 990513 03/30/2017 04/13/2017 04/03/2017 Other: Advance Notice - South Substation Crane Plan
8748 ELF Structural Fix 51109820 03/28/2017 04/11/2017 04/05/2017 Crack repair around parapet wall of building and the vertical surface above the window/door glazing. Design steel structural system at window panels above double-doors. Located at north-east protion of the east wall. 1st Floor-North Elevation-Remove and reset (8) windows from a steel storefront and reset at a later date. Framing to be repaired as needed. Plans, 80% Review.
8747 Rowland Hall Tenant Improvement 5110409 03/28/2017 04/11/2017 03/29/2017 Tenant improvement of 5th level lab space in Rowland Hall, Room 537 & 539. Work entails renovation of existing lab space including mechanical systems, electrical, plumbing, wall, doors, flooring, finishes and fire Life Safety. Plans, 100% Review, Approval Stamp
8746 Classroom & Building Office 990016 03/27/2017 04/10/2017 04/07/2017 Submittal: Site Fire Acces Plan
8745 Classroom & Building Office 990016 03/27/2017 04/10/2017 03/27/2017 Submittal 01 32 00 - 5097 - 0 - Supplemental Instruction No. 01
8744 Classroom & Office Building 990016 03/27/2017 04/10/2017 03/27/2017 Submittal 01 32 00 - 5098 - 0 - Supplemental Instruction No. 02
8743 CRII 2013 - Engineering Gateway Victaullic Fittinh CWS 5110231 03/24/2017 04/07/2017 03/27/2017 Reroute CWS to exterior to the building.Plans, Specifications, Final Review
8742 Classroom & Office Building 990016 03/23/2017 04/06/2017 03/23/2017 SI-3 for CP-3
8741 Primary Electrical Improvement Step-4 990513 03/23/2017 04/06/2017 03/28/2017 Submittal 27 0500.01 Fire Stopping Products.
8740 Security Panel Upgrade 5110157 03/23/2017 04/06/2017 03/24/2017 Upgrade alarm panels and infrastructure. Approval stamp.
8739 Continuing Education University Extension Building D Paint 5112011 03/22/2017 04/05/2017 03/27/2017 Interior Painting of Walls, Ceiling Doors & Frames - Patch & Texture Included - for Buildings CE-3; CE-4; B; CE-5; CE-6. Specifications, Approval for Contracts
8738 ELF 116A Cooling 5110320 03/22/2017 04/05/2017 03/23/2017 Install split system for 116A. Specifications, 100% Review, Final Review, Approval for Contracts.
8737 Classroom & Office Building 990016 03/21/2017 04/04/2017 03/27/2017 Submittal 27 05 00 - 5078 - 0 - Product Data for Common Work Results For Communications. RFI 2027 R1 Service Level non-highway Electric Vehicles
8736 Classroom & Office Building 990016 03/21/2017 04/04/2017 03/23/2017 Submittal 27 05 00 - 5078 - 0 - Product Data for Common Work Results For Communications. RFI 2026 R1 Service Level Parking Garage
8735 Classroom & Office Building 990016 03/17/2017 03/31/2017 03/20/2017 RFI_2081 - Elevator Shaft Smoke Detector
8734 CalIT2 add humid to supply air 5110218 03/16/2017 03/30/2017 03/22/2017 Provide the addition of two new AHU humidifiers in AH-1 & AH-2, ductwork and associated reverse osmosis water treatment at rooftop. Plans, Approval Stamp
8733 Classroom & Office Building 990016 03/16/2017 03/30/2017 03/20/2017 Submittal 27 05 00 - 5078 - 0 - Product Data for Common Work Results For Communications
8732 Rowland Hall Construct Exhaust Ductwork Upgrade 5110345 03/15/2017 03/29/2017 03/20/2017 Replacing air valves for two fume hoods. Specifications, Final Review, Approval for Contracts
8731 Primary Electrical Improvement Step-4 990513 03/14/2017 03/28/2017 03/22/2017 Other: Step-4_DB Specifications (Div 02-33)
8730 Primary Electrical Improvement Step-4 990513 03/14/2017 03/28/2017 03/16/2017 RFI 077_South Substation Temporary Fencing Plan-G-003
8729 Classroom & Office Building 990016 03/13/2017 03/27/2017 03/13/2017 Submittal 21 10 00 - 5049 - 1 - Revised Product Data for Fire Protection For Sprinkler Systems. Submittal 01 3200 Humanities Hall Southeast Stair Fence Plan
8728 Classroom & Office Building 990016 03/09/2017 03/23/2017 03/16/2017 Submittal 33 11 10 - 5083 - 0 - Supplemental Product Data for Site Water Distribution Piping
8727 Small Cap 15/16 Engineering Gateway Lab Renovations 5110110 03/09/2017 03/23/2017 03/10/2017 Renovate lab space for new wind tunnel and fuel cell labs. Plans, Final Review, Approval Stamp, Approval for Contracts
8726 SEP 2014 Reines Hall MBCx 5109588 03/09/2017 03/23/2017 03/09/2017 AHU-1 & AHU-2 remove and replace HHW and CHW coils per MBCx. Plans, Approval Stamp
8725 CalIT2 5110218 03/09/2017 03/23/2017 03/10/2017 Provide the addition of two new AHU humidifiers in AH-1 & AH-2, ductwork and associated reverse osmosis treatment at rooftop. Plans, Approval Stamp
8724 IH, SoM Dean's Ste Renovation 5110318 03/09/2017 03/23/2017 03/10/2017 Plan Check. Plans, 100% Review.
8723 SC 15-16 Tamkin Hall E-Lighting & Nelson Auditorium Upgrade 5110101 03/08/2017 03/22/2017 03/09/2017 Addition of electrical outlets & recommisioning of lighting systems and finish upgrades in Nelson library. Addendum, Final Review, Other: Submittal Review
8722 CRII-2 2015: Improve Laboratory Emergency Circuits 5110005/9929490 03/07/2017 03/21/2017 03/20/2017 Evaluate and design new emergency circuits for Engineering Tower (ET) t meet the needs of the building occupants up to the capacity of the existing emergency generator. Plans, Specifications, 100% Review.
8721 CRII-2015 Step Lights - Pereira Phase 1 5110206 03/07/2017 03/21/2017 03/08/2017 Electrical work to replace step lights at various locations across campus with LED solutions. Specifications
8720 Replace Boilers 5109724 03/06/2017 03/20/2017 03/21/2017 Replace boiler 3 and 4 with HTw generators. Plans, 100% Review, Final Review, Comments & Corrections, Approval Stamp, Approval for Contracts
8719 IH, SoM Dean's Ste Renovation 5110318 03/07/2017 03/21/2017 03/08/2017 Plan Check. Plans, 100% Review
8718 Engineering Tower 444 Renovation 5110053 03/07/2017 03/21/2017 03/07/2017 See the attached Project Management Review Log. Plans, 100% Review, Final Review, Comments & Corrections, Approval Stamp
8717 INRF EF Replacement Design 5109358 03/06/2017 03/20/2017 03/10/2017 Balance the exhaust air-Relocated benches and repair paneling. Plans, 100% Review, Comments & Corrections
8716 Mesa Court Expansion 996296 03/06/2017 03/20/2017 03/06/2017 Fire Alarm Drawings Showing Candelas
8715 MRI unit installation at SBSG G-201 5110217 03/03/2017 03/17/2017 03/08/2017 Plan Check
8714 SS-2, 2nd floor renovation 5110388 03/03/2017 03/17/2017 03/07/2017 Plan check.
8713 SEP 2014 Reines Hall MBCx 5109588 03/03/2017 03/17/2017 03/09/2017 AHU-1 & AHU-2 remove and replace HHW and CHW coils per MBCx. Plans, Approval stamp
8712 ANSI Z9.5 Fume Hood Phase 2 5110295 03/02/2017 03/16/2017 03/09/2017 Attached. Plans, Final Review, Approval for Contracts
8711 Classroom & Office Building 990016 03/02/2017 03/16/2017 03/13/2017 Submittal 21 10 00 - 5049 - 1 - Revised Product Data for Fire Protection For Sprinkler Systems
8710 Classroom & Office Building 990016 03/02/2017 03/16/2017 03/15/2017 RFI_2059-Elevator Two Way Communication
8709 Classroom & Office Building 990016 03/02/2017 03/16/2017 03/13/2017 RFI_2061-Elevator Recall
8708 Primary Electrical Improvement Step-4 990513 02/28/2017 03/14/2017 03/13/2017 DP 2.4 Revised Switchgear Dwgs for approval.
8707 Classroom & Office Building 990016 02/28/2017 03/14/2017 03/08/2017 RFI_2060-Knox Box Installation Detail.
8706 MRI Replacement 5110138 02/27/2017 03/13/2017 03/08/2017 Prepare site to receive new MRI. Plans, Final Review, Approval for Contracts
8705 SEP 2014 Reines MBCx 5109588 02/27/2017 03/13/2017 03/07/2017 Provide and install new DDC controls on the Leibert Crac unit in Reines Hall 3171. Install exhaust system static pressure sensors to enable static pressure reset. Specifications, 100% Review
8704 Classroom and Office Building 990016 02/24/2017 03/03/2017 03/08/2017 Submittal 28 31 11 - 5043 - 0 - Alvine Response - Spots and Dots Shop Drawings
8703 Replace Roof 5109877 02/24/2017 03/10/2017 02/28/2017 Repair Roof Leaks. Final Review; Approval for Contracts
8702 Stucco Repairs 5110153 02/24/2017 03/02/2017 03/07/2017 Remove / replace damaged joint material around existing panels and seal all sides of existing bay doors. Panel access will be via swing gate. Final Review, Approval for Contracts
8701 SEP 2014 Reins MBCx 5109588 02/22/2017 03/08/2017 02/27/2017 Plans, Specifications
8700 Engineering Tower Suite 416 Renovation 5110059 02/22/2017 03/08/2017 02/27/2017 Specifications
8699 CRII-2 2015 Fall Hazard Protection 5110132 02/22/2017 03/01/2017 02/28/2017 Installs horizontal lifeline systems atop the domed roofs at Social Sciences Plaza A & B. Items #14 & 15 on attached Prioritied List. Plans, Specifications, Final Review, Approval for Contracts
8698 Classroom & Office Building 990016 02/21/2017 03/07/2017 03/08/2017 Submittal 01 32 00 - 5008 - 1 - Revised G Drawings (backcheck)
8697 2nd Graphic on TES Tank 5110309 02/21/2017 03/07/2017 02/27/2017 Plans
8696 Mesa Court Expansion 996296 02/21/2017 03/07/2017 02/21/2017 Fire Alarm As-Built dwgs (2-Full Size), & 1-CD
8695 IH, SoM Dean's Ste Renovation 5110318 02/21/2017 03/07/2017   Plans
8694 FM Sign Shop 9929290-9100 02/21/2017 03/07/2017 02/24/2017 Plans
8693 Construct ACC Pathway 5110301 02/21/2017 02/16/2017 02/22/2017 Plans, Specifications
8692 Local Exhaust Ventilation CRII-2015 5110060 02/21/2017 03/07/2017 03/07/2017 Plans
8691 Classroom and Office Building 990016 02/17/2017 03/03/2017 02/17/2017 CP-2 Drawings (FRO)
8690 SEP 2014 Reines MBCx 5109588 02/16/2017 03/02/2017 02/16/2017 Plans, Specifications
8689 CallT2 add humidifier to suply air 5110218 02/15/2017 03/01/2017 02/16/2017 Plans
8688 Small Cap 15/16 Engineering Gateway Lab Renovations 5110110 02/15/2017 02/24/2017 02/16/2017 Plans, Specifications
8687 CRII-2 2015: Improve Laboratory Emergency Circuits 5110005/9929490 02/14/2017 02/28/2017 02/16/2017 Plans, Specifications
8686 Replace Outside Air Damper 5112006 02/14/2017 02/28/2017 02/15/2017 Specifications
8685 Engineering Lecture Facility 5109331 02/13/2017 02/28/2017 02/14/2017 Plans
8684 Electric Bus Yard 5110267 02/13/2017 02/28/2017 02/14/2017 Plans
8683 MRI REPLACEMENT 5110138 02/10/2017 02/24/2017 02/27/2017 Plans
8682 CRII - 2015 Step Lights - Bridges 5110206 02/10/2017 02/24/2017 02/16/2017 Specifications
8681 CRII - 2013 - Engineering Gateway Victaullic Fitttings CWS 5110231 02/10/2017 02/24/2017 02/16/2017 Plans and Specifications
8680 ELF 121A Roof Investigation and Repair 5110395 02/09/2017 02/09/2017 02/09/2017 Specifications
8679 SEP MBCX DDC Upgrade 5109331 02/08/2017 02/15/2017 02/14/2017 Plans
8678 CR II - 2015 - Replace Fire Alarm; Public Services, UNEX C, Bison Admin Trailer 5110006 02/07/2017 02/09/2017 02/14/2017 Other: Shop Drawings and Submittal
8677 Classroom &Office Building 990016 02/07/2017 02/15/2017 02/15/2017 Submittal 21 10 00 - 5049 - 0 - Product Data for Fire Protection for Sprinkler Systems
8676 Bio Sci Plaza Improvements 990021 02/07/2017 02/15/2017 02/14/2017 Submittal 051R1 - Fire Extinguisher and Cabinet
8675 Classroom & Office Building 990016 02/07/2017 02/15/2017 02/14/2017 Submittal 01 32 00 - 5032 - 0 - Relocate Humanities South Stair
8674 Classroom & Office Building 990016 02/08/2017 02/15/2017 02/14/2017 Submittal: Submittal 01 32 00 - 5033 - 0 - Work Plan For New Humanities Ramp
8673 Fire Life Safety Improvements 998611 02/07/2017 02/21/2017 02/09/2017 Specs (Systems Criteria)
8672 Fire Life Safety Improvements 998611 02/07/2017 02/09/2017 02/09/2017 Sprinkler Densities (Resubmittal)
8671 CRII-2 2015 Repair Roadway at Grounds Department 5110304 02/03/2017 02/17/2017 02/08/2017 Plans & Specifications
8670 Bio Sci Plaza Improvements 990021 02/03/2017 02/03/2017 02/03/2017 Life Safety Systems Sticker for Knox Box
8669 Bio Sci Starbucks Kiosk null 02/02/2017     Plans
8668 Electric Bus Yard 5110267 02/02/2017 02/09/2017 02/06/2017 Plans
8667 HIHP School of Social Ecology 1 - 1 Lab 126 Renovation 5110156 02/01/2017 02/03/2017 02/01/2017 Other: Crane Plan review
8666 Engineering Tower Suite 416 Renovation 5110059 01/31/2017 02/14/2017 02/08/2017 Specifications-FA Spec
8665 Women's Locker Room 5110374 01/30/2016 02/13/2016 02/01/2017 Plans & Specifications
8664 Small Cap School of Engineering-Engineering Gateway Lab Renovation 3327 A/B_(1101/1102) 5110098 01/27/2017 02/10/2017 01/30/2017 See the attached Project Management Review Log. Plans, 100% Review, Approval for Contracts
8663 CR II-2015-Replace Fire Alarms; Multiple Buildings 5109528 01/27/2017 02/10/2017 01/31/2017 Install a new fire alarm system in Building 901, and remove the existing system once the installation is approved. Additive alternate to provide new LED lighting in the Arena. Plans, Specifications, 100% Review, Approval for Contracts, Other: Spec 28 3111 Fire alarms
8661 Bio Sci Starbucks Kiosk 16-60 01/27/2017 02/10/2017 01/30/2017 T.I. Bio Sci Starbucks Kiosk SET #2
8660 Classroom & Office Building 990016 01/27/2017 02/10/2017 01/27/2017 CP-2 Package-Specs & Dwgs for Approval
8659 Primary Electrical Improvement Step-4 990513 01/27/2017 02/10/2017 02/14/2017 RFI 063 Connecting New Fire Alarm Devices to Existing FACP
8658 Engingeering Laboratory Facility-141 Lab Renovation 5110117 01/27/2017 02/10/2017 01/27/2017 See the attached-Project Management Review Log. Plans, 100% Review, Final Review, Comments & Corrections, Approval Stamp, Approval for Contracts
8657 INRF EF Replacement Design 5109358 01/25/2017 02/08/2017 01/27/2017 Balance the exhaust air-Relocated benches and repair paneling. Plans, 100% Review, Comments & Corrections
8656 Classroom & Office Building 990016 01/23/2017 02/06/2017 01/25/2017 CP-3 Package-Specs
8655 Classroom & Office Building 990016 01/23/2017 02/06/2017 01/23/2017 RFI 2009R1. RFI 2009R1-Classroom Net Floor Area
8654 CRII-2 2015: Improve Laboratory Emergency Circuits 5110005/9929490 01/23/2017 02/06/2017 01/27/2017 Evaluate and design new emergency circuits for Engineering Tower (ET) to meet the needs of the building occupants up to the capacity of the existing emergency generator. Plans.
8653 CR II -2015-Replace Fire Alarms; Public Services, UNEX C, Bison Admin Trailer 5110006 01/20/2017 02/03/2017 01/30/2017 Install a new fire alarm system in Building 515, and remove the existing system once the installation is approved. Other: Shop Drawings & Submittal
8652 Electric Bus Yard 5110267 01/19/2017 02/02/2017 01/23/2017 Install new charging stations for 20 electric buses. Relocate existing hydrant and Fire Dept Connection. Plans, 80% Review, Comments & Corrections
8651 Small Cap 15/16 Engineering Gateway Lab Renovations 5110110 01/19/2017 02/02/2017 01/23/2017 Renovate lab space for new wind tunnel and fuel cell labs. Plans, Specifications, Final Review, Comments & Corrections, Approval Stamp, Approval for Contracts
8650 Classroom & Office Building 990016 01/19/2017 02/02/2017 01/23/2017 CP-3 Package-Dwgs
8649 Rowland Hall Tenant Improvement 5110409 01/18/2017 02/01/2017 01/26/2017 Tenant improvement of 5th level lab space in Rowland Hall, Room 537 & 539. Work entails renovation of existing lab space including mechanical systems, electrical, plumbing, wall, doors, flooring, finishes and fire Life Safety. Plans, Preliminary Review, Comments & Corrections
8648 Engineering Laboratory Facility -141 Lab Renovation 5110117 01/18/2017 02/01/2017 01/23/2017 See the attached-Project Management Review Log. Plans, 100% Review, Final Review, Comments & Corrections, Approval Stamp
8647 Engineering Tower ET_444_Renovation 5110053 01/18/2017 02/01/2017 01/23/2017 See the attached Project Management Review Log. Plans, 100% Review, Final Review, Comments & Corrections, Approval Stamp
8646 Small Cap School of Engineering-Engineering Gateway Lab Renovation 3327 A/B_(1101/1102) 5110098 01/18/2017 02/01/2017 01/23/2017 See the attached Project Management Review Log. Plans, 100% Review, Approval for Contracts
8645 CR II-2015-Replace Fire Alarms; Multiple Buildings 5109528 01/17/2017 01/31/2017 01/30/2017 Install a new fire alarm system in Building 901, and remove the existing system once the installation is approved. Additive alternate to provide new LED lighting in the Arena. 80% Review, Comments & Corrections, Other: Submittal
8644 Lot-5 Resource Center Renovation 5110257 01/13/2017 01/27/2017 01/19/2017 Plan check on the Site plan. Plans, Final Review, Approval Stamp
8643 BSL-3 997493 01/12/2017 01/26/2017 01/12/2017 As-Builts (For Record Only)
8642 SEP 2015 MBCx-Campus Compressed Air 5109897 01/11/2017 01/25/2017 01/17/2017 See Attached. Specifications, Final Review, Approval for Contracts
8641 HIHP School of Social Ecology-1 Lab 126 Renovation 5110156 01/11/2017 01/25/2017 01/25/2017 Removes/Replaces to exhaust fans from roof servicing renovated lab. Plans, Final Review, Other: Crane Plan review
8640 Construct ACC Pathway 5110301 01/11/2017 01/25/2017 01/17/2017 Project constructs new pathway connecting ACC housing parking lot and Campus Drive near the intersection of Campus/Culver. Plans, Specifications, Final review, Approval for contracts
8639 Bio Sci Starbucks Kiosk 16-60 01/10/2017 01/24/2017 01/23/2017 T.I. drawings for Bio Sci Starbucks Kiosk
8638 Classroom & Office Building 990016 01/05/2017 01/19/2017 01/19/2017 CP-2 Package-Specs & Dwgs for Approval
8637 Classroom & Office Building 990016 01/05/2017 01/19/2017 01/05/2017 RFI_2026-Service Level Parking Garage
8636 Classroom & Office Building 990016 01/05/2017 01/19/2017 01/05/2017 RFI 2027-Service Level Non Highway Electric Vehicle
8635 Bio Sci Plaza Improvements 990021 12/16/2016 12/30/2016 12/19/2016 RFI 033R2 - Fire Penetration
8634 TEM Facilities 990013 12/16/2016 12/30/2016 12/19/2016 Submittal 087111.002 DSA Hardware for T1100, T1902A.
8633 SEP 2014 Reines MBCx 5109588 12/15/2016 12/29/2016 12/16/2016 Air Compressor-see attached spreadsheet for Consultant direction for scope. 100% Review
8632 CR II-2015-Replace Fire Alarms; Public Services, UNEX C, Bison Admin Trailer 5110006 12/14/2016 12/28/2016 12/19/2016 Revised Fire alarm Shop Drawings and Submittal. Approval Stamp, Other: submittal
8631 SEP 2016-Implement Fume Hood Hibernation Mode 5110346 12/14/2016 12/28/2016 12/19/2016 Replace Fume Hood Displays to allow for Hibernation Mode. Specifications, Final Review, Approval for Contracts
8630 Small Cap 2017-HIB 320 and 335B Office Renovation 5110361 12/13/2016 12/27/2016 12/13/2016 New demising walls with doors, rezoned electrical and mechanical systems, and new finishes throughout. Plans, 100% Review, Other: Specifications
8629 Small Cap 15/16 Engineering Gateway Lab Renovations 5110110 12/13/2016 12/27/2016 12/16/2016 Renovate lab space for new wind tunnel and fuel cell labs. Plans, 100% Review, Final Review, Comments & Corrections
8628 Major Building Renovation 5109723 12/13/2016 12/27/2016 12/20/2016 100% Delta 1 and Delta 2 Drawing Review. Plans, 100% Review, Comments & Corrections, Approval Stamp
8627 Construct ACC Pathway 5110301 12/12/2016 12/26/2016 12/16/2016 Project constructs new pathway connecting ACC housing parking lot and Campus Drive near the intersection of Campus/Culver. Plans, Specifications, Preliminary Review, Approval for Contracts
8626 MRI Replacement 5110138 12/12/2016 12/26/2016 12/15/2016 Prepare site to receive new MRI. Plans, 80% Review, Comments and Corrections
8625 Small Cap 2017-HIB 320 and 335B Office Renovation 5110361 12/08/2016 12/22/2016 12/08/2016 New demissing walls with doors, rezoned electrical and mechanical systems, and new finishes throughout. Plans, 90% Review, Other: Specifications
8624 Mesa Court Expansion 996296 12/08/2016 12/22/2016 12/08/2016 Fire Alarm Drawings Showing Candelas_FRO
8623 Engineering Laboratory Facility - 141 Lab Renovation 5110117 12/08/2016 12/22/2016 12/13/2016 See the attached - Project Management Review Log. Plans, 100% Review, Comments & Corrections, Approval Stamp
8622 Engineering Tower ET_444 Renovation 5110053 12/08/2016 12/22/2016 12/13/2016 See the attached_Project Management Review Log. Plans, Specifications, 100% Review, Comments & Corrections, Approval Stamp
8621 ELF Gas Monitoring and Local Exhaust Ventilation 5109861 12/08/2016 12/22/2016 12/15/2016 Install Lab exhaust system including ductwork filter housing exhaust fan and controls to serve fume hoods in rooms 108 and 135. Plans, 100% Review, Comments & Corrections, Approval Stamp
8620 Classroom & Office Building 990016 12/07/2016 12/21/2016 01/12/2017 Design Development Package
8619 Fire Life Safety Improvement 998611 12/07/2016 12/21/2016 12/14/2016 Pre-Bid Spec Review_Section 21 1000
8618 CRII-2 2015 Reliability for Research Equipment 5109973 12/07/2016 12/21/2016 12/12/2016 Feasibility Study for Individual UPS Systems for Ultra-low Freezers.
8617 Fire Life Safety Improvements 998611 12/06/2016 12/20/2016 12/16/2016 Sprinkler Densities
8616 Mesa Court Expansion 996296 12/06/2016 12/20/2016 12/06/2016 RFI 2908R1-Cloud Ceiling Extension Screens
8615 HIHP School of Social Ecology-1 Lab 126 Renovation 5110156 12/06/2016 12/20/2016 12/12/2016 Project renovates lab for high impact hire. Crane needed to add two new exhaust fans to the mechanical enclosure on the roof. Plans, Final Review, Other: Crane Plan review
8614 Mesa Court Expansion 996296 12/05/2016 12/19/2016 12/14/2016 RFI 2922-Revised FA Sequence of Operations.
8613 CR II-2015-Replace Fire Alarms; Public Services, UNEX C, Bison Admin Trailer 5110006 12/05/2016 12/19/2016 12/12/2016 Fire alarm Shop Drawings and Submittal-to include duct detectors, additional devices in new meeting rooms and a relocated annunciator panel. Plans, 100% Review, Approval Stamp, Other: Submittal
8612 Lot-5 Resource Center Renovation 5110257 12/02/2016 12/16/2016 12/08/2016 Plan check on the Site plan. Plans, 80% Review, Comments & Corrections
8611 Mesa Court Expansion 996296 12/02/2016 12/16/2016 12/06/2016 Sprinkler Densities
8610 Classroom & Office Building 990016 11/30/2016 12/14/2016 12/01/2016 RFI_2012 R1 - Occupancy For Rated Corridor
8609 Classroom & Office Building 990016 11/29/2016 12/13/2016 11/29/2016 Site Fencing Plan
8608 OIT Core Fiber Upgrade Phase 2 5110379 11/29/2016 12/13/2016 12/06/2016 Please see attached. Plans, Specifications (in scope), Final Review, Approval for Contracts
8607 Classroom & Office Building 990016 11/29/2016 12/13/2016 11/29/2016 Submittal 5001 - 01 32 00 - Parking Lot 7 Fencing, Demo and Grading Plan.
8606 Bio Sci Plaza Improvements 990021 11/29/2016 12/13/2016 12/05/2016 RFI 033R1-Fire Pentration Detail
8605 Anteater Stadium 5110228 11/28/2016 12/12/2016 11/28/2016 Relocate Hammer Cage. Plans, 100% Review, Approval for Contracts
8604 Engineering Gateway Atomizer Lab for EVCP 5110008 11/28/2016 12/05/2016 12/06/2016 Install Electrical for Atomizer Power Supplies; Plans, Preliminary Review, 80% Review, Comments and Corrections
8603 CR II - 2015 - Replace Fire Alarms; Public Services, UNEX C, Bison Admin Trailer 5110006 11/28/2016 12/12/2016 11/30/2016 Fire alarm Shop Drawings and Submittal; Plans, 100% Review, Approval Stamp, Other: Submittal
8602 Security Panel Upgrade 5110157 11/28/2016 11/30/2016 12/08/2016 Upgrade alarm panels and infrastructure. Plans, Specifications, 100% Review, Final Review, Approval Stamp
8601 CR II-2015-Replace Fire Alarms; Public Services, UNEX C, Bison Admin Trailer 5110006 11/28/2016 12/12/2016 11/29/2016 Addition of duct detectors to project scope in response to RFI 1. Plans, 100% Review, Other: Submittal-Duct Detectors
8600 Classroom & Office Building 990016 11/23/2016 12/07/2016 12/01/2016 CP-1. CP-1 Demolition, Grading, Access, Fencing & Erosion Package
8599 Classroom & Office Building 990016 11/22/2016 12/06/2016 12/06/2016 Submittal 5008 - G Sheets. Submittal 500 8 - G Sheets
8598 Classroom & Office Building 990016 11/22/2016 12/06/2016 12/01/2016 RFI 2009. RFI 2009 - Classroom Net Floor Area
8597 Primary Electrical Improvement Step-4 990513 11/22/2016 12/06/2016 12/02/2016 Other: Final 100% Switchgear Design Pkg.. Final 100% Switchgear Design Pkg with Backcheck
8596 Classroom & Office Building 990016 11/18/2016 12/02/2016 11/21/2016 RFI_2010-Electrical Room Wall Rating
8595 CRII-2 Rowland Hall Construct Exhaust Ductwork 5110345 11/18/2016 12/02/2016 11/18/2016 See the attached. Specifications, Final Review, Approval for Contracts
8594 Classroom & Office Building 990016 11/17/2016 12/01/2016 11/21/2016 RFI 2008. RFI 2011 - Roof Standpipe
8593 Classroom & Office Building 990016 11/17/2016 12/01/2016 11/21/2016 RFI 2008. RFI 2012 - Occupancy for Rated Corridor
8592 Major Building Renovation 5109723 11/16/2016 11/30/2016 11/18/2016 Addressable Fire Safety Devices and Plans. Plans, Addendum, Final Review, Comments & Corrections, Approval Stamp
8591 Install Bus Turnout and Bus Turn around 5110016 11/16/2016 11/30/2016 11/18/2016 Ashalt and concrete paving with curves. Plans, Final Review, Approval for Contracts
8590 Small Cap 2016 Tennis Court Slab Repair & Resurfacing 5110167 11/16/2016 11/22/2016 11/18/2016 Install new post-tensioned concrete slabs, paint and improve fencing, install new shade structures and lights, and demo old court surfaces. Plans, Final Review, Approval for Contracts
8589 Renewal Elevator 5110001 11/16/2016 11/30/2016 11/18/2016 Renovate Elevator. Specifications, 100% Review, Comments & Corrections
8588 Mesa Court Expansion 996296 11/16/2016 11/30/2016 11/22/2016 RFI 2908 - Cloud Ceiling Extension Screens
8587 Anteater Instructional Research Building FLR_4_RM_400_C_Mesa Parking Structure 5109744 11/16/2016 11/30/2016 11/18/2016 This project is for the installation of antenna with associated DAS equipment at (3) DAS HUB equipment areas. Plans, Final Review, Approval Stamp.
8586 Small Cap 2016 Tennis Court Slab Repair & Resurfacing 5110167 11/16/2016 11/22/2016 11/18/2016 Install new post-tensioned concrete slabs, paint and improve fencing, install new shade structures and lights, and demo old court surfaces. Plans, Final Review, Approval for Contracts
8585 SEP 2013-Implement ANZI Z9.5 Fume Hood Ventilation 5109341 11/15/2016 11/29/2016 11/30/2016 Furnish & Install Automatic Sash Positioning Systems for (2) Ventilation Hoods. Specifications, Final Review, Approval for Contracts
8584 SC 15-16 Tamkin Hall E-Lighting & Nelson Auditorium Upgrade 5110101 11/14/2016 11/28/2016 11/14/2016 Addition of electrical outlets & recommisioning of lighting systems and finish upgrades in Nelson Lobby.
8583 Major Building Renovation 5109723 11/14/2016 11/28/2016 11/17/2016 Addressable Fire Safety Devices and Plans. Plans, Addendum, Final Review, Comments & Corrections, Approval Stamp
8582 Classroom & Office Building 990016 11/10/2016 11/24/2016 11/21/2016 RFI 2007. RFI 2007 - Exterior Exit Stair
8581 Classroom & Office Building 990016 11/10/2016 11/24/2016 11/21/2016 RFI 2008. RFI 2008 - Elevator Lobby Smoke Protection
8580 SEP 2015 Exterior Lighting Upgrades Phase 4-Bollards 5110026 11/09/2016 11/23/2016 11/17/2016 Demo (175) existing bollard lamps and furnish and install (175) lamps in accordance with LED calculator and specifications. Specifications.
8579 Bio Sci Plaza Improvements 990021 11/08/2016 11/22/2016 11/16/2016 RFI 034-Building Number Locations
8578 Bio Sci Plaza Improvements 990021 11/08/2016 11/22/2016 11/17/2016 RFI 033-Fire rated wall water service penetration.
8577 Major Building Maintenance 5109723 11/07/2016 11/21/2016 11/14/2016 DM including major mechanical equipment replacement. Plans, 80% Review, Comments & Corrections
8576 SC 15-16 Tamkin Hall E-Lighting & Nelson Auditorium Upgrade 5110101 11/04/2016 11/18/2016 11/09/2016 Addition of electrical outlets & recommisioning of lighting systems and finish upgrades in Nelson library.
8575 Small Cap 15-16 OIT Aisle Light Installation & Upgrade 5110102 11/04/2016 11/18/2016 11/08/2016 Chair Mounted Aisle Light LED Upgrade and controls recommissioning. Specifications, Final Review.
8574 Primary Electrical Improvement Step-4 990513 11/04/2016 11/18/2016 11/22/2016 RFI-043 UL Listing for Switchgear Enclosure PDC.
8573 Remediate Sycamore Tree Infestation-Tree Planting Phase 3 5109992 11/03/2016 11/08/2016 11/08/2016 Supplying and planting 163 trees around campus to replace trees demo'd due to PSHB infestation. Includes irrigation work as required. Plans, Specifications, Final Review, Approval for Contracts
8572 Remediate sycamore tree infestation - tree planting phase 3 5109992 11/02/2016 11/16/2016 11/08/2016 Plans, Specs, Final review, approval for contracts.
8571 Central Plant 5109724 11/01/2016 11/15/2016 11/09/2016 Plans, 80% review, comments & corrections. Replace boiler 3 and 4 with HTW generators
8570 McGaugh Hall 5110106 10/31/2016 11/14/2016 11/01/2016 To provide an exhaust system to maintain proper pressure in the basement to eliminate odor mitigation to the upper floors and stairwells. Plans, Approval Stamp
8569 Primary Electrical Improvement Step-4 990513 10/28/2016 11/11/2016 11/22/2016 Submittal 26 1326.01 Metal Clad Switchgear House. 26 1326.01 Metal Clad Switchgear House
8568 Lot-5 Resource Center Renovation 5110257 10/28/2016 11/11/2016 11/03/2016 Plan check on the Site plan. Plans, 80% Review, Comments & Corrections
8567 Convert Cooling Towers to Reclaimed Water 5110012 10/27/2016 11/10/2016 11/01/2016 Support IRWD project to run reclaimed water form Calif. Ave to CP. Retrofit make-up water system for Cooling Towers with reclaimed water. Plans; Final Review; Approval for Contracts
8566 Classroom & Office Building 990016 10/26/2016 11/09/2016 10/27/2016 Other: Fencing Plan for Staging Area Lot 17; Supplemental Instruction #16
8565 2015 CRII- Repair Floor at Contemporary Arts 5110339 10/25/2016 10/31/2016 10/25/2016 Specifications; Final Review; Approval for Contracts
8564 SEP 2016 MBCx 5110233,-234,236,239 10/25/2016 11/08/2016 10/25/2016 Specifications
8563 5 Year Sprinkler Certification Repairs 5110259 10/24/2016 11/07/2016 10/24/2016 100% Review, Approval for Contracts
8562 Anteater Intructional Research Building FLR 4 Room 400_C 5109744 10/24/2016 11/07/2016 10/27/2016 Plans
8561 CRII 2015 - Replace Fire Alarms; Public Services, UNEX C, Bison Admin Trailer 5110006 10/21/2016 11/04/2016 10/24/2016 Install a new fire alarm system in Building 515, and remove the existing system once the installation is approved.
8560 ENGINEERING GATEWAY ESTIMATE TO RELOCATE 2 EMERGENCY GENERATORS 5110286 10/17/2016 10/31/2016 10/20/2016 Perform a study to determine if it is feasible to construct a new automobile shop where the (e) 2 emergency generators are currently located at the Eng. Gateway loading dock. ROM estimate will be provided after the Consultant has received comments from UCI.
8559 5 YEAR CERTIFICATION 2016 5110204 10/17/2016 10/31/2016 10/17/2016 VFS Report dated 2016
8557 Aldrich Hall Installation of AT&T Cellular Equipment 5110165 10/13/2016 10/27/2016 11/17/2016 Plans, Final Review, Comments & Corrections, Approval Stamp
8556 McGaugh Hall Vivarium Balance 5110106 10/13/2016 10/27/2016 10/20/2016 Plans, Specs, 100% Review
8555 Central Plant - HTW Pump and Piping Modifications 5109807 10/13/2016 10/27/2016 10/13/2016 Plans, Final Review, Approval stamp
8554 EH RONVATE ROOM 1106,1108,1110,1111,1112 5110052 10/12/2016 10/26/2016 10/12/2016 Dry Lab to wet lab reno
8553 SEP 2015 MBCX-CAMPUS COMPRESSED AIR 5109897 10/11/2016 10/25/2016 10/17/2016 SEE ATTACHED
8552 INSTALL BUS TURNOUT & BUS TURN AROUND 5110016 10/11/2016 10/25/2016 10/17/2016 ASPHALT AND CONCRET PAVING WITH CURVES
8551 MESA COURT EXPANSION 996296 10/10/2016 10/24/2016 10/12/2016 Submittal 32 3900-001 - Operable Metal Bollard Product Data
8550 TEM FACILITIES 990013 10/12/2016 10/24/2016 10/18/2016 TEM Main Door Signage
8549 ANTEATER INST. RESEARCH BLDG. FLR 4 RM 400c 5109744 10/10/2016 10/24/2016 10/13/2016 This project is for the installation of antennas with associated DAS equipment at (3) DAS HUB equipment areas.
8548 ANTEATER INST. RESEARCH BLDG. FLR_4_rm_400_C_Mesa 5109744 10/10/2016 10/24/2016 10/13/2016 This project is for the installation on antennas with associated DAS equipment at (3) DAS HUB equipment areas.
8547 LOT-5 RESOURCE CENTER RENOVATION 5110257 10/07/2016 10/21/2016 10/13/2016 PRELIM PLAN CHECK
8546 ARC CLIMBING WALL & ACTIVITY ROOM STRUCTURAL INTEGRITY 5110316 10/06/2016 10/20/2016 10/11/2016 See attached PM Review Log
8545 MESA COURT EXPANSION 996296 10/05/2016 10/19/2016 10/10/2016 RFI 2914 - Pavillion Pull Station Location
8544 MESA COURT EXPANSION 996296 10/05/2016 10/19/2016 10/10/2016 RFI 2913 - 1ST Floor Elevator Lobby Fire Alarm Device
8543 EH RENOVATE ROOM 1106,1108,1110,1111,1112 5110052 10/04/2016 10/18/2016 10/05/2016 DRY LAB TO WET LAB RENO
8542 LAW BUILDING REHEAT COIL 5110209 10/04/2016 10/18/2016 10/05/2016 INSTALL A NEW REHEAT COIL. PROVIDE NEW HEATING HOT WATER CONNECTION TO SUPPLY AND RETURN. PROVIDE NEW DDC CONTROLS, RESET/SCHEDULE SEQUENCE OF OPERATION
8541 CRII- 2015-REPLACE FIRE ALARMS;PUBLIC SERVICES, UNEX D, BISON MODULAR 5110006 10/04/2016 10/18/2016 10/05/2016 INSTALL NEW FIRE ALARM SYSTEM AND REMOVE OLD FIRE ALARM SYSTEM
8540 SMALL CAP 15/16 ENGINEERING GATEWAY LAB RENOVATIONS 5110110 10/03/2016 10/17/2016 10/10/2016 Renovate lab space for new wind tunnel and fuel cell labs.
8539 SEPT 2013-IMPLEMENT ANZI Z9.5 FUME HOOD VENTILATION 5109341 10/03/2016 10/17/2016 10/04/2016 FURNISH & INSTALL AUTOMATIC SASH POSITIONING SYSTEMS FOR (2) VENTILATION HOODS
8538 FMB PROJECT SERVICES RENOVATION 5110268 09/30/2016 10/14/2016 10/04/2016 See attached Review Log
8537 Henry Samueli SoE Monument Sign 5110314 09/29/2016 10/13/2016 10/05/2016 Specifications
8536 MESA COURT EXPANSION 996296 09/28/2016 10/12/2016 10/18/2016 Submittal 21 1000-013-0 - Fire Sprinkler Flow Test Report
8535 MESA COURT EXPANSION 996296 09/28/2016 10/12/2016 09/28/2016 Submittal 27 5319-002 - Distributed Radio Antenna - Signal Test
8534 Mesa Court Expansion 996296 09/28/2016 10/12/2016 09/29/2016 Other: Fire Marshal Transmittal - 160914_DAS BDA Sign off - Certification - Public Safety Radio System Coverage
8533 LIBRARY/GATEWAY PLAZA 5110203 09/26/2016 10/10/2016 09/27/2016 Alt Anchorage B(rev 2); After June 2016 installation it was determined that adding plywood under the round seating area and using the Tiring house method of transferring shear could be more re-useable for less cost than Alt-A. Thus, sheets S1.2B and S2.1B were added. Rev2 is anticipated to be used for Season VI(2017) and beyond.
8532 IRVINE HALL HUMIDITY MODIFICATIONS 5110305 09/26/2016 10/10/2016 09/26/2016 Replace CHW Coil ATU-2
8531 AHU HUMIDIFIER REPLACEMENT 5109919 09/26/2016 10/10/2016 09/27/2016 Replace existing humidifier
8530 INRF EF Replacement Design 5109358 09/26/2016 10/10/2016 09/27/2016 Balance the exhaust air - Relocated benches and repair paneling
8529 EDUCATION BUILDING 5110103 09/23/2016 10/07/2016 09/26/2016 Project renovates EDU Bldg Rms 2007, 2075, & 2077 to include casework, carpet, electrical/data raceways, ceiling work, lighting & paint.
8528 UNEX CLASSROOM BUILDING 990003 09/22/2016 10/06/2016 09/27/2016 Supplemental Instruction #16
8527 CENTRAL PLANT 5109724 09/22/2016 10/06/2016 09/27/2016 Replace boiler 3 and 4 with HTW generators
8526 MED SCI C 5109723 09/20/2016 10/04/2016 09/26/2016 DM including major mechanical equipment replacement
8525 UNEX CLASSROOM BLDG. 990003 09/20/2016 10/04/2016 09/27/2016 800 MHZ Acceptance Report
8524 ARTS & CULTURE TECHNOLOGY 5110084 09/20/2016 10/04/2016 09/23/2016 Provide emergency power for exterior stairway wall packs
8523 ENGINEERING HALL 5110052 09/19/2016 10/03/2016   Dry lab to wet lab reno
8522 ROBERT COHEN THEATRE AND DANCE STUDIOS (713) 5109594 09/19/2016 10/03/2016 09/23/2016 Install two new air handlers. Fire Alarm System Submittal Review
8521 ENGINEERING GATEWAY 5110132 09/19/2016 10/03/2016 09/23/2016 Adds two fixed ladders at Engineering Gateway to access subsections of roof.
8520 ENGINEERING TOWER 5110291 09/19/2016 10/03/2016 09/23/2016 See attached PM Review Log or Section 01 1000
8519 CRAWFORD HALL 5110211 09/16/2016 09/30/2016   RENOVATE ATHLETICS FOR NFL
8518 ANTENNA & POWER FOR CAMPUS RADIO SYSTEM 5110192 09/16/2016 09/30/2016 09/23/2016 INSTALL TEMPORARY ANTENNA MOUNTS AND CONDUIT RISERS TO ROOFTOP
8517 CHILD CARE SERVICES BUILDINGS IN VERANO 5110186 09/16/2016 09/30/2016   CHILD CARE SERVICES SECURITY CAMERA
8516 null 5110172 09/15/2016 09/29/2016 09/20/2016 INVESTIGATION WATER INTRUSTION TO DESIGN FIX
8515 PRIMARY ELECTRICAL IMPROVEMENT STEP-4 990513 09/15/2016 09/29/2016 09/26/2016 OTHER 100% SWITCHGEAR DWGS W/BACK-CHECK
8514 MESA COURT EXPANSION 996296 09/13/2016 09/27/2016   K1 ELEVATOR KEY, UNIVERSAL FOB, 62-KEY FACILITIES KEY
8513 SOCIAL ECOLOGY I 5110109 09/13/2016 09/27/2016   FLOORING, LIGHTING, WALLS, ELECTRICAL, DEMO WORK
8512 MEDICAL EDUCATION BUILDING 5110310 09/13/2016 09/27/2016   CRII- 2 2015 MODIFY EXHAUST MEDICAL EDUCATION BUILDING CAFÉ
8511 MESA COURT EXPANSION 996296 09/09/2016 09/23/2016   RFI 2870R2 - ROOF SPRINKLER COVERAGE
8510 ANTEATER REC CENTER 5110308 09/09/2016 09/21/2016   ARC add Generator and Water System
8509 Mesa Court Expansion 996296 09/09/2016 09/23/2016   RFI: 2907-South Entry OCFA Fire Access
8508 BILL & SUE GROSS HALL 5110307 09/08/2016 09/22/2016 09/09/2016 FURNISH AND INSTALL CUSTOM EXTERIOR BUILDING SIGNAGE LIGHTING
8507 BIO SCIENCE IMPROVEMENTS 990021 09/02/2016 09/16/2016 09/07/2016 SUBMITTAL 039 - FIRESTOP SEALANT
8505 MESA COURT EXPANSION 996296 09/01/2016 09/15/2016   RFI 2870R1 - Roof Sprinkler Coverage
8504 CHILD CARE SERVICES SECURITY CAMERA 5110186 08/31/2016   09/21/2016 PLAN CHECK
8503 MESA COURT EXPANSION 996296 08/31/2016   09/07/2016 RFI 2904 Kitchen Floor Penetrations Rating
8502 CRII - 2 2015 SOTA MOLD & MOISTURE REMEDIATION 5110229 08/31/2016 09/14/2016 09/07/2016 Project removes old and installs new plenum wall in air handler one of the theater.
8501 ALDRICH HALL 5110116 08/31/2016 09/14/2016 09/08/2016 Aldrich Hall Installantion of AT&T Cellular Equipment
8500 ENGINEER TOWER 5109817 08/31/2016 09/14/2016   FLOOR PLAN RECONFIGURATION AND LABORATORY EQUIPMENT UPGRADE
8499 MESA COURT EXPANSION 996296 08/30/2016 09/13/2016   RFI 2869R1 - PODIUM ROOF FSR RELOCATION
8498 STUCCO REPAIRS/EXTERIOR PANELS 5110153 08/26/2016     REMOVE/REPLACE DAMAGED PANEL (1-PANEL) AND CLEAN THE REST OF THE PANELS TO IMPROVE THE CONTRAST BETWEEN EXISTING PANELS AND NEW WALL PANEL.
8497 Middle Earth Housing 5110240 08/26/2016 09/09/2016 08/26/2016 Final Review -Provide approximately 70,000 sq. ft. of slurry seal to existing asphaltic concrete at Middle Earth Housing pedestrian foot paths, fire lanes and service roads.
8496 BIO SCI PLAZA IMPROVEMENTS 990021 08/26/2016 09/09/2016 08/26/2016 SUBMITTAL 024 - DRYWALL - INSULATION
8495 INSTRUCTIONAL SPACE IMPROVEMENTS 5110109 08/26/2016 09/09/2016 09/01/2016 INSTRUCTIONAL SPACE IMPROVEMENTS
8494 PRIMARY ELECTRICAL IMPROVEMENT STE-4 990513 08/25/2016 09/08/2016   Advanced Notification - Cable Pull Activity - Bison
8493 REPLACE/UPGRADE UPS ROOM COOLING UNIT 5109954 08/25/2016 09/08/2016   Upsize cooling unit;add return ductwork to draw heat from inverters
8492 `SEP 2015 Exterior Lighting Upgrades Phase 4 - Half Rounds 5110026 08/25/2016 09/08/2016   Demo (73) existing exterior wall packs fixtures and furnish and install (73) fixtures in accordance with LED calculator specifications.
8491 STUDENT CENTER HANDRAILS-STARBUCKS 5110208 08/25/2016 09/08/2016   Replace deteriorated handrails/sleeves, prep and paint entire rail
8490 STUDENT CENTER CHW REPLACE PH.2 5109988 08/24/2016 09/07/2016   REPLACE CHW COIL AND REHEAT COIL AT AH 6 & 7
8489 SEP 2013-2015 AIRB SCE/UCI EMERGING TECH UPGRADE 5110177 08/23/2016 09/06/2016 09/07/2016 LIGHTING & CONTROLS UPGRADE FOR ALL FLUORESCENT
8488 MESA COURT EXPANSION 996296 08/18/2016 09/01/2016 08/26/2016 RFI-2895-ELECTRICAL GROUT MATERIAL
8487 Mesa Court Expansion 996296 08/18/2016 09/01/2016 08/24/2016 RFI 2893 - Outdoor Exit Sign Clarification
8486 PRIMARY ELECTRICAL IMPROVEMENT STEP-4 990513 08/16/2016 08/30/2016   RFI-027 LOCATION OF EMH-7 CHANGE
8485 BIO SCI PLAZA IMPROVEMENTS 990021 08/15/2016 08/29/2016 08/25/2016 OTHER G-0.2 FIRE ACCESS PLAN WITH BACK-CHECK
8484 TEM FACILITIES 990013 08/15/2016 08/29/2016 08/15/2016 OTHER - RECORD DRAWINGS - FIRE ALARM
8483 EH Renovate Room 1106, 1108,1110, 1111, 1112 5110052 08/15/2016 08/29/2016 08/15/2016 Plans, Specifications, EHS Redlines
8482 Mesa Court Expansion 996296 08/12/2016 08/26/2016 08/24/2016 RFI:2885-Added Sprinkler Head under Stair #2 Great Rooms
8481 Mesa Court Expansion 996296 08/12/2016 08/26/2016   Other: "Life Safety Systems" Stickers for Kox box
8478 Mesa Court Expansion 996296 08/12/2016 08/26/2016   Other: Elevator Keys
8477 SEP 2015 exterior lighting upgrades phase 4 Tennis Courts 5110026 08/12/2016 08/26/2016 08/15/2016 Specifications
8476 Gillespie Neuroscience 5110238 08/12/2016 08/26/2016 08/15/2016 Specifications
8475 Small Cap 2016 ICS 4th Floor Room Updates 5110205 08/12/2016 08/26/2016 08/12/2016 Specifications:
8474 TEM Facilities 990013 08/11/2016 08/25/2016 08/11/2016 Other: Evacuation Signs & Maps for approval Stamp/Sign
8473 Bio Sci Plaza Improvements 990021 08/10/2016 08/24/2016 08/10/2016 Submittal 011 - Knox Box Location
8472 Submittal 027-know box 990021 08/10/2016 08/24/2016 08/10/2016 Submittal 027 - Knox Box
8471 CRII 2013 Robert Cohen & Dance Studio A/C Replacement 5109594 08/10/2016 08/24/2016 08/11/2016 Plans
8470 Student Center HTW Leak 2016 5110247 08/08/2016 08/22/2016 08/11/2016 Plans, Specifications / Remove and Replacement of leaking HTW line
8469 Convert EH1130 to Wet Lab 5110055 08/04/2016 08/08/2016 08/11/2016 Plans, Specs-Convert 1130 to Wet Lab
8468 Security Panel Upgrade 5110157 08/03/2016 08/17/2016 08/15/2016 Plans, Specifications
8467 Mesa Court Expansion 996296 08/03/2016 08/17/2016 08/10/2016 Submittal: Submittal 08 8000-010-Laundry Room 20-Minute Door Lite
8466 Primary Electrical Improvement Step-4 990513 08/02/2016 08/16/2016 08/11/2016 Other: South Substation Fire Access Plans w/backcheck
8465 UNEX Classroom Building 990003 07/29/2016 08/12/2016   Submittal: NFPA 13, 14 and 24
8464 Mesa Court Expansion 996296 07/28/2016 08/11/2016 08/10/2016 RFI 2869 - Podium Roof FSR Relocation
8463 UNEX Classroom Building 990003 07/28/2016 08/11/2016   Submittal: NFPA 13, NFPA 14, NFPA 24, NFPA 72 Original documents for record
8461 UNEX Classroom Building 990003 07/27/2016 08/10/2016 07/27/2016 Submittal-6 sets: 40 key, Elevator Key , FA panel key, Sprinkler Riser Closet chain key
8460 Computer Lab Upgrades 5110108 07/27/2016 08/10/2016 07/27/2016 Plans, Final review, approval stamp, approval for contracts
8459 Mesa Arts Building - Remove / Replace Antenna Structure 51100165 07/26/2016 08/09/2016 07/27/2016 Plans, Approval for Stamp, Approval for Contracts / Install additional antenna on existing steel beam support frame
8458 Primary Electrical Improvement Step-4 990513 07/26/2016 08/09/2016 08/08/2016 Other / Notice of Construction Activity - Placing Man-holes
8457 Bio Sci Plaza Improvements 990021 07/25/2016 08/08/2016 07/27/2016 Other: A-5.0 Details
8456 UNEX Classroom Building 990003 07/25/2016 08/08/2016 08/01/2016 Submittal - Evacuation Sign Proofs
8455 MedSci Bldg Plumbing Repairs 5109729 07/25/2016 08/08/2016 07/25/2016 Plans, Specifications / Remove and replace section of piping and flex joints found in Vivarium entry way
8454 MBCx Science Buildings - Ayala Library AH-7 Add Economizer 5109812 07/25/2016 08/08/2016 07/25/2016 Plans, Specifications / Installk new outside air dampers on AH-7 rooftop unit and tie new motorized damper controls into existing Siemen's DDC
8453 HVAC Filtrasion Addition 5109972 07/25/2016 08/08/2016 07/25/2016 Plans, 100% Review, Approval for Contracts / Replace AHU-1
8452 Mesa Court Expansion 996296 07/25/2016 08/08/2016 08/01/2016 RFI / RFI 2862 Art Paseo Fire Lane West End Alignment
8451 Med Sci Bldgs. B, C & D Plumbing Repairs 5109729 07/25/2016 08/08/2016 07/25/2016 Submittal Review/ Approval Stamp
8450 Mesa Court Expansion 996296 07/22/2016 08/05/2016 07/26/2016 RFI 2873 - LV1. 1 S. Tower Stair 3 Egress & Standpipe Conflict
8449 Mesa Court Expansion 996296 07/22/2016 08/05/2016   RFI 2687 - First Floor Cloud Sprinklers
8448 UCI Graphics on TES Tank 5110294 07/21/2016 08/04/2016 07/21/2016 Final Review/ Approval for Contracts - Paint anteater logo on side of TES Tank at Central Plant Facility
8447 Primary Electrical Improvement Step 4 990513 07/21/2016 08/04/2016 08/01/2016 Other: South Substation Fencing & Fire Access Plan
8446 Mesa Court Expansion 996296 07/21/2016 08/04/2016 07/26/2016 RFI 2870 - Roof Sprinkler Coverage
8445 Mesa Court Expansion 996296 07/21/2016 08/04/2016   RFI 2841 - Fire Alarm Exit Corridor Duct Detectors Clarification
8444 Mesa Court Expansion 996296 07/20/2016 08/03/2016 07/27/2016 RFI / RFI 2857 - First Floor Cloud Sprinklers
8443 Mesa Court Expansion 996296 07/20/2016 08/03/2016 07/26/2016 RFI / RFI 2847 - Elevator Lobby Fire Alarm Smoke Detector
8442 Engineering Tower Metering 5109947 07/19/2016 08/02/2016 07/21/2016 Specifications, Final Review, Aprroval for Contracts/ New BTU meters and pipe
8441 Primary Electrical Improvement Step-4 990513 07/19/2016 08/02/2016 07/27/2016 Other: Delta-1 Dwgs (E-100, E-111, E-206, & E-701) w/ Backcheck
8440 Primary Electrical Improvement Step-4 990513 07/19/2016 08/02/2016 07/25/2016 Other: Advance Notice of Construction Activity Ph-5 @ South Circle Dr.
8438 Mesa Court Expansion 996296 07/18/2016 08/01/2016   Other: Fire protection drawings - for record
8437 Mesa Court Expansion 996296 07/18/2016 08/01/2016 07/22/2016 RFI: RFI 2831 Planter At Northeast Corner of North Tower
8436 Mesa Court Expansion 996296 07/18/2016 08/01/2016 07/25/2016 RFI: RFI 2854 - FSD Jackshaft Pin Adjustment Confirmation
8435 Engineering Tower Plaz/ ICS 5110159 07/18/2016 08/01/2016 07/18/2016 Repair threee spalled areas; route all open/ failed cracks; prepare concrete to create bonding profile; fill sealant with sand into cracks; provide Dex-O-Tex as; texture coast to match existing; apply primer; and 2 colorcoat
8434 Primary Electrical Improvement Step-4 990513 07/15/2016 07/29/2016 07/26/2016 Other:Advance Notice of Construction Activity @ Bison-Phase 3
8433 Mesa Court Expansion 996296 07/15/2016 07/29/2016 07/18/2016 Submittal 10 1400-015 Building Address Numbers
8432 Mesa Court Expansion 996296 07/14/2016 07/28/2016 07/18/2016 RFI - RFI 2829 - Rack Oven Shroud
8431 Bio Sci Plaza Improvements 990021 07/14/2016 07/28/2016 07/25/2016 Other - G-0.2 Access Plan
8430 Engineering Hall 5110235 07/14/2016 07/28/2016 07/18/2016 Specifications, Final Review, Approval for Contracts / New BTU meters and pipe
8429 Bio Sciences III Metering 5110234 07/14/2016 07/28/2016 07/18/2016 Specifications, Final Review, Approval for Contracts / New BTU meters and pipe
8428 Sprague Hall Meeting 5110239 07/14/2016 07/28/2016 07/18/2016 Specifications, Final Review, Approval for Contracts / New BTU meters and pipe
8427 Building Safety Mitigation Ph-2 5109555 07/14/2016 07/28/2016 07/19/2016 Other - State Fire Masrhal letter, Review of fire resistive material
8426 Small Cap 2015/16 SOTA Costume Shop Renovation 5110096 07/13/2016 07/27/2016   Plans-See attached reference documents
8425 Nat Sci 1 Meeting 5110233 07/12/2016 07/26/2016   Specifications
8424 Mesa Court Expansion 996296 07/11/2016 07/25/2016   RFI 2808 - Middle Tower Fire Riser Re-Route
8423 UNEX Classroom Building 990003 07/11/2016 07/25/2016 07/15/2016 Other: Supplemental Instruction #15
8422 BioSci Plaza Improvements 990021 07/11/2016 07/25/2016 07/14/2016 Backcheck Review of 100% CD Package
8421 Palo Verde Resurface Parking Lots and Roadways 5110078 07/11/2016 07/11/2016 07/13/2016 Final Review-Provide slurry seal to existing asphaltic concrete at Palo Verde Parking Lots & Roadways
8420 Middle Earth Lighting 5110194 07/11/2016 07/25/2016 07/13/2016 Plans, Spec's-Provide new Emergency Lighting & Exit Signs
8419 MedSci Bldgs B, C & D Plumbing Repairs 5109729 07/11/2016 07/25/2016 07/14/2016 Approval Stamp-Submittal Review
8418 Mesa Court Expansion 996296 07/06/2016 07/20/2016 07/11/2016 RFI 2808 - Middle Tower Fire Riser Re-Route
8417 UNEX Classroom Building 990003 07/05/2016 07/19/2016 07/18/2016 RFI - 0598 - Smoke Detector At Top Of Elevator Shaft
8416 Primary Electrical Improvement Step-4 990513 07/01/2016 07/15/2016   Other: Advance Notice of Construction Activity @ Bison-Phase 2
8415 Engineering Gateway 5110264 06/30/2016 07/14/2016 06/30/2016 Plans, Specs, Final Review, Approval of Contracts
8414 CRII-2 2015 Fall Hazard Protection 5110132 06/30/2016 07/07/2016   Specifications-Repairs several high-risk safety findings from EH&S fall hazard report. Adds fixed ladders, guard rail, and corrects rooftop door swing at Hewitt.
8413 Rowland Hall Loading Dock Build-out 5109950 06/30/2016 07/14/2016 07/08/2016 Specifications-Eye wash station submittal
8412 Small Cap 2015/16 SOTA A Costume Shop Renovation 5110096 06/30/2016 06/30/2016   Plans-See attached reference document
8411 CRII-2 2015 Fall Hazard Protection 5110132 06/29/2016 07/07/2016 06/30/2016 Specifications-Repairs several high-risk safety findings from EH&S fall hazard report. Adds fixed ladders, guard rail and corrects rooftop door swing at Hewitt.
8410 TEM Facilities 990013 06/28/2016 07/12/2016 07/01/2016 Other:Final CD for approval Stamp/Sign
8409 CRII-2 2015 SOTA Mold & Moisture Remediation 5110229 06/28/2016 07/06/2016 06/30/2016 Plans,Spec's-Project retrofits waterproofing on costume shop exterior and interior west and north wall to eliminate moisture intrusion into the space.
8408 Cooling Towers Reclaimed Water 5110012 06/28/2016 06/28/2016 06/28/2016 Plans-Pothole Utilities
8407 Mesa Court Expansion 996296 06/28/2016 07/12/2016 07/22/2016 RFI 2808 - Middle Tower Fire Riser Re-Route
8406 Mesa Court Expansion 996296 06/27/2016 07/11/2016 07/01/2016 Submittal 26 5100-002 0 - Interior Lighting
8405 Croul Hall Basement B212 Laboratory Remodeling 5109994 06/27/2016 07/11/2016 02/28/2016 Specifications-Fire stopping UL Listing
8404 EH Renovate Room 1106, 1108, 1110, 1111, 1112 5110052 06/27/2016 07/11/2016 07/08/2016 Plans, Spec's-EH Renovate Room 1106, 1108, 1110, 1111, 1112
8403 Bio Sci Plaza Improvements 990021 06/23/2016 07/07/2016 06/28/2016 Other: Backcheck Review of 100% CD Package
8402 CALIT IMRI Shell Space and Lab Buildouts 990048 06/23/2016 07/07/2016 06/23/2016 Submittal: 11 5300-009-01 Lab Equipment 2422 Flammable Acid Storage Cabinet
8401 CRII-2 2015 SOTA Smith Hall Lighting Improvements 5110190 06/23/2016 07/07/2016 06/23/2016 Plans-Remove & replace the house light fixtures in Winifred Smith Theater with new LED DMX house lighting fixtures & install new control wiring.
8400 CRII-2 2015 SOTA Theater Lighting Improvements 5110137 06/23/2016 07/07/2016 06/23/2016 Plans-Remove/replace house light fixtures in Claire Trevor Theater w/new LED DMX house lighting fixtures; install new control wiring & controls.
8399 Bio Sci Plaza Improvements 990021 06/22/2016 07/06/2016 06/28/2016 Other: G-0.2 Fire Access Plan
8398 UNEX Classroom Building 990003 06/22/2016 07/06/2016 06/27/2016 RFI-0582-Level 4 Fire Extinguisher Cabinet Relocation
8397 TEM Facilities 990013 06/21/2016 07/05/2016 06/27/2016 Submittal: 28 3111.002.A Fire Alarm Drawings and Product Data w/ Back check
8396 TEM Facilities 990013 06/21/2016 07/05/2016 06/28/2016 RFI 032 - Mechanical Shaft Details w/Back check
8395 UNEX Classroom Building 990003 06/20/2016 07/04/2016   RFI-0581-Knox Box locations at Level 1 and 2
8394 Aldrich Hall Installation of of AT&T Cellular Equipment 5110116 06/17/2016 07/01/2016 06/22/2016 Plans-Unmanned DAS Telecommunication Facility
8393 SOTA Swan Theater 2016, Season V - 2016 Supplemental Anchors 5110203 06/16/2016 06/30/2016 06/17/2016 Plans-Supplement anchors are required due to the installation of 3/8" anchors (instead of 5/8")
8392 Primary Electrical Improvements Step-4 990513 06/15/2016 06/29/2016 06/17/2016 Other: 01 5000.010_Advance Notice of Disruption-Trench-work
8391 Mesa Court Expansion 996296 06/15/2016 06/29/2016 06/17/2016 OTHER: ASI -15 MEP Revisions
8390 Mesa Court Expansion 996296 06/13/2016 06/27/2016 06/15/2016 RFI 2782 - Recessed Fire Extinguisher Cabinet in CMU at Loading Dock
8388 Primary Electrical Improvement Step-4 990513 06/13/2016 06/27/2016 06/13/2016 Other: Work Plan for Temp Water Commection w/ Backcheck
8387 Bio Sci Plaza Improvements 990021 06/13/2016 06/27/2016 06/15/2016 Other: Review of 95% CD Package (Arch & MEP)
8386 CRII-2 2015 SOTA Smith Hall Lighting Improvements 5110190 06/13/2016 06/15/2016 06/17/2016 Plans-Remove & replace the house light fixtures in Winifred Smith Theater with new LED DMX house lighting fixtures & install new contril wiring.
8385 CRII-2 2015 SOTA Theater Lighting Improvements 5110137 06/13/2016 06/15/2016 06/17/2016 Plans-Remove/replace house light fixtures in Claire Trevor Theater w/new LED DMX house lighting fixtures; install new control wiring & controls
8384 UNEX Classroom Building 990003 06/10/2016 06/24/2016 06/13/2016 RFI - 0566 - To UCI - Rated Ceiling at Coffee Shop
8383 TEM Facilities 990013 06/10/2016 06/24/2016 06/20/2016 OTHER: FP-0 and FP-1 (100% Construction Documents) with Calcs
8382 Mesa Court Expansion 996296 06/10/2016 06/24/2016 06/13/2016 RFI 2767 - Service Elevator Key Box Obstruction
8381 UNEX Classroom Building 990003 06/10/2016 06/24/2016 06/13/2016 RFI - 0564 - 5th Floor Balcony Swing Doors
8380 Primary Electrical Improvements 990513 06/10/2016 06/24/2016 06/13/2016 RFI 017: Fire Rating of South SS Switchgear Enclosure w/Ref.
8379 SC 15-16 School Of Education Renovate Research Rooms 5110103 06/09/2016 06/13/2016 07/13/2016 Plans, Spec's-Project renovates EDU Bldg Rms 2007, 2075 & 2077 in include casework, carpet, electrical/data raceways, ceiling work, lighting and paint.
8378 Bio Sci Plaza Improvements 990021 06/09/2016 06/23/2016 06/09/2016 Other: Review of 95% CD Package
8377 Primary Electrical Improvement Step-4 990513 06/08/2016 06/22/2016 06/09/2016 Other: 100% CD Sitework Dwgs for Stamp/Sign
8376 CRII-2015 BLS3 Repair 5110219 06/07/2016 06/21/2016 06/13/2016 Plans, Specifications
8375 Mesa Court Expansion 996296 06/06/2016 06/20/2016 06/09/2016 RFI 2535R1 - Shaft bottom at Shaft 5
8374 Mesa Court Expansion 996296 06/06/2016 06/20/2016 06/09/2016 RFI 2224R3 North Wall of Shaft 1 from Levels 2-6
8373 Mesa Court Expansion 996296 06/06/2016 06/20/2016 06/09/2016 RFI 2677 Stair 1 Trash Room Wall Fire Rating
8372 Mesa Court Expansion 996296 06/06/2016 06/20/2016 06/06/2016 RFI 2761 - Fire Extinguisher Cabinets in the Study Rooms Levels 2-6
8371 UNEX Classroom Building 990003 06/06/2016 06/20/2016 06/06/2016 RFI - 0559 - Fire Hydrant Hole Pattern
8370 MBCx Science Buildings AIRB Gas Meter 5109812 06/06/2016 06/06/2016 06/06/2016 Plans, Spec's-Furnish/Install new gas meter and connect to existing EMS.
8369 Bio Sci Plaza Improvements 990021 06/03/2016 06/17/2016 06/03/2016 Other: Review of Underground Package
8368 Engineering Tower Renovation Request 716 Suite 5109990 06/02/2016 06/16/2016 06/06/2016 Plans, Specs-Install new Fire Alarm system in the project area
8367 TEM Facilities 990013 06/02/2016 06/16/2016 06/06/2016 RFI 036 - Door T1121A Swing Change
8366 Aldrich Hall Sidewalk Replacement 5110004 06/01/2016 06/15/2016 06/06/2016 Plans, Spec-Remove and replace sidewalk and trees along Periera Drive. Install new irrigation.
8365 Primary Electrical Improvement Step-4 990513 06/01/2016 06/15/2016 06/03/2016 Other: Temp. water connection to laydown
8364 Primary Electrical Improvement Step-4 990513 06/01/2016 06/15/2016 06/13/2016 Other: Fire access plans for duct bank work for approval
8363 UNEX Classroom Bldg 990003 06/01/2016 06/15/2016   Submittal 27 1100-505-0- Hot Aisle Containment
8362 UNEX Classroom Building 990003 06/01/2016 06/15/2016 06/07/2016 RFI-0550-Sprinkler Head Adjustments on Level 2
8361 UNEX Classroom Building 990003 06/01/2016 06/15/2016 06/02/2016 RFI: 0550-Sprinkler Head Adjustment on Level 2
8360 Mesa Court Expansion 996296 05/31/2016 06/14/2016 06/07/2016 RFI 2734 - Elevator Emergency Power Indicator
8358 Antenna & Power for Campus Radio System 5110192 05/31/2016 06/14/2016 06/09/2016 Plans, Specifications
8357 Student Cenetr Flood Mitigation, Phase II 5110225 05/31/2016 06/14/2016 06/06/2016 Plans, Specifications
8356 TEM Facilities 990013 05/27/2016 06/10/2016 06/02/2016 RFI 032 Mechanical Shaft Details
8355 UNEX Classroom 990003 05/27/2016 06/10/2016 06/02/2016 RFI - 0551 - Sprinkler Head Adjustments on Level 3
8354 UNEX Classroom 990003 05/27/2016 06/10/2016 06/02/2016 RFI - 0552- Conduit Membrane Penetrations on level 5 near Stair 6
8353 UNEX Classroom Building 990003 05/27/2016 06/10/2016 06/02/2016 RFI- 0535- Building Address Locations
8352 Mesa Court Expansion 996296 05/27/2016 06/10/2016 06/02/2016 RFI 2748- Bottom of Shaft 4 EJ
8351 Primary Electrical Improvement Step-4 990513 05/27/2016 06/10/2016 06/01/2016 Other: Step-4 Laydown Area Lay -Out
8350 TEM Facilities 990013 05/26/2016 06/08/2016 05/26/2016 Other: E-602-Photometric Dwg w/backcheck
8349 Bio Sci Plaza Improvements 990021 05/25/2016 06/08/2016 06/02/2016 Other: Review of Underground Package
8348 Mesa Court Expansion 996296 05/25/2016 06/08/2016 08/26/2016 Submittal: 07 8446-003-0-Hilti Mineral Wool Speed Strips CP767
8347 Athletic's Communications Cable for Rams Training Camp 5110253 05/25/2016 06/08/2016 05/26/2015 Plans Specifications
8346 Antenna & Power for Campus Radio System 5110192 05/25/2016 06/08/2016 05/31/2016 Plans, Specifications
8345 HVAC Filtrastion Addition 5109972 05/24/2016 06/07/2016 05/31/2016 Plans-Replace AHU-1
8344 Primary Electrical Improvement Step-4 990513 05/24/2016 06/07/2016 05/26/2016 Other: 100% CD Site-work Dwgs w/backcheck
8343 Classroom Enhancement 5110107 05/23/2016 06/06/2016 05/25/2016 Plans-Install acoustic partition wall, tech upgrades, electrical, paint, flooring
8342 Small Cap - 2016, Bio-Sci 3 Enlarge Classroom 5110099 05/23/2016 06/06/2016 05/25/2016 Plans-Demolition, MEP, Framing & Drywall, Painting and Fire Sprinklers
8341 Student Center Greast Trap Vent Line 5110160 05/23/2016 05/25/2016 05/24/2016 Plans-Investigate/confirm vent line connection
8340 UNEX Classroom Building 990003 05/20/2016 06/03/2016 05/24/2016 RFI - 0543 - South Adobe Fire Hydrant Location
8339 Instructional Space Improvements 5110109 05/19/2016 06/02/2016 05/31/2016 Plans-Flooring, lighting, walls, electrical, demo work
8338 SC 15-16 School of Education Renovate Research Rooms 5110103 05/18/2016 05/24/2016 05/23/2016 Plans, Specs-Project renovates EDU Bldg Rms 2007, 2075 & 2077 to include casework, carpet, electrical/data raceways, ceiling work, lighting & paint
8337 Engineering Tower Rnovation Request 716 Suite 5109990 05/18/2016 06/01/2016 05/23/2016 Other: E.J. Detail -Reconfigure the floor plan and renovate the space
8336 Bio Sci Plaza Improvements 990021 05/18/2016 06/01/2016 05/18/2016 Submittal 001a - Mobilization Plan
8335 Los Trancos Service road improvement 5109734 05/18/2016 06/01/2016 05/23/2016 Plans-Plan check
8334 Rowland Hall 5109950 05/18/2016 06/01/2016 05/23/2016 Plans, EH&S Redlines-Fire alarm shops-back check
8333 TEM Facilities 990013 05/16/2016 05/30/2016   Submittal 21 0000.004 Pre Action Valve Assembly
8332 Mesa Court Expansion 996296 05/16/2016 05/30/2016 05/19/2016 RFI 1706R1 - FE Cabinet Mounting Height
8331 Computer Lab Upgrades 5110108 05/16/2016 05/30/2016 05/19/2016 Plans-New data and power cabling, enclose a door
8330 Mesa Court Expansion 996296 05/13/2016 05/27/2016 05/20/2016 RFI 2535R1 - Shaft Bottom at Shaft 5
8324 Mesa Court Expansion 996296 05/13/2016 05/27/2016 05/25/2016 RFI 2677 Stair 1 Trash Room Wall Fire Rating
8323 TEM Facilities 990013 05/13/2016 05/27/2016 05/18/2016 Submittal 210000.003 Fire Suppression Materials
8322 TEM Facilities 990013 05/13/2016 05/27/2016 05/18/2016 RFI 034 existing Prep Lab Door
8321 Engineering Tower Renovations Request (Suite 716) 5109990 05/13/2016 05/27/2016 05/19/2016 Plans,Addendum-Renovate Engineering Tower Suite 716 for new EVCP
8320 School of Social Ecology-1 Lab 126 Renovation 5110156 05/13/2016 05/27/2016 05/19/2016 Plans, Specs-This project renovates Lab 126 and the adjacent office 134: Upgrades finishes/benches, adds storage, eliminates walk-in freezers & fume hood.
8319 Small Cap - 2016, Bio-Sci 3 Enlarge Classroom 5110099 05/13/2016 05/27/2016 05/18/2016 Plans-Demolition, MEP, Framing & Drywall, Painting and Fire Sprinklers
8318 Small Cap 2016 - Humanities Hall 2nd Floor Renovation 251 & 257 5110100 05/13/2016 05/27/2016 05/18/2016 Security upgrade of corridors and combining of two rooms into one.
8317 Croul Hall 5109994 05/12/2016 05/26/2016 05/13/2016 Plans-Fire alarm shop drawings
8316 Mesa Court Expansion 996296 05/12/2016 05/26/2016 05/17/2016 RFI 2638R1 - HM Door Frame Caulk EJ
8315 Mesa Court Expansion 996296 05/12/2016 05/26/2016 05/20/2016 RFI 1771R1 - Laundry Room Wall Types and Dimension Clarifications
8314 Airb Floor 4 Room 4000 5109744 05/12/2016 05/18/2016 05/19/2016 Plans:Install DAS cell site at AIRB, Mesa Parking, and East Campus Parking
8313 Rowland Hall 5109950 05/12/2016 05/26/2016 05/13/2016 Specifications:Fire alarm shops back check
8312 Mesa Court Expansion 996296 05/11/2016 05/25/2016 05/27/2016 Submittal 10 4400-005-Fire Extinguisher Brackets (Brackets Only) Product Data
8311 MPAA 5110107 05/11/2016 05/25/2016 05/12/2016 Plans-Install acoustic partition wall, tech upgrades, electrical, paint, flooring
8310 UNEX Classroom Building 990003 05/10/2016 05/24/2016 05/11/2016 Submittal 26 3213 - 139 - 0 - Engine Generator Submittal
8309 UNEX Classroom Building 990003 05/10/2016 05/24/2016 05/13/2016 Submittal 26 3213-479-0-Engine Generator Startup and Onsite Testing Procedure Checklist
8308 UNEX Classroom Building 990003 05/10/2016 05/24/2016 05/17/2016 RFI - 0519 - Fire Stopping Sprinkler Riser at Stair 6 Level 3
8307 Mesa Court Expansion 996296 05/10/2016 05/24/2016 05/19/2016 RFI 2640 - Slab Edges and Framing at Stair 3 in Middle Tower Level 2
8306 Primary Electrical Improvement Step-4 990513 05/10/2016 05/24/2016 05/12/2016 Other: Traffic Mitigation Plans for Duct-work
8305 Primary Electrical Improvement Step-4 990513 05/10/2016 05/24/2016 05/19/2016 Other: 50% CD Switchgear Dwgs
8304 Mesa Court Expansion 996296 05/10/2016 05/24/2016 05/19/2016 RFI 2688 - Grease Duct To Hood Connection Detail
8303 Rowland Hall 5109950 05/10/2016 05/24/2016 05/12/2016 Specifications - Fire stopping submittals
8302 Bio Sci Plaza Improvements 990021 05/09/2016 05/23/2016   Submittal 001 - Mobilization Plan
8301 Mesa Court Expansion 996296 05/09/2016 05/23/2016 05/11/2016 RFI - 2541R2 - Horizontal Shaft Bottom Fire Caulking Details
8300 Mesa Court Expansion 996296 05/09/2016 05/23/2016 05/09/2016 RFI - Concrete and CMU Door Frame Anchor Clarification
8299 UNEX Classroom Building 990003 05/06/2016 05/20/2016 05/12/2016 RFI - 0525 - Level 4 Column Detail Fire Stop
8298 Primary Electrical Improvement Step-4 990513 05/06/2016 05/20/2016 05/09/2016 Submittal: 01 5000.01D_Laydown Area Site Plan w/ Backcheck
8297 UNEX Classroom Building 990003 05/06/2016 05/20/2016 05/17/2016 Submittal: 28 3111-107-3- Preliminary Fire Alarm Device Placement Plan & Wiring Typ.
8296 UNEX Classroom Building 990003 05/06/2016 05/20/2016 05/11/2016 Submittal: 28 3111-471 - 0 - Fire Alarm Riser Cable Supplemental Submittal
8295 Primary Electrical Improvement Step-4 990513 05/05/2016 05/19/2016 05/06/2016 Submittal: 01 5000.01C_Laydown Area Site Plan
8294 Student Center Flood PXCM Replacement 5109573 05/05/2016 05/19/2016 05/09/2016 Specs: Replace PXCM damaged by 4/8 flood
8293 Med Sci C PXCM Migration 5109723 05/05/2016 05/19/2016 05/09/2016 Specifications: Migrate MBC to PXCM at Med Sci C
8292 UNEX Classroom Building 990003 05/05/2016 05/19/2016 05/05/2016 Other: SI-14
8291 Primary Electrical Improvement Step-4 990513 05/05/2016 05/19/2016 05/06/2016 Submittal: 01 5000.04_Mobilization and Temporary Power Work Plan -Laydown Yard
8290 Los Trancos Service road Improvement 5109734 05/04/2016 05/18/2016 05/05/2016 Plans 80% Review
8289 Mesa Court Fire Road 5110152 05/04/2016 05/18/2016 05/05/2016 Plans, 100% Review
8288 UNEX Classroom Building 990003 05/04/2016 05/18/2016 05/09/2016 RFI-0501r001 - Head of Wall Sealant Rating
8287 Mesa Court Expansion 996296 05/04/2016 05/18/2016 05/12/2016 RFI 2686 - Fire Rating for When a Static Condition Changes to a Dynamic
8286 UNEX Classroom Building 990003 05/04/2016 05/18/2016 05/06/2016 RFI-0460r0001-Stair #5 Clarification
8285 UNEX Classroom Building 990003 05/04/2016 05/18/2016 05/06/2016 RFI-0523-Rated Plaster Wall Type 'EP1" and 'EP2'
8284 Primary Electrical Improvement Step-4 990513 05/03/2016 05/17/2016 05/04/2016 Other: SWPPP-LRP Signature Page
8283 TEM Facilities 990013 05/03/2016 05/17/2016 05/17/2016 Submittal: 12 3553 Lab Casework, Bio-safety Hood
8282 UNEX Classroom Building 990003 05/03/2016 05/17/2016 05/04/2016 Submittal: 26 3213-479 - 0 - Engine Generator Startup and Onsite Testing Procedure Checklist
8281 Mesa Court Expansion 996296 05/03/2016 05/17/2016 05/12/2016 RFI 2681 - Head of Wall Attaching to the Underside of Horizontal Shaft Bottom at Shaft 6
8280 Mesa Court Expansion 996296 05/03/2016 05/17/2016 05/11/2016 RFI 2661 - Elevator Smoke Door Pocket
8279 Mesa Court Expansion 996296 05/03/2016 05/17/2016 05/05/2016 RFI 2663 - Cable Rail Spacing Clarification
8278 HVAC Renovation 5110045/230701 05/03/2016 05/17/2016 05/05/2016 Plans-Retrofit AHU and controls
8277 Mesa Court Expansion 996296 05/02/2016 05/16/2016 05/09/2016 RFI 2676 - Duct Penetration EJ
8276 Mesa Court Expansion 996296 05/02/2016 05/16/2016 05/09/2016 RFI 2680 - Multiple Penetrations in IDF UL
8275 UNEX Classroom Building 990003 05/02/2016 05/16/2016 05/09/2016 RFI - 0505- Wall Separating Coffee 2001 and Pantry 2003
8274 Mesa Court Expansion 996296 05/02/2016 05/16/2016 05/09/2016 RFI 2653 Delete Access Door at Mid Landing Trash Room
8273 Mesa Court Expansion 996296 04/29/2016 05/13/2016 05/02/2016 RFI: 2665 Trash Chute Shaftwall System
8272 Mesa Court Expansion 996296 04/28/2016 05/12/2016 05/02/2016 RFI 2541 R1 - Horizontal Shaft Bottom Fire Caulking Details
8271 UNEX Classroom Building 990003 04/27/2016 05/11/2016 05/09/2016 SUBMITTAL: UNEX Coffee Shop Plans for Sanitation Review only.
8270 Mesa Court Expansion 996296 04/27/2016 05/11/2016 04/28/2016 RFI 2553R1 - Occupancy Signage Requirements for Project
8269 UNEX Classroom Building 990003 04/27/2016 05/11/2016 05/02/2016 RFI - 0519 - Fire Stopping Sprinkler Riser at Stair 6 Level 3
8268 Mesa Court Expansion 996296 04/27/2016 05/11/2016 05/05/2016 RFI 2596 - Laundry Room EF Shift
8267 UNEX Classroom Building 990003 04/26/2016 05/10/2016 05/02/2016 RFI - 0516 - Occupancy Sensors In Stairs #5 and 6
8266 TEM Facilities 990013 04/26/2016 05/10/2016 05/02/2016 SUBMITTAL: 07 8400.003 Fire Stopping Materials & Detail
8265 Mesa Court Expansion 996296 04/26/2016 05/10/2016 05/02/2016 RFI 2653 Delete Access Door at Mid Landing Trash Room
8264 PD lobby security enhancement 5109834 04/26/2016 05/10/2016 04/29/2016 Plans-Plan check
8263 Mesa Court Expansion 996296 04/26/2016 05/10/2016 05/05/2016 RFI 2597 - Middle Tower Stair 3 Bottom Level Sprinkler Head Piping Clarification
8262 Mesa Court Expansion 996296 04/26/2016 05/10/2016 04/28/2016 RFI 2536 - Fire Caulk of Underside of Slab Deck
8261 Student Center Flood Mitigation 5110225 04/25/2016 05/09/2016 04/26/2016 Plans, Specs-Repairs related to the April 8, 2016 flood
8260 CRII-2 2015 BSL-3 Repair 5110219 04/25/2016 05/09/2016 04/26/2016 Specifications
8259 Small Cap - 2016, Bio-Sci 3 Enlarge Classroom 5110099 04/25/2016 05/09/2016 04/29/2016 Plans-Demolition, MEP, Framing & Drywall, Painting and Fire Sprinklers
8258 Small Cap 2016 - Humanities Hall 2nd Floor Renovation 251 & 257 5110100 04/25/2016 05/09/2016 04/29/2016 Final Review - Security upgrade of corridors and combining of two rooms into one.
8257 Renovate Athletics for NFL 5110211 04/25/2016 05/09/2016 04/26/2016 Plans-Renovate Athletics for NFL
8256 Advanced Lighting and Controls Pilot 5109964 04/25/2016 05/09/2016 04/27/2016 Plans, Specs-Advanced Lighting and Controls Pilot
8255 Fire sprinkler shop drawings R-1 5109994 04/25/2016 05/09/2016 04/26/2016 Plans-Type II Fire resistive Sprinklered / A3, B-2, H-7 & H-8
8254 Rowland Hall Loading Dock Build-out 5109950 04/25/2016 05/09/2016 04/25/2016 Plans-Fire sprinkler shop drawing
8253 Mesa Court Expansion 996296 04/22/2016 05/06/2016 04/28/2016 RFI 2645 - Paint Finish Clarification at Kitchen and Dining Areas
8252 Mesa Court Expansion 996296 04/22/2016 05/06/2016 04/28/2016 Submittal 08 8000-008 Stair #1 90-minute Door Wire Lite
8251 Mesa Court Expansion 996296 04/22/2016 05/06/2016 04/28/2016 RFI 2643 Column Location and FRP in Janitor's Rooms on Levels 2-6
8250 Mesa Court Expansion 996296 04/22/2016 05/06/2016 04/27/2016 RFI 2647 - Add (2) FSD to Mech Rm L423
8249 Mesa Court Expansion 996296 04/21/2016 05/05/2016 04/28/2016 RFI 2628 - Shaft 3 Grease Duct Insulation EJ
8248 TEM Facilities 990013 04/21/2016 05/05/2016 04/28/2016 SUBMITTAL: 07 8400.002 Product Data for Fire Stopping Materials
8247 School of Socical Ecology-1 Lab 126 Renovation 5110156 04/21/2016 04/28/2016 04/26/2016 Plans, Spec- This project renovates Lab 126 and the adjacent office 134: Upgrades finishes/benches, adds storage, eliminates walk-in freezers & fume hood.
8246 Mesa Court Expansion 996296 04/20/2016 05/04/2016 04/22/2016 RFI 2215R1 - Bay Window Fire Rating Clarification
8245 TEM Facilities 990013 04/20/2016 05/04/2016 04/22/2016 SUBMITTAL: 28 3111.002 Fire Alarm Drawings w/ approved Devices for Ref.
8244 TEM Facilities 990013 04/20/2016 05/04/2016 04/28/2016 SUBMITTAL: 28 1000.001 Product Data for Security Equipment
8243 TEM Facilities 990013 04/20/2016 05/04/2016 04/28/2016 RFI 28_Exiting Doors T 1121B & T1130B-No Exit Signs
8242 Mesa Court Expansion 996296 04/19/2016 05/03/2016 04/21/2016 RFI 2351 - Ansul Sequence of Operations
8241 Engineering Laboratory Facility 5110145 04/19/2016 05/03/2016 04/20/2016 Specifications- Upgrade to DDC Contorls on HVAC
8240 AV Kitchen Renovation 5110176 04/19/2016 05/03/2016 04/21/2016 Final Review-Renovate Kitchen Interior-Corrections
8239 Aldrich Hall Installation of AT&T Cellular Equipment 5110116 04/19/2016 05/02/2016 04/26/2016 Plans - Unmanned DAS Telecommunications Facility
8238 MBCx Science Buildings SE-1 3rd Floor Re-Ducting 5109812 04/19/2016 04/25/2016 04/20/2016 Plans, Specs-Demo connection to existing rooftop packaged AC units and run new duct and stand-alone DDC controls per provided layout. Patch as needed.
8237 PD lobby security enhancement 5109834 04/18/2016 05/02/2016 04/21/2016 Plans-Plan check
8236 Mesa Court Expansion 996296 04/18/2016 05/02/2016 04/28/2016 RFI 2638 - HM Door Frame Caulk EJ
8235 Mesa Court Expansion 996296 04/18/2016 05/02/2016 04/27/2016 RFI 2629 - Maintaining the Smoke Wall Rating at Elevator Doors
8234 Mesa Court Expansion 996296 04/18/2016 05/02/2016 04/25/2016 RFI 2529 - Fire Rating for Edge of Slab that Varies at Elevator Shafts
8233 Small Cap 14/15 Steinhaus Hall Room B-47 Seawater Lab Renovation 5109837 04/18/2016 04/28/2016 04/20/2016 Plans - Prepare room to Accept Seawater Lab Equipment
8232 Tower #1 Control Valve Replacement 5109422 04/18/2016 05/02/2016 04/20/2016 Specifications - Replace leaking Tower #1 control valve
8231 Boiler 3 Temporary Insulation 5109724 04/18/2016 05/02/2016 04/20/2016 Specifications - Install temporary insulation on Boiler 3 after abatement
8230 ELF Heat Exchanger Insulation 5019331 04/18/2016 05/02/2016 04/20/2016 Specifications-Install insulation on new heat exchanger, piping and pumps
8229 Urea Preheat with Steam 5109422 04/18/2016 05/02/2016 04/20/2016 Plans, Specs - Install stainless tubing for steam to preheat urea air.
8228 Mesa Court Expansion 996296 04/18/2016 05/02/2016 04/27/2016 RFI 2587 - Revision to 10_A6.31 - Stair 3 Slab Edge in Towers
8227 TEM Facilities 990013 04/15/2016 04/29/2016 04/22/2016 100% Construction Drawings - Photometrics
8226 Small Cap 14/15 Steinhaus Hall Room B-47 Seawater Lab Renovation 5109837 04/15/2016 04/28/2016 04/18/2016 Plans-Prepare Room to Accept Seawater Lab Equipment
8225 Mesa Court Expansion 996296 04/15/2016 04/29/2016 04/21/2016 RFI 2620 - Fire Alarm Strobe Color Clarification
8224 UNEX Classroom 990003 04/15/2016 04/29/2016 04/21/2016 RFI - 0501 - Head of Wall Sealant Rating
8223 UNEX Classroom Building 990003 04/15/2016 04/29/2016 04/21/2016 RFI - 0500 - Sprinklers Under Stair in Food Service 1005
8222 Mesa Court Expansion 996296 04/15/2016 04/29/2016 04/21/2016 RFI 2290R3 - Fire Rating at Corridor Column
8221 AV Kitchen Renovation 5110176 04/15/2016 04/29/2016 04/15/2016 Renovate Kitchen Interior
8220 Mesa Court Expansion 996296 04/14/2016 04/28/2016 04/27/2016 RFI 2529 Fire Rating for Edge of Slab that Varies at Elevator Shafts
8219 Mesa Court Expansion 996296 04/14/2016 04/28/2016 04/27/2016 RFI - 2567 - Fire Alarm In Trash Rooms
8218 UNEX Classroom Building 990003 04/12/2016 04/26/2016 04/21/2016 RFI - 0460 - Stair #5 Clarifications
8217 Middle Earth Showers 5109882 04/12/2016 04/26/2016 04/15/2016 Plans - Demo and install new solid surface shower enclosures
8216 Mesa Court Expansion 996296 04/12/2016 04/26/2016 04/19/2016 RFI 2553 - Occupancy Signage Requirements for Project
8215 Mesa Court Expansion 996296 04/12/2016 04/26/2016 04/19/2016 Submittal 10 4400-004 - 0 - Surface Mounted Fire Extinguisher Cabinets for Lower Level and Level 1
8214 UNEX Classroom Building 990003 04/12/2016 04/26/2016 04/19/2016 RFI - 0493 - Clarification On Detail 17-A-509
8213 UNEX Classroom Building 990003 04/12/2016 04/26/2016 04/20/2016 RFI - 0491 - Level 3 Sprinkler Soffit
8212 Mesa Court Expansion 996296 04/12/2016 04/26/2016 04/19/2016 RFI - 2592 - Stair 4 Wall Assembly Attachment at Deck Beam and Column
8211 Mesa Court Expansion 996296 04/12/2016 04/26/2016 04/19/2016 RFI 2600 - Basement Sprinkler Pendant Head At M-5 Line
8210 Mesa Court Expansion 996296 04/12/2016 04/26/2016 04/19/2016 RFI 2601 - Stair 3 Standpipe Valve Impeding Into Egress Path
8209 Engineering Gateway 5110041 04/12/2016 04/25/2016 04/12/2016 Engineering Gateway Lab 3101 General Renovations
8208 Medical Education Building 5109976 04/12/2016 04/26/2016 04/12/2016 Plans - Seal building from Rain Water
8207 Engineering Gateway 5110008 04/11/2016 04/25/2016 04/20/2016 Plans, Final Review, Approval Stamp, Approval for Contracts
8206 TEM Facilities 990013 04/11/2016 04/25/2016 04/25/2016 Other: 100% CD Specifications w/ Backcheck
8205 TEM Facilities 990013 04/11/2016 04/25/2016 04/14/2016 Submittal: 28 3111.001 Product Data for Fire Alarm Devices
8204 Mesa Court Expansion 996296 04/11/2016 04/25/2016 04/12/2016 RFI 2584 - Furr Wall Around Pipes at Janitors Closet
8203 Mesa Court Expansion 996296 04/11/2016 04/25/2016 04/12/2016 RFI 2589 - Wall Type in Trash Rooms on Levels 2-6 for Pony Wall
8202 Remediate Sycamore Tree Infestation 5109992 04/11/2016 04/15/2016 04/20/2016 Final Review
8201 Mesa Court Expansion 996296 04/08/2016 04/22/2016 04/12/2016 RFI 2453R1 - Added FSD's at Shafts 1 & 6
8200 Mesa Court Expansion 996296 04/08/2016 04/22/2016 04/14/2016 RFI - 2419R1 - Stair 3 Steel Penetrating Shaft Wall
8199 Mesa Court Expansion 996296 04/07/2016 04/21/2016 04/14/2016 RFI 2592 - Stair 4 Wall Assembly Attachment at Deck Beam and Column
8198 MBCx Science Buildings Vavarium Re-Balancing 5109812 04/07/2016 04/13/2016 04/12/2016 Plans, Specifications, Final Review
8197 Croul Hall 5109994 04/07/2016 04/21/2016 04/19/2016 Plans, Specifications, 100% Review, Approval Stamp
8196 Fiber Survey 5110213 04/07/2016 04/21/2016 04/07/2016 Specifications, Final Review, Approval for Contracts
8195 UNEX Classroom Building 990003 04/06/2016 04/20/2016 04/14/2016 RFI - 0487 - Fire Stopping for Sprinkler Drain at Stair 6 Level 3
8194 Croul Hall Basement B2121 Laboratory Remodeling 5109994 04/06/2016 04/20/2016 04/12/2016 Plans, Specifications, 100% Review, Approval Stamp
8193 TEM Facilities 990013 04/05/2016 04/19/2016 04/12/2016 Other: 100% Construction Drawings
8192 SCIP 15/16: Disability Services Accessibility Improvement 5110112 04/05/2016 04/19/2016 04/11/2016 100% Review, Approval Stamp
8191 Mesa Court Expansion 996296 04/04/2016 04/18/2016 04/07/2016 RFI 2580 - Framing Revision to Horizontal Bottom at Shaft 1
8190 Mesa Court Expansion 996296 04/04/2016 04/18/2016 04/06/2016 RFI 2581 - Slab Edge Framing Condition at Shaft 4
8189 School of Social Ecology-1 Lab 126 Renovation 5110156 04/04/2016 04/11/2016 04/12/2016 Plans, 80% Review, Comments & Corrections
8188 Langson Library 5109910 04/04/2016 04/18/2016 04/04/2016 Plans, Specifications, Final Review, Approval for Contracts
8187 Mesa Court Expansion 996296 04/04/2016 04/18/2016 04/11/2016 RFI 2490R1 - Exit Passageway G904 Wall & Ceiling Rating
8186 Mesa Court Expansion 996296 04/04/2016 04/18/2016 04/06/2016 RFI 2581 - Slab Edge Framing Condition at Shaft 4
8185 Los Trancos Service road improvement 5109734 04/04/2016 04/18/2016 04/04/2016 Plans, 80% Review, Comments & Corrections
8184 Apartment Renovation 5110077 04/04/2016 04/18/2016 04/04/2016 Final Review
8183 Rowland Hall 5109950 04/01/2016 04/15/2016 04/11/2016 Plans, Specifications
8182 Humanities Hall 5110100 03/31/2016 04/14/2016 04/07/2016 80% Review
8181 UNEX Classroom Building 990003 03/30/2016 04/13/2016 04/06/2016 Submittal: 06 1053-456 - 0 - Misc. Carpentry - Interior Fire Treated Wood
8180 MedSci Bldgs B, C & D Plumbing Repairs 5109729 03/30/2016 04/13/2016 04/12/2016 Specifications, 100% Review
8179 UNEX Classroom Building 990003 03/29/2016 04/12/2016 03/31/2016 Submittal 07 8413-049- 0 - Penetration Firestopping Additional Systems
8178 AH-7 Duct Cleaning 5110141 03/29/2016 04/12/2016 04/04/2016 Specifications
8177 Small Cap 2016 Renovate McGaugh Hall #1 5110120 03/29/2016 04/12/2016 04/04/2016 Plans, Specifications
8176 SCIP 15/16: Disibility Service Accessibility improvement 5110112 03/29/2016 04/12/2016 03/30/2016 100% Review
8175 Engineering Gateway LENS lab for EVCP (Fume Hood) 5110007 03/29/2016 04/12/2016 03/30/2016 Other: Review Scope of work
8174 Small cap 2016 Renovate McGaugh Hall #2 5110121 03/29/2016 04/12/2016 03/30/2016 Plans, Specifications
8173 TEM Facilities 990013 03/29/2016 04/12/2016 03/31/2016 Submittal 06 1053.01_Fire Treated Plywood & Fasteners
8172 Primary Electrical Improvement Step-4 990513 03/29/2016 04/12/2016 04/06/2016 Other: 50% CD Site-Work Dwgs
8171 Small Cap 2016 Renovate McGaugh Hall #1 5110120 03/29/2016 04/04/2016   Plans, Specifications, Final Review
8170 Mesa Court Expansion 996296 03/28/2016 04/11/2016 04/06/2016 RFI 2290R2 - Fire Rating at Corridor Column
8169 Mesa Court Expansion 996296 03/28/2016 04/11/2016 03/30/2016 RFI: 2489R1-Elevator Control Room Ventillation
8168 TEM Facilities 990013 03/28/2016 04/11/2016 04/18/2016 Submittal: 21 1000.02_Fire Suppression Dwgs, Calcs & Material
8167 SCIP 15/16: Disability Services Accessibility improvement 5110112 03/28/2016 04/11/2016 03/30/2016 Plan 100% Review
8166 Mesa Court Expansion 996296 03/24/2016 04/07/2016 03/28/2016 RFI 2550 - Horizontal Shaft Bottom Termination Detail
8165 Mesa Court Expansion 996296 03/23/2016 04/06/2016 03/30/2016 Submittal: 14 2100-005 - A - Elevator Fire Status Panel
8164 Mesa Court Expansion 996296 03/23/2016 04/06/2016 03/28/2016 RFI 2535 - Shaft Bottom at Shaft 5
8163 Mesa Court Expansion 996296 03/23/2016 04/06/2016   Other: Mesa Court Bridge Package (For Record Only)
8162 Mesa Court Expansion 996296 03/22/2016 04/05/2016 03/28/2016 RFI 2452 - Framing Details for Double Wall and Beam at Elevator Shafts
8161 Mesa Court Expansion 996296 03/21/2016 04/04/2016 03/28/2016 RFI 2357 - 1st Floor Middle Tower Sprinkler Branchline Offset
8160 Mesa Court Expansion 996296 03/21/2016 04/04/2016 03/23/2016 RFI 2339R1 - Wall Dimensions and Types Surrounding South
8159 Mesa Court Expansion 996296 03/21/2016 04/04/2016 03/23/2016 RFI 2541 - Horizontal Shaft Bottom Fire Caulking Details
8158 TEM Facilities 990013 03/21/2016 04/04/2016 03/28/2016 Submittal: 09 2900-001_Gypsom Board Assemblies
8157 Rowland Hall Loading Dock Build-out 5109950 03/21/2016 04/04/2016 04/06/2016 Plans, 80% Review, Comments & Corrections
8156 Small Cap - 2016, Bio-Sci 3 Enlarge Classroom 5110099 03/18/2016 04/01/2016 03/23/2016 Plans, Preliminary Review
8155 TEM Facilities 990013 03/18/2016 04/01/2016 03/28/2016 Submittal: 22 0000-002_Complete Plumbing Submittal
8154 TEM Facilities 990013 03/18/2016 04/01/2016 03/28/2016 Submittal: 23 3117-001_Fire Rated Ductwork
8153 Crawford Hall 5110126 03/18/2016 04/01/2016 03/23/2016 Specifications, Final Review
8152 Mesa Court Expansion 996296 03/17/2016 03/31/2016 03/17/2016 Submittal 01 7839-000 Package 6 - Pedestrian Bridge for Permit Set
8151 UNEX Classroom Building 990003 03/16/2016 03/30/2016 03/17/2016 RFI - 0412r002 - Detail For Elevator Guardrail Fire Protection
8150 Mesa Court Expansion 996296 03/16/2016 03/30/2016 03/17/2016 RFI 2377R2 - Elevator Wall Penetration EJ's
8149 CALIT IMRI Shell Space and Lab Buildouts 990048 03/16/2016 03/30/2016 03/31/2016 Other: Substitute: alternate Fume Hood to meet ADA
8148 Greast Trap Vent line 5110160 03/16/2016 03/23/2016 03/23/2016 Specifications, Preliminary Review, 100% Review
8147 UNEX Classroom building 990003 03/15/2016 03/29/2016 03/15/2016 SI #13
8146 UNEX Classroom Building 990003 03/15/2016 03/29/2016 03/15/2016 RFI - 0412r002 - Detail For Elevator Guardrail Fire Protection
8145 TEM Facilities 990013 03/15/2016 03/29/2016 03/23/2016 Submittal: 07 8400-001_Fire Material
8144 Mesa Court Expansion 996296 03/14/2016 03/28/2016 03/21/2016 RFI 2528 - Five-Sided Box Detail for Shaft 3
8142 Mesa Court Expansion 996296 03/11/2016 03/25/2016 03/14/2016 RFI 2498R1 - Grease Duct Wrap EJ
8141 UNEX Classroom Building 990003 03/11/2016 03/25/2016 03/15/2016 RFI 459 - Hanging and Bracing Installation Details
8140 Primary Electrical Improvement Step-4 990513 03/11/2016 03/25/2016 03/16/2016 Work plan for Medium-Voltage Manhole Investigation including Traffic Control & Dewatering
8138 Mesa Court Expansion 996296 03/11/2016 03/25/2016 03/11/2016 RFI 2940 - Follow Up to Fire Concern at Exterior from RFI 2341
8137 Primary Electrical Improvement Step-4 990513 03/10/2016 03/24/2016 03/23/2016 Submittal 01 5000 Storm Water Pollution Prevention Plan
8136 Engineering Hall 5110095 03/10/2016 03/16/2016 03/14/2016 Plans, Specifications, Final Review
8135 Emergency Eyewash/Shower Installation 5110061 03/10/2016 03/24/2016 03/17/2016 Specifications, Preliminary Review
8134 Mesa Court Expansion 996296 03/09/2016 03/23/2016 03/11/2016 RFI - 2494R1 - Shaft 3 J-Track Notch
8133 Mesa Court Expansion 996296 03/09/2016 03/23/2016 03/11/2016 RFI 2511 - Added Ceiling in Fire Riser G605
8132 Mesa Court Expansion 996296 03/09/2016 03/23/2016 03/10/2016 RFI 2523 - Shaft 4 Bottom into Shaftwall System at Stair 3
8131 TEM Facilities 990013 03/08/2016 03/22/2016 03/15/2016 95% Construction Drawings
8130 Mesa Court Expansion 996296 03/08/2016 03/22/2016 03/11/2016 RFI - 2341R1 - Wall Type Changes Surrounding Women's Restroom G116
8129 Mesa Court Expansion 996296 03/07/2016 03/21/2016 03/09/2016 RFI - Shaft Wall to Shaft Wall Intersections
8128 Mesa Court Expansion 996296 03/07/2016 03/21/2016 03/08/2016 RFI 2498 - Grease Duct Wrap EJ
8127 School of Science Ecology-1 Lab 126 Renovation 5110156 03/07/2016 03/14/2016 03/07/2016 Plans
8126 Mesa Court Expansion 996296 03/04/2016 03/18/2016 03/08/2016 RFI 2497 - Fire Alarm Wire Size
8125 Mesa Court Expansion 996296 03/04/2016 03/18/2016 03/08/2016 RFI 2489 - Elevator Control Room Ventilation
8124 Small Cap 14/15 Eng Tower Suite 644 & Lab 909 Renovation 5109817 03/04/2016 03/22/2016 03/18/2016 Plans, Final Review
8123 Engineering Tower Renovations Request 716 Suite 5109990 03/04/2016 03/22/2016 03/17/2016 Plans
8122 Mesa Court Expansion 996296 03/03/2016 03/17/2016 03/09/2016 RFI 2501 - U529 Assembly At Shaft & Pipe Conflicts
8121 Mesa Court Expansion 996296 03/03/2016 03/17/2016 03/11/2016 RFI 2485 - M6.07 Thru Penetration Detail
8120 Mesa Court Expansion 996296 03/03/2016 03/17/2016 03/09/2016 Submittal 10 4400-003 - 0 - Fire Extinguishers for Kitchen only
8119 UNEX Classroom Building 990003 03/02/2016 03/16/2016 03/09/2016 RFI - 0412r1 - Detail For Elevator Guardrail Fire Protection
8118 Mesa Court Expansion 996296 03/02/2016 03/16/2016 03/11/2016 Submittal 26 0533-003 - 0 - Electrical Box Extenders
8117 TAM Facilities 990013 03/02/2016 03/16/2016 03/15/2016 Submittal 21 0000-001_Edited Fire Protection Specs
8116 Mesa Court Expansion 996296 02/29/2016 03/14/2016   RFI: 2377R2-Elevator Wall Penetration EJ'S
8115 TEM Facilities 990013 02/26/2016 03/11/2016 03/09/2016 Submittal: 21 1000-001_Hydrant Flow Test Report
8114 UNEX Classroom Building 990003 02/25/2016 03/10/2016 03/02/2016 Submittal 07 8413-414-0 - Penetration firestopping supplemental submittal - electrical
8113 Mesa Court Expansion 996296 02/25/2016 03/10/2016 03/08/2016 RFI 2224R2 - North Wall of Shaft 1 from Levels 2-6
8112 Mesa Court Expansion 996296 02/25/2016 03/10/2016 03/01/2016 RFI 204R2 - Head of Wall Engineering Judgements with attached slip track detail
8111 UNEX Classroom Building 990003 02/25/2016 03/10/2016 03/02/2016 RFI - 0416r001 - Level 2 Firestop System Detail for Shaft
8110 AIRB 5110177 02/25/2016 03/10/2016 02/29/2016 Plans, Specs, Final Review, Approval Stamp, Approval for Contracts
8109 Unex Classroom Building 990003 02/23/2016 03/08/2016 03/01/2016 Other: Supplemental Instruction No.12
8108 Mesa Court Expansion 996296 02/22/2016 03/07/2016 02/24/2016 Submittal: 275319-001-DAS 800 & 700 Emergency Radio
8107 Engineering Hall 5110095 02/22/2016 03/07/2016 02/29/2016 Plans, 100% review
8106 SCE/UCI Emerging Technology Upgrade 5110177 02/18/2016 03/03/2016 02/22/2016 Plans, Specifications
8105 AITR Room 190 Renovation 5109833 02/18/2016 03/03/2016 02/22/2016 Plans
8104 University Substraction 5109956 02/17/2016 03/02/2016 02/17/2016 Plans
8103 Mesa Court Expansion 996296 02/17/2016 03/02/2016 03/01/2016 RFI: 2387-Wall Finishes in food preperation Areas
8102 Mesa Court Expansion 996296 02/17/2016 03/02/2016 02/22/2016 RFI: 2377R1-Elevator Wall Penetration EJ's
8101 Mesa Court Expansion 996296 02/17/2016 03/02/2016 02/18/2016 RFI: 2419-Stair 3 Steel Penetrating Shaft Wall
8100 Engineering Tower renovation request 716 suite 5109990 02/16/2016 03/01/2016 02/17/2016 Plans
8099 Mesa Court Expansion 996296 02/19/2016 03/04/2016 02/29/2016 Submittal: 10 1400-002-B Signage Shop Drawings
8098 UNEX Classroom Building 990003 02/12/2016 02/26/2016 03/02/2016 RFI: -0411-Detail for shaft wall types
8097 Mesa Court Expansion 996296 02/12/2016 02/26/2016 02/16/2016 RFI: 2432-Finish for Knox Boxes
8096 UNEX Classroom Building 990003 02/11/2016 02/25/2016 02/26/2016 Submittal: 27 1700-250-2-800 MHz Submittal
8095 Mesa Court Expansion 996296 02/11/2016 02/25/2016 02/24/2016 RFI: 2237-Elevator Call Box and Lantern Block Outs
8094 UNEX Classroom Building 990003 02/11/2016 02/25/2016 02/25/2016 RFI: 0412-Detail for elevator Guardrail fire protection
8093 Central Plant Install H2 Electrolyzer 5110013 02/10/2016 02/24/2016 02/17/2016 Plans
8092 TEM Facilities 990013 02/10/2016 02/24/2016 02/12/2016 RFI: 019_TEM perimeter and Corridor Fire rating
8091 Central Plant 5110013 02/10/2016 02/24/2016 02/17/2016 Plans
8090 El Nino preparations 5110044 02/09/2016 02/23/2016 02/10/2016 Plans, Specifications
8089 Replace HTW Pump 5109807 02/08/2016 02/22/2016 02/22/2016 Plans
8088 TEM Facilities 990013 02/09/2016 02/23/2016 02/17/2016 RFI: 015_Pre_Action Fire Protection POC
8087 UNEX Classroom Building 990003 02/08/2016 02/22/2016 02/10/2016 RFI: 0410R1-EN-11-13-T Rating required for floor penetrations
8086 TEM Facilities 990013 02/08/2016 02/22/2016 02/24/2016 Other: 100% design Developemet Dwgs (Folder)
8085 Mesa Court Expansion 996296 02/08/2016 02/22/2016 02/18/2016 RFI: 2407-Building Signage for OCFA review
8084 TEM Facilities 990013 02/08/2016 02/22/2016 02/12/2016 Other: 100% Design Development Specifications
8083 Mesa Court Expansion 996296 02/08/2016 02/22/2016 02/17/2016 Submittal: 14 2100-0105-0-Elevator Fire Status Panel
8082 Mesa Court Expansion 996296 02/08/2016 02/22/2016 02/10/2016 RFI: 2414 -Shared Annular Space through Rated Wall Detail
8081 Mesa Court Expansion 996296 02/08/2016 02/22/2016 02/11/2016 RFI: 1952R1-Unistrut Attach to deck insert and wedge Anchor detail
8080 Unex Classroom Building 990003 02/08/2016 02/22/2016 02/17/2016 RFI: 0416-Level 2 Firestop System Detail for shaft
8079 Fire Sprinkler Inspection Repairs 5109910 02/08/2016 02/22/2016 02/09/2016 Plans
8078 Mesa Court Expansion 996296 02/08/2016 02/22/2016 02/17/2016 RFI: 2361R-North Tower Stair Entry Lobby West Wall Location and type
8077 UNEX Classroom Building 990003 02/08/2016 02/22/2016 02/08/2016 Other-CP-4 Specs
8076 Unex Classroom building 990003 02/08/2016 02/22/2016 02/08/2016 Other: Supplemental Instruction #9 -Specifications
8075 Small Cap 2016 Medical Science B, C, D Flooring Replavement 5109979 02/08/2016 02/22/2016 02/17/2016 Plans
8074 Mesa Court Expansion 996296 02/05/2016 02/19/2016 02/12/2016 RFI: 2312-Skewed North Wall of Shaft 4
8073 Mesa Court Expansion 996296 02/04/2016 02/18/2016 02/12/2016 RFI: 2364-Soffitt Ceiling Near Hanging stair on Level 1
8072 Mesa Court Expansion 996296 02/04/2016 02/18/2016 02/12/2016 RFI: 2339-Wall Dimensions Surronding South Tower Stair 3
8071 UNEX Classroom Building 990003 02/04/2016 02/18/2016 02/12/2016 RFI: 095r001-Attachment fir fired rated floor assembly at electrical boxes
8070 Mesa Court Expansion 996296 02/04/2016 02/18/2016 02/12/2016 RFI: 2193-Millwork in Conflict with FA Control Panel and in reception G404
8069 Mesa Court Expansion 996296 02/04/2016 02/18/2016 02/16/2016 Submittal: 11 4000-001-B-Kitchen Equipment Hood
8068 Brabdywine Commons 16-044 02/02/2016 02/16/2016 02/08/2016 Plans
8067 CALIT IMRI Shell Space and lab buildouts 990048 02/02/2016 02/16/2016 02/04/2016 Submittal: 21 1000-003-01 Revised Fire Sprinkler Dwg-Add #2
8066 Tissue Culture Room 5110032 02/02/2016 02/16/2016 02/02/2016 Plans
8065 Engineering Hall 5110095 02/01/2016 02/15/2016 02/03/2016 Plans
8064 Mesa Court expansion 996296 02/01/2016 02/15/2016 02/04/2016 RFI: 2393-Multiple pipes through penetration detail
8063 Engineering Tower Plaza 5110159 02/01/2016 02/15/2016 02/03/2016 Plans
8062 Mesa Court Expansion 996296 01/29/2016 02/12/2016   RFI: 2381-Typical Bathroom Wall Type Behind cubby
8061 Mesa Court Expansion 996296 01/29/2016 02/12/2016 02/04/2016 RFI: 2377-Elevator Wall Penetration EJ's
8060 TEM Facilities 990013 01/29/2016 02/12/2016 01/29/2016 Submittal: 01 1500.001A_Site logistic Plan, Phased Barricade Plan & Env. Mitigation w/ Backcheck
8059 Tree up-ligh repair 5110154 01/28/2016 02/11/2016 01/28/2016 Specifications
8058 Brandywine Commons 16-044 01/27/2016 02/10/2016 01/28/2016 Plans
8057 Mesa Court Expansion 996296 01/27/2016 02/10/2016 01/27/2016 Other: ASI#14-MEP Drawing Updates (FOR RECORDS ONLY)
8056 Mesa Court expansion 996296 01/26/2016 02/09/2016 02/02/2016 Submittal: 22-0500-006-0-Proset Blank Plug
8055 UNEX Classroom Building 990003 01/26/2016 02/09/2016 02/02/2016 Submittal: 07 8446-395-0-Fire-Resistive Joint Systems-Product data
8054 Mesa Court Expansion 996296 01/25/2016 02/08/2016 01/26/2016 RFI: 2372-Sprinkler Branchile Restrait
8053 Mesa Court Expansion 996296 01/25/2016 02/08/2016 02/04/2016 RFI: 2361-North Tower Stair Enrty lobby West Wall Location and type
8052 Mesa Court Expansion 996296 01/25/2016 02/08/2016 02/03/2016 RFI: 2377-Elevator Wall Penetration EJ's
8051 Mesa Court Expansion 996296 01/22/2016 02/05/2016 01/26/2016 RFI: 2373-Shaft Wall on West Side of Women's restroom G544
8049 ET 111/115 Electrical Service 5110051 01/21/2016 02/04/2016 01/21/2016 Plans:
8048 AH Ste 510 Lobby Security 5110143 01/21/2016 02/04/2016 01/21/2016 Final Review
8047 ET637 Relocate Fume Hood 5109983 01/20/2016 02/03/2016 01/21/2016 Plans
8046 Mesa Court Expansion 996296 01/20/2016 02/03/2016 02/02/2016 RFI; 2310-Signage Layout at Stair 3 Areas
8045 Croul Hall Loboratory Construction 5109994 01/19/2016 02/02/2016 01/27/2016 Plans
8044 Engineering gateway lab 3101 general Renovations 5110041 01/19/2016 02/02/2016 01/21/2016 Plans. Specifications
8043 Move and install 2MW Battery 5109956 01/19/2016 02/02/2016 01/21/2016 Plans
8042 Mesa Court Expansion 996296 01/19/2016 02/02/2016 01/19/2016 Other: ASI#14
8041 Mesa Court Expansion 996296 01/19/2016 02/02/2016 01/21/2016 RFI: 2352-Gauges on Sprinkler Riser
8040 Mesa Court Expansion 996296 01/19/2016 02/02/2016 01/26/2016 RFI: 2354-Loading Dick top of stair 5 Sprinkler
8039 Unex Classroom Building 990003 01/19/2016 02/02/2016 01/21/2016 RFI: 0395-Attachement for fired rated floor assembly at Electrical Boxes
8038 Mesa Court Expansion 996296 01/15/2016 01/29/2016 01/28/2016 RFI: 2355-Sprinkler Conflic with elevator in pits
8037 Mesa Court Expansion 996296 01/15/2016 01/29/2016 01/28/2016 RFI: 2347-3M Through Penetration Details
8036 UNEX Classroom Building 990003 01/15/2016 01/29/2016 01/28/2016 RFI: -0373-To UCI Mounting Heights for FA bell and annunciator
8035 Mesa Court Expansion 996296 01/14/2016 01/28/2016 01/26/2016 RFI: 2341 Wall Type Chamges Surronding Women's Restroom G116
8034 Sprauge Hall 5110032 01/14/2016 01/28/2016 01/20/2016 Plans
8033 Mesa Court Expansion 996296 01/13/2016 01/27/2016 02/02/2016 Other: ASI#12
8032 McGaugh Hall 5109824 01/12/2016 01/26/2016 01/20/2016 Plans
8031 Tree Reforestation 5109992 01/12/2016 01/26/2016 01/20/2016 Plans & Specifications
8030 Advanced Lighting and Control Pilot 5109964 01/12/2016 01/26/2016 01/21/2016 Plans, Specifications
8029 Unex Classroom Building 990003 01/12/2016 01/26/2016 01/12/2016 Other: Supplemental Instruction No. 10-Specifications
8028 Mesa Court Expansion 996296 01/12/2016 01/26/2016 01/21/2016 RFI-2214R1-HSS Posts at the Service Elevator 1.12
8027 Mesa Court Expansion 996296 01/12/2016 01/26/2016 01/28/2016 RFI: 2319-Fire Alarm Strobe location in B406
8026 Mesa Court Expansion 996296 01/11/2016 01/25/2016 01/21/2016 RFI: 2224R1-North Wall of Shaft 1 from Levels 2-6
8025 Engineering Gateway lab 3101 General Renovation 5110041 01/11/2016 01/25/2016 01/11/2011 Plans, Specifications
8024 Replace HVAC 5109815 01/11/2016 01/25/2016 01/11/2016 Plans
8023 TEM Facilities 990013 01/11/2016 01/25/2016 01/19/2016 Submittal: 01 1500.001_Site, Phased Barricade Plan & Environmental. Mitigation
8022 UNEX Classroom Building 990003 01/08/2016 01/22/2016 01/11/2016 RFI: 0384-To UCI-Fire Extinguisher not required in Electrical and mechanical
8021 UNEX Classroom Building 990003 01/08/2016 01/22/2016   Other: Supplemental Instruction No.9
8020 Mesa Court Expansion 996296 01/08/2016 01/22/2016 01/19/2016 RFI: 2335-Abandoned Electrical Sleeves fire Caulk UL
8019 Social Science Parking Structure HVAC Service Access 5110090 01/08/2016 01/22/2016 01/08/2016 Specifications
8018 Mesa Court Expansion 996296 01/07/2016 01/21/2016 01/26/2016 RFI: 2313-Shaftwall wall types at level 1 North Wall
8017 UNEX Classroom Building 990003 01/07/2016 01/21/2016 01/26/2016 RFI: 0290-Rated HM Door 2001A in Café Curtain Wall
8016 Mesa Court Expansion 996296 01/07/2016 01/21/2016 01/21/2016 RFI: 2214R1-HSS Posts at the service elevator
8015 Engineering Tower 51099990 01/07/2016 01/21/2016 01/20/2016 Plans
8014 Small Cap/ Eng. Tower Suite 644 & Lab 909 Renovation 5109817 01/07/2016 01/21/2016 01/11/2016 Plans
8013 Student Health II (building 6) Room 101-111 5109857 01/07/2016 01/21/2016 01/07/2016 Plans:
8012 ET 111/115 Electrical Service 5110051 01/07/2016 01/21/2016 01/07/2016 Plans
8011 Mesa Court Expansion 996296 01/05/2016 01/19/2016 01/19/2016 RFI: 2305-Revising the P-22 Wall on drawing A9.01
8010 Mesa Court Expansion 996296 01/05/2016 01/19/2016 01/21/2016 RFI: 2043R2-Elevator Entrance Wall Type Change
8009 Mesa Court Expansion 996296 01/05/2016 01/19/2016 01/26/2016 Submittal: 11 8226-001-A-Trash Chutes
8008 UNEX Classroom Building 990003 01/05/2016 01/19/2016 01/06/2016 Submittal: 07 2100-282-0-Thermal Insulation
8007 HVAC Renovations 5110045/230701 01/04/2016 01/18/2016 01/07/2016 Plans
8006 UNEX Classroom Building 990003 12/23/2015 01/06/2016 01/11/2016 RFI: 0370-Confirmation of the location of generator EPO and remote
8005 Mesa Court Expansion 996296 12/21/2015 01/04/2016 01/11/2016 Submittal: 10 1400-002-A-signage Shop drawings
8004 UNEX Classroom Building 990003 12/21/2015 01/04/2016 01/12/2016 RFI: 0365-Confirmation of mounting height of auduble appliances (FA Speakers)
8003 Mesa Court Expansion 996296 12/21/2015 01/04/2015 01/12/2016 RFI: 2316-Firestop Sealant for Fire Protection Pipe
8002 UNEX Class Building 990003 12/21/2015 01/04/2016 01/11/2016 Submittal: 21 1000-367-0-To UCI-Test Valves
8001 Mesa Court Expansion 996296 12/21/2015 01/04/2016 12/22/2015 RFI: 2001R1-Elevator Smoke Detectors
8000 Mesa Court Expansion 996296 12/21/2015 01/04/2015 12/22/2015 RFI: 2117R1 Fire Proofing at Shaftwall with no slab at shaft 2 per RFI 1739 &1868
7999 Croul Hall 5109994 12/21/2015 01/04/2015 01/06/2016 Plans
7998 Rowland Hall Loading 5109950 12/21/2015 01/04/2015 12/22/2015 Plans
7997 CallT2 IMRI Shell Space and labs Buildout 990048 12/18/2015 01/01/2016 12/18/2015 Other: 100% Construction drawings-FOR RECORD ONLY
7996 CallT2 IMRI shell space and labs Buildout 990048 12/17/2015 12/31/2015 12/17/2015 Submittal: 21 1000-002-01 Fire Protection Systems Systems Sprinkler Addendum #1 Drawing and Calcs + Flex Head Data
7995 Mesa Court Expansion 996296 12/15/2015 12/29/2015 12/21/2015 RFI: 2256-Mech_plumbing Deck Penetration Details
7994 Mesa Court Expansion 996296 12/15/2015 12/29/2015 12/16/2015 RFI: 2293-Health Code Clarification for ice machines on level 1
7993 Mesa Court Expansion 996296 12/14/2015 12/28/2015 12/21/2015 RFI: 2290-Fire Rating at Corridor Column
7992 Rowland Hall Loading Dock Build-Out 5109950 12/11/2015 12/25/2015 12/11/2015 Plans
7991 UNEX Classroom Building 990003 12/11/2015 12/25/2015 12/16/2015 Other: Supplemantal Instruction #9 -Specifications
7990 Mesa Court Expansion 996296 12/11/2015 12/25/2015 12/17/2015 RFI: 2274-Updated Site Fence Plan
7989 UNEX Classroom Building 990003 12/09/2015 12/23/2015 12/16/2015 Other: Suplemental Instruction #9
7988 CallT2 IMRI shell Space and labs buildout 990048 12/09/2015 12/23/2015   Other: 100% Contruction Drawings
7987 CallT2 IMRI Shell Space and labs buildouts 990048 12/09/2015 12/23/2015 12/16/2015 Other: Project Manual -Specifications
7986 Fire Prinkler Inspections 5109910 12/08/2015 12/22/2015 12/09/2015 Plans
7985 Engineering Gateway Lab 3101 General Renovations 5110041 12/08/2015 12/22/2015 12/17/2015 Plans, Specifications
7984 Mesa Court Expansion 996296 12/08/2015 12/22/2015 12/17/2015 RFI: 2242R-Rated walls around storage and IDF rooms in resident towers
7983 Remediate Syamore Tree Infectation 51099992 12/07/2015 12/21/2015 12/09/2015 Specifications
7982 Campus El Nino Preparation 2015 5110044 12/07/2015 12/21/2015 12/09/2015 Plans, Specifications
7981 Unex Classroom Building 990003 12/04/2015 12/18/2015 12/18/2015 Other: CP-6
7980 Croul Hall Laboratory Construction 5109994 12/03/2015 12/17/2015 12/08/2015 Plans
7979 CallT2 IMRI Shell Space and labs Buildout 990048 12/03/2015 12/17/2015   Submittal: 21 1000-002-01 Fire Protection System Sprinkler Addendum #1 Drawings and Calcs + Flex Head data
7978 UNEX Classroom Building 990003 12/03/2015 12/17/2015 12/04/2015 UNEX Classroom Building
7977 SEP 2015 Langson Library MBCx 5109955 12/03/2015 12/17/2015 12/07/2015 Specifications
7976 ELF High Temp Water Distribution CRII Project 5109756 12/03/2015 12/17/2015 12/03/2015 Specifications
7975 Mesa Court Expansion 996296 12/01/2015 12/15/2015 12/07/2015 RFI: 2001-Elevator Smoke Detectors
7974 UNEX Classroom Building 990003 12/01/2015 12/15/2015   Other: Conformed Set Up to SI#8 (Sections included:General, Civil, Structural, Architectural, Mechanical, Electrical, Plumbing, Telecom)
7973 Mesa Court Expansion 996296 12/01/2015 12/15/2015 12/07/2015 RFI: 2205 Solar Hot water pipe Attachement Detailin Shaft 4
7972 Mesa Court Expansion 996296 12/01/2015 12/15/2015 12/01/2015 Other: Complete Project Specs (Issue Date: 10/21/2015
7971 Install Metering Section 5109588 11/30/2015 12/14/2015 12/01/2015 Specifications
7970 Evacuation Maps Sign Shop 11/30/2015 12/14/2015 12/07/2015 Evacs
7969 Eng. Gateway Data Center Controls Retrofit 5110027 11/30/2015 12/14/2015 11/30/2015 Specifications
7968 Mesa Court Expansion 996296 11/25/2015 12/09/2015 12/07/2015 RFI: 2238 Clarification for Specifications 09 22 16
7967 CALIT IMRI shell space and lab buildouts 990048 11/25/2015 12/09/2015 12/03/2015 Submittal: 07 8413-002-01 Through Penetration Firestopping UL Details
7966 UNEX Classroom Building 990003 11/23/2015 12/07/2015 11/25/2015 Other: CP-6
7965 UNEX Classroom Building 990003 11/23/2015 12/07/2015 12/03/2015 Submittal: 10 4400-329-0-MCN-Fire Protection Specialties (FECs)
7964 Mesa Court Expansion 996296 11/23/2015 12/07/2015 11/23/2015 RFI: 2235-Plumbing and mechanical ProSet Sleeve Detail A-1010
7963 ET924 Fume Hood Addition 5109887 11/20/2015 12/04/2015 12/01/2015 Plans
7962 Engineering Gateway 5110008 11/20/2015 12/04/2015 12/01/2015 Preliminary Review
7961 UNEX Classroom Building 990003 11/20/2015 12/04/2015 11/25/2015 Submittal: 27 1700-250-1-800 MHz Submittal
7960 Disability Services Center Building 5109938 11/19/2015 12/03/2015   Plans
7959 Croul Hall Laboratory Construction 5109994 11/19/2015 12/03/2015 11/19/2015 Plans
7958 Mesa Court Expansion 996296 11/18/2015 12/02/2015 11/19/2015 Other: FR-12 Fire rated ice maker outlet box
7957 Mesa Court Expansion 996296 11/18/2015 12/02/2015 11/23/2015 RFI 2235 - Plumbing and mechanical proset sleeeve detail A-1010
7956 Starbucks at Student Center 15-238 11/18/2015 12/02/2015   Plans
7955 SOTA Gas Leak Repair 5110094 11/18/2015 12/02/2015 11/19/2015 Plans
7954 Engineering Tower 5109887 11/17/2015 12/01/2015 11/19/2015 Plans:
7953 Mesa Court Expansion 996296 11/17/2015 12/01/2015 11/23/2015 RFI: 2242-Rated Walls around storage and IDF rooms in Resident Towers
7952 Engineering Tower 5109983 11/17/2015 12/01/2015 11/19/2015 Preliminary Review
7951 UNEX Classroom Building 990003 11/17/2015 12/01/2015 11/23/2015 RFI: 0327-FEC location Levels 1, 4, and 5
7950 UNEX Classroom Building 990003 11/17/2015 12/01/2015 11/19/2015 RFI: 0326-FEC Location Levels 2-3
7949 Mesa Court Expansion 996296 11/17/2015 12/01/2015 11/23/2015 RFI: 2227-Using UL C-AJ-1551 instead of proset Assembly
7948 EG1106 Fume Hood Addition 5110007 11/13/2015 11/27/2015 11/19/2015 Plans, Final Review
7947 EG3107 Fume Hood Addition 5109861 11/13/2015 11/27/2015 11/19/2015 Plans, 100% Review
7946 Student Health II (Building 6) 5109857 11/13/2015 11/27/2015 11/19/2015 Plans, Final Review
7945 Mesa Court Expansion 996296 11/13/2015 11/27/2015   ASI #11 Fire Alarm Drawings_FRO
7944 Mesa Court Expansion 996296 11/12/2015 11/26/2015 11/25/2015 RFI: 2214-HSS Post at the Service Elevator
7943 UNEX Classroom Building 990003 11/10/2015 11/24/2015   Other: Fire Protection Plans
7942 Student Health II (Building 6) Room 101-111 5109857 11/10/2015 11/24/2015 11/10/2015 Plans
7941 Replace /Repair roof leak 5110066 11/10/2015 11/24/2015 11/10/2015 Final Review
7940 Mesa Court Expansion 996296 11/09/2015 11/23/2015 11/10/2015 RFI: 1869R1-Stair 3 Deluge frame fire Rating
7939 Rowland Hall Loading Dock Build Out 5109950 11/09/2015 11/23/2015 11/18/2015 Plans
7938 Mesa Court Expansion 996296 11/09/2015 11/23/2015 11/16/2015 RFI: 2224-North Wall of Shaft 1 from Levels 2-6
7937 UNEX Classroom Building 990003 11/09/2015 11/23/2015   Other: Fire Alarm Plans
7936 Mesa Court Expansion 996296 11/06/2015 11/20/2015 11/20/2015 RFI: 2042r1-Head of Wall Engineering Judgements with additional Slip Track Detail
7935 Mesa Court Expansion 996296 11/05/2015 11/19/2015 11/20/2015 RFI: 2161-Conduit Attachement in Shafts
7934 CALIT IMRI Shell Space and Lab Buildouts 990048 11/05/2015 11/19/2015 11/16/2015 Submittal 09 0000-001-01 - Plywood Backing for Shielding
7933 CALIT IMRI Shell Space and Lab Buildouts 990048 11/05/2015 11/19/2015 11/16/2015 Submittal 22 0000-001-LN2 Piping and Fittings
7932 Mesa Court Expansion 996296 11/05/2015 11/19/2015 11/19/2015 RFI: 2215-Bay Window Fire Rating Clarification
7931 Temporary Electric Dryers 5109926 11/04/2015 11/18/2015 11/04/2015 Final Review
7930 UNEX Classroom Building 990003 11/04/2015 11/18/2015 11/09/2015 Submittal 21 1000-200-Fire Protection Drawing resubmittal
7929 Engineering Gateway (Engineering Tower 2) 5109548 11/04/2015 11/18/2015 11/04/2015 Specifications:
7928 UNEX Classroom Building 990003 11/04/2015 11/18/2015 11/04/2015 Other: CP-4 SI-7 with backcheck
7927 Mesa Court Expansion 996296 11/03/2015 11/17/2015 11/17/2015 RFI: 2169-Kitchen 2169-Hood Drawings update
7926 ECEC and CC Security Lobby 5109828 11/03/2015 11/17/2015 11/04/2015 Plans
7925 Mesa Court Expansion 996296 10/29/2015 11/12/2015 11/11/2015 RFI: 2191-Signage Clarification
7924 Mesa Court Expansion 996296 10/29/2015 11/12/2015 11/12/2015 RFI: 2120R1-RLC UL Asssembly
7923 Door -Code Compliance 990048 10/29/2015 11/12/2015 11/04/2015 Other: Drawings & Specs Section
7922 UNEX Classroom Building 990003 10/29/2015 11/12/2015 11/12/2015 Submittal: 07 2100-282-0-Thermal Insulation
7921 UNEX Classroom Building 990003 10/28/2015 11/11/2015 11/10/2015 Other: Supplemental Instruction No. 8
7920 CALIT IMRI Shell Space and lab Buildouts 990048 10/28/2015 11/11/2015 11/02/2015 Submittal: #28 3111-001-02_ Fire Alarm Shop Dwgs-Rev 1 w/back-check
7919 CALIT IMRI Shell Space and Lab Buildouts 990048 10/28/2015 11/11/2015   Submittal: #21 1000-001-02 _ Fire Sprinkler Calcs & Shop Dwgs. w/BC
7918 Mesa Court Expansion 996296 10/27/2015 11/10/2015 11/05/2015 Other: ASI #11 Fire Alarm Sheets with backcheck
7917 Irrigation gate valve replacement 510079 10/27/2015 11/10/2015 11/04/2015 Final Review
7916 Mesa Court Expansion 996296 10/27/2015 11/10/2015 11/09/2015 RFI: 2180-Exterior Sheathing joiny Confirmation
7915 Ayala Science Library 5109338 10/26/2015 11/09/2015 11/04/2015 Plans, Specifications
7914 Move and install 2MW Battery 5109956 10/26/2015 11/09/2015 11/04/2015 Plans
7913 Building HVAC System (multizone) replacement 5109815 10/23/2015 11/06/2015 11/04/2015 Plans
7912 SSL 3rd + 4th floor lab renovation 5109932/997478 10/22/2015 11/05/2015 10/28/2015 Plans
7911 ECEC and SS Security lobby 5109828 10/22/2015 11/05/2015 11/04/2015 Plans
7910 UNEX Classroom Building 990003 10/21/2015 11/04/2015 11/02/2015 Submittall: 28 3111-107-2-Preliminary Fire Alarm Device Placement Plan and wiring Typ
7909 Mesa Court Expansion 996296 10/20/2015 11/03/2015 11/05/2015 Submittal: 23 3713-001-A-Diffusers, Registers, and Grilles
7908 Mesa Court Expansion 996296 10/20/2015 11/03/2015 10/28/2015 RFI: 1869R1-Stair Deluge Frame Fire Rating
7907 Mesa Court Expansion 996296 10/20/2015 11/03/2015 10/26/2015 RFI: 1739R1-P32 Wall vs Shaft Opening
7906 UNEX Classroom 990003 10/20/2015 11/03/2015 11/02/2015 Submittal: 28 3111-114-2-Digital Addressable Fire-Alarm System Product Data
7905 Mesa Court Expansion 996296 10/20/2015 11/03/2015 10/26/2015 RFI: 2120-RLC Roof UL Assembly
7904 Mesa Court Expansion 996296 10/19/2015 11/02/2015 10/28/2015 RFI: 2173-GFRC Fire Safing EJ at NW Corner Dorm Room
7903 Mesa Court Expansion 996296 10/20/2015 11/03/2015 10/28/2015 RFI: 2117-Fire Proofing at Shaftwall with no slab at Shaft 2 per RFI's 1739 1868
7902 Humidifier Drain Pans 5109892 10/19/2015 11/02/2015 10/19/2015 Specifications
7901 Student Health II (building 6) Room 101-111 5109857 10/19/2015 11/02/2015 10/29/2015 Specifications
7900 ARC 5110066 10/16/2015 10/30/2015 10/19/2015 Proposal
7899 Mesa Court Expansion 996296 10/15/2015 10/29/2015 10/23/2015 RFI: 2043R1-Elevator Entrance Wall Tyoe Change
7898 UNEX Classroom Building 990003 10/15/2015 10/29/2015 10/22/2015 RFI: -0273-Temp standpipe product data
7897 CALIT IMRI Shell Space and Lab Buildouts 990048 10/15/2015 10/29/2015 11/06/2015 Other: Specifications
7896 CALIT IMRI Shell Space and Lab Buildouts 990048 10/15/2015 10/29/2015 10/19/2015 Submittal: 07 8413-001-01 Fire Stopping-Fire Barrier Sealant and Fomohill
7895 CALIT IMRI SHEll Space and Lab Buildouts 990048 10/12/2015 10/26/2015 10/19/2015 Submittal: 23 3300-004-02 Comb. Fire Dampers-FSD Instructions
7894 Mesa Court Expansion 996296 10/13/2015 10/27/2015   RFI: 1958R1-Exterior Wall Type Clarification
7893 Mesa Court Expansion 996296 10/13/2015 10/27/2015 10/28/2015 RFI: 2159-GFRC Edge of deck Firestopping EJ-Point of contact
7892 Mesa Court Expansion 996296 10/13/2015 10/27/2015 10/26/2015 RFI: 1872-Shaft 3 Add Div. Wall and wall type Clarif
7891 Mesa Court Expansion 996296 10/13/2015 10/27/2015 10/26/2015 Submittal: 08 7000-007-0- Stair 3 Door and window schedule
7890 Mesa Court Expansion 996296 10/13/2015 10/27/2015 10/22/2015 RFI: 1916R3-Engineering Judgement for CW Edge deck
7889 Replace/Repair roof leak 5110066 10/13/2015 10/27/2015 10/13/2015 Final Review
7888 Student Center Parking Structure Replace Heat Pump HP-1 511058 10/13/2015 10/27/2015 10/13/2015 Addendum
7887 Mesa Court Expansion 996296 10/13/2015 10/27/2015 10/22/2015 Submittal: 08 7000-008-0- Elevator HM Door and Frame-Schedule ,PD, SD
7886 UNEX Classroom Building 990003 10/13/2015 10/27/2015 10/28/2015 Submittal: 09 2116-281-0-Gypsum Board Shaft -Wall Assemblies
7885 UNEX Classroom Building 990003 10/13/2015 10/27/2015 10/26/2015 Submittal: 08 1113-234-1-Hollow Metal Door Frames and Int. Alum. Frames Schedule & Product Data
7884 Mesa Court Expansion 996296 10/09/2015 10/23/2015 10/13/2015 Submittal: 07-8413-004-0-3M Putty Pads
7883 Mesa Court Expansion 996296 10/09/2015 10/23/2015 10/13/2015 RFI: 2042-Head of Wall Engineering Judgement
7882 Bussiness Unit 2 9900500 10/08/2015 10/22/2015 10/08/2015 Submittal: 05 5000-017-GKD Mesh Installtion Work Plan
7881 Bussiness Unit 2 990500 10/08/2015 10/22/2015 10/14/2015 Submittal: 05 5000-011-1-GKD Screen Support Drawings
7880 CallT2 IMRI Shell Space and Labe Buildout 990048 10/08/2015 10/22/2015 10/09/2015 Submittal-A-422 Beneficial Occupancy for Room 2422A
7879 Student Center Parking Structure Replace Heat Pump HP-1 5110058 10/07/2015 10/21/2015 10/08/2015 Addendum, Final Review
7878 Mesa Court Expansion 996296 10/07/2015 10/21/2015 10/09/2015 RFI 2051R2 - Edge of Slab Engineering Judgements for GFRC
7877 Engineering Gateway 5109861 10/05/2015 10/19/2015 11/04/2015 Plans, 100% review, Comments and Corrections
7876 Beckman Laser Eye Center 5109546 10/05/2015 10/19/2015 10/06/2015 Specs. & Final Review
7875 Engineering Gateway 5110007 10/05/2015 10/19/2015   Plans, 100% review, Comments & Corrections.
7874 Exterior Lighting - Athletics 5109000 10/01/2015 10/15/2015 10/01/2015 Specifications, Final Review
7873 Multiple Locations Fire Alarm systems 5109528-A 10/01/2015 10/15/2015 10/01/2015 Specifications, 100% Review, Final Review
7872 UNEX Classroom Building 990003 09/30/2015 10/14/2015 10/23/2015 Sumbittal 21 1000-251 - Fire Protection Material & Equipment
7871 Rowland Hall Loading Dock Build-out 5109950 09/29/2015 10/13/2015 10/01/2015 Plans. Preliminary Review.
7870 UNEX Classroom Building 990003 09/29/2015 10/13/2015 10/14/2015 RFI-0228R2-Construction Use Standpipe
7869 Mesa Court Expansion 996296 09/29/2015 10/13/2015 10/14/2015 RFI 1869-Stair 3 Deluge Frame Fire Rating
7868 null 990003 09/29/2015 10/13/2015 10/06/2015 **Duplicate**Plan ID #7870
7867 Mesa Court Expansion 996296 09/25/2015 10/09/2015   RFI - 2051RI - Edge of Slab Engineering Judgements for GFRC
7866 UNEX Classroom Building 990003 09/25/2015 10/09/2015 10/13/2015 Other - CP-4 SI-7
7865 CALIT IMRI Shell Space and Lab Buildouts 990048 09/25/2015 10/09/2015 10/06/2015 Other: 100% design drawing set with back-check
7864 Mesa Court Expansion 996296 09/24/2015 10/08/2015 10/01/2015 RFI 1980R1 - Steel Angle Penetrating Fire Rated Assembly
7863 Mesa Court Expansion 996296 09/24/2015 10/08/2015 10/01/2015 RFI 1916R2 - Engineering Judgement for Edge of Deck Firestopping
7862 Engineering Bike Center 5109898 09/24/2015 10/08/2015   Final Review
7861 UNEX Classroom Bldg 990003 09/23/2015 10/07/2015 09/30/2015 Submittal: 21 1000-0263 Fire Protection Material & Equipment Supplemental Submittal
7860 Cal IT IMRI Shell Space & lab Built-out 990048 09/23/2015 10/07/2015 09/30/2015 Submittal: #23 3300-04 Fire Smoke Dampers Product Data
7859 AITR Room 109 Renovation 5109833 09/22/2015 10/06/2015 09/24/2015 Plans
7858 UNEX Classroom Bldg. 990003 09/22/2015 10/06/2015 09/23/2015 RFI:# 228Ri# Classroom Bldg. temporary Stand-Pipe w/back Check
7857 Partial upgrade in Science Library Fire Alarm Upgarde 5109338 09/18/2015 10/02/2015 09/22/2015 Plans
7856 UNEX Classroom Building 990003 09/18/2015 10/02/2015   RFI:-0231r1-Rating Seperating Between stair 3 and coffee house
7855 Cal IT IMRI Shell Space and lab Built-Out 990048 09/18/2015 10/02/2015 10/21/2015 Submittal: #21 1000-01 Fire Protection dwgs with appoved Product Data
7854 Cal IT IMRI Shell Space & Lab Built-Out 990048 09/18/2015 10/02/2015 10/05/2015 Submittal: #28 3111-01 Fire Alarm dwgs w/approved product data
7853 Interior Lighting-SOTA Painting Studio Lighting 5109546/999021 09/18/2015 10/02/2015 09/22/2015 Specifications: Demo Existing and furnish and install Forty-Five (45) interior pendant flood lights
7852 Mesa Court Expansion 996296 09/16/2015 09/30/2015 09/29/2015 Submittal: 11 4000-001-A Kitchen Equipment Hood Ansul System
7851 Mesa Court Expansion 996296 09/16/2016 09/30/2015 09/29/2015 Other: ASI#11 Fire Alarm Sheets
7850 Mesa Court Expansion 996296 09/16/2015 09/30/2015 09/22/2015 Other: ASI #11 Architectural Sheets (A9.01, A9.02)
7849 UNEX Classroom Building 990003 09/16/2015 09/30/2015 09/29/2015 Submittal: 21 1000-251-Fire Protection Material and equipment
7848 Mesa Court Expansion 996296 09/16/2015 09/30/2015 10/07/2015 RFI: 2042-Head of Wall Engineering Judgements
7847 Mesa Court Expansion 996296 09/15/2015 09/29/2015 09/23/2015 RFI: 1685R1-Diffusers with dampers
7846 UNEX Classroom Building 990003 09/15/2015 09/29/2015 09/29/2015 Submittal: 28 3111-107-1-Preliminary Fire Alarm Device Placement plan & wiring Typ
7845 Mesa Court Expansion 996296 09/15/2015 09/29/2015 09/22/2015 RFI: 1408R2-Elevator Shaft Roof Level Fire Rating
7844 Mesa Court Expansion 996296 09/15/2015 09/29/2015 09/15/2015 Other : FOR RECORD ONLY: ASI #11 (Architectural)
7843 Mesa Court Expansion 996296 09/15/2015 09/29/2015 09/15/2015 Other: FOR RECORD ONLY: ASI#11 (General, Civil, Electrical, Kitchen, Landscape, Mechanical, Plumbing)
7842 Mesa Court Expansion 996296 09/15/2015 09/29/2015 09/24/2015 RFI: 1957 RI -Stair 3 Deluge Sprinkler Coverage Clarification
7841 Mesa Court Expansion 996296 09/15/2015 09/29/2015 09/30/2015 Submittal: 09 8133-002-0-Mechanical Plumbing Acoustical Insulation and Sealants
7840 UNEX Classroom Building 990003 09/15/2015 09/29/2015 09/29/2015 Submittal: 28 3111-114-Digital Addressable fire Alarm system product Data
7839 Mesa Court Expansion 996296 09/15/2015 09/29/2015 09/22/2015 RFI: 2055-Mesa Court Monument Sign with Physical Address
7838 Mesa Court Expansion 996296 09/15/2015 09/29/2015 09/23/2015 Submittal: 21 1000-011-0-Fire Sprinkler Flange Bolt PD
7837 Sprague Hall 5110032 09/08/2015 09/22/2015 09/11/2015 Plans
7836 Install Paneling 5109855 09/14/2015 09/28/2015 09/21/2015 Final Review
7835 Mesa Court Expansion 996296 09/11/2015 09/25/2015   RFI: 2043-Elevator Entrance Wall Type Change
7834 Mesa Court Expansion 996296 09/11/2015 09/25/2015 09/15/2015 RFI: 2022-Elevator Control Room Ventilation
7833 AITR Room 190 Renovation 5109833 09/10/2015 09/24/2015 09/11/2015 Plans
7832 Cal IT IMRI Shell Space & Lab Build-Out 990048 09/09/2015 09/23/2015 09/11/2015 Submittal: #21 0500-001-01 Fire Suppression System Product Data
7831 Door -Code Compliance 99XXX 09/09/2015 09/23/2015 09/15/2015 Other: Drawings & Specs Section
7830 Mesa Court Expansion 996296 09/08/2015 09/22/2015 09/09/2015 Submittal: 09 2116-002 o Gypsum Board Shaft-Wall Assemblies-Face Layer Product
7829 Cal IT IMRI Shell Space & Lab Built-Out 990048 09/08/2015 09/22/2015 09/10/2015 Submittal: #26 2726-001-01 Wiring devices-Hubbell in Floor System
7828 Croul Hall Basement B212 Laboratory Remodeling 51099994 09/08/2015 09/22/2015 09/14/2015 Plans
7827 Rowland Hall Loading Dock Build-Out 5109950 09/08/2015 09/22/2015 09/21/2015 Plans
7826 EG3107 Fume Hood Addition 5109861 09/04/2015 09/18/2015 09/10/2015 Plans
7825 Mesa Court Expansion 996296 09/03/2015 09/17/2015 09/10/2015 RFI: 2006-Rated Wall Termination at Stair 1 and Trash Room Door
7824 UNEX Classroom Building 990003 09/02/2015 09/16/2015 09/02/2015 Other: CP-4 Architectural Drawings
7823 UNEX Classroom Building 990003 09/02/2015 09/16/2015 09/02/2015 Other: CP-5 Bridge Package (For Record Only)
7822 Robert Cohen Theatre and Dance Studios (713) 5109594 09/03/2015 09/17/2015 09/08/2015 Plans, Specifications
7821 Engineering Bike Center 5109898 09/01/2015 09/15/2015 09/08/2015 100% Review, Final Review
7820 Exterior Lighting-Parking Structures 5109000/999023 09/02/2015 09/16/2015 09/08/2015 Specifications
7819 Student Health I 5109877 09/02/2015 09/16/2015 09/09/2015 Plans
7818 ET924 Fume Hood Addition 5109887 09/02/2015 09/16/2015 09/09/2015 Plans
7817 Engineering Gateway 5110007 09/02/2015 09/16/2015 09/10/2015 Plans
7816 Engineering Tower 5109526/997468 09/02/2015 09/16/2015 09/08/2015 Plans
7815 Mesa Court Expansion 996296 09/01/2015 09/15/2015 09/01/2015 Other: ASI# 11 (kitchen Equipment Updates)
7814 Mesa Court Expansion 996296 09/01/2015 09/15/2015 09/01/2015 Other: ASI#11 (architectural Updates)
7813 Mesa Court Expansion 996296 09/01/2015 09/15/2015 09/11/2015 Submittal: 21 1000-010-0-Water-Based Fire Suppression Systems-Fittings
7812 Mesa Court Expansion 996296 09/01/2015 09/15/2015 09/11/2015 Submittal: 06 6416-001-B-3 Form Decorative Polymer Panels
7811 CallT2 OMRI Shell Space and Labs Buildout 990048 09/01/2014 09/15/2015 09/11/2015 Submittal: 28 3111-001-01-Fire Alarm Product Data
7810 Remediate Sycamore Tree Infestation 5109992 09/01/2015 09/15/2015 09/01/2015 Tree Soil injections and spray treatments
7809 UNEX Classroom Building 990003 08/31/2015 09/14/2015 09/10/2015 RFI: 0224-Stair 5 Handrail Extension
7808 Hewitt Hall 5109812 08/31/2015 09/14/2015 09/02/2015 Specifications
7807 Call T2 IMRI Shell Spaces and labs Buildout 990048 08/28/2015 09/11/2015 09/02/2015 Other: 95% Progress Plans
7806 UNEX Classroom Building 990003 08/28/2015 09/11/2015 09/14/2015 RFI: 0231-Rating Separating Between Stair 3 and Coffee House
7805 Mesa Court Expansion 996296 08/28/2015 09/11/2015 09/11/2015 RFI: 1685R1-Diffisers with Dampers
7804 UNEX Classroom Building 990003 08/28/2015 09/11/2015 09/04/2015 RFI:-0228 Construction Use Sandpipe
7803 Mesa Court Expansion 996296 08/27/2015 09/10/2015 09/09/2015 Submittal: 07 8446-001-A-Fire-Resistive Joint Systems Product Data
7802 Mesa Court Expansion 996296 08/27/2015 09/10/2015 09/01/2015 RFI: 1916R1-Engineering Judgement for Edge of deck Firestopping
7801 Bren Events Center 5109528-A 08/27/2015 09/10/2015 09/14/2015 Specifications
7800 MPAA 2nd floor renovation 5109775 08/27/2015 09/10/2015 08/27/2015 Plans
7799 BSL-3 997493 08/26/2015 09/09/2015 09/01/2015 Submittal: #51 Fire Sprinkler NFPA
7798 BSL-3 997493 08/26/2015 09/09/2015 09/01/2015 Submittall: 50# Fire Sprinkler NFPA
7797 Mesa Court Expansion 996296 08/26/2015 09/09/2015 09/01/2015 RFI: 1969 Site and Fire Water Connection to Basement
7796 UNEX Classroom Building 990003 08/25/2015 09/08/2015 09/15/2015 RFI: 0208-Level 4 Balcony Sprinkler Protection
7795 Mesa Court Expansion 996296 08/25/2015 09/08/2015 09/04/2015 RFI-1951-Fire Sprinkler Post Installed Anchor-2 north
7794 Mesa Court Expansion 996296 08/25/2015 09/08/2015 09/01/2015 RFI 1952-Unisttrut Attach to deck insert and wedge anchor detail
7793 Cal IT IMRI Shell Space & Lab Built-out 990048 08/25/2015 09/08/2015 09/01/2015 Submittal #11 53113-002 Lab Fume Hood Product Data
7792 ah STE 510 Renovation , 2015 5110037 08/24/2015 09/07/2015 08/24/2015 Plans
7791 Mesa Court Expansion 996296 08/24/2015 09/07/2015 08/31/2015 RFI: 1935-Added Wall Type P-22B and updated A9.01-A9.02 Sheets with UL listings
7790 Mesa Court Expansion 996296 08/21/2015 09/04/2015 09/10/2015 Submittal: 07 8413-0003-0-Mech Plumb Penetration Fire Stopping
7789 Mesa Court Expansion 996296 08/21/2015 09/04/2015 09/11/2015 RFI: 1980 Steel Angle Penetrating Fire Rated Assembly
7788 UNEX Classroom Building 990003 08/21/2015 09/04/2015 09/11/2015 RFI-0216-Level 5 Balcony Closely Spaces Sprinklers
7787 Mesa Court Expansion 996296 08/21/2015 09/04/2015 08/31/2015 RFI: 1957-Stair 3 Deluge Sprinkler Coverage Clarifications
7786 Mesa Court Expansion 996296 08/21/2015 09/04/2015 09/09/2015 RFI: 1958-Exterior Wall Type Clarifications
7785 Mesa Court Expansion 996296 08/21/2015 09/04/2015 09/09/2015 RFI: 1830-Wall Type P-22 Gauge Clarifications ans missing UL ratings
7784 Student Health I 5109877 08/20/2015 09/03/2015 08/27/2015 Plans
7783 Mesa Court Expansion 996296 08/20/2015 09/03/2015 08/21/2015 RFI: 1935-Added Wall Type P-22B and Updated A9.01-A9.02 sheets with UL listings
7782 Robert Cohen Theatre and Dance Studio (713) 5109594 08/17/2015 08/31/2015 08/20/2015 Plans, Specifications
7781 Mesa Court Expansion 996296 08/13/2015 08/27/2015 08/19/2015 Submittal: 23 3300-002-0- Air Duct Accessories
7780 Mesa Court Expansion 996296 08/13/2015 08/27/2015 08/18/2015 RFI: 1666R1-Grease Duct Shaft Access Doors
7779 Mesa Court Expansion 996296 08/13/2015 08/27/2015 08/25/2015 RFI: 1602_QF100_Overall Food Service Key-Plan
7778 Mesa Court Expansion 996296 08/12/2015 08/26/2015 08/24/2015 RFI: 1936-California Building Code Requirements for indentification of rated walls
7777 CallT2 IMRI Shell Space and Labs Buildout 990048 08/11/2015 08/25/2015 08/11/2015 Other: Design Development Progress Plans
7776 UNEX Classroom Building 990003 08/11/2015 08/25/2015 08/13/2015 Other: CP-4 Architectural Drawings with backcheck
7775 Student Center PXCM Migration Phase 1 5109573 08/10/2015 08/24/2015   Specs, 100% review, approval for contracts
7774 UNEX Classroom Building 990003 08/06/2015 08/20/2015 08/18/2015 Other: CP-4 E sheets resubmittal with backcheck
7773 Mesa Court Expansion 996296 08/06/2015 08/20/2015   Other: FRO:Transmittal, G-sheets & A -sheets
7772 Mesa Court Expansion 996296 08/06/2015 08/20/2015 08/10/2015 RFI: 1916-Engineering Judgement for edge of deck firestopping
7771 UNEX Classroom Building 990003 08/06/2015 08/20/2015 08/19/2015 RFI: 0185-Dimensions for alternating tread stair opening
7770 Banning House Demolition 997104 08/05/2015 08/19/2015 08/05/2015 Other: Fencing and Site Access plan , & Demolition plan for Stamp/sign
7769 Rowland Hall Duct sealing Pilot 5109812 08/05/2015 08/19/2015 08/06/2015 Specifications
7768 Reines Hall EMS system to BACnet compatible PXCM System 5109588 08/05/2015 08/19/2015 08/06/2015 Specifications
7767 natural Sciences I Flood Restoration 5110019 08/05/2015 08/19/2015 08/05/2015 Plans
7766 Middle Earth Replace Kitchen Windows 5109981 08/05/2015 08/19/2015 08/05/2015 Specifications
7765 Mesa Court Expansion 996296 08/04/2015 08/18/2015 08/12/2015 RFI: RFI 161R1 Evacuation Map
7764 Mesa Court Unit III Fire Sprinkler Installation 996261 08/04/2015 08/18/2015 08/04/2015 RFI: 015-Tiger Box Clarification
7763 Mesa Court Unit III Fire Sprinkler Installation 996261 08/03/2015 08/17/2015 08/05/2015 Submittal: 21 1000-04.A Water -Based Fire Suppression System-Gate Valve
7762 Mesa Court Expansion 996296 08/03/2015 08/17/2015 08/10/2015 RFI 1830-Wall Type P22 Gauge Clarifications
7761 Rowland Hall 5109812 08/03/2015 08/17/2015 08/05/2015 Specifications
7760 Aldrich Hall 5109733 08/03/2015 08/17/2015 08/04/2015 Plans
7759 Reines Hall 5109900 08/03/2015 08/17/2015 08/03/2015 Specifications
7758 Mesa Court Expansion 996296 07/31/2015 08/14/2015 08/10/2015 RFI: RFI 1778R-Electrical Room G555 Wall Clarification
7757 Mesa Court Expansion 996296 07/31/2015 08/14/2015 08/10/2015 RFI: RFI 1869 Stair 3 Deluge Frame Fire Rating
7756 SOTA-Renovate Costume Shop/Dance Studio 5109608 07/31/2015 08/14/2015 08/03/2015 Plans
7755 Mesa Court Expansion 996296 07/30/2015 08/13/2015 08/04/2015 RFI: 1337R1 Trash Chutes Fire Rating Detail Through Slab
7754 Mesa Court Expansion 996296 07/30/2015 08/13/2015 08/06/2015 RFI# 1860 Fire Alarm Horn Strobe and Doorbell in Dorm Rooms
7753 Middle Earth Basketball Court 5109991 07/30/2015 08/13/2015 08/05/2015 Plans & Specifications
7752 Mesa Court Expansion 996296 07/30/2015 08/13/2015 08/10/2015 RFI# 1771-Laundry Room Wall Types-Dimensions Clarifications
7751 Beckman Laser Repair AH-1 5109527 07/29/2015 08/12/2015 07/30/2015 Specifications
7750 ET 3rd + 6th Floor renovation 5109526/997468 07/28/2015 08/11/2015 07/29/2015 Plans
7749 Mesa Court Expansiion 996296 07/28/2015 08/11/2015 08/04/2015 RFI: 1890 Retractable Bollard Activation
7748 Mesa Court Expansion 996296 07/28/2015 08/11/2015 08/06/2015 RFI# 1755-Rebar Clearance in Shear wall
7747 UNEX Classroom Building 990003 07/28/2015 08/11/2015 07/31/2015 RFI-0201-Stair 5 Fall Deterence
7746 Interior lighting-Cal-IT 2 lecture Hall 5109546 07/28/2015 08/11/2015 07/30/2015 Specifications
7745 UNEX Classroom Building 990003 07/27/2015 08/10/2015 07/27/2015 Other: CP-4 Architectural Drawings with backcheck
7744 Mesa Court Unit III Fire Sprinkler Installtion 996261 07/27/2015 08/10/2015 07/27/2015 Submittal: 10 4400-01 Fire Protection Specialities _FEC
7743 Mesa Court Unit III Fire Sprinkler Installation 996261 07/24/2015 08/07/2015 07/27/2015 Submittal: 07 8413-03 Penetration Firestopping -Non Metallic Pipe
7742 Mesa Court Expansion 996296 07/24/2015 08/07/2015 07/30/2015 RFI# 1796-LL Shaft 1 Fire Rated Enclosure
7741 Mesa Court Expansion 996296 07/22/2015 08/05/2015 07/27/2015 RFI 1770R1-Fire Alarm in Trash Chutes
7740 Mesa Court Unit III Fire Sprinkler Installation 996261 07/14/2015 07/28/2015 07/21/2015 Submittal: 21 1000.02.B Plans and Calcs
7739 Mesa Court Expansion 996296 07/21/2015 08/04/2015 07/21/2015 Other: Layout for top-off meeting (revision 1)
7738 Reines Hall 5109900 07/20/2015 08/03/2015 07/24/2015 Specifications
7737 ET 3rd +6th Floor renovation 5109526/997468 07/20/2015 08/03/2015 07/24/2015 Plans
7736 Mesa Court Unit III Fire Sprinkler Installation 996261 07/20/2015 08/03/2015 07/23/2015 Submittal: 07 8413-02 Penetration Between Floors
7735 Mesa Court Expansion 996296 07/20/2015 08/03/2015 07/30/2015 RDI: 1799-Angled Exterior Wall at door G554-B Clarification
7734 Mesa Court Unit III Fire Sprinkler Installation 996261 07/17/2015 07/31/2015 07/23/2015 Submittal: 21 1000.04 Water-Based Fire Suppenssion System -Gate Valve
7733 UNEX Classroom Building 990003 07/17/2015 07/31/2015 07/27/2015 Other: CP-A Architectural Drawings with backcheck
7732 Mesa Court Expansion 996296 07/17/2015 07/31/2015 07/21/2015 Other: Lauout for top-off meeting
7731 Mesa Court Unit III Fire Sprinkler Installation 996261 07/16/2015 07/30/2015 07/16/2015 Submittal: 26 7200-03 Fire Detection and Alarm System-Modules at Backflow and risers
7730 Expand H2 Fueling Station 5109642 07/14/2015 07/28/2015 07/16/2015 Final Review
7729 Sep 2015 Computer Science Building MBCx 5109947 07/14/2015 07/28/2015 07/20/2015 Specifications
7728 Mesa Court Expansion 996296 07/14/2015 07/28/2015 07/22/2015 RFI: 1739-P32 Wall vs Shaft Opening
7727 Mesa Court Unit III Fire Sprinkler Installation 996261 07/14/2015 07/28/2014 07/14/2015 Other: Submittal 01 5000.01A Temporary Facilities and Control -Fencing Plan
7726 Mesa Court Unit III Fire Sprinkler Installation 996261 07/14/2015 07/28/2015 07/14/2015 Other: Submittal 26 7200.01 Fire Detection and alarm system-Drawings
7725 Mesa Court Unit III Fire Sprinkler Installation 996261 07/14/2015 07/28/2015 07/14/2015 Other: Submittal 26 5100-01 Lighting
7724 Mesa Court Unit III Fire Sprinkler Installation 996261 07/14/2015 07/28/2015   Submittal: 21 1000.02B plans & Calcs
7723 UNEX Classroom Building 990003 07/10/2015 07/24/2015 07/13/2015 RFI: #0181-Site Fencing plan-Phase 2
7722 SOTA-Renovate Costume Shop/ Dance Studio 5109608 07/09/2015 07/23/2015 07/20/2015 Plans
7721 Mesa Court Unit Fire Sprinkler Installation 996261 07/06/2015 07/20/2015 07/09/2015 RFI 010-Fire Alarm devices wall to ceiling location clarification
7720 Mesa Court Unit III Fire Sprinkler Installation 996261 07/06/2015 07/20/2015 07/13/2015 RFI: 004r1 Fire Sprinkler Pipe entering Dormitory Clarification
7719 UNEX Classroom Building 990003 07/06/2015 07/20/2015 07/13/2015 Submittal: 07 8413-084-2- Penetration fire stopping for electrical
7718 UNEX Classroom Building 990003 06/30/2015 07/14/2015 07/23/2015 Submittal 21 1000-200-Fire Protection Drawings
7717 UNEX Classroom Building 990003 06/30/2015 07/14/2015 07/23/2015 Submittal: 21 1000-199-Fire Protection Calculations
7716 Mesa Court Expansion 996296 06/30/2015 07/14/2015 07/09/2015 RFI: 1771-Laundry Room Wall Types-Dimension Clarifications
7715 ET 3rd & 6th Floor renovation 5109526/997468 06/29/2015 07/13/2015 07/06/2015 Plans
7714 Mesa Court Unit III Fire Sprinkler Installation 996261 06/26/2015 07/10/2015 06/30/2015 RFI 004-Fire Sprinkler Pipe Entering Dormitory Clarification
7713 Mesa Court Unit III Fire Sprinkler Installation 996261 06/26/2015 07/10/2015 06/30/2015 RFI 005-Fire Sprinkler Drop-Escutcheon Rated Assembly Clarification
7712 Mesa Court Expansion 996296 06/25/2015 07/09/2015 07/13/2015 RFI 1599-Fireproofing Requirements for 1.5 inch diameter deck sleeve at roof slab
7711 UNEX Classroom Building 990003 06/25/2015 07/09/2015 07/08/2015 Other: CP-4 Architectural Drawing with backcheck
7710 Mesa Court unit III Fire Sprinkler Installation 996261 06/25/2015 07/09/2015 07/09/2015 Submittal: 21 1000-03 water based fire suppression system-Underground piping product data
7709 Mesa Court Expansion 996296 06/25/2015 07/09/2015 06/30/2015 Submittal: 06 1600-002 Fire Treated Plywood Sheathing Product Data
7708 Mesa Court Expansion 996296 06/24/2015 07/08/2015 07/09/2015 Submittal: 07 8446-002-Fire Resistive Joint Systems
7707 Mesa Court Expansion 996296 06/24/2015 07/08/2015 07/09/2015 Submittal: 21-1000-009 Water Based Fire -Suppression Systems
7706 Resurfacing tennis courts 5109879 06/24/2015 07/08/2015 06/24/2015 Final Review
7705 Arroyo Vista Summer Painting 5109982 06/24/2015 07/08/2015 06/24/2015 Paint interior of 7 buildings, Owner to provide paint
7704 Messa Court Expansion 996296 06/24/2015 07/08/2015 07/13/2015 RFI#1797-Wall Type at lower level Elevator Control RM
7703 Mesa Court Unit III Fire Sprinkler Installation 996261 06/23/2015 07/07/2015 06/25/2015 Submittal: 21 1000.01B Product Data
7702 Mesa Court Expansion 996296 06/23/2015 07/07/2015 06/23/2015 RFI# 1776R1 Lower Level Patio Area of Refugewith backcheck
7701 Mesa Court Expansion 996296 06/22/2015 07/06/2015 07/13/2015 Submittal: 11 4000-001-Kitchen Equipment Hood Ansul System
7700 UNEX Classroom Building 990003 06/22/2015 07/06/2015 06/24/2015 Other: CP-4 Drawings with backcheck
7699 Mesa Court Expansion 996296 06/19/2015 07/01/2015 07/09/2015 RFI 1778 Electrical Room G555 Wall
7698 Mesa Court Expansion 996296 06/19/2015 07/03/2015 06/23/2015 RFI 1744-Wall Type Conflict with FEC Cabinet at Rooms L412 & L419
7697 Mesa Court Unit III Fire Sprinkler Installation 996261 06/19/2015 07/03/2015 06/25/2015 Submittal: 07 8413-01 Penetration Firestopping
7696 Mesa Court Unit III Fire Sprinkler Installation 996261 06/19/2015 07/03/2015 06/25/2015 Submittal: 09 2900-01 Drywall
7695 UNEX Classroom Bldge 990003 06/18/2015 07/02/2015 06/25/2015 Submittal 23 3300-179-0-air duct accessories
7694 Exterior lighting - remaining state funded bldgs 5109000 06/18/2015 07/02/2015 06/22/2015 Specs, final review
7693 UNEX Classroom Bldg 990003 06/18/2015 07/02/2015 07/02/2015 RFI - 0161 - stair 5
7692 Mesa Court Expansion 996296 06/18/2015 07/02/2015 06/18/2015 Other: Fire protection drawings (for your records)
7691 Mesa Court Expansion 996296 06/18/2015 07/02/2015 06/30/2015 FRI 1337R1 Trash chutes fire rating detail through slab
7690 Mesa Court Expansion 996296 06/18/2015 07/02/2015 07/13/2015 RFI 1685 Diffusers w/dampers attached smoke rated
7689 Mesa Court Expansion 996296 06/17/2015 07/01/2015 06/19/2015 RFI# 1778 Electrcial Room G555 Wall
7688 Mesa Court Expansion 996296 06/17/2015 07/01/2015 06/25/2015 RFI#1761 Proset Drain Detail
7687 Hewit Hall Third Floor Electrical and HVAC Modifications 5109908 06/17/2015 07/01/2015 06/23/2015 Plans
7686 CRII 2013 Robert Theatre at Dance Studio (713) 5109594 06/17/2015 07/01/2015 06/23/2015 Install new air handlers for Robert Cohen Theatre and dance Studios
7685 Banning House Demolition 997104 06/16/2015 06/30/2015 06/19/2015 Other: Fencing & Site Access Plan, & Demolition plan w/backcheck
7684 UNEX Classroom Building 990003 06/15/2015 06/29/2015 06/24/2015 UNEX Classroom Building
7683 Expand H2 Fueling Station 5109642 06/15/2015 06/29/2015 06/17/2015 Final Review
7682 UNEX Classroom Building 990003 06/15/2015 06/29/2015 06/23/2015 RFI-0041r1-Level 5 Slab Edge Fire Stopping
7681 Business Unit 2 990500 06/11/2015 06/25/2015 06/25/2015 Submittal: 01 3200-536-Sketches
7680 BSL-3 997493 06/11/2015 06/25/2015 06/18/2015 Submittal:#21.2 Fire Sprinklers
7679 Mesa Court Unit III Fire Sprinkler Installation 996261 06/11/2015 06/25/2015 06/11/2015 Submittal: 01 5000.01A Temporary Facilities and Control-Fencing Plan
7678 HTW Extenmsion,Gross Hall 5109218 06/11/2015 06/25/2015 06/16/2015 Addendum
7677 Mesa Court Expansion 996296 06/09/2015 06/23/2015 06/16/2015 RFI1770 Fire Alarm in Tash Chutes
7676 Mesa Court Unit III Fire Sprinkler Installation 996261 06/09/2015 06/23/2015 06/10/2015 Submittal 21 1000.01 A Product Data - Piping materials, including fittings, connections and specialty fittings
7675 Mesa Court Unit III Fire Sprinkler Installation 996261 06/09/2015 06/23/2015 06/10/2015 Submittal 21 1000.02 A water-based fire suppression system - plans and calcs
7674 Mesa Court Unit III Fire Sprinkler Installation 996261 06/09/2015 06/23/2015 06/16/2015 Submittal: Submittal 26 5100.02 lighting - drawings
7673 SOTA - Renovate Costume Shop/Dance Studio 5109608 06/08/2015 06/22/2015 06/09/2015 Plans, Specs, 100% review, final review, comments & corrections, approval stamp
7672 Reines Hall 3rd floor store front glass 5109900 06/08/2015 06/22/2015 06/09/2015 Plans, 100% review, approval stamp
7671 Valve Controls 5109812 06/08/2015 06/22/2015 06/10/2015 Plans, specs, final review, approval for contracts
7670 Housing Wireless Installation 5109795 06/04/2015 06/18/2015 06/11/2015 Specifications
7669 BSL-3 997493 06/04/2015 06/18/2015 06/08/2015 Submittal: #21 Fire Sprinklers with backcheck
7668 Submittal #49 Fire Alarm Shop Drawings & Product data 997493 06/03/2015 06/17/2015 06/08/2015 Submittal: #49 Fire Alarm Shop Drawings & Product Data
7667 Mesa Court Expnasion 996296 06/03/2015 06/17/2015 06/09/2015 RFI: 1706 FE Cabinet Mounting Height
7666 Mesa Court Expansion 996296 06/03/2015 06/17/2015 06/09/2015 Submittal: 07 8446-001 Fire-Resistive Joint systems product data
7665 Mesa Court Expansion 996296 06/03/2015 06/17/2015 06/09/2015 Submittal: 07 2100-001 Thermal Insulation Product Data
7664 Office Isolation Dampers 5109812 06/03/2015 06/17/2015 06/04/2015 Plans, Specifications
7663 Mesa Court Unit III Fire Sprinkler Installation 996261 06/02/2015 06/16/2015 06/08/2015 Submittal: 26 7200.02 Fire Detection and alarm System-Modules
7662 Mesa Court Unit III Fire Sprinkler Installation 996261 06/02/2015 06/16/2015 06/08/2015 Submittal: 26 72000.01 Fire Detection and Alarm System-Drawings
7661 Student Health II (Building 6) 5109857 06/02/2015 06/16/2015 06/04/2015 Plans
7660 SOTA Renovate Sculpture/Ceramic Studio-Photo lab 275/175 5109432 06/01/2015 06/15/2015 06/10/2015 Modifications to the existing FA System that will ne cohesive with the proposed FA System
7659 Mesa Court Expansiom 996296 06/01/2015 06/15/2015 06/09/2015 Submittal: 10 4400-001 Fire Extinguisher Cabinets and Knox Box
7658 Mesa Court Unit III Fire Sprinkler Installation ` 996261 06/01/2015 06/15/2015 06/02/2015 Submittal: 01 5000.01 Temporary Facilities and control-Fencing Plan
7657 Mesa Court Expansion 996296 06/01/2015 06/15/2015 06/02/2015 RFI:# 1623 Elevator Smoke Doors
7656 Mesa Court Unit III Fire Sprinkler Installation 996261 05/29/2015 06/12/2015 06/08/2015 Submittal: 21 1000.01 Product Data-Piping Materials, Including Fittings, Connections and Specialty Fittings
7655 Mesa Court Unit 3 Fire Sprinkler Upgarde 996261 05/29/2015 06/12/2015 06/08/2015 Other:MCE Fire Access Plan , Submittal: 21 1000.1 Water based Suppression System Product date
7654 Mesa Court III Fire Sprinkler Installation 996261 05/29/2015 06/12/2015 06/08/2015 Submittal: 21 1000.02 Water-Based Fire Suppresion system-Plans and Calcs
7653 Small Cap 14/15 ELF gas monitoring and local exhaust ventilations , PI 5109861 05/27/2015 06/10/2015 05/28/2015 Specifications
7652 SOTA upgrade performance studio 5109835 05/26/2015 06/09/2015 05/28/2015 Plans
7651 Student Center Parking Stairwell Repairs 5109967 05/22/2015 06/05/2015 05/26/2015 Plans
7650 UNEX Classroom Bldg 990003 05/22/2015 06/05/2015 06/08/2015 RFI#136: Card Readers in Starirs 5 & 6
7649 UNEX Classroom Building 990003 05/21/2015 06/04/2015 05/21/2015 RFI: 0124-Knox Box
7648 Mesa Court Expansion 996296 05/20/2015 06/03/2015 05/21/2015 Submittal : ASI#10 (Fire Pretection Single Sheet DWG) with Backcheck
7647 SEP Modulat Upgrades 5109768 05/20/2015 06/03/2015 05/21/2015 Final Review
7646 BSL-3 997493 05/20/2015 06/03/2015 05/21/2015 Submittal: FireStop Penetration Submittal
7645 UNEX Classroom Bldg. 990003 05/19/2015 06/02/2015 06/15/2015 Submittal: #21 1000-141: Fire Protection Material & Equipment Product Data
7644 Mesa Court Expansion 996296 05/19/2015 06/02/2015 05/21/2015 Submittal: ASI #10 (Fire Alarm Dwgs) With backcheck
7643 UNEX Classroom Building 990003 05/19/2015 06/02/2015 05/21/2015 RFI# 0130-Smoke and area detection in fan coil units
7642 UNEX Classroom Building 990003 05/18/2015 06/01/2015 06/21/2015 Other: CP-4 Drawings (Rev. 1 dated 05/14/2015
7641 Mesa Court Expansion 996296 05/14/2015 05/28/2015 05/21/2015 Submittal: ASI#10 (Fire Protection DWGs & Packet) with backcheck
7640 Mesa Court Expansion 996296 05/14/2015 05/28/2015 05/20/2015 Submittal: Smole, or combination Fire Smoke Dampers
7639 Mesa Court Expansion 996296 05/14/2015 05/28/2015 05/18/2015 RFI# 1612R1 Fiber Wrap of Structural Column MD-M-4
7638 BSL-3 997493 05/13/2015 05/27/2015 05/20/2015 RFI# UCI BSL-3 RFI #9 Fire Pad
7637 Student Health II (Building 6) Room 101-111 5109857 05/13/2015 05/27/2015 05/18/2015 Plans
7636 Mesa Court Expansion 996296 05/12/2015 05/26/2015 05/20/2015 Submittal: Fire-Rated Damper
7635 SEP Modular Upgrades 5109768 05/12/2015 05/26/2015 05/18/2015 Final Review
7634 Mesa Court Expansion 996296 05/12/2015 05/26/2015 05/20/2015 Submittal: 21 1000-007 Water-Based Fire Suppression Systems
7633 UNEX Classroom Building 990003 05/12/2015 05/26/2015   Submittal: 26 -0500-084 Common Work Results for electrical and fire preventions. Fire Stopping
7632 Science Library 129A Cooling Unit 5109808 05/12/2015 05/26/2015 05/12/2015 Plans, Specifications
7631 High Bay Lighting Additional Lobbies 5109066 05/11/2015 05/25/2015 05/12/2015 Specifications
7630 BSL-3 997493 05/11/2015 05/25/2015 05/20/2015 Submittal: UCI BSL-3 Submittal #32 Door Interlock
7629 UNEX Classroom Building 990003 05/08/2015 05/22/2015 05/18/2015 RFI# -0123-Shaft Enclosure at the Bottom
7628 UNEX Classroom Building 990003 05/08/2015 05/22/2015 05/18/2015 RFI# 0124-Knox Box
7627 Mesa Court Expansion 996296 05/07/2015 05/21/2015 05/14/2015 RFI# 1246R1-Wall type P22 Clarification
7626 Submittal #40-Monokote 997493 05/08/2015 05/21/2015 05/08/2015 Submittal: #40-Monokote
7625 Mesa Court Expansion 996296 05/07/2015 05/21/2015 05/07/2015 Submittal: Potter Roemer Part Number 4065 Brass Angle Valves
7624 SEL 2014 Vivaria Air Change Reduction 5109812 05/06/2015 05/20/2015 05/12/2015 Specifications
7623 UNEX Classroom Building 990003 05/06/2015 05/20/2015 05/20/2015 Other: CP-4 Drawings
7622 Unex Classroom Building 990003 05/05/2015 05/19/2015 05/20/2015 Other: CP-4 Specs
7621 Mesa Court Expansion 996296 05/05/2015 05/19/2015 05/20/2015 RFI#1676 Lower level Patio Area of refuge
7620 Electrical Drawings Submittal 997493 05/05/2015 05/19/2015 05/12/2015 Submittal: Electrical Drawings Submittal
7619 BSL-3 997493 05/05/2015 05/19/2015 05/06/2015 Other: Fire Alarm Drawings (FA000&FA001) w/backcheck
7618 Primary Electrical Improvement Step-4 990513 05/05/2015 05/19/2015 05/06/2015 Other: Final Code Analysis Report for South Sustation per MTG dated 04/21/15
7617 Mesa Court Expansion 996296 05/04/2015 05/18/2015 05/12/2015 Other: CP-3 Specs w/backcheck
7616 Mesa Court Expansion 996296 05/04/2015 05/18/2015 05/06/2015 Submittal: 11 8226-001 Trashy Chutes
7615 UNEX Classroom Building 990003 04/30/2015 05/14/2015 05/18/2015 Submittal: 07 8413-117 Penetration Firestopping-PRM
7614 Mesa Court Expansion 996296 04/30/2015 05/14/2015 04/30/2015 Other: ASI#8-Misc Sheets
7613 Mesa Court Expansion 996296 04/30/2015 05/14/2015 04/30/2015 Other: ASI #10
7612 Fire Pump Removal 5109289 04/30/2015 05/14/2015 05/14/2015 Final Review
7611 Install Irrigation Communication Cables 5109935 04/30/2015 05/14/2015 05/30/2015 Final Review
7610 UNEX Classroom Building 990003 04/29/2015 05/13/2015   RFI-0112-Waterline at Peltason Testing
7609 Mesa Court Expansion 996296 04/28/2015 05/12/2015 04/30/2015 Submittal: 21 1000-006A-Temp Standpipe Plan
7608 Mesa Court Expansion 996296 04/28/2015 05/12/2015 04/29/2015 Submittal: 21 1000-008-Water based Fire-Suppression System PD
7607 Student Health I 5109877 04/27/2015 05/11/2015 05/04/2015 Plans
7606 Mesa Court Expansion 996296 04/27/2015 05/11/2015 05/12/2015 RFI: RFI 1616 Evacuation Map
7605 Submittal #11 HVAC-Misc 997493 04/27/2015 05/11/2015 05/05/2015 Submittal: #11 HVAC-Misc
7604 Mesa Court Expansion 996296 04/27/2015 05/11/2015 04/30/2015 Submittal: 08 3113-001 Access Doors and Frames combined
7603 BSL#3 997493 04/27/2015 05/11/2015 04/28/2015 Submittal: #31 Fire Extinguisher Cabinet
7602 UNEX Classroom Building 990003 04/27/2015 05/11/2015 05/13/2015 Submittal: 28 3111-114 Digitak Addressable Fire Alarm System Product Data
7601 Mesa Court Expansion 996296 04/27/2015 05/11/2015   Other: ASI #9
7600 BSL-3 997493 04/24/2015 05/08/2015 04/30/2015 Submittal: Fire alarm submittal
7599 UNEX Classroom Building 990003 04/24/2015 05/08/2015   RFI - 0105 Confirm levels of elevator recall
7598 UNEX Classroom Building 990003 04/24/2015 05/08/2015 05/08/2015 RFI-0107 Confirmation of elevator machine room 5401 rating
7597 BSL-3 997493 04/24/2015 05/08/2015   Other: BSL-3 100% CD set RFC
7596 UNEX Classroom Building 990003 04/23/2015 05/07/2015 05/05/2015 Submittal: RFI 094 - Smoke detector in the elevator hoistway
7595 Mesa Court Expansion 996296 04/23/2015 05/07/2015 05/05/2015 RFI: RFI 1612 Fiber wrap of structural column MD/M-4 (MSDS review only)
7594 Mesa Court Expansion 996296 04/23/2015 05/07/2015 04/23/2015 Other: ASI#9
7593 Housing Wireless Installation 5109795 04/23/2015 05/07/2015 04/23/2015 Plans, final review, approval stamp, approval for contracts
7592 Submittal #21 Fire Sprinklers 997493 04/20/2015 05/04/2015 04/30/2015 Submittal: Submittal #21 Fire Sprinklers
7591 UNEX Classroom Building 990003 04/20/2015 05/04/2015 05/13/2015 Submittal: 0107-28 23 00-0- Preliminary Fire Alarm Device Placement plan and wiring
7590 Housing Wireless Installation 5109795 04/20/2015 05/04/2015 04/20/2015 Plans
7589 UCI-CCC Glass Wall and Door Replacement 5109816/205018 04/20/2015 05/04/2015 04/28/2015 Plans
7588 Multiple locations replace fire alarm systems 5109528-A 04/20/2015 05/04/2015 05/04/2015 Specifications
7587 Mesa Court Expansion 996296 04/17/2015 05/01/2015 04/22/2015 RFI#1603 Fire Riser Repair At South tower
7586 Mesa Court Expansion 996296 04/17/2015 05/01/2015 04/28/2015 Submittal: 09 8133-001 Accoustical Ins & Seal
7585 UNEX Classroom Building 990003 04/17/2015 05/01/2015 04/28/2015 Submittal: RFI 092-Relocation on Fire Hydrant on E. Peltason
7584 UNEX Classroom Building 990003 04/17/2015 05/01/2015 04/29/2015 Submittal: RFI 089-Postponed Installation on Fire Hydrant on Adobe Circle
7583 Mesa Court Expansion 996296 04/17/2015 05/01/2015 04/30/2015 Submittal: n07 8413-001A Penetration Firestoping
7582 Mesa Court Expansion 996296 04/16/2015 04/30/2015 04/28/2015 RFI# 1581-Wall Partition Type P-23 Change
7581 Middle Erath -Harrowdale/Balin 5109882 04/15/2015 04/29/2015 04/17/2015 Plans
7580 WBP Freezer 5109685 04/14/2015 04/28/2015 04/17/2015 Plans
7579 Multiple Locations Replace Fire Alarm Systems 5109528-B 04/13/2015 04/27/2015 04/17/2015 Replace the existing fire alarm systems with new fire alarm systems
7578 Ayala Science Library 5109338 04/13/2015 04/27/2015 04/20/2015 Plans
7577 Engineering Tower Exhaust 5109764 04/13/2015 04/27/2015 04/17/2015 Plans
7576 Computer Science 1 5109876 04/13/2015 04/27/2015 04/17/2015 Final Review
7575 UNEX Classroom Building 990003 04/10/2015 04/24/2015 04/30/2015 Submittal: 0047 01 32 00-2- DCFM Submittal
7574 UNEX Classroom Building 990003 04/10/2015 04/24/2015 04/28/2015 Submittal: Supplemental Instruction #2 ( Site Utilities Plan)
7573 Mesa Court Expansion 996296 04/09/2015 04/23/2015 04/29/2015 Submittal: ASI #0 (Fire Protection DWGs & Packet)
7572 Mesa Court Expansion 996296 04/09/2015 04/23/2015 04/29/2015 Submittal: ASI#10 (Fire Alarm DWGs)
7571 BSL3 Training Facility 997493 04/09/2015 04/23/2015 04/21/2015 Submittal: 100% CD Plans
7569 BSL3 Training Facility 997493 04/09/2015 04/23/2015 04/28/2015 Submittal: 100% CD Specifications
7568 Dispatch Center Renovation 5109586/997448 04/09/2015 04/23/2015 04/14/2015 Plans
7567 Student Health II (Building 6) Room 101-111 5109857 04/08/2015 04/22/2015 04/14/2015 Plans
7566 Fire Pump Removal 5109289 04/08/2015 04/22/2015   Final Review
7565 Mesa Court Expansion 996296 04/07/2015 04/21/2015 04/07/2015 Other: Fire Access Plan w/back-check
7564 UNEX Classroom Building 990003 04/06/2015 04/20/2015 04/07/2015 Submittal: G-100B Site Fire Access Plan Phase 2 & Elevations
7563 Mesa Court Expansion 996296 04/03/2015 04/17/2015 04/07/2015 Submittal: 21 1000-006 Temporary Standpipe Plan
7562 UNEX Classroom Building 990003 04/02/2015 04/16/2015 04/02/2015 Other: CP-3A_SI# Foundation & MEP Underground Dwgs
7561 UNEX Classroom Building 990003 04/02/2015 04/16/2015 04/06/2015 Other: CP-2 Site Dermo & Grading : Specifications with backchecks
7560 BSL3 Training Facility 997493 04/02/2015 04/16/2015 04/13/2015 Submittal: Door Interlock Sequence of Operation
7559 Mesa Court Expansion 996296 04/02/2015 04/16/2015 04/07/2015 RFI# 1527 Schedule 40 plumbing Sleeve
7558 Engineering Tower-Small cap Renovation-508-516,616 5109563 04/01/2015 04/15/2015 04/09/2015 Plans, Specifications
7557 UCI-CCC Glass Wall and Door Replacement 5109816/205041 04/01/2015 04/15/2015 04/13/2015 Plans
7556 UNEX Classroom Building 990003 03/31/2015 04/14/2015 04/13/2015 RFI#0071-Elevator Two Way Communication
7555 Mesa Court Expansion 996296 03/31/2015 04/14/2015 04/06/2015 Submittal: 33 11100-007 Mechanical Joint Retainer
7554 Mesa Court Expansion 996296 03/31/2015 04/14/2015 04/07/2015 Submittal: 07 8413-001 Penetration Firestopping
7553 UNEX Classroom Building 990003 03/30/2015 04/13/2015 04/06/2015 Submittal: Submittal; 066-33 1110-Site work distribution -US Pipe gate Valve
7552 Engineering Tower Exhaust 5109764 03/26/2015 04/08/2015 03/31/2015 Plans
7551 MPAA 1st Floor Room Renovation 5109830 03/26/2015 04/09/2015 03/31/2015 Plans
7550 Banning House Demolition 997104 03/25/2015 04/08/2015 03/31/2015 Other: Fencing & Site Access Plan, & Demolition Plan
7549 UNEX Classroom Building 990003 03/25/2015 04/08/2015 04/02/2015 Other: CP-2 Site Demo & Grading:Specifications
7548 Mesa Court Expansion 996296 03/24/2015 04/07/2015   Submittal 33 1110-006A Wet Barrel Fire Hydrant Extension
7547 UNEX Classroom Building 990003 03/24/2015 04/07/2015   CP-2 Site Demo & Grading
7546 MPAA 1st Floor room Renovation 5109830 03/24/2015 04/07/2015 03/26/2015 Plans, Final review, approval stamp
7545 WBP - Install Freezer/Refrigerator 5109685 03/24/2015 04/07/2015 03/26/2015 Plans, 100% review, approval stamp, approval for contracts
7544 5 Bus Stop Pads 5109819/195397 03/24/2015 04/07/2015 03/25/2015 Final Review, Approval stamp, approval of contracts
7543 Resurfacing Courts 5109907 03/24/2015 04/07/2015 03/24/2015 Final review, approval stamp, approval for contracts
7542 Replace Reines Supply Fan Isolation Dampers 5109593 03/24/2015 04/07/2015 03/24/2015 Specs, 100% review, approval for contracts
7541 Central Plant MBCx - Install Tunnel flowmeter 5109422 03/24/2015 04/07/2015 03/24/2015 Specs, Final review, approval for contracts
7540 Remove Sound Attenuators - Nat Sci 1 Efs 5109067 03/24/2015 04/07/2015 03/26/2015 Specs, Final Review, Approval for contracts
7539 Dispatch Center Renovation 5109586/997448 03/23/2015 04/06/2015 03/23/2015 Plans
7538 UNEX Classroom Building 990003 03/20/2015 04/04/2015   RFI#064-Elevator Shaft Smoke detector
7537 UNEX Classroom Building 990003 03/18/2015 04/01/2015   RFI: 050r1-Elevator Requireed as an accessible Means of Egress
7536 UNEX Classroom Building 990003 03/18/2015 04/01/2015 03/19/2015 Submittal: CP-2 Site Demo & Grading
7535 UNEX Classroom Building 990003 03/17/2015 03/31/2015 03/19/2015 Submittal: -0053-33 11 10-0-To UCI-Site Water Distrubution Piping-Fire Water
7534 Mesa Court Expansion 996296 03/16/2015 03/30/2015 04/01/2015 RFI: RFI 1456 W. Stair Window Sprinkler
7533 Multiple Locations fire alarm 5109338 D 03/16/2015 03/30/2015 03/24/2015 Plans
7532 Multiple locations Fire work 5109528 C 03/16/2015 03/30/2015 03/24/2015 Plans and specifications
7531 Engineering tower-small cap renovation-508,516,616 5109563 03/16/2015 03/30/2015 03/24/2015 Plans and specifications
7530 Multiple locations fire alarm 5109528E 03/16/2015 03/30/2015 03/24/2015 Plans
7529 Multiple locations Replace Fire Alarm Systems 5109528-B 03/16/2015 03/30/2015 03/25/2015 Plans and Specifications
7528 Mesa Court Expansion 996296 03/13/2015 03/27/2015 03/19/2015 Other: Revised CP-4 Specs with Backcheck
7527 Room 154/150-Door/Frame Install & Electrical Work 5109923 03/12/2015 03/26/2015 03/13/2015 Plans
7522 Exterior Lighting Upgrade-East Peltason & Pereira Buildings 5109000 03/12/2015 03/26/2015 03/13/2015 Demo and install new LED fixtures abd clean and retrofit existing lamps
7521 Primary Electrical Improvement Step-4 990513 03/11/2015 03/25/2015 03/19/2015 Other: Code Analysis Report for South Substation @ Revised Location w/BC
7520 Mesa Court Expansion 996296 03/11/2015 03/25/2015 03/12/2015 Submittal: Submittal 33 1110-006 West Barrel Fire Hydrant Extension
7519 Mesa Court Expansion 996296 03/11/2015 03/25/2015 03/13/2015 Submittal: 33 1110-005 Fire Hydrant Bury
7518 Mesa Court Expansion 996296 03/10/2015 03/24/2015 03/16/2015 Submittal: 28 3111-001A Digital Addressable Fire Alarm System
7517 First Floor Lab 127/133-Chemical Storage cabinet Cross Ventilation 5109913 03/10/2015 03/24/2015 03/13/2015 Estimate cost of upgarde
7516 CR Roof Replacement 5109728 03/09/2015 03/23/2015 03/23/2015  
7515 Mesa Court Unit III Fire Sprinkler Installation 996261 03/09/2015 03/23/2015 03/19/2015 Submittal: Spec Sec. 01 1000, Mesa Court Map & Fence and lay down Areas Map
7514 Mesa Court Expansion 996296 03/06/2015 03/20/2015   RFI: #1399 Walls of Exist enclosures
7513 Unex Classroom Building 990003 03/06/2015 03/20/2015 04/01/2015 Submittal: G-100B Site Fire Access Plan Phase 2
7512 Mesa Court Expansion 996296 03/06/2015 03/20/2015 03/23/2015 RFI: #1047 South Stair Fire Sprinklers
7511 BSL3 Training Facility 997493 03/06/2015 03/20/2015 03/13/2015 Submittal: 100% CD Plans and Specs
7510 Verano Place Housing Unit 6 5109845 03/05/2015 03/19/2015   Plans
7509 UNEX Classroom Building 990003 03/05/2015 03/19/2015   G-100B Site Fire Access Plan Phase 2
7508 UNEX Classroom Building 990003 03/05/2015 03/19/2015 03/10/2015 Submittal: CP-3A Undergrpund Work
7507 ELF MBCx-Machine Shop Lights 5109331 03/05/2015 03/19/2015 03/06/2015 Specifications
7506 UNEX Classroom Building 990003 03/03/2015 03/17/2015 03/19/2015 Submittal: 0047 01 32 00-0-dcfm Submittal
7505 M.S. 2-Install Walk In Freezer/ Refrigerator 5109685 03/03/2015 03/17/2015 03/10/2015 Updated electrical drawings and new FA drawings and cut sheets
7504 Multiple Locations Replace Fire Alarm Systems 5109528-A 02/27/2015 03/13/2015 03/05/2015 Replace existing Fire Alarm system with new Fire Alarm System
7503 Mesa Court Expansion 996296 02/27/2015 03/13/2015 03/03/2015 RFI#1396_Fire Sprinkler Sleeves thru beam
7502 UNEX Classroom Building 990003 02/26/2015 03/12/2015 03/03/2015 Submittal: CP-3A Underground work-See Tabbed Sheets
7501 UNEX Classroom Building 990003 02/26/2015 03/12/2015 03/12/2015 RFI: 050-Elevator Required As An Accesible Means of Egress
7500 Mesa Court Expansion 996296 02/26/2015 03/12/2015 02/26/2015 Submittal: #07 8413-002_Hilty Putty pad for Knox Box
7499 BSL3 Training Facility 03/13 02/25/2015 03/11/2015 03/13/2015 Submittal:Electrical /Fire Alarm Plans
7498 MPAA 1st floor Room Renovations 5109830 02/25/2015 03/11/2015 03/03/2015 Plans
7497 Engineering Lab Facility 204851 02/25/2015 03/11/2015 03/04/2015 Other: Proofs
7496 Scheiderman Lecture lab 210864 02/25/2015 03/11/2015 03/04/2015 Other: Proofs
7495 Rockwell Engineering Center 204852 02/25/2015 03/11/2015 03/04/2015 Other: Proofs
7494 Drama Building 204850 02/25/2015 03/11/2015 03/04/2015 Other: Proofs
7493 Mesa Court Expansion 996296 02/24/2015 03/10/2015 02/24/2015 Other: Revised CP-4 Specs w/backcheck
7492 BSL3 Traning Facility 997493 02/24/2015 03/10/2015 03/02/2015 Fire Sprinkler system modifications
7491 Engineering Tower Exhaust 5109764 02/24/2015 03/10/2015 02/25/2015 Plans, Specifications
7490 Bioson Monument 5109789 02/24/2015 03/10/2015 02/24/2015 Plans
7489 Room 3242 Renovation 5109864 02/23/2015 03/09/2015 02/25/2015 Plans
7488 Kitchen Rennovation 5109831 02/23/2015 03/09/2015 02/26/2015 Plans
7487 Verano Re-Pipe and Exterior Closets 5109845 02/23/2015 03/09/2015 03/02/2015 Plans
7486 UNEX Classroom Building 990003 02/19/2015 03/05/2015 03/13/2015 RFI: 0004 Sprinkler Requirements at plaster soffits (Revised)
7485 ELF-Repair Basement Cracks 5109615 02/19/2015 03/05/2015 02/19/2015 Final Review
7484 Mesa Court Expansion 996296 02/19/2015 03/05/2015 02/19/2015 Other: ASI #9 Revised F-1.2 Sheet
7483 Mesa Court Expansion 996296 02/19/2015 03/02/2015 02/19/2015 Other: ASI #9 Revised Telecomm Sheet
7482 Mesa Court Expansion 996296 02/17/2015 03/03/2015 02/19/2015 RFI# 1337 Trash Chutes Fire Rating Detail Through Slab
7481 Mesa Court Expansion 996296 02/17/2015 03/03/2015 02/26/2015 RFI# 1394 Reclaim Water and Fire Water Spacing
7480 Mesa Court Expansion Mesa Court Expansion 996296 02/17/2015 03/03/2015 02/19/2015 RFI# 1401-Floor Cleanouts
7478 MPAA 1st floor room renovation 5109830 02/17/2015 03/03/2015 02/20/2015 Plans
7477 Flooring Renovation 5109902 02/17/2015 03/03/2015 02/20/2015 Remove Existing Flooring and install new MMA system
7476 M.S. 2 Room 335-Installation of Walk-in frezzer and refrigerator 5109685 02/17/2015 03/03/2015 02/17/2015 Plans, Specifications
7475 G318 Office Renovation 424187 02/13/2015 02/27/2015 02/20/2015 Student Center-G318 Office Renovation
7474 Multiple Locations Fire Alarm 5109528 C 02/12/2015 02/26/2015 02/20/2015 Plans, Specifications
7473 MultipleLocations Fire Alarm 5109528 E 02/12/2015 02/26/2015 02/20/2015 Plans
7472 Multiple locations fire Alarm 5409338D 02/12/2015 02/26/2015 02/20/2015 Plans
7471 UNEX Classroom Building 990003 02/11/2015 02/25/2015 02/26/2015 RFI: 0041 Level 5 Slab Edge Fire Stop
7470 UNEX Classroom Building 990003 02/11/2015 02/25/2015 02/18/2015 RFI 0004 Sprinkler Requirements at Plaster Soffits
7468 Fire Pump Removal 5109289 02/09/2015 02/23/2015 02/19/2015 Remove piping , Fitting vavales and pumps, install new DCDA pipe/ fitting
7467 UNEX Classroom Building 990003 02/09/2015 02/23/2015 02/19/2015 RFI: 0039 Deletion of door 4628
7464 Expand H2 Fueling Station 5109642 02/05/2015 02/19/2015 02/11/2015 Final Review
7463 Engineering Tower Plaza Planter Covers 5109848 02/05/2015 02/19/2015 02/09/2015 Plans:
7462 Med Surge II pressurized air embalming system 5109872 02/05/2015 02/19/2015 02/19/2015 Plans
7461 MPAA 1st floor room renovation 5109838 02/05/2015 02/19/2015 02/09/2015 Plans
7460 Engineering Bike Center 5109898 02/05/2015 02/19/2015 02/09/2015 Install D&G, bike racks, skateboard racks ect.
7459 INRF Cleanroom Compressed Air Modifications 5109358 02/05/2015 02/19/2015 02/09/2015 Plans, Specifications
7458 Pereria Drive Walkway 5109896 02/04/2015 02/18/2015 02/04/2015 Plans,Specifications
7457 BSL3 Training Facility 997493 02/04/2015 02/18/2015 02/13/2015 Submittal: G Sheets and Demo Package
7455 UNEX Classroom Building 990003 02/04/2015 02/18/2015 03/25/2015 Other: CP-1 Conformed Set
7454 Mesa Court Expansion 996296 02/04/2015 02/18/2015 02/24/2014 RFI# 1352-Elevator Communication
7453 Mesa Court Expansion 996296 02/03/2015 02/17/2015 02/11/2015 RFI: #1304-Middle Tower Stair Enclosure
7452 Med Surge 2 5109685 01/29/2015 02/12/2015 02/02/2015 Specifications:
7451 Sue & Gross Hall-4th Floor TI 994040 01/28/2015 02/11/2015 03/25/2015 Other: Record Drawings
7450 North Campus 5109642 01/28/2015 02/11/2015 02/02/2015 Final Review:
7449 North Campus 5109841 01/28/2015 02/11/2015 02/05/2015 Plans:
7448 Mesa Court Expansion 996296 01/20/2015 02/03/2015 02/20/2015 Other: ASI 8_ Fire Alarm Dwgs
7447 Mesa Court Expansion 996296 01/20/2015 02/03/2015 01/20/2015 Submittal: 28 3111-001 Fire Alarm Product Data
7446 Mesa Court Expansion 996296 01/20/2015 02/03/2015 01/20/2015 Other-Revised CP-4 Dwgs w/backcheck
7445 Mesa Court Expansion 996296 01/20/2015 02/03/2015 01/20/2015 Other: Revised CP-5 Dwgs w/backcheck
7444 Engineering Tower 5109764 01/27/2015 02/10/2015 01/28/2015 Plans, Specifications
7443 Engineering Tower Plaza Plateer Covers 5109848 01/27/2015 02/10/2015 01/28/2015 Plans
7442 UNEX Classroom Building 990003 01/26/2015 02/09/2015 02/04/2015 RFI# 0003R1: Confirmation of Standpipe Hose Connections
7441 Mesa Court Expansion 996296 01/26/2015 02/09/2015 01/29/2015 Other: ASI-8 Signage (EG) Dwgs
7440 Mesa Court Expansion 996296 01/26/2015 02/09/2015 01/27/2015 Other: ASI_8_Revised Food Service Dwgs
7439 Mesa Court Expansion 996296 01/26/2015 02/09/2015 01/26/2015 Other: Sub Request : 26 533 -SR5011 ENT & Deck Boxes
7438 Mesa Court Expasions 996296 01/21/2015 02/04/2015 01/27/2015 Submittal: #11 400-002Custome Waldrof Island Cooking Suite
7437 Mesa Court Expansion 996296 01/21/2015 02/04/2015 01/21/2015 Other: ASI-8_Revised CP3Dwgs w/backcheck reference
7436 Mesa Court Expansion 996296 01/21/2015 02/04/2015 01/21/2015 Other: ASI-8_Revised CP-1 Dwgs w/backcheck reference
7435 Mesa Court Expansion 996296 01/21/2015 02/04/2015 02/02/2015 Other: ASI-8_A/V & Telecomm dwgs
7434 Mesa Court Expansion 996296 01/21/2015 02/04/2015 01/27/2015 Other: ASI_8_Revised Fire Protection Dwgs
7433 Mesa Court Expansion 996296 01/20/2015 02/03/2015 01/27/2015 RFI: #1148RI_Knox box heights
7432 Engineering Campus Exterior Lighting (Phase 2) 5109000 01/20/2015 02/03/2015 01/23/2015 Specifications:
7431 Primary Electrical Improvement Step -4 990513 01/20/2015 02/03/2015 01/28/2015 Other: Schematic Design -South Substation @ Revised Location w/BC
7430 Mesa Court Expansion 996296 01/19/2015 02/02/2015 01/26/2015 Other: Sub Request: 26 533-SR011 ENT & Deck Boxes
7429 Mesa Court Expansion 996296 01/19/2015 02/02/2015 01/27/2015 RFI: 1246_Wall Type P22 Clarification
7428 Reines Hall 5th Floor Storefront 5109839 01/15/2015 01/29/2015 01/23/2015 Plans: Install Storefront glass assembly to isolate an existing gathering area adjascent to the elevator lobby. Fire Life Safety to be performed in house
7427 Mesa Court Expansion 996296 01/15/2015 01/29/2015 01/26/2015 Other: Substitution Request : 21 1000-SR002_ Bull Moses tube
7426 Mesa Court Expansion 996296 01/15/2015 01/29/2015 01/26/2015 Other: Sub Request: 21 1000-SR003 FppI Glove Valves/3way valves
7425 Mesa Court Expansion 996296 01/15/2015 01/29/2015 01/26/2015 Other: Substitution Request: 21 1000-SR004 Milwaukee Ball-Valves
7424 Mesa Court Expansion 996296 01/15/2015 01/29/2015 01/28/2015 Other: Substitution Request: 22 4000-SR004 ProSet T-Rite
7423 Multiple Locations Fire Alarm 5109528 C 01/14/2015 01/28/2015 01/22/2015 Plans, Specifications
7422 Multiple Locations Fire Alarm 5109338D 01/14/2015 01/28/2015 01/22/2015 Plans
7421 Engineering Campus Exterior Lighting Phase 3 5109000 01/14/2015 01/28/2015 01/15/2015 Specifications
7420 High Bay -Engineering Gateway Lobby 5109000 01/14/2015 01/28/2015 01/15/2015 Specifications
7419 Interior Lighting-LED Light Bar Retrofit 5109546 01/14/2015 01/28/2015 01/15/2015 Specifications
7418 Student Center Chilled Water coil Replacement Phase I 5109573 01/13/2015 01/27/2015 01/15/2015 plans and specifications
7417 Student Center Chilled Water Coil Replacement Phase I 5109573 01/13/2015 01/27/2015 01/15/2015 Plans, Specifications
7416 Phoenix Grill Repace Kitchen Exhaust Fans 5109786 01/13/2015 01/27/2015 01/13/2015 Replace 2 exhaust fans on roof
7411 Croul Hall 1226 Fumme Hood Installation 5109847 01/12/2015 01/26/2015 01/15/2015 Plans,Specifications, Addendum
7410 Mesa Court Expansion 996296 01/12/2015 01/26/2015 01/16/2015 Submittal: FP Package with backcheck
7409 Mesa Court Expansion 996296 01/08/2015 01/22/2015   RFI: RFI 1224 Exposed Fire Sprinkler in Great Rooms
7408 Unex Classroom Building 990003 01/08/2015 01/22/2015 01/16/2015 RFI: RFI 0015 Access to parking lot 20
7407 Mesa Court Expansion 996296 01/08/2015 01/22/2015 01/08/2015 Submittal: Sanitary Waste piping and specialties for info only
7406 Mesa Court Expansion 996296 01/07/2015 01/21/2015 03/03/2015 Other: MCE Fire Access Plan
7405 Expand H2 Fueling Station 5109642 01/06/2015 01/20/2015 01/14/2015 Fianal Review
7404 Public Services 5109528C 01/06/2015 01/20/2015 01/15/2015 Plans
7403 Engineering Tower Exhaust 5109764 01/05/2015 01/19/2015 01/08/2015 plans
7402 Multipurpose Academic and Administration (MPAA) building 5109830 01/05/2015 01/19/2015 01/07/2015 Plans
7401 Mesa Court Expansion 996296 01/02/2015 01/16/2015 01/13/2015 Other: Food Service Dwgs w/backcheck
7400 Mesa Court Expansion 996296 01/02/2015 01/16/2015 01/13/2015 Submittal: Fire Alarm Dwgs w/backcheck
7399 Mesa Court Expansion 996296 01/02/2015 01/16/2015 01/20/2015 Submittal: Fire Protection Dwgs & Product data, Calcs w/backcheck
7398 UNEX Classroom Bldg 990003 12/22/2014 01/05/2014 01/16/2015 RFI: #008: Lvl North Stair Raiting w/backcheck RFI #001
7397 Unex Classroom Bldg 990003 12/22/2014 01/05/2015 01/13/2015 RFI: #007:Elevator Lobby not required at Lvl 1, and 2
7396 Mesa Commons Temp Dining null 12/22/2014 01/05/2015 12/23/2014 Revision #1 New Vulcan Char Broler
7395 Mesa Court Expansion 996296 12/19/2014 01/02/2015 12/19/2014 Other: G-Sheets
7394 Med Surge 2 Room 335-Install Walk-in freezer/refrigerator 5109685 12/18/2014 01/01/2015 12/23/2014 Final Review
7393 MPAA 2nd Floor Renovations 5109775/201865 12/18/2014 01/01/2015 12/18/2014 Plans
7392 UNEX Classroom Building 990003 12/17/2014 12/31/2015 01/08/2015 Other: CP-1 Driveway Construction Package Specs
7391 Unex 990003 12/16/2014 12/30/2014 12/16/2014 Other: CP-1 Driveway Construction Package
7390 Renovate Room 256 5109651 12/11/2014 12/25/2014 12/16/2014 Specifications:
7389 Mesa/Lot 5 null 12/10/2014 12/24/2014 12/16/2014 Add new Charbroiler
7388 UNEX Classroom Building 990003 12/10/2014 12/24/2014 12/23/2014 RFI#RFI 0004 Café Wall Rating
7387 Mesa Court Expansion 996296 12/09/2014 12/23/2014   Other: Conformed CP-3 Dwgs for Records Only
7386 UNEX Classroom Bldg. 990003 12/08/2014 12/22/2014 12/09/2014 Other: Site Fire access Plan-G-100A (2 copies)
7385 Theatre Exterior Lighting 5109000 12/05/2014 12/19/2014 12/09/2014 Specifications
7384 Mesa Court Expansion 996296 12/05/2014 12/19/2014 12/09/2014 Other: Cp-4 Revised G-Sheets w/backcheck
7383 UNEX Classroom Building 990003 12/05/2014 12/19/2014 03/13/2015 RFI: 0004 Sprinkler Requiremnets at Plaster Soffits
7382 UNEX Classroom Building 990003 12/02/2014 12/16/2014 12/11/2014 Other: CP-1 Driveway Construction Package
7381 UNEX Classroom Building 990003 12/02/2014 12/16/2014 12/19/2014 Other: Design Development Package
7380 Mesa Court Expansion 996296 11/25/2014 12/09/2014 12/11/2014 Submittal: #28 3111-001_Fire Alarm Dwgs w/backcheck
7379 Mesa Coourt Expansion 996296 11/25/2014 12/09/2014 11/26/2014 Other: Temporary Fence re-route plan
7378 UNEX Classroom Bldg 990003 11/25/2014 12/09/2014 12/11/2014 RFI: #0003: Confirmation of Standpipe Hose Connections
7377 Mesa Court Expansion 996296 11/24/2014 12/08/2014 12/02/2014 Submittal# 21 1000-002_Fire Sprinkler Seismic
7376 UNEX Classroom Bldg. 990003 11/24/2014 12/08/2014 12/05/2014 RFI: #0001:Level 3 North Stair Rating
7375 Mesa Court Expansion 996296 11/21/2014 12/05/2014 12/11/2014 Other: CP#4-Revised M & P dwgs dated 11/13/2014
7374 Mesa Court Expansion 996296 11/21/2014 12/05/2014 12/03/2014 Other: CP #5-Revised dwgs dated 11/20/2014 (Ref EH&S #7351)
7373 Mesa Court Expansion 992696 11/21/2014 12/05/2014 12/05/2014 Other: CP-4dated 10/28/2014 w/backcheck #7342
7372 Mesa Court Expansion 996296 11/21/2014 12/05/2014 12/05/2014 Other: ASI#4 dated 11/18/2014 for civil , Arch & Struct. Revisions
7371 Mesa Court Expansion 996296 11/21/2014 12/05/2014 11/21/2014 Other: ASI#7 dated 11/17/2014 for civil, & MEP revisions
7370 MPAA 2nd Floor Renovation 5109775/201865 11/19/2014 12/03/2014 12/02/2014 Plans
7369 Mesa Court Expansion 996296 11/19/2014 12/03/2014 11/19/2014 Other: CP-2_Structire Specs for sign/stamp
7368 Croul Hall 7260R15KML 11/17/2014 12/01/2014 11/19/2014 Plans
7366 Croul Hall 1226 Prime Hood installation 5109847 11/14/2014 11/28/2014 11/24/2014 Plans
7365 AH Room 510 Renovations 5109829 11/13/2014 11/27/2014 11/14/2014 Plans
7364 Starbucks 13008 11/12/2014 11/26/2014 11/12/2014 Field Revisions -Starbucks
7363 Replace Sprinkler Heads 5109289 11/12/2014 11/26/2014 11/13/2014 Specifications
7362 Business Unit 2 990500 11/10/2014 11/24/2014   other: G-104_Fire Access Plan Sheets for records
7361 Mesa Court Expansion 996296 11/10/2014 11/24/2014 12/03/2014 Other: CP-4_MEP & Arch Specs for sign /Stamp
7359 SSPS,MPS,SCPS 5109281 11/06/2014 11/20/2014 11/13/2014 Plans, EH&S Redlines
7358 Business Unit 2 990500 11/06/2014 11/20/2014 11/07/2014 Other: Fire Access Plans per SI#12
7357 Mesa Court Expansion 996296 11/06/2014 11/20/2014 11/21/2014 Other: CP-3_Specs for sign /Stamp
7356 Business Unit 2 990500 11/04/2014 11/18/2014 11/21/2014 RFI# 1499_revised FP dwgs per RFI 1492 review
7355 Primary Electrical Improvement Step-4 990513 11/04/2014 11/18/2014 11/21/2014 Other: Schematic Design for South-Substation & Ductbank route to East-Substation
7354 Mesa Court Expansion 996296 11/04/2014 11/18/2014 01/26/2015 Other: Summary and discussion notes for Fire Alarm System Design
7353 Mesa Court Expansion 996296 11/04/2014 11/18/2014 12/11/2014 Other: 100% CD Fire Protection, Life Safety , Building Code Compliance Report
7352 Mesa Arts Building -Room 300 5109582 10/27/2014 11/10/2014 10/27/2014 Plans
7351 Mesa Court Expansion 996296 10/27/2014 11/10/2014 12/11/2014 Other: CP-5_Finishes dwgs for review
7350 Mesa Court Expansion 996296 10/27/2014 11/10/2014 10/27/2014 Submittal: #33 1110-004_Stainless Steel Fire Riser Product
7349 Engineering Tower Roof AT&T Cell Site 5109759 10/22/2014 11/05/2014 10/27/2014 Plans
7348 Verano Parking lot lighting lots 20-25 5109760 10/22/2014 11/05/2014 10/23/2014 Plans
7347 Facility office buildout on 3rd floor Not Determined Yet 10/21/2014 11/04/2014 10/28/2014 Plans
7346 CRII 2013-Plumbing repairs multiple buildings 5109729 10/15/2014 10/29/2014 10/21/2014 Repair sewer pipe at back of Rowland Hall
7345 Mesa Court Expansion 996296 10/15/2014 10/29/2014 12/02/2014 Submittal: #21 1110-001_Fire Protection Material, Calcs & Dwgs
7344 Mesa Court Expansion 996296 10/15/2014 10/29/2014 11/21/2014 Other: Revised CP-4-ARCH & MEP w/backcheck
7343 EH1120 Exhaust Modifications 5109534 10/10/2014 10/24/2014 10/14/2014 Convert Plenum Return and decuted return
7342 Mesa Court Expansion 996296 10/09/2014 10/23/2014   Other: Revised CP-4 Arch & MEP Ref. EHS#7319 for backcheck
7341 Au Bon Pain and Starbucks 990500 10/09/2014 10/23/2014 10/23/2014 Fire Alarm Plans-Revision #2
7340 Business Unit 2 990500 10/08/2014 10/22/2014 10/21/2014 RFI# 1472_Loading Dock Egress Lighting
7339 Business Unit 2 990500 10/08/2014 10/22/2014 10/21/2014 RFI#1492_Proposed Modifications to comply EN11-78
7338 Replace Sprinkler Heads 5109289 10/08/2014 10/22/2014 10/10/2014 Remove and Replace Sprinkler Heads
7337 Starbucks 13008 10/08/2014 10/22/2014 10/23/2014 Drawings-for Starbucks at UCI Paul Merage Business unit 2 from Mark Keller
7336 ARC HVAC Controls Upgrade 5109430 10/02/2014 10/16/2014 10/10/2014 Specification
7335 Student Health Center Renovation and Dental Clinic 990010 10/02/2014 10/16/2014 10/09/2014 Other: Abatement Work Plan -Student Health Center Room 177
7334 Mesa Office and Parking Structure Replavce Transformer and Switchgera 5109498 10/01/2014 10/15/2014 10/01/2014 Replace Transformer and Main Switchboard
7333 EH1120 Exhaust Modification 5109534 10/01/2014 10/15/2014 10/03/2014 Plans:
7332 Replace Sprinkler Heads 5109289 10/01/2014 10/15/2014 10/06/2014 Remove and replace Sprinkler Heads
7331 F. Reines Hall null 10/01/2014 10/15/2014 10/03/2014 Install 2hr Rated door assembly berween Chen Wing and elevator lobby
7330 HVAC control Energy Rertofit-GSB outside Air Dampers 5109293/999029 09/26/2014 10/10/2014 09/30/2014 Remove existing dumpsters and replace with new
7329 Business Unit 2 990500 09/23/2014 10/07/2014 10/07/2014 RFI#1303.002_Redundant Knox box at door #0001
7328 Student Health Cebter Renovation and Dental Clinic 990010 09/23/2014 10/07/2014 10/09/2014 Other:Abatement work plan-Student Health Center Room #177
7327 2014 5 Year Fire Sprinkler Certifications 5109605 09/19/2014 10/03/2014 09/19/2014 Install Fire Sprinkler head in alchil storage bunker
7326 Au Bon Pain & Starbucks-UCI Paul Merage Business Unit 2 990500 09/22/2010 10/06/2014 09/24/2014 Fire Alarm Plan Au Bon Pain & Starbucks
7325 Mesa Court Expansion 996296 09/19/2014 10/03/2014 09/26/2014 Other: Revised CP-3- Skin Pkg w/backcheck for stamp/sign
7324 SSPS-Paking Structure Solar Canopies 5109281 09/18/2014 10/02/2014   Parking Structure Solar Canopies
7323 Engineering Tower Floors 5 and 6 lab suite Renovation 5109563 09/18/2014 10/02/2014 09/30/2014 See Attached Project Manager Review Log
7322 Business Unit 2 990500 09/18/2014 10/02/2014 10/07/2014 Other: Revised S1-12 w/ backcheck
7321 Au Bon Pain UCI Paul Merage Business Unit 2 LS-0611 09/18/2014 10/02/2014   Fire Spinkler TI Plans-Revised Per plan check comments
7320 Starbucks LS-0623 09/18/2014 10/02/2014 10/07/2014 Fire Sprinkler T.I Plans-Revised per plan check comments
7319 Mesa Court Expansion 996296 09/17/2014 10/01/2014 10/09/2014 Other:100% DP-4_Arch & MEO for Review
7318 Install Electrci Charging Stations 5109585 09/16/2014 09/30/2014 09/17/2014 Provide and install three (3) dual port Charging stations
7317 Small Cap 2011-Engineering Gateway-Re-Roof 5108907 09/16/2014 09/30/2014 09/16/2014 Add steel ramp at cast roof
7316 GHEI Parking Lot 5109617 09/16/2014 09/30/2014 09/23/2014 Construct new Parking lot
7315 Studios Exterior Lighting 5109000 09/15/2014 09/29/2014 09/16/2014 LED Exterior lighting upgrade
7314 Art Gallery Ext. Lighting 5109000 09/15/2014 09/29/2014 09/16/2014 LED Exterior Lighting Upgrade
7313 Interior Lighting -Obsolete Light Erradication 5109546 09/15/2014 09/29/2014 09/15/2014 Remove and replace obsolete T-12 and U Fluroscent Lights
7312 Business Unit 2 990500 09/15/2014 09/29/2014 09/18/2014 RFI#1489-Response to EN11-61-Regarding flow Switch check valve and test connection
7311 Business Unit 2 990500 09/15/2014 09/29/2014 09/18/2014 RFI#1488-Response to EN11-61 Regarding Main Drain Test
7310 Business Unit 2 990500 09/15/2014 09/29/2014 09/18/2014 RFI# 1485 Manifold Enclosure Rating
7309 Business Unit 2 990500 09/15/2014 09/29/2014 09/18/2014 RFI# 1490 EN11-61_Main Drain Capacity
7308 Mesa Court Expansion 996296 09/12/2014 09/26/2014   Other: Conformed CP-2-Structure Dwgs-FRO
7307 Mesa Court Expansion 996296 09/12/2014 09/26/2014   Other: Conformed CP-1-Demo & Utilities Dwgs-FRO
7306 Mesa Court Expansion 996296 09/12/2014 09/26/2014 09/18/2014 RFI#1009 Response _Security Gate Elect. Route-FRO
7305 Social Sciences Lab & Tower Bldg Repair 990009 09/12/2014 09/26/2014 10/06/2014 Other: Existing Evacuation plans-SS tower & lab during repair
7304 Mesa Court Expansion 996296 09/12/2014 09/26/2014 10/06/2014 RFI# 1008 Concrete /Rebar Installation for fire lane expansion
7303 Repair Twisted Beam 5109725 09/11/2014 09/25/2014 09/16/2014 Provide Structucal Support to the Scope Board
7302 Refurbish Concrete Pad 5109741 09/11/2014 09/25/2014 09/16/2014 Refurbish Pad to replace the LN2 tank with new tank
7301 School Business IR-990500 09/10/2014 09/24/2014 09/22/2014 Evaluation maps
7300 Mesa Court Expansion 996296 09/09/2014 09/23/2014 09/23/2014 Other: Package 4_interior -75% progress
7299 Business Unit 2 990500 09/09/2014 09/23/2014 09/22/2014 RFI#1479-Sprinkler Spacing on Lvl 2 at GSM per EN11-60
7298 Install electric Charging Stations 5109585 09/05/2014 09/19/2014 09/15/2014 Provide and install three (3) dual port Charging Stations
7297 Parking Structure Solar Canopies 5109281 09/04/2014 09/18/2014 09/15/2014 Parking Structure Solar Canopies
7296 H2 Tank 5108636 09/04/2014 09/18/2014 09/15/2014 Site Work to receive bulk hydrogen
7295 Business Unit 2 990500 09/04/2014 09/18/2014 09/10/2014 RFI:#1445 East Egress Per EN-11 #50
7294 Business Unit 2 990500 09/04/2014 09/18/2014 09/18/2014 RFI: #1476 Knox box keys close-out requirement
7293 Engineering Hall III 5109534 09/03/2014 09/17/2014 09/09/2014 Convert Plenum Return to ducted return
7292 Photo Lab Renovations - Sculpture Studio 5109432 09/02/2014 09/16/2014   Plans, specs, 100% review, comments & corrections, approval stamp
7291 Parking Lot 6956 - Install planters, landscape/walkways 5109769 09/02/2014 09/16/2014 09/04/2014 Plans , Final Review
7290 SSPS SW Corner Tendon is Protruding from wall 5109776 09/02/2014 09/16/2014 09/04/2014 Specifications, 100% review, Comments & Corrections, Approval Stamp
7289 Gavin Herbert Eye Institute Parking lot 5109617 09/02/2014 09/16/2014 09/04/2014 Plans, 100% review, Final review
7288 Mesa Court Expansion 996296 08/27/2014 09/10/2014 08/29/2014 Other: Package 2_Structure -Assorted Sheets
7287 Starbucks UCI Paul Merage Business Unit 2 LS-0623 08/27/2014 09/10/2014 08/27/2014 Fire Sprinkler T.I. Plans
7286 Au Bon Pain & Starbucks UCI Paul Merage Bussiness Unit 2 990500 08/27/2014 09/10/2014 08/27/2014 Fire Alarm Plan Au Bon Pain & Starbucks
7285 Mesa Court 996296 08/26/2014 09/09/2014   Submittal: Plan review comments spot and dots only
7284 Install Preheat Coils-Med Sci A 5109655 08/26/2014 09/09/2014 08/27/2014 Install Preheat Coils-Med Sci A
7283 Student Center Parking Structure q 5109755 08/26/2014 09/09/2014 08/27/2014 Repair Ceiling Cracks and Spalling
7282 Bussiness Unit 2 990500 08/25/2014 09/08/2014 09/09/2014 Other: Food Service Are-Fire Protection Plans & Material
7281 Business Unit 2 990500 08/25/2014 09/08/2014 09/08/2014 Other: Food Service Area -Fire Alarm Dwgs
7280 Au Bon Pain 13008 08/22/2014 09/05/2014 08/22/2014 Au Bon Pain UCI Paul Merage Business Unit 2
7279 Starbucks 13008 08/22/2014 09/05/2014 08/22/2014 Revision Drawings: Tenant Improvement UCI Pail Merage Business Unit 2
7278 Phoenix Grill 5109722 08/21/2014 09/04/2014 08/22/2014 Install new 10 ton a/c package unit and 2 filtered supply fans. Existing duct detector to be removed and re-installed
7277 Fire Alarm System Replacement 5109365 08/21/2014 09/04/2014 08/27/2014 New Simplex FA system install
7276 Mesa Parking Structure 5109631 08/20/2014 09/03/2014 08/22/2014 Prepare and paint stucco wall on north side of parking structure
7275 Bussiness Unit 2 990500 08/19/2014 09/02/2014 09/03/2014 Other: SI-12 for review and sign/stamp
7274 Mesa Court Expansion 996296 08/19/2014 09/02/2014 09/08/2014 Other: DP-3 Skin Package
7273 ELF MBC's-Chilled Water Coil Replacement 5109331 08/18/2014 09/01/2014 08/19/2014 Replaced chilled water coils at ELF's AH-1 and AH-2
7272 Mesa Arts Building Room #0300 5109582 08/18/2014 09/01/2014 08/22/2014 Installation of new Tri-pod structure at roof level multip purpose office building. Work shall also include new electrical and telcom services to the proposed Verizon wireless equipment
7271 Au Bon Pain UCI Merage Business Unit 2 13008 08/13/2014 08/27/2014 08/18/2014 Interior Tenant Improvement Au Bon Pain UCI Paul Merage Business Unit 2
7270 Aldrich Hall -Develop Three Wireless Facilities Room B027 5109580 08/12/2014 08/26/2014 08/13/2014 Reference Project Manager Review Log
7269 Engineering Tower 5109563 08/12/2014 08/26/2014 08/20/2014 See Attached Project Manager Review Log
7268 Small Cap 13/14-Renovate Constume Shop 5109608 08/12/2014 08/26/2014 08/13/2014 See Attached Project Management Review Log
7267 Lot 36_Landscape and curb improvement 5109762 08/08/2014 08/22/2014 08/12/2014 Remove 2,000sf of paving and 170 lf of curb. Install new curb, 2 trees and shrubs to match existing layout, irrigation and irrigation clock
7266 Aldrich Hall Security Windows 5109600 08/08/2014 08/22/2014 08/12/2014 ReConstruct Counselling tables per design drawings to improve security
7265 GHEI Parking Lot 5109617 08/08/2014 08/22/2014 08/13/2014 Construct new parking lot
7263 Crawford Hall Plaza 997405 08/07/2014 08/21/2014 08/07/2014 Other: East Court Plaza Photometric dwgs
7262 Starbucks Revision #2 13008 08/06/2014 08/20/2014   UCI Paul Merage Business Unit 2
7261 Verano Place Replace Parking Lot 20 5109761 08/06/2014 08/20/2014 08/06/2014 Remove asphalt and base to a depth of 10" install 6" of new base and 4" of new asphalt. Re-stripe per existing layout
7260 Aldrich Hall 5109651 08/06/2014 08/20/2014 08/08/2014 Construct new wall, Electrical , HVAC duct relocation , data , fire alarm
7259 Chris Seals 996296 08/06/2014 08/20/2014 09/18/2014 Other: Roof Plans For Safety Review
7258 Mesa Temp Dine-Utilities 996296 08/06/2014 08/20/2014 08/19/2014 Other: Specifications for Stamp/Sign
7257 Mesa CT Expansion 996296 08/06/2014 08/20/2014 08/19/2014 Submittal# 01 5000-004_Electrical Shut Down MOP & Utility Re-Route
7256 Business Unit 2 990500 08/06/2014 08/20/2014 08/14/2014 Submittal:#07 8413-469_Shower Drain Firestop
7255 Business Unit 2 990500 08/06/2014 08/20/2014 08/29/2014 Other: Revised SI-11 for sign /stamp
7254 Au Bo Pain UCI Paul Merage Business Unit 2 LS-0611 08/06/2014 08/20/2014 09/03/2014 Fire Sprinkler T.I. Plans
7253 Social Sciences Pod B Emergency Repair-Undergropund Fire Line . Partial Demolition and Modification 5109289 08/05/2014 08/19/2014 08/08/2014 Partial demolition and modification of existing Fire Pump Station-See Drawings
7252 Mesa Office and Parking Structures replace trasformer and switchgear 5109498 08/05/2014 08/19/2014 08/05/2014 Replace Transformer and Main Switchboard
7251 Flooring Renovation 5109770 08/04/2014 08/18/2014 08/18/2014 Remove and replace Flooring
7250 Business Unit 2 990500 08/04/2014 08/18/2014 08/06/2014 RFI# 1447.001_EN11 #46-Sprinkler Window Mullion
7249 Business Unit 2 990500 08/04/2014 08/14/2014 08/14/2014 RFI# 1391_Stair 1 Fire Raiting
7248 Aldrich Hall 5109580 08/04/2014 08/18/2014   Reference Project Manager Review Log
7247 Mesa Court Expansion Temp ODFA Fire Access plan 994040 08/04/2014 08/18/2014 08/08/2014 Other: Gross Hall 4th Floor Certificate of Substantial Completion
7246 Mesa CT Expansion 996296 07/31/2014 08/14/2014 08/07/2014 Other: Early Start & late start site access Plan-Fire
7245 CNLM Lab 203 & 205 Renovation 5109571 07/30/2014 08/13/2014 08/05/2014 Lab Renovation
7244 EH1120 Exhaust Modifications 5109534 07/30/2014 08/13/2014 08/07/2014 Convert Plenum return to ducted return
7243 Mesa CT Expansion 996296 07/29/2014 08/12/2014 07/29/2014 Other: SI# 1 for CP-1 Package w/ narrative
7242 Engineering Gateway 5108636 07/29/2014 08/12/2014 08/07/2014 Final Review, approval stamp, aproval for contacts
7241 Mesa Court Expansion Temp OCFA Temp Access Plan 996296 07/28/2014 08/11/2014 11/07/2014 Submittal: MCE Temp OCFA Fire Access Plan
7240 Mesa CT Expansion 996296 07/28/2014 08/11/2014 08/07/2014 Submittal: #02 4116-001_Struct Demo Work Plan & AQMD Notifications
7239 Mesa Expansion 996296 07/25/2014 08/08/2014   Submittal: #01 5000-003_Construction Fire Access plan
7238 Mesa CT Expansion 996296 07/25/2014 08/08/2014 07/28/2014 Other: MOP _Mesa Common Power Shut Down work plan
7237 Business Unit 2 990500 07/25/2014 08/08/2014 08/13/2014 RFI: #1411.001 Smoke detector at top of Elevator shaft w/backcheck
7236 Business Unit 2 990500 07/25/2014 08/08/2014 07/30/2014 Submittal: #07 8413-456_Fire Stopping (Superior Wall Systems)
7235 PH SE-2 Lab utility Room Renovation 5109586 07/25/2014 08/08/2014 07/30/2014 TI-Utility Room Renovation
7234 SC AV Consilidation 5109113 07/25/2014 08/08/2014 07/29/2014 AV System Upgrade -Student Center
7233 INRF Cleanroom Compressed Air Modification 5109358 07/25/2014 08/08/2014 07/30/2014 Install New Air Compressors, dryer, storage Tank
7232 Business Unit 2 990500 07/24/2014 08/07/2014 07/30/2014 Submittal: #26 3213-446_Engine Generators-Start-up and testing
7231 Business Unit 2 990500 07/24/2014 08/07/2014 07/29/2014 RFI# #1447_EN-11 # 46_Sprinkler Window Mullion
7230 Business Unit 2 990500 07/24/2014 08/07/2014 08/06/2014 Submittal #21 0500-443.1_GSM Water Curtain Dwgs. & FP Calcs
7229 Parking Structures Solar Canopies 5109281 07/23/2014 08/06/2014 07/23/2014 Parking Sturctures solar canopies
7228 Crawford Gym 5109641 07/22/2014 08/05/2014 07/24/2014 Furnish and Intall fabric accoustical panels
7227 Mesa CT Expansion 996296 07/22/2014 08/05/2014 07/28/2014 Submittal: #33 1110-001_Site Water Distribution Product Data
7226 Mesa CT Expansion 996296 07/22/2014 08/05/2014 07/28/2014 RFI:#1000_temp . Water Re-Route
7225 ELF MBCx-Pony Air Compressor 5109331 07/21/2014 08/04/2014 07/23/2014 Install top-off air compressor outside of ELF to maintain process tank level
7224 Mesa Court Expansion 996296 07/18/2014 08/01/2014 07/28/2014 RFI:Temp Water Tie-in
7223 Business Unit 2 990500 07/18/2014 08/01/2014 07/24/2014 RFI: #1439_Level 3-Stair3 Smoke Cooling Shutter
7222 Medical Education Ultrasound Teaching Facility 994640 07/18/2014 08/01/2014 07/18/2014 Other: Egress Letter
7221 Starbucks Revision #1 13008 07/18/2014 08/01/2014   Starbucks Revision
7220 Mesa CT Expansion 996296 07/17/2014 07/31/2014 07/17/2014 Other: Mesa Exptn-CP-1 Demo and Utility for stamp
7219 Au Bo Pan UCI Paul Merage Business Unit 2 13008 07/17/2014 07/31/2014 08/04/2014 AU BO Pain UCI Paul Merage Business Unit 2
7218 Mesa CT Expansion 996296 07/16/2014 07/30/2014 07/16/2014 Other: Msa Exptn.-Food Service Dwgs for review
7217 Mesa CT Expansion 996296 07/15/2014 07/29/2014 07/17/2014 Submittal: #23 3113-001A_Blue Duct Product Data with backcheck
7216 Business Unit 2 990500 07/14/2014 07/28/2014 07/24/2014 Submittal: #21 0500-445_Food Service Fire Protection Dwg
7215 Business Unit 2 990500 07/11/2014 07/25/2014 07/17/2014 Submittal:#21 0500-448_GSM Water Curtain Dwgs
7214 Install Electric Screens 5109719 07/11/2014 07/25/2014 07/22/2014 Replace screens with new screens
7213 Mesa CT Expansion 996296 07/10/2014 07/24/2014 07/11/2014 Submittal: #02 8200-001A _Revised Abatement work Plan w/backchecks
7212 Renovate Room 256 5109651 07/10/2014 07/24/2014 07/15/2014 Construct new wall, Electrical, HVAC duct relocation, data , fire alarm
7211 HTW Extension to Gross Hall 5109218 07/10/2014 07/24/2014 07/10/2014 Extend high temp water Gross Hall, install piping, tanks, heat exchanges
7210 null 5109616 07/09/2014 07/23/2014 07/09/2014 Void See 7202
7209 Facilities Management Building, Office Revisions 5109712 07/08/2014 07/22/2014 07/15/2014 Preliminary Design to enlcose building entrance, evaluate MEP/Structural
7208 UNEX-Plant Trees to create Screen Wall 5109740 07/08/2014 07/22/2014 07/09/2014 Scope Of Work: mark u/g utitlities plant 34 trees in coordination with facilities project mgr.
7207 CRII 2013-Plumbing repairs 5109729 07/08/2014 07/22/2014 07/09/2014 Aldrich Storm and sewer lines, Rowland sewer lines,hw exp. Jts at MedSci C
7206 Mesa CT Expansion 996296 07/07/2014 07/21/2014 07/15/2014 Other: DP-1 Demo and utility drawings
7205 Mesa CT Expansion 996296 07/07/2014 07/21/2014 07/10/2014 Submittal: #02 8200-002_Asbestos Abatement work plan
7204 Verano Place Parking lot 20.25, Replace lighting 5109353 07/02/2014 07/16/2014 07/10/2014 Install new Lighting Fixtures
7203 BEC-Arena Floor Renovation 5109720 07/02/2014 07/16/2014 07/15/2014 Sand,Refinish and paint arena floor
7202 Replace Central Plant VFD Room A/C 5109616 07/02/2014 07/16/2014 07/09/2014 Replace central Plant VFD room air conditioning unit. Non occupied space , only VFDs
7201 Mesa Temp Dine-Modular 996296 07/01/2014 07/15/2014 07/01/2014 Submittal: 01 3200-005A-Revised Kitchen Dwgs (ECHO)
7200 Expand H2 Fueling Station 5109642 07/01/2014 07/15/2014 07/07/2014 Expand 25kg 1 day up tp 270kg 1 day
7199 Multiple Buildings Campus Wide 5109237 07/01/2014 07/15/2014 07/07/2014 Connect Electrical Meters Campus Wide install MelRok 12/24 channel electrica; meters in campus buildings. Provide labor and material to install metering assemblies in multiple building
7198 Business Unit 2 990500 07/01/2014 07/15/2014 07/15/2014 Submittal: #03 3000-431_North Pereira Stairs -Work Plan
7197 Mesa CT Expansioon 996296 07/01/2014 07/15/2014 07/29/2014 Submittal: 01 5000-001A-Fencing Plan Revised (Excavation Ph.)
7196 Business Unit 2 990500 06/30/2014 07/14/2014 07/01/2014 RFI#1425_Sprinkler Location in Room #3405
7195 Student Health Center Renovation & Dental Clinic 990010 06/30/2014 07/14/2014 07/01/2014 Other: Revised Fire Sprinkler Plan
7194 Mesa Temp Dining-Modular 996296 06/27/2014 07/11/2014 06/30/2014 Other: Construction Dwgs (Rev 5) w/ Backchecks
7193 Student Health Center Remo-Dental Clinic 990010 06/27/2014 07/11/2014 07/09/2014 Submittal: #21 0500-14.2_Revised Fire Sprinkler at SHC IT Closet per field change
7192 High Bay Lighting Retrofit 5109066 06/27/2014 07/11/2014 07/07/2014 Scope Of Work: Remove and replace exterior wall packs and high bay lighting
7191 Student Health Center Main Lobby room 100 underground duct repair 5109645 06/26/2014 07/10/2014 07/07/2014 Scope of work: Rerpair duct work with sheetmetal sleeves and caulking
7190 Estimate to replace roof and air conditioning units 5109195 06/26/2014 07/10/2014 07/07/2014 Scope of work: Install perimeter roof gutter
7189 Mesa Temp Dining -Modular 996296 06/26/2014 07/10/2014 06/30/2014 Submittal: #028 3111-004_Revised Fire Alarm Pkg. w/backcheck
7188 Mesa Temp Dining Modular 996296 06/26/2014 07/10/2014 06/30/2014 Other: Ansul UL 300 Wet Fire Protection system w/backcheck
7187 CNLM Lab 203 and 205 Renovation 5109571 06/26/2014 07/10/2014 07/07/2014 Scope of work: Lab Renovation
7186 TI Utility Room Renovation 5109586 06/26/2014 07/10/2014 06/27/2014 TI-Utility Toom Renovation-Social Ecology-2
7185 Parking Stuctures Solar Canopies 5109281 06/26/2014 07/10/2014 06/26/2014 Plans: Parking Structures solar Canopies-Mesa, Student center & Social Sciences
7184 Mesa Expansion 996296 06/26/2014 07/10/2014 06/30/2014 Submittal: #01 5000-002_Temp Fence Plan (Excavation)
7183 Business Unit 2 990500 06/23/2014 07/07/2014 07/11/2014 Submittal: # 335-08 7111_ Door Finish Hardware w/back-check
7182 Mesa Expansion 996296 06/20/2014 07/04/2014 06/30/2014 Submittal: #02 2800-001 _Asbestos Abatement Work Plan
7181 Student health Center Renovation and Dental Clinic 990010 06/19/2014 07/03/2014   Other NFPA 72 Form
7180 Mesa Expansion 996296 06/19/2014 07/03/2014 06/30/2014 Other: Blue Duct
7179 Business Unit 2 990500 06/19/2014 07/03/2014 06/26/2014 Other : Revised Supplemental Info #10 Dwgs w/revision for stamp/sign
7178 Mesa-Temp Dining -Modular 996296 06/17/2014 07/01/2014 07/14/2014 Other: NFPA 13-Mat. & Test Certificate
7177 Business Unit 2 990500 06/17/2014 07/01/2014 06/19/2014 Other:Supplemental Info#11 Dwgs w/Narrative
7176 Mesa-Temp Dining-Modular 996296 06/17/2014 07/01/2014 06/23/2014 Submittal#28 3111-03_Fire Alarm Dwgs w/backcheck sets
7175 Business Unit 2 990500 06/16/2014 06/30/2014 06/26/2014 Submittal: #407-01 3200_ASK 79R1 Shower AMP
7174 Business Unit 2 990500 06/16/2014 06/30/2014 06/26/2014 RFI# 1411_Smoke Detector at Top of Elevator Shaft
7173 Mesa-Temp Dining -Modular 996296 06/13/2014 06/27/2014 06/19/2014 Submittal: #21 3111-02_fire Sprinkler Dwgs (Rev 2) w/ approved References
7172 Nat Sci 2-3rd Floor Lab Remodel 5109565 06/13/2014 06/27/2014 06/16/2014 Remodel 3412,3135 and 3464 Building B
7171 Business Unit 2 990500 06/12/2014 06/26/2014 07/14/2014 Submittal: #01 3200-412 Dinig Room & Survey
7170 NatSci 1 Window Replacement null 06/11/2014 06/25/2014 06/17/2014 Other: Laydown Area
7169 SEP 2014 Reines Hall Fan Wall Replacement 5109588 06/11/2014 06/25/2014   Scope of Work: Taje four airflow measurements and two static pressure measurements at fan discharge
7168 Mesa-Temp Dining -Modular 996296 06/11/2014 06/25/2014 06/23/2014 Other: Construction dwg Documents (Rev 4) w/backcheck
7167 Install UPS -Engineering Gateway 5109595 06/11/2014 06/25/2014   Install UPS for Data Center
7166 Mesa -Temp Dining -Modular 996296 06/10/2014 06/24/2014 07/28/2014 Other: A-1.0_Fire Access Site plan (Rev 4) w/ backcheck
7165 Mesa -Temp Dining -Modular 996296 06/10/2014 06/24/2014 06/19/2014 Submittal: #01 3200-04_Electrical Dwgs-Site Plan
7164 Business Unit 990500 06/09/2014 06/23/2014 09/03/2014 Other: Alternate West Stair plan
7163 Verano Re-roof 5109610 06/09/2014 06/23/2014 06/16/2014 Remove existing Built-Asphalty shingles.. Install new Single ply and Asphalt shingle
7162 F Reines Hall null 06/09/2014 06/24/2014 06/11/2014 Install 2hr rated door assembly between chem wing and elevator Lobby
7161 Bonney Center-CNLM Lab 203&205 Renovation 5109571 06/09/2014 06/23/2014 06/16/2014 Lab Renovation (Framing, Drywall , ceiling ,mech plumbing, , elec & Fire Alarm 1/B2
7160 PH SE-2 Lab Utility Room Renovation Social Ecology 2 5109586 06/09/2014 06/23/2014 06/16/2014 II FR Group B -Social Ecology 2
7159 Student Health Renovation & Dental Clinic 990010 06/09/2014 06/23/2014 06/09/2014 Other: Final Specification
7158 Mesa CT Expansion 996296 06/04/2014 06/18/2014 06/09/2014 Submittal: #01 5000-01_Jobsite Trailer Fence Plan
7157 Business Unit 2 990500 06/04/2014 06/18/2014 06/17/2014 Submittal: #07 8413-415 Penetration Firestopping Submittal
7156 Phoenix Grille/Replace Grille 5109701 06/03/2014 06/17/2014 06/09/2014 Scope of Work: Demo existing multi-ply roof and replace w/same
7155 Bussiness Unit 2 990500 06/03/2014 06/17/2014 06/26/2014 Submittal: #28 3111-179.3 Fire Alarm Submittal w/backcheck
7154 Mesa Court Expansion 996296 06/02/2014 06/16/2014 07/01/2014 Other: Design Development Package
7153 Banney Research Lab CHW leak repair 5109686 06/02/2014 06/16/2014 06/04/2014 Repair Ruptured CHW Pipe/Upgrade
7152 LED Lighting Upgrade Beckman Laser Institute #817 5109066 06/02/2014 06/16/2014 06/02/2014 Lighting Retrofile at Corridors and office
7151 Engineering Gateway 5109548 05/30/2014 06/13/2014 06/05/2014 LAB C+ Core north Hot/Cold aisle containment
7150 Mesa Court _Temp Dining_Modular 996296 05/30/2014 06/13/2014 06/05/2014 Other: Fire Alarm revision w/backchecks
7149 Mesa Court _Temp Dining -Modular 996296 05/30/2014 06/13/2014 06/19/2014 Other: Ansul UL 300 Wet Chemical Fire Suprpresion w/Approved Ref
7148 BUT 2 13008 05/29/2014 06/12/2014 07/15/2014 Interior Tenant Improvement for Starbucks
7147 eh1120 Eshaust Modifications 5109534 05/29/2014 06/12/2014 06/04/2014 Convert Plenum Return to Ducted Return Type II Group B
7146 AV Kitchen Renovation_Arroyo Vista 5109661 05/28/2014 06/11/2014 06/03/2014 Renovate Kitchen Interior Type 5
7144 DM 06/07 Replace oil Switch OS-32 Rowland Hall 5109418 05/28/2014 06/11/2014 06/03/2014 Replace 05-32 with new SF6 Switch
7143 DM 06/07 Replace Oil Switch 05-32 Rowland Hall 5109418 05/28/2014 06/11/2014   Replace 05-32 with new SF6 switch
7142 Crawford Gym-rewfinish Gym Floor 5109641 05/28/2014 06/11/2014 05/28/2014 Removal of Accoustical panles basketball padding ass new padding and install vball post sleeves
7141 Business Unit 2 990500 05/28/2014 06/11/2014 06/19/2014 RFI# 1393.001_Stair 3 Lvl 3,4,5 closely spaced spriinklers with backcheck
7140 Sttele Bernard -Anza Borrego PH-11 991085 05/28/2014 06/11/2014 05/29/2014 RFI# #59_Riser bracings per EN11 #8
7139 Engineering Gateway 5109595 05/23/2014 06/06/2014 06/03/2014 Install UPS for Data Center
7138 Business Unit 2 990500 05/22/2014 06/05/2014 05/29/2014 RFI# 1399_EN11 #34_Smoke Detection in elevator Shaft
7137 Remodel Trailer 5109712 05/22/2014 06/05/2014 05/30/2014 Trailer A-New Carpet ,paint , roof repairs, exterior panel repairs
7136 Engineering Gateway 5108636 05/22/2014 06/05/2014 06/02/2014 H2 Tank Sitework to receive bulk Hydrosen
7135 Business Unit 2 990500 05/21/2014 06/04/2014 06/03/2014 Submittal: #8 7111-335_Door Finishh Hardware
7134 Student Health Center Reno-Dental Clinic 990010 05/21/2014 06/04/2014 05/22/2014 Submittal: #02 8200-54_Abatement Work Plan & AQMD Notification
7133 ARC HVAC Controls Upgrade 5109430 05/21/2014 06/04/2014 05/29/2014 ARC-HVAC Controls Upgarde
7132 LED Lighting Upgrade 5109000 05/21/2014 06/04/2014 05/29/2014 PSLH/LED lighting upgarde
7131 LED Lighting Upgrade 5109000 05/21/2014 06/04/2014 05/21/2014 Labor and material for lighting Retro/ Schneiderman LH & Dance Studio
7130 LAW/EDU 5109556 05/20/2014 06/03/2014 05/21/2014 Law/Edu HVAC Replacement Submittal review
7129 Student center 5109332 05/20/2014 06/03/2014 05/29/2014 1 for 1 replacement of retrofit of light fixtures Offices meeting space, bookstore (Retail), food service
7128 Bussiness Unit 990500 05/20/2014 06/03/2014 06/11/2014 Other: Supplemental info. 10 dwgs w/revised sheets and backcheks
7127 Steele Bernard-Anza Borrego PHII 991085 05/19/2014 06/02/2014 05/22/2014 RFI: #57 _Fire Sprinkler Restraints
7126 Vereno Housing 5109351 05/19/2014 06/02/2014 05/28/2014 Renovation Laundry rooms at unit 6
7125 North Campus 5109642 05/16/2014 05/30/2014 05/28/2014 Expand H2 Fueling Station -Expaned from 05kg 1day up to 270 kg 1day
7124 Nat Sci 2 5109565 05/16/2014 05/30/2014 05/30/2014 3rd Floor Lab Remodel, Remodel 3412,3135 & 3464
7123 BU2 996296 05/16/2014 05/30/2014 06/17/2014 Other:Dwgs w/ Starbucks TI
7122 Social Ecology -2 5109586 05/15/2014 05/29/2014 05/21/2014 PH SE-2 Lab Utility Rm Reno TI-Utility Room Renovation 11FR/Group B
7120 Sue & Gross hall-4th Floor TI 994040 05/15/2014 05/29/2014 06/03/2014 Other: ADA Fume Hood Test Report
7119 Business Unit 2 990500 05/15/2014 05/29/2014 05/21/2014 RFI: #1393_Stair 3 Levels 3, 4, 5, closely spaced sprinklers
7118 Eng. Gateway 5109593 05/13/2014 05/27/2014 05/15/2014 CRIP 2013 Multiple HVAC Repairs-EG AH-! Chilled water coil , Replace CHW coil & Drain /condensate EG-AH-1
7117 Social Sciences Bldg 5109000 05/13/2014 05/27/2014 05/15/2014 Exterior Lighting upgrade , remove , replace and /or retrofit ext. lighting
7115 Green House (514) 5109570 05/13/2014 05/27/2014 05/28/2014 Small Cap 13/14 Green House lighting upgrade , Add lighting to Green house Room 9,10,11 Type V-B/Occupancy U
7114 Mesa Court_Temp Dining Modular 996296 05/12/2014 05/26/2014 06/03/2014 Other: Revised Dwgs set w/ backcheck
7113 Bussiness Unit 2 990500 05/09/2014 05/23/2014 05/15/2014 Submittal: #10 4400-325_Fire Extinguisher & Cabinet PD
7112 Steele Bernard -Anza Borrego Ph-11 991085 05/09/2014 05/23/2014 05/13/2014 RFI: #56_Fire Sprinklers-200 instead of 150
7111 Mesa Court _Temp Dining Trailer 996296 05/09/2014 05/23/2014 05/12/2014 Submittal: Fire Protection Dwgs w/Responses and Backchecks
7110 Steele Bernard_Anza Borrego PhII 991085 05/09/2014 05/23/2014 05/13/2014 Submittal: #13 3123-04_Tensioned fabric structure -Fabric Smaples
7109 Business Unit 2 990500 05/09/2014 05/23/2014 05/13/2014 RFI# 1386_Resolution to EN11 #25-Sprinkler Protection Under Stair 3
7108 Mesa Court _Temp Dining Utilies 996296 05/09/2014 05/23/2014 05/13/2014 RFI# 08_Fire Hydrant Substitution
7107 Student Health Center Renovation and Dental Clinic 990010 05/09/2014 05/23/2014 05/29/2014 Other: Final Specification
7106 Aldrich Hall 5109651 05/08/2014 05/22/2014 05/14/2014 Construct new wall ,elctical, HVAC duct relocation , Data ect.2A,B
7105 Mesa Court_Temp Dining -Utilities 996296 05/06/2014 05/20/2014 05/13/2014 Other: Revised C-103 & C-104 with approved Ref., for stamp/sign
7104 Student Health Center Reno-Dental Clinic 990010 05/06/2014 05/20/2014 05/15/2014 Student Health Center Reno Dental Clinic
7103 Steele Bernard-Anza Borrego PhII 991085 05/05/2014 05/19/2014 05/13/2014 Other: Substitution Request #2_Cotego Flame Retardant Paint
7102 Bussiness Unit 2 990500 05/05/2014 05/19/2014 06/09/2014 Submittal: #01 3200-301.1_App. For Approval -Alt means of Design with back check
7101 Bussiness Unit 2 990500 05/05/2014 05/19/2014 05/06/2014 RFI# 1348_Main & Branch Line Hangers_Response to EN11 #18
7100 Mesa Court _Temp Dining Utilities 996296 05/01/2014 05/15/2014 05/15/2014 Other: 100% CD Specification
7099 Bonney CTR 5109571/997444 04/30/2014 05/14/2014   Plan Check Bonney Court Lab 203 & 205 Renovation Type 2 B occupancy
7098 Mesa-Court _Temp Dining-Utilities 996296 04/30/2014 05/14/2014 05/01/2014 Submittal: #26 0500-17_3M Fire Barrier Sealant
7097 Social & Behavioral Gateway 5109597 04/29/2014 05/13/2014 05/02/2014 Remodel Rooms 3241-3251 Install Cabinets , Electrical Raceway, Painting & Drywall
7096 Quereshey 5109671 04/29/2014 05/13/2014 04/29/2014 LAB Modifications
7095 Run Fiber Optic Cable from Med Sci "D" to EH&S 5109343 04/29/2014 05/13/2014 04/29/2014 Pull Cable Between Buildings (By Contractor)
7094 CALIT2 5109687 04/29/2014 05/13/2014 05/02/2014 Install XPS Equipment , Chilled Water, 5 vacuum Pump, Electrical
7093 Bussiness Unit 2 990500 04/28/2014 05/12/2014 05/01/2014 Submittal: #08 3400-243_Rolling Fire Doors Product Data
7092 SBSG 5109149/997264 04/25/2014 05/09/2014 05/13/2014 Plan check-Type II A/B
7091 Law/Edu 5109556 04/24/2014 05/08/2014 05/06/2014 Plan Check Type-II
7090 Med Sci C 5109431/998588 04/24/2014 05/08/2014 05/02/2014 DM 2006/2007 Replace oil switch OS-41 Med Sci C Replace OS-41 and 15KV cable
7089 Mesa Court_Temp Dinin-Utilities 996296 04/24/2014 05/08/2014 04/25/2014 Submittal : #33 0500-15_Wafer Check Valve & Mech Restraint product Data
7088 Mesa Court Temporary Facilities 996296 04/22/2014 05/06/2014 04/23/2014 RFI:Review Revised Fire Service Sketch
7087 Mesa Court Temporary Facilities 996296 04/21/2014 05/05/2014 05/06/2014 Submittal: Review revised fire suppresion Plans
7086 Multiple 5109341 04/21/2014 05/05/2014 04/30/2014 ANSI Z9.5 See Spec
7085 Multiple ` 5109341 04/21/2014 05/05/2014   ANSI Z
7084 Steele Bernard-Anza Borrego Ph-11 991085 04/21/2014 05/05/2014   Other: Conformed Constn. Dwgs -For records only
7083 Student Health Center Reno-Dental Clinic 990010 04/21/2014 05/05/2014   Other:Conformed Constn. Dwgs.-For records only
7082 Mesa Court _Temp Dining Utilities 996296 04/21/2014 05/05/2014 04/21/2014 Other: Egress Plan
7081 Engineering Gateway, Install UPS 5109595 04/17/2014 05/01/2014 04/23/2014 Scope of work: Insta;; UPS for Data Center
7080 Bussiness Unit 2 990500 04/17/2014 05/01/2014 04/25/2014 Submittal: #28 3111-179.2 Revised Fire Alarm pkg. w/backcheck
7079 Steel Bernard-Anza Borrego Ph-II 991085 04/17/2014 05/01/2014 04/23/2014 Submittal: 13 3123.03 Tensile Fabric Structure Sample
7078 Quereshey Lab Modifications 5109671 04/16/2014 04/30/2014 04/21/2014 Remove Interior Wall
7077 Mesa Court Temporary Utilies 996296 04/15/2014 04/29/2014 04/17/2014 Submittal: Fence Plan Revision
7076 Brandywine Student Center 5109649 04/15/2014 04/29/2014 04/23/2014 Middle Earth brandywine alc Replacement
7075 Social and Behavioral Science Gateway 5109597 04/15/2015 04/29/2014 04/21/2014 Remodel Rooms 3241-3251 Install cabinets, electrical/data raceway,painting and drywall
7074 Mesa Court Temporary Utilities 996296 04/15/2014 04/29/2014 04/16/2014 Submittal: Site Temporary Egress Work Plan
7073 Mesa Court_Te,p Dining Utilities 996296 04/15/2014 04/29/2014 04/16/2014 Other: Electrcial E-1.0 for stamp/sign
7072 Bussiness Unit 2 990500 04/14/2014 04/28/2014 04/25/2014 Submittal. # 01 3200-330_Supplemental Info #10
7071 Mesa Court _Temp Dining modular Trailers 996296 04/14/2014 04/28/2014 04/25/2014 Other: Revised Fire Access Dwgs.with backcheck OCFA Review
7070 Crawford Hall 5109641 04/11/2014 04/25/2014 04/14/2014 Crawford Hall_refinish Gym Floor and Adacent Raised Stage
7069 Gross Hall 5109218 04/11/2014 04/25/2014 04/23/2014 Extend HTW and Gross hall New tanks amd Hx for water Heater
7068 Mesa Court Temporary Utilities 996296 04/10/2014 04/24/2014 04/10/2014 Submittal: Site Electrical Plan
7067 Business Unit 2 990500 04/09/2014 04/23/2014 04/10/2014 RFI:#1364_Response to EN11 #26_Sprinkler in Elevator
7066 Mesa Court Temp Dining facility 996296 04/09/2014 04/23/2014 04/10/2014 Submittal: Modular Trailer Temporary Utilities Plans
7065 Steele Bernard-Anza Ph-II 991085 04/08/2014 04/22/2014 04/08/2014 Submittal: #07 8116.01_Cementious Fireproofing
7064 Nat Sci 2 5109565 04/08/2014 04/22/2014 04/10/2014 3rd floor Lab Remodel -Remodel 3412,3464,3466
7063 Tamkin Hall 5109574/997446 04/07/2014 04/21/2014 04/09/2014 Scope of work: Plan Check , Assembly
7062 Bussiness Unit 2 990500 04/07/2014 04/21/2014 04/08/2014 RFI: # 1357_Fire Alarm Tie-in Lighting w/GH--reference
7061 Bussiness Unit 2 990500 04/07/2014 04/21/2014 04/09/2014 RFI#1351_Level 2&% Baffle & Grille Ceiling
7060 Mesa Court Temp Dining Facility 996296 04/03/2014 04/17/2014 04/17/2014 Submittal: Revised Fire Alarm Plan
7059 Mesa Court Temp Dining Facility 996296 04/03/2014 04/17/2014 04/17/2014 Submittal: Modular Trailer Plans
7058 Gross Hall 4th floor Build-Out 994040 03/19/2014 04/02/2014 03/19/2014 Other:Sign Beneficial Occupancy Certificate
7057 Mesa Court Temp Dining 996296 03/26/2014 04/09/2014 03/31/2014 Submittal: Review Fence Plan
7056 Mesa Court Temp Dining Facility 996296 03/26/2014 04/09/2014 03/31/2014 Submittal: Mesa CourtTemp Dining Facility
7055 Student Health Center Renovation and Dental Clinic 990010 03/26/2014 04/09/2014 04/07/2014 Other: Final CD Plans (backcheck set attached)
7054 Gross Hall 994040 03/03/2014 03/17/2014 03/03/2014 Scope of work: 4th Floor Build-Out evac maps
7053 Steele Bernard-Anza Borrego Ph-II 991085 03/24/2014 04/07/2014 04/07/2014 Submittal: #28 3111.01 A revised Fire Alarm w/Backcheck
7052 Steele Bernard-Anza Borrego PhII 991085 03/24/2014 04/07/2014 03/31/2014 Other: 100% CD Specs Stamp/Sign per #7037 Review
7051 Steele Bernard-Anza Borrego Ph II 991085 03/24/2014 04/07/2014 03/31/2014 Other: 100% CD Dwgs & Specs for stamp/Sign per #7037 Review.
7050 Sue & Gross hall-4th floor TI 994040 03/21/2014 04/04/2014   Submittal: #174-21 1000_NFPA 13-Sprinkler Test Certification
7049 Sue & Gross hall-4th Floor TI 994040 03/21/2014 04/04/2014   Submittal: 176-28 3111_NFPA 72-Fire Alarm record of completion
7048 Bussiness Unit 2 990500 03/21/2014 04/04/2014 03/31/2014 RFI#RFI#1318_Electrical Rm. Rating
7047 Mesa Court Temp Dining Facility 996296 03/20/2014 04/03/2014 04/10/2014 Submittal: Fire Access Plan
7046 Bonney Center 5109635 03/19/2014 04/02/2014 03/21/2014 Scope of work: Install pre-heat coil-AH-3
7045 Gross Hall 4th Floor Build-Out 994040 03/19/2014 04/02/2014 03/19/2014 FOR RECORDS ONLY: Final Test and balance report
7044 Gross Hall 4th Floor Build-Out 994040 03/19/2014 04/02/2014 03/19/2014 Other: Sign Beneficial Occupancy Certificate
7043 Mesa Court Temp Dining Facility 996296 03/18/2014 04/01/2014   Submittal: Fire Suppression System for Modular Dining Facility
7042 Steele Bernard-Anza Borrego Ph-II 991085 03/18/2014 04/01/2014 03/25/2014 Submittal:#21 0500-01 C Fire Sprinkler dwgs w/backcheck & Apprvd Ref.
7041 Campus Monument Walls & Signage 997404 03/17/2014 03/31/2014 03/31/2014 Other: Electrical Dwgs w/signage for stamp sign
7040 Tamkin Hall Renovation 5109574 03/17/2014 03/31/2014 03/18/2014 Plan Check
7039 Bussiness Unit 2 990500 03/14/2014 03/28/2014 03/31/2014 Other:Revised SI#9 w/response & backcheck
7038 Sue&Gross Hall-4th Floor TI 994040 03/14/2014 03/28/2014 03/31/2014 RFI#1105_Elevator Control Room
7037 Steele Bernard -Anza Borrego Ph-II 991085 03/13/2014 03/27/2014 03/17/2014 Other: Revised 100% CD w/ Comment Responses & Back-check
7036 Crawford Hall Plaza 997405 03/10/2014 03/24/2014   Other: 100% CD Dwgs w/backcheck
7035 Hitachi /Plywood House 5109282 03/07/2014 03/21/2014   Upgrdade FA System
7034 Mesa Court Temp Dining Facility 996296 03/06/2014 03/20/2014 04/09/2014 Submittal: Fire Suppression package
7033 Mesa Court Temp Dining Facility 996296 03/06/2014 03/20/2014 03/27/2014 Submittal:Fire Alarm System for Modular dining facility
7032 Ayala Science Library 5109338 03/06/2014 03/20/2014 03/20/2014 Replace Fire Alarm System
7031 Bussiness Unit 2 990500 03/06/2014 03/20/2014 03/31/2014 Submittal: #01 3200-310_Application for Approval of Alt. Means of Design
7030 Bussiness Unit 2 990500 03/06/2014 03/20/2014 04/08/2014 Submittal #08 7111-280_Door Hardware Submittal
7029 ELF 5109365 03/05/2014 03/19/2014 03/07/2014 Scope of Work: Fire Alarm system Replacement
7028 Krieger Hall (600) Humanities Hall (601) 5109419 03/05/2014 03/19/2014 03/19/2014 Scope of Work: Replace Oil Switches OS-12 and 05-13
7027 CalRTZ Room 1419 5109654 03/05/2014 03/19/2014 03/18/2014 Scope of work : Connect 2x gas cabinets and burntop to exhaust system
7026 Ayala Science Library 5109338 03/04/2014 03/18/2014 03/07/2014 Scope of work: New Fire Alarm System
7025 Steele Bernard -Anza Borrego PhII 991085 03/04/2014 03/18/2014   Submittal: #21 0500.02A_Fire Sprinkler Materials
7024 Mesa Court Temp Dining Facility 996296 03/03/2014 03/17/2014   Submittal: Fire Suppression System For Modular Dining Family
7023 Campus Monument Walls & Signage 997404 02/28/2014 03/14/2014 03/04/2014 Other: Revised CD for stamps/Sign w/approved Ref.#6986
7022 Steele Bernard -Anza Borrego Ph-II 991085 02/28/2014 03/14/2014   Submittal: #21 0500.01A Fire Sprinkler dwgs w/backchecks
7021 Sue&Gross Hall-4th Flooor TI 994040 02/28/2014 03/14/2014 03/03/2014 Submittal: #21 1000-20.2 Fire Protection FP-2.04, w/backcheck
7020 Student Center 5109113/2126113 02/27/2014 03/13/2014 02/27/2014 Submittal Review -FA plan
7019 Student center Av. Consolidation 5109113-990011 02/27/2014 03/13/2014 02/27/2014 Scope of work: Submittal Review Type II A/B Occupancy
7018 Sue Gross hall-4th Floor T 994040 02/27/2014 03/13/2014 02/27/2014 RFI# #1086_EN-11 #-FA Tie with lighting w/backcheck
7017 ELF 5109365 02/26/2014 03/12/2014 02/27/2014 Scope of work:Fire Alarm system replacement
7016 Sue & Gross Hall -4th Floor TI 994040 02/26/2014 03/12/2014   Submittal: #169 28-3111_Automatic Heart Detector
7015 Mesa Court Temporary Dining Facilities 996296 02/25/2014 03/11/2014 03/03/2014 Submittal: Fire -Lite Fire Alarm Panel
7014 Bussiness Unit 2 990500 02/25/2014 03/11/2014 03/03/2014 RFI:#1333_Knox Box Model,& Location
7013 Steele Bernard-Anza Borrego Ph-II 991085 02/22/2014 03/08/2014   Submittal:#10 4400.01_Fire Extinguisher & Cabinets
7012 ELF 5109365 02/21/2014 03/07/2014 02/27/2014 Scope of work: Fire alarm System Replacement
7011 Campus Monument Walls & Signage 997404 02/20/2014 03/06/2014 03/03/2014 Other: Electrical Dwgs w/approved plans for referrence
7010 Aldrich Hall 5109651 02/19/2014 03/05/2014 02/26/2014 Scope of work : UU Advising plans
7009 Social/Behavioral Science Gateway 5109597 02/19/2014 03/05/2014 02/26/2014 Scope of work :Install Electromagnetic Shielding
7008 Sue & Gross hall-4th Floor TI 994040 02/19/2014 03/05/2014 02/25/2014 Submittal: #28 3111.055.4_Fire Alarm dwgs w/approved ref.
7007 Bussiness Unit 2 990500 02/19/2014 03/05/2014 03/03/2014 Submittal: #26 0519-289_Low Voltage Elect power
7006 Student Health Center Reno-Dental Clinic 990010 02/18/2014 03/04/2014 02/25/2014 Submittal: #28 3111.10A_Revised Fire Alarm Dwgs w/backcheck
7005 Student Health Center Rheno-Dental Clinic 990010 02/18/2014 03/04/2014 02/25/2014 Submittal: #21 500.14A_Fire Sprinkler Dwgs w/backcheck
7004 Student Health Center Rheno-Dental Clinic 990010 02/18/2014 03/04/2014 02/19/2014 Submittal: #28 3111.10B_Fire Alarm Cable Wire
7003 Hitachi Plumwood House 5109282 02/18/2014 03/04/2014 03/06/2014 Scope of work : Upgrade FA System
7002 Verano Unit 6 5109389 02/18/2014 03/04/2014 02/18/2014 Mechanically Fasten raised post and piers at complex 2-7 umit 6'
7001 Student CTR AV System Upgrade 5109113 02/18/2014 03/04/2014   SUBMITTAL Review Type II A A&B Occupancy
7000 Steele Bernard -Anza Borrego Ph-II 991085 02/13/2014 02/27/2014 02/19/2014 RFI#41_Test and Drain at sprinkler Riser
6999 Steele Bernard-Anza Borrergo Ph-II 991085 02/12/2014 02/26/2014 02/26/2014 Submittal: #28 3000.001A_Revised FA w/Backcheck Responses
6998 Crawford Hall Plaza 997405 02/11/2014 02/25/2014 03/03/2014 Other: 90% CD Drawings
6997 North Campus Warehouse #091 5109605 02/10/2014 02/24/2014 02/21/2014 Replace suppression system-Alchohol storage Room
6996 Sue&Gross Hall-th Floor TI 994040 02/07/2014 02/21/2014 02/19/2014 RFI:#1093_Fire Caulking Between Elevator shaft & ? Bldg. on Lvl 1
6995 Pipper Commons 5109627 02/05/2014 02/19/2015 02/06/2014 Install Canopy Structure to building
6994 Sue & Gross hall-4th Floor TI 994040 02/05/2014 02/19/2014 02/10/2014 Submittal: # 08 3113-156_Access Doors
6993 Sue &Gross Hall-4th Floor TI 994040 02/05/2014 02/19/2014 02/10/2014 Submittal: # 21 1000-162_Flex Piping Data
6992 Sue&Gross hall-4th Floor TI 994040 02/05/2014 02/19/2014 02/10/2014 RFI# 1091_Confirm Location of heat detector for elevator recall FA
6991 LAW/EDU VAV/DDC Upgrade 5109556 02/04/2014 02/18/2014 02/05/2014 Plan Check
6990 Law/EDU HVAC Replacement 5109249 02/04/2014 02/18/2014 02/05/2014 Scope of work: Plan Check Type II-A B-occup
6989 Student Center AV System Upgrade 5109113/990011 02/04/2014 02/18/2014 02/05/2014 Submittal: Review -Fire Sprinkler Type II A, A/B occupancy
6988 Gross Hall 4th Floor Build-Out 994040 02/04/2014 02/18/2014 02/05/2014 RFI: Review of RFI by Jim Pack
6987 Student Center AV Consolidation 5109113/990011 02/03/2014 02/17/2014 02/03/2014 Scope of work: Submittal Riview-Non Metalic Box fire putty pads/Type II, BA Occup
6986 Campus Monument Walls and Signage 997404 02/03/2014 02/17/2014 02/06/2014 Other: Construction Dwgs w/backcheck Sheet TS-1
6985 IAB # 625 5109339 01/31/2014 02/14/2014 02/05/2014 Scope of work: Review Simplex/Briggs Electric as-builts
6984 Sue & Gross Hall-4th Floor TI 994040 01/30/2014 02/13/2014 02/06/2014 RFI:#1086_EN-11-#5-Fire Alarm Tie-in with lighting
6983 Hitachio/Plywood House 5109282 01/29/2014 02/12/2014 02/04/2014 Scope of Work: Upgrade FA System- III.A/B plans ,submittlas 100% review
6982 Unex Bldg "D" 5109092 01/29/2014 02/12/2014 01/29/2014 Scope of work : Fire Alarm System for HVAC Replacement/Updates with code info
6981 Ayala Science Library 5109338 01/29/2014 02/12/2014 02/12/2014 Scope of Work: New Fire Alarm System
6980 Steele Bernard-Anza Borrergo Ph-II 991085 01/29/2014 02/12/2014 02/19/2014 Other: 100% CD Dwgs & Specs with backcheck
6979 Bussiness Unit 2 990500 01/29/2014 02/12/2014 02/03/2014 RFI# 1281_GSM Rated Glass
6978 Business Unit 2 990500 01/28/2014 02/11/2014 02/10/2014 Submittal #01 3200-282_Supplemental Info #09 Dwgs
6977 Student Health Center Reno-Dental Clinic 990010 01/28/2014 02/11/2014 03/03/2014 Other: 100% CD Dwgs w/G-sheet backcheck
6976 Verano Place Site Improvements 996268 01/24/2014 02/07/2014 02/03/2014 Plan Review
6975 Central Plant 5109422 01/28/2014 02/11/2014 02/05/2014 Scope of work: Install Electrical Mmetering devices-Central Plant . Plant, Specifications
6974 Business Unit 2 990500 01/24/2014 02/07/2014 03/03/2014 Submittal: #28 3111-179.1 _Fire Alarm Data &Dwgs w/Backchecks
6973 Sue & Gross Hall-4th floor TI 994040 01/24/2014 02/07/2014 02/03/2014 RFI# 1083_ Elimination Of Horizontal Shaft on Level 3
6972 SBSG RM G231, Census Bureau 5109149/997264 01/24/2014 02/07/2014 01/29/2014 Scope of Work Plan Check , Tupe -II A B-Occoupancy Plans 100% Review
6970 Crawford Hall Plaza 997404 01/23/2014 02/06/2014 02/05/2014 Other:Site Logestic & Exiting Plan
6969 Student Health Center Reno-Dental Clinic 990010 01/23/2014 02/06/2014 02/05/2014 RFI#13,#14,#15 & #16_ Fire Alarm Dwgs Review Mark-ups
6968 Student Health Center Reno-Dental Clinic 990010 01/23/2014 02/06/2014 02/03/2014 Submittal: #10 4400-23_Fire Extinguisher
6967 Sue &Gross Hall-4th Floor TI 994040 01/22/2014 02/05/2014 01/23/2014 RFI#1080 _Additional Duct Detector
6966 Sue & Gross Hall-4th Floor TI 994040 01/22/2014 02/05/2014 01/23/2014 RFI# 1082 Elimination & Relocation of Sprinklers in RM 4001
6965 Steele Bernard-Anza Borrego Ph-II 991085 01/21/2014 02/04/2014 02/05/2014 Submittal: #21 0500-01_Fire Sprinkler Product Data & Dwgs
6964 Sue & Gross hall-4th floor TI 994040 01/21/2014 02/04/2014 01/23/2014 Submittal# 21 1000.161_Fire Sprinkler Dwg Area B
6963 Sue & Gross Hall -4th Floor TI 994040 01/16/2014 01/30/2014 01/21/2014 RFI# 1068.001_Furring at Elevatoe Shaft @ Lvl 4
6962 Student Health Center Reno-Dental Clinic 990010 01/16/2014 01/30/2014 01/22/2014 Submittal: #01.500-2.3.1_ Dental Clinic Barricade& Exit Plan w/backckeck
6961 Vereano Place Unit 4 replacement 996268 01/15/2014 01/29/2014 01/21/2014 RFI: #001_Clarification for Wall-Mounted Fire Pulls
6960 Campus Monument wall & signage 997404 01/15/2014 01/29/2014 01/21/2014 Others: DD dwgs
6959 Irvine Hall 5108919 01/15/2014 01/29/2014 01/15/2014 Scope of work: Replace Store Front Entrance Doors ADA/CBC Compliance Other : Letter
6958 Law/Edu VAV&DDC Upgarde 5109556/999035 01/15/2014 01/29/2014 01/22/2014 VAV/Doc upgarde B-2 Type II Plans-Final Review
6957 Law/Edu HVAC Unit Replacement 5109249/158964 01/15/2014 01/29/2014 01/22/2014 Scope of work :HVAC unit replacement roof Plans
6956 Student CTR AV Upgrafde 5109113 01/14/2014 01/28/2014 01/15/2014 Scope of work: Submittal check-3m fire barrier larger box
6955 University Dubstation (40) 5109121 01/14/2014 01/28/2014 01/22/2014 Scope of work: Implement Cogen System Inadvertent Export-Plans-Other Crane Lifting Plan-University Substation
6954 Bussiness Unit 2 990500 01/10/2014 01/24/2014 02/05/2014 Other: Revised CP-3 Specs w/responses for Stamp/Sign
6953 Business Unit 2 990500 01/09/2014 01/23/2014 02/04/2014 Other: SI # 8 Revised with responses
6952 Verano Housing 5109351 01/07/2014 01/21/2014 01/08/2014 Plans -Renovate laundry room and Unit 6
6951 Campus Monument Walls & Signage 997404 01/07/2014 01/21/2014 01/13/2014 Submittal: 01 5000-002_Mobilization & Demo Plans
6950 Sue & Gross Hall-4th Floor TI 994040 01/07/2014 01/21/2014 01/13/2014 Submittal: #152.1-07 8413_Fire Barrier Penetration Assembly w/ref
6949 Sue Gross hall-4th Floor TI 994040 01/06/2014 01/20/2014 01/14/2014 RFI: #1068_Furring at Elevator shaft
6948 Business Unit 2 990500 01/06/2014 01/20/2014 01/16/2014 RFI: #1265_Exterior CMU at Shaft Walls
6947 University Substation (40) 5109121 01/06/2014 01/20/2014 01/22/2014 Implement Cogen System Inadvertent Export-Equipment Layouts, single line
6946 Business Unit 2 990500 01/03/2014 01/17/2014 01/13/2014 Submittal: #07 8413-261_Penetration Firestopping for Electricals w/T-Rating
6945 Campus Monument walls & signage 997404 01/02/2013 01/16/2013 01/07/2014 Submittal: 01 5000-001_Site plan & Fencing plan
6944 Engineering Hall Lab 3111 Construction 990076 12/23/2013 01/06/2014 01/06/2014 Submittal: #07 8413-03.1: Fire Stopping -Thru-wall cable -bundle w/backcheck
6943 Sue & Gross Hall-4th Floor TI 994040 12/23/2013 01/06/2013 01/06/2014 RFI: #1060_Ceiling in Elevator Closet
6942 Student Health Center Reno-Dental Clinic 990010 12/23/2013 01/06/2014 01/13/2014 Submittal: #21.0500-14_Fire Sprinkler Product data & Shop Dwgs
6941 Engineering Hall Lab 3111 Construction 990076 12/18/2013 01/01/2014 12/19/2013 RFI: #14.1 Fire Extinguisher at 3111
6940 Sue&Gross Hall-4th Floor TI 994040 12/18/2013 01/01/2014 01/06/2014 Submittal# 28 3111-55.3 Fire Alarm Dwgs w/ backcheck Responses
6939 Sue&Gross hall-4th Floor TI 994040 12/18/2013 01/01/2014 01/13/2014 Submittal: #01 3200-151_Supplemental Information #4 Dwgs
6938 Unex Bldg. "D" #234 5109092 12/18/2013 01/01/2014 01/22/2014 Fire Alarm System for HVAC Replacement
6937 Steele Bernard -Anza Borrego Ph-II 991085 12/17/2013 12/31/2013   Submittal: #28 3111.01_Fire Alarm Shop dwgs
6936 Steele Bernard-Anza Borrego Ph-II 991085 12/17/2013 12/31/2013 12/20/2013 Other-G-Sheets
6935 Steele Bernard-Anza Borrego Ph-II 991085 12/17/2013 12/31/2013 01/13/2014 Submittal : #28 3111.02_Fire Alarm Product Data
6934 Student Health Center Reno-Dental Clinic 990010 12/16/2013 12/30/2013 01/14/2014 Submittal # 28.3111-10_Fire Alarm Product Data and Shop Dwgs
6933 Sue & Gross hall-4th Floor TI 994040 12/16/2013 12/30/2013 12/18/2013 Submittal #07 8413-152_Fire Barriers
6932 Student CTR AV System Consolidation 5109113 12/13/2013 12/27/2013 12/13/2013 Review Student CTR
6931 Sue & Gross Hall -4th Floor TI 994040 12/12/2013 12/26/2013 12/16/2013 Other:Application -Alternate Means of Design-Air Cuity
6930 Sue Gross hall-4th floor TI 994040 12/12/2013 12/26/2013 01/06/2014 RFI#1040_Temp Disabling Smoke Deraectors & FSD at return Air .
6929 Business Unit 2 990500 12/11/2013 12/25/2013 01/06/2014 Submittal #08 3470-252.1_Revised Smoke Containment Curtain Assembly w/backcheck
6928 Mesa Parking Structure/Mesa Arts BLDG./Mesa Office BLDG 5109498 12/11/2013 12/25/2013 12/17/2013 Replace Main Transformer and Switchboard. Plans and Specifications Final Review
6927 Steele Bernard- Anza Borrego Ph-ll 991085 12/10/2013 12/24/2013 12/18/2013 Other: Site Water Distribution Product Data & C-4 (RFI #22)
6926 Crawford Hall Renovation 991028 12/09/2013 12/23/2013 12/09/2013 Other:Certificate of Substantial Completion
6925 Business Unit 2 990500 12/06/2013 12/20/2013 12/10/2013 Submittal: #08 3470-252_252_Smoke Containment Curtain Assembly
6924 Student Health Center Reno-Dental Clinic 990010 12/06/2013 12/20/2013 12/10/2013 RFI# 002_Fire Sprinkler at SH-1
6923 Student Health Center Reno-Dental Clinic 990010 12/04/2013 12/18/2013 12/10/2013 Submittal: #01 5000-002.2_2nd Revision Student Health Center Logestic Plan w/Backcheck
6922 Student Health Center Reno-Dental Clinic 990010 12/04/2013 12/18/2013 12/11/2013 Submittal:#01 5000-002.3_Dental Clinic Barricade & Existing Plan
6921 Engineering Gateway 5109163 12/04/2013 12/18/2013 12/10/2013 Plans 80% Review
6920 sue & Gross hall -4th floor TI 994040 11/27/2013 12/11/2013 12/04/2013 Submittal: #10 4400-129_Fire Extinguisher & Cabinet Data
6919 Student Center 764034-74000-03 11/27/2013 12/11/2013 12/13/2013 Student Center Canopy Project 100% review
6918 Sue & Gross Hall-4th Floor TI 994040 11/26/2013 12/10/2013 12/10/2013 Submittal: #28 3111-55.2_Fire Alarm Dots & Spots Dwgs w/ Backcheck
6917 Sue & Gross hall-4th Floor TI 994040 11/26/2013 12/10/2013 12/04/2013 Submittal #26 0519-149_Fire Alarm MC cable
6916 Mesa Court Expansion 996296 11/26/2013 12/10/2013 12/12/2013 Submittal: Preliminary Fire Access drawing for temp food services
6915 Sue & Gross hall 4th floor TI 994040 11/21/2013 12/05/2013 11/25/2013 Submittal: # 01-3100-146_Normal &Emergency Power Shut Down.
6914 Engineering Hall Lab 3111 Construction 990076 11/21/2013 12/05/2013 11/25/2013 Submittal : #21 10003-01.1:Water Based FP Product-Couplings. w/Backcheck
6913 Emgineering Hall Lab 3111 Construction 990076 11/20/2013 12/04/2013 11/25/2013 Submittal: #07 8413-003:Thru-wall cable bundle firestoping product data
6912 BUSINESS UNIT 2 990500 11/18/2013 12/02/2013   OTHER: CURRENT CONFORMED ST W/SI'S-FRO
6911 BUSINESS UNIT 2 990500 11/18/2013 12/02/2013 11/21/2013 RFI: #1243_5TH FLOOR CORE WALLS
6910 ENGINEERING HALL LAB 3111 CONSTRUCTION 990076 11/18/2013 12/02/2013 11/25/2013 RFI#14: ELIMINATION OF FIRE EX. AT ENTRY DOOR
6909 ENGINEERING HALL LAB 3111 CONSTRUCTION 99076 11/14/2013 11/28/2013 11/25/2013 SUBMITTALL: #28 3111-001_DIGITAL ADDRESSABLE FIRE ALARM PRODUCT DATA
6908 SUE&GROSS HALL-4TH FLOOR TI 994040 11/14/2013 11/28/2013 11/20/2013 SUBMITTAL: #09-2116-093_SHAFT WALL ASSEMBLY W/4"&6" CH STUD.
6907 GENERAL 996296 11/14/2013 11/28/2013 11/25/2013 OTHER:MODIFICATIONS TO CAMPUS STANDARDS SECTN-21
6906 SUE & GROSS HALL-4TH FLOOR TI 994040 11/13/2013 11/27/2013 11/19/2013 SUBMITTAL: #23-3610-089 LAB AIR FLOW_AIRCUITY SYSTEM, ECT.
6905 BUSINESS UNIT 2 990500 11/13/2013 11/27/2013 11/20/2013 SUBMITTAL: #07 8413-212_PENETRATION FIRE STOP
6904 BUSINESS UNIT 2 990500 11/13/2013 11/27/2013 11/21/2013 SUBMITTAL: #01 3200-226_SI-8 REVISED SPECS
6903 STUDENT HEALTH CENTER RENO-DENTAL CLINIC 990010 11/13/2013 11/27/2013 11/25/2013 SUBMITTAL: #01 5000-002.1_TEMP. FACILITIES LOGISTIC PLAN WITH BACKCHECK
6902 engineering lab facility 5109365 11/13/2013 11/27/2013 11/20/2013 PLANS AND SUBMITTALS 80% REVIEW COMMENTS AND CORRECTIONS
6901 SOCIAL SCIENCE PLAZA 5109289 11/12/2013 11/26/2013 11/26/2013 PLANS AND SPECIFICATIONS
6900 SUE &GROSS HALL-4TH FLOOR TI 994040 11/08/2013 11/22/2013 11/12/2013 SUBMITTAL: #09 2116-132_HORIZONTAL SHAFT WALL ASSEMBLY
6899 Business unit 2 990500 11/08/2013 11/22/2013 11/12/2013 RFI: #12170002-REVISED STANDPIPE PLAN AT TEMP STAIRS W/BACKCHECK
6898 ENGINEERING HALL LAB 3111 CONSTRUCTION 990076 11/07/2013 11/21/2013   SUBMITTAL : #07 8413-002_TOP-OF- WALL FIRE STOPPING DETAIL
6897 ENGINEERING HALL LAB 3111 CONSTRUCTION 990076 11/07/2013 11/21/2013 11/12/2013 SUBMITTAL: #10 4400-001_FIRE EXTINGUISHER CABINET PRODUCT DATA
6896 ENGINEERING HALL LAB 3111 CONSTRUCTION 990076 11/07/2013 11/21/2013 11/19/2013 SUBMITTAL:#23 3113-002_FIRE RATES DUCTWORK-FLAMBAR PRODUCT DATA
6895 ENGINEERING HALL LAB 3111 CONSTRUCTION 990076 11/07/2013 11/21/2013 11/12/2013 SUBMITTAL: #07 8413-002_TOP-OF-WALL FIRE STOIPPING DETAIL
6894 BUSINESS UNIT 2 990500 11/07/2013 11/21/2013 11/20/2013 OTHER: #01 3200-226_SUPPLEMENTAL INFO #07
6893 SUE & GROSS HALL-4TH FLOOR TI 994040 11/07/2013 11/21/2013 11/21/2013 SUBMITTAL:#01 3200-128_SUPPLEMENTAL INFO #03 DWGS
6892 Business Unit 2 990500 11/07/2013 11/21/2013 11/12/2013 SUBMITTAL:#07 8413-229-PENETRATION FIRE STOPPING FOR ELECTRICALS
6891 Gavin Herbert Eye Institue 998170 11/06/2013 11/20/2013 11/19/2013 Other: Site Specific Work Plan- Relocation of Elevator Emergency Power Indicator
6890 Gavin Herbert Eye Institute 998170 11/06/2013 11/20/2013 11/18/2013 Submittal: #01 3200-534_Bending Conduit in Bio-Waste Enclosure w/ Ref RFI 1630
6889 Sue & Gross Hall- 4th Floor TI 994040 11/06/2013 11/20/2013 11/12/2013 Submittal # 28 3111-051.1_Fire Life Safety- 10aH Batteries w/ backcheck
6888 CAL IT 2 EVAC Signs null 11/06/2013 11/20/2013 06/12/2017 Plans
6887 Law/Edu blg. DOC/VAV Upgrade 5109556 11/06/2013 11/20/2013 11/14/2013 Plans, 80% Review,
6886 Business Unit 2 990500 11/04/2013 11/18/2013 11/04/2013 Other: SI# 7 Resubmittal w/ responses w/ backcheck
6885 Business Unit 2 990500 11/04/2013 11/18/2013 11/06/2013 Other: SI#6 Resubmtmittal w/responses w/ backcheck
6884 Business Unit 2 990500 10/30/2013 11/13/2013 11/04/2013 RFI: #1217.001 - Standpipe at Temporary Stairs w/Backcheck
6883 Student Health Center Reno-Dental Clinic 990010 10/30/2013 11/13/2013 11/04/2013 Submittal: # 01 5000-002 - Temp. Facilities Logistic Plans
6882 Engineering Hall Lab 3111 Construction 990076 10/29/2013 11/12/2013 11/05/2013 Submittal: #21 1000-001 - Fire Supression Product Data
6881 Business Unit 2 990500 10/29/2013 11/12/2013 10/31/2013 RFI: 1038.001 - Mechanical Room Partition Rating
6880 Mesa Commons Expansion 996293 10/28/2013 11/11/2013   Submittal: Preliminary Fire Suppression Drawing for Temp Food Service
6878 Engineering Hall Lab 3111 Construction 990076 10/25/2013 11/08/2013 10/31/2013 Other: Revised 100% CD with Backcheck set
6877 Engineering Hall Lab 3111 Construction 990076 10/25/2013 11/08/2013 10/31/2013 Submittal: #07 8413-001 - Firestopping Schedule & Product Data
6876 Sue & Bill Gross Hall 4th Floor TI 994040 10/24/2013 11/07/2013 10/28/2013 RFI: #1034 - Floor Sink Fire Stop Detail
6875 Gavin Herbert Eye Institute 998170 10/24/2013 11/07/2013 10/25/2013 Submittal: 21 1000-529 - NFPA 13 Test certificates - FOR RECORDS ONLY
6874 Sue & Bill Gross Hall 4th Floor TI 994040 10/24/2013 11/07/2013 10/31/2013 RFI: #1033 - Chemical Waste Piping Wrap
6873 Business Unit 2 990500 10/24/2013 11/07/2013 10/31/2013 Submittal: # 08 8000-215 - Fire Rated Glazing
6872 Sue & Bill Gross Hall 4th Floor TI 994040 10/18/2013 11/01/2013 10/25/2013 RFI: # 1003.002 - Push bars for Glass Door 4901C
6871 Sue & Bill Gross Hall 4th Floor TI 994040 10/18/2013 11/01/2013 10/25/2013 RFI: 1003.001 - Push bars for Glass Door 4901C
6870 Anteater Parking Structure 5109157 10/18/2013 11/01/2013 10/21/2013 Install Smart Grid Solar Car Shade
6869 Engineering Hall Lab 3111 Construction 990076 10/17/2013 10/31/2013 10/25/2013 Submittal: #26 0000-001 - General Electrical Product Data
6868 Sue & Bill Gross Hall 4th Floor TI 994040 10/17/2013 10/31/2013 10/25/2013 Submittal: 08 1113-074 - Doors & Frame Data Schedule
6867 Sue & Bill Gross Hall 4th Floor FI 994040 10/17/2013 10/31/2013 10/25/2013 Submittal: #11 5313-076 - Fume Hood Data
6866 Sue & Bill Gross Hall 4th Floor TI 994040 10/17/2013 10/31/2013 10/25/2013 Submittal #08 7111-075 - Doors Hardware Data
6865 Gavin Herbert Eye Institute 998170 10/17/2013 10/31/2013 10/25/2013 Submittal # 28 3111-528 - Fire Alarm & Emergency Comm. System Completion Record
6864 Engineering Hall Lab 3111 Construction 990076 10/17/2013 10/31/2013 10/25/2013 Submittal: # 08 1113-001 - Hollow Metal Doors.
6863 Engineering Hall Lab 3111 Construction 990076 10/17/2013 10/31/2013 10/25/2013 Submittal: #08 7113-001 - Door Hardware Schedule & Product data
6862 Mesa Commons Evac Signs null 10/17/2013 10/31/2013 10/29/2013 Evacuation Maps
6861 Business Unit 2 990500 10/16/2013 10/30/2013 10/25/2013 RFI # 1216_Emergency Phone in 2 Hr. walls with Ref. RFI 1054
6860 Business Unit 2 990500 10/16/2013 10/30/2013 10/25/2013 RFI #1217_Standpipe at Temporary stairs
6859 Sue & Bill Gross Hall 4th Floor TI 994040 10/16/2013 10/30/2013 10/16/2013 OTHER: SI-2 Resubmittal with Response set
6858 Business Unit 2 990500 10/14/2013 10/28/2013 10/31/2013 Submittal: #21 1000-160.1 - Fire Protection Pkg. w/Backcheck
6857 Business Unit 2 990500 10/14/2013 10/28/2013 10/14/2013 Other: SI # 6 Revisions & Responses with Backcheck
6856 Engineering Hall Lab 3111 Construction 990076 10/14/2013 10/28/2013 10/16/2013 Other: Chemical Inventory
6855 Enineering Hall Lab 3111 Construction 990076 10/11/2013 10/25/2013 10/16/2013 Submittal #22 0000-003 Plumbing Product Data w/ REF.
6854 Verano Housing 5109351 10/10/2013 10/24/2013 10/15/2013 Plans
6853 Sue & Bill Gross Hall - 4th Floor TI 994040 10/10/2013 10/24/2013 10/16/2013 Other: SI-2 Resubmittal w/Response set
6852 Business Unit 2 990500 10/10/2013 10/24/2013 10/25/2013 Other: CP-3 Specifications for Stamp/Sign
6851 Sue & Bill Gross Hall 994040 10/09/2013 10/23/2013 10/11/2013 Submittal: #11 5325-044 Walk in Environmental Room Data dwgs - FYI
6850 Business Unit 2 990500 10/09/2013 10/23/2013 10/11/2013 RFI: #1212.001-Water Flowreduction w/Backcheck # 6843
6849 Business Unit 2 990500 10/09/2013 10/23/2013 10/11/2013 Fire Stopping Penetration for Piping (WL-1054)
6848 Gavin Herbert Eye Institute 998170 10/09/2013 10/23/2013 10/14/2013 RFI: RI# 1630 - UCI requested Bio-Waste Enclosure
6847 Steele Bernard- Anza Borrego Ph-II 991085 10/03/2013 10/17/2013 10/07/2013 Other: 100% DD Set
6846 Crawford Hall 991028 10/03/2013 10/17/2013 10/07/2013 Other: Evac Maps
6845 Sue & Bill Gross Hall 4th Floor TI 994040 10/03/2013 10/17/2013 10/07/2013 Submittal # 07 8413-069 - Penetration Firestopping for HVAC
6844 Sue & Bill Gross Hall 4th Floor TI 994040 10/03/2013 10/17/2013 10/07/2013 Submittal #07 8413-085 - Penetration Firestopping for Electricals
6843 Business Unit 2 990500 10/01/2013 10/15/2013 10/02/2013 RFI: #1212 Water Flow Reduction
6842 Engineering Hall Lab 3111 Construction 990076 10/01/2013 10/15/2013 10/11/2013 Submittal #11 5313-01_Lab Fume Hood
6841 Verano Housing 5109351 09/30/2013 10/14/2013 10/02/2013 Plans
6840 Business Unit 2 990500 09/30/2013 10/14/2013 10/02/2013 RFI # 1187 _ Floor Box Fire Rating Options
6839 Business Unit 2 990500 09/30/2013 10/14/2013 10/01/2013 RFI # 1210_Stair- 3 Pull Station
6838 Business Unit 2 990500 09/27/2013 10/11/2013 10/10/2013 RFI#1207_Stair Impact to approved fire plan
6836 Business Unit 2 990500 09/26/2013 10/10/2013 10/24/2013 Submital #179-28 3111_Fire Alarm Product Data and shop dwgs
6835 Sue & Gross hall - 4th floor TI 994040 09/26/2013 10/10/2013 09/26/2013 Submittal #28 3111-55.1_Fire Alarm spots & Dots w/ Backcheck
6834 Gavin Herbert Eye Institute 998170 09/26/2013 10/10/2013 09/26/2013 Submittal: #28 3111_2nd & 3rd Floor Fire alarm shop dwgs w/backchecks
6833 Business Unit 2 990500 09/25/2013 10/09/2013 10/02/2013 RFI #1178_Level 5 Terrace Fire Protection
6832 Education null 09/26/2013 10/10/2013 09/26/2013 Plans specifications
6831 IAB #625 5109339 09/26/2013 10/10/2013 09/30/2013 Plans
6830 Crawford Hall Renovation 991028 09/25/2013 10/09/2013 09/25/2013 Other: Emergency Lightning Plans - E-201, E-701, for Stamp/Sign
6829 Engineering Hall Lab 3111 Construction 990076 09/25/2013 10/09/2013 10/02/2013 Submittal: #22 0000-02 _ Plumbing Material Submittal
6828 Ayala Science Library 5109338 09/24/2013 10/08/2013 10/08/2013 Plans - New Fire Alarm System
6827 Engineering Hall Lab 3111 Construction 990076 09/24/2013 10/08/2013 09/26/2013 Other: Proposed Lab Waste Piping Product Data
6826 Sue & Bill Gross Hall 4th Floor TI 994040 09/23/2013 10/07/2013 10/02/2013 Other: CP 3 Specifications
6825 Engineering Gateway 5108907 09/23/2013 10/07/2013 10/08/2013 Plans
6824 Engineering Hall Lab 311 Construction\ 990076 09/23/2013 10/07/2013 10/07/2013 Other: Construction Drawings
6823 Sue & Bill Gross Hall 4th Floor TI 994040 09/23/2013 10/07/2013 10/02/2013 Other: Supplemental Information # 1 Dwgs
6822 Sue & Bill Gross Hall - 4th Floor TI 994040 09/23/2013 10/07/2013 09/27/2013 Submittal: #23 3300-067: Air Duct accessories - Flex connect, FSD
6821 Business Unit 2 990500 09/19/2013 10/03/2013 10/01/2013 Other: Supplemental Info #7
6820 Sue & Bill Gross Hall 4th Floor TI 994040 09/19/2013 10/03/2013 10/02/2013 Submittal: 21 1000-020.1 Fire Protection Pkg. w/Backcheck
6819 Crawford Hall Renovation 991028 09/12/2013 09/26/2013 09/25/2013 Submittal: 28 3111-5 Fire Alarm Revision dwgs w/Approved Backcheck
6818 Sue & Bill Gross Hall 4th Floor TI 994040 09/12/2013 09/26/2013 09/16/2013 Submittal: #034-09-2900 - Gyp Board Trim & Joint Treatment Material Data
6817 Sue & Bill Gross Hall - 4th Floor TI 994040 09/11/2013 09/25/2013 09/25/2013 Submittal: #055-28 3111 - Fire Life Safety Spots & dots dwgs
6816 Gavin Herbert Eye Institute 998170 09/11/2013 09/25/2013 09/18/2013 Submittal: #522-28 3111 - 3rd Floor Terrace Fire Alarm Shop dwgs
6815 Sue & Bill Gross Hall - 4th Floor TI 994040 09/11/2013 09/25/2013 09/26/2013 Submittal: #051-28 3111 - Fire Life Safety Product data
6814 Engineering Gateway 5108907 09/09/2013 09/23/2013 09/10/2013 Plans
6813 Sue & Bill Gross Hall 4th Floor TI 994040 09/09/2013 09/23/2013 09/09/2013 Other: Conformed CP3 Dwgs. - FOR RECORDS ONLY
6812 Business Unit 2 990500 09/09/2013 09/23/2013 09/10/2013 RFI: #1176.001 FDC Cover in Fire Access Road
6811 Business Unit 2 990500 09/09/2013 09/23/2013 09/16/2013 RFI: #1187 Floor Box Fire Rating Options
6810 SBSG 5th Floor Dean's Office Renovation 5109529 09/09/2013 09/23/2013 09/09/2013 Plans
6809 Gavin Herbert Eye Institute 998170 09/05/2013 09/19/2013 09/05/2013 RFI 1623.001
6808 Gavin Herbert Eye Institute 12007 09/03/2013 09/17/2013 09/03/2013 Plans/Specifications
6807 Business Unit 2 990500 08/30/2013 09/13/2013 09/17/2013 Submittal: 21 1000-160 - Fire Protection Dwgs & Calcs.
6806 Sue & Gross Hall - 4th Floor TI 994040 08/30/2013 09/13/2013 09/04/2013 Other: 01 3200-006_CP3 Dwgs resubmittal w/Backchecks
6805 Gavin Herbert Eye Institute 998170 08/28/2013 09/11/2013 08/28/2013 RFI: #1624 - Alt. Means - Oversized Ext. Door (G902)
6804 Gavin Herbert Eye Institute 998170 08/28/2013 09/11/2013 08/29/2013 RFI: #1623 Engineering Judgement for 2nd Floor Sink
6803 Gavin Herbert Eye Institute 998170 08/28/2013 09/11/2013 08/29/2013 RFI: #1622_Fire Stopping at 2nd Floor Sink
6802 Gavin Hervert Eye Institute 998170 08/26/2013 09/09/2013 08/26/2013 Submittal: Reviewer 28 3111-6 Fire Alarm dwgs - 2nd Floor TI Built-up with approved product.
6801 Gavin Herbert Eye Institute 998170 08/26/2013 09/09/2013 09/12/2013 Submittal: 28 3111-6 Fire Alarm dwgs - 2nd Floor TI Built-up with approved product Data
6800 Engineering Gateway 5108907 08/23/2013 09/06/2013 08/23/2013 Plans & Simplex Submittals
6799 Sue & Bill Gross Hall - 4th Floor TI 994040 08/22/2013 09/05/2013 08/22/2013 Other: SI-1 (for CP-2) w/ Back-Reference & Narrative
6798 HA12T1 Housing Transformer Replacement 760091 08/22/2013 09/05/2013 08/22/2013 Other: Delta B_Grounding Coordination dwgs for Stamp-Sign
6797 Gavin Herbert Eye Institute 998170 08/21/2013 09/04/2013 08/22/2013 Other: Fire Alarm As-Builts dwgs - Garden Level, Level 1 & Levil 3- FRO
6796 Gavin Herbert Eye Institute 998170 08/21/2013 09/04/2013 08/22/2013 Other: Fire Suppression As-Builts dwgs - Garden Level, Level 1 & Level 3-FRO
6795 DM 2006/2007 Replace Oil Switch OS-41 5109431 08/21/2013 09/04/2013 08/22/2013 Plans - Bid Set
6794 Sue & Bill Gross Hall - 4th Floor TI 994040 08/21/2013 09/04/2013 09/04/2013 Submittal: #21 1000-020 - Fire Sprinker Pkg.
6793 Business Unit 2 990500 08/21/2013 09/04/2013 09/04/2013 Other: SI-6 Dwgs (Revisions to CP3) w/Narrative
6792 Verano Housing 5109351 08/20/2013 09/03/2013 08/22/2013 Plans
6791 MPAA 163936 08/09/2013 08/23/2013 08/09/2013 Plans/Specifications
6790 Crawford Hall Renovation 991028 08/08/2013 08/22/2013 08/16/2013 Submittal: 28 3111-4 Fire Alarm Revision dwgs w/Approved Backcheck
6789 Gavin Herbert Eye Institute 998170 08/08/2013 08/22/2013 08/26/2013 Submittal #21 1000-491.1-2nd Flr Fire Sprinkler Heads Dwgs w/Backcheck (CACCS, & Product Data)
6787 SC AV System Consolidation 5109113 08/07/2013 08/21/2013 08/08/2013 Plans
6786 Sue & Bill Gross Hall - 4th Floor IT 994040 08/06/2013 08/20/2013 08/21/2013 Other: CP3 Package Drawings
6785 Engineering Hall Lab 3111 Construction 990076 08/06/2013 08/20/2013 08/21/2013 Other: DD Dwgs date 7/10/2013
6784 Business Unit 2 990500 08/05/2013 08/19/2013 08/07/2013 RFI: #1157 Cover at FDC Line at GSM
6783 HA12T1 Housing Transformer Replacement 760091 08/02/2013 08/16/2013 08/08/2013 Other: Delta - A-Coordination Change Dwgs (Ref. #6757)
6782 HA12T1 Housing Transformer Replacement 760091 08/02/2013 08/16/2013 08/08/2013 Other: 01 3200-006 - Specifications
6781 Mesa Court Housing - Walkway Lighting Replacement 996265WL 08/02/2013 08/16/2013 08/15/2013 Other: 01 3200-04 - Specifications
6779 Hitachi/Plumbwood House 5109282 08/02/2013 08/16/2013 08/13/2013 Plans/Submittal Devices
6778 Sue & BillGross Hall 4th Floor TI 994040 08/01/2013 08/15/2013 08/01/2013 Other: CP2 - Demo and Elevator Structure dwgs
6777 Sue & Bill Gross Hall - 4th Floor TI 994040 08/01/2013 08/15/2013 08/21/2013 Other: CP 3 Package - Specifications
6776 Enginerring Hall III Room 5109290 08/01/2013 08/15/2013 08/08/2013 Plans/Specifications
6775 Verano Unit 6 5109301 07/31/2013 08/14/2013 08/08/2013 Plans
6774 Business Unit 2 990500 07/30/2013 07/30/2013 07/30/2013 OTHER: CONFORMED G-SHEETS - FOR RECORDS ONLY
6773 Gavin Herbert Eye Institute 998170 07/30/2013 08/13/2013 08/08/2013 Submittal: #493-05 7313 - 3rd Floor Terrace Guardrail shop dwgs
6772 Gavin Herbert Eye Institute 998170 07/29/2013 08/12/2013 08/01/2013 Other: Revised SI-16 Dwgs w/Response narrative & BackCheck
6771 Gavin Herbert Eye Institute 998170 07/29/2013 08/12/2013 07/31/2013 Submittal: #502-13 3123 Tensioned fabric Shade Structure
6770 Hitachi 5109131 07/26/2013 08/09/2013 07/26/2013 Plans
6769 Sue & Bill Gross Hall 4th Floor TI 994040 07/25/2013 08/08/2013 07/30/2013 RFI: #1001 - Fire Protection Water Supply - Flow Test Data
6768 Business Unit 2 990500 07/25/2013 08/08/2013 07/30/2013 RFI # 1148 Thrust Block at FS POC w/ Backcheck
6767 Gavin Herbert Eye Institute 998170 07/25/2013 08/08/2013 07/25/2013 Submittal: #496-01 3200 Start Up & Test Report - NFPA (FOR RECORDS ONLY)
6766 Business Unit 2 990500 07/23/2013 08/06/2013   Other: CP3 Conformed Dwgs-Vol 1 & 2 For Records Only
6765 Mesa Court Renovation Unit 2 Rcyts Bed Conversion (Arroyo) 996265 07/22/2013 08/05/2013 07/22/2013 Other: Certificate of Substantial Completion for signature
6764 HA12T1 Housing Transformer Replacement 760091 07/22/2013 08/05/2013 08/05/2013 Other: T-106 Drawing Docs - E-006, E-009
6763 HA12T1 Housing Transformer Replacement 760091 07/22/2013 08/05/2013 08/05/2013 Other: Method of Procedure - Replace T - 104
6762 Engineering Hall 1120 5109290 07/22/2013 08/05/2013 07/26/2013 Plans/Specifications
6761 Gavin Herbert Eye Institute Café 12007 07/17/2013 07/31/2013 07/26/2013 Plans
6760 Business Unit 2 990500 07/16/2013 07/30/2013 07/23/2013 Other: CP3_Revised A-303, and A-442 for Stamp/Sign w/Backcheck
6759 Gain Herbert Eye Institute 998170 07/16/2013 07/30/2013 07/16/2013 Other: NFPA 13 & 14 Contractor's Material & Test Cert. for Above Ground
6758 Gavin Herbert Eye Institute 9988170 07/16/2013 07/30/2013 07/16/2013 Other: NFPA 13 & 24 Contractors' Material & Test Cert. for Underground piping
6757 HA12T1 Housing Transformer Replacement 760091 07/16/2013 07/30/2013 08/05/2013 Other: 100% CD Dwg Package
6756 Gavin Herbert Eye Institute 998170 07/16/2013 07/30/2013 07/19/2013 RFI #1594 Level 2-Fire Alarm Work Plan
6755 Business Unit 2 990500 07/16/2013 07/30/2013 07/25/2013 RFI #1138_Mechancial Room Partition Rating
6754 Business Unit 2 990500 07/15/2013 07/29/2013 07/25/2013 Submittal: #21 1000-137_ Automatic Fire Sprinkler System
6753 Verano Place Unit 6 5109301 07/15/2013 07/29/2013 07/17/2013 Plans
6752 Business Unit 2 990500 07/12/2013 07/26/2013 07/25/2013 RFI: 1132_Radiant Heat Manifold
6751 Gavin Herbert Eye Institute 998170 07/12/2013 07/26/2013 07/25/2013 Submittal: #21 1000-492 - 2nd Floor Fire Sprinkler Heads Dwgs
6750 Gavin Herbert Eye Institute 998170 07/12/2013 07/26/2013 07/15/2013 Submittal: #07 8413-490 - MC Cable Fire Stopping Product data
6749 Business Unit 2 990500 07/11/2013 07/25/2013 07/22/2013 Submittal: 132-21 1000_Fire Sprinkler UG POC
6748 Business Unit 2 990500 07/10/2013 07/24/2013 07/11/2013 Other: CP3 Dwgs - Replaced sheets to Sign/stamp
6747 Multi-Bldg Research Facility Security Camera 5109112 07/10/2013 07/24/2013 07/11/2013 Plans
6746 Sue & Bill Gross Hall - 4th Floor TI 994040 07/10/2013 07/24/2013 08/05/2013 Other: CP-2_100% DD package - Demo & Elevator Struct. - Specs. + Dwgs.
6745 Gavin Herbert Eye Institute 998170 07/10/2013 07/24/2013 07/22/2013 Other: SI #16 Dwgs w/Narrative
6744 Business Unit 2 990500 07/10/2013 07/24/2013 07/25/2013 Submittal: #33 1110-128 GSM bldg., FDC work plan
6743 Mesa Court Housing - Walkway Lightning Replacement 996265WL 07/10/2013 07/27/2013 07/25/2013 Other: Fencing Plan - Laydown Area
6742 Gavin Herbert Eye Institute 998170 07/10/2013 07/24/2013 07/10/2013 Submittal: #28 3111-072.5_Fire Alarm Dwg - Garden Level w/Chimes
6741 Mesa Court Housing - Walking Walkway Lightning Replacement 996265WL 07/10/2013 07/24/2013 07/16/2013 Other: 100% Construction Drawings
6740 Engineering Hall 1120 5109290 07/08/2013 07/22/2013 07/11/2013 Plans
6739 Gateway Study Center 17E - PRF 07/08/2013 07/22/2013 07/08/2013 Other: Evac Maps
6738 Gavin Herbert Eye Institute 998170 07/03/2013 07/17/2013 07/03/2013 Submittal #21 3100-483_Fire Sprinkler As-Built Shop Dwgs. FRO
6737 Business Unit 2 990500 07/03/2013 07/17/2013 07/23/2013 Submittal #23 3300-125 Air Duct Accessories
6736 Gavin Herbert Eye Institute 998170 07/02/2013 07/16/2013 07/10/2013 Other: FA-101-Garden Lvl with Chimes_Discuss at 1:30 FLS Mtg.
6735 Student Ctr. AV System Consolidation 5109113 07/02/2013 07/16/2013 07/10/2013 Plan Check
6734 Engineering Gateway H 2 TANK 07/01/2013 07/15/2013 07/09/2013 Site work to receive Bulk Hydrogen
6733 Gavin Herbert Eye Institute 998170 07/01/2013 07/15/2013 07/02/2013 Submittal: #28 0600-478_Public Safety Test Procedures - 800MHZ
6732 Gavin Herbert Eye Institute 998170 07/01/2013 07/15/2013 07/02/2013 RFI: #1589.001 Fire Stopping Detail for Level 2 Plumbing Flr.
6731 Mesa Court - Arroyo Room Conversion 996265AR 06/28/2013 07/12/2013 07/10/2013 Other: Construction Dwgs for Sign/Stamp
6730 Business Unit 2 990500 06/28/2013 07/12/2013 07/15/2013 RFI: #1120 Concrete Staging Plan
6729 Business Unit 2 990500 06/27/2013 07/11/2013 07/25/2013 RFI: #1106_Floor Access Added
6728 Gavin Herbert Eye Institute 998170 06/27/2013 07/11/2013 07/02/2013 RFI: #1581_Location of Generator Remote Anunciator Panel
6727 Gavin Herbert Eye Institute 998170 06/26/2013 07/10/2013 06/26/2013 Other: Conformed SI #13 - FOR RECORDS ONLY
6726 Gavin Herbert Eye Institute 998170 06/26/2013 07/10/2013 06/26/2013 Other: Conformed SI# 15 FOR RECORDS ONLY
6725 Sue & Bill Gross Hall-4th Floor TI 994040 06/26/2013 07/10/2013 07/02/2013 Other: CP-1_Revised G-Sheets w/Backcheck
6724 Verano Place 4 Demolition 996295 06/26/2013 07/10/2013 06/26/2013 Submittal: Completion Certificate
6723 Gavin Herbert Eye Institute 998170 06/26/2013 07/10/2013 06/27/2013 RFI: 1588_Response to EH-11 #94 Vestibule G924 - 2nd Exit
6722 Engineering Parking Structure 5109157 06/25/2013 07/09/2013 06/28/2013 Other: Final Review/Install Smart Grid Solar Car Shade
6721 Gavin Herbert Eye Institute 12007 06/25/2013 07/09/2013 07/02/2013 Submittal: Interior Tenant Improvement for new Café at UCI Gavin Herbert Eye Institute.
6720 Panda Express 109-2011 06/24/2013 07/08/2013 06/26/2013 Ansul System: add nozzle for Gas Griddle
6719 Gavin Herbert Eye Institute 998170 06/21/2013 07/05/2013 06/26/2013 Submittal: #249 06 4000-3_Privacy Curtain w/Backcheck RFI
6718 Business Unit 2 990500 06/21/2013 07/05/2013 06/27/2013 Submittal: #107-23 3113-0_PVS Metal Duct Product Data
6717 Social Science Parking Structure 5109281 06/20/2013 07/04/2013 06/26/2013 Plans/Specifications
6716 Crawford Hall Renovation 991028 06/20/2013 07/04/2013 06/25/2013 Other: Revise G-0.03, & A-10.00, A-10.10 for stamp/sign
6715 Crawford Hall Renovation 991028 06/20/2013 07/04/2013   Other: Conformed CP3 Dwgs (half size set) - For Records Only
6714 Gavin Herbert Eye Institute 998170 06/20/2013 07/04/2013   Submittal: #475-01 3200-0_NFPA - For Records
6713 Business Unit 2 990500 06/20/2013 07/04/2013 06/27/2013 RFI: #1119_Elevator Control Closet Rating
6712 Engineering Parking Structure 5109157 06/20/2013 07/04/2013 06/20/2013 Back Check
6711 Intercollegiate Athletics Bldg. # 625 5109339 06/19/2013 07/03/2013 06/26/2013 Plans & Submittals
6710 Gavin Herbert Eye Institute 998170 06/19/2013 07/03/2013 06/20/2013 RFI #1582_EJ - T-Rating for 800MHZ cable
6709 Gavin Herbert Eye Institute 998170 06/19/2013 07/03/2013 06/20/2013 Other: SI #15 (Revised G-102) w/ Backcheck
6708 GHEI 998170 06/19/2013 07/03/2013   RFI: 1569.001
6707 Business Unit 2 990500 06/18/2013 07/02/2013 06/20/2013 Other: Application for Approval - Alt. Means of Design-Fire safety
6706 Verano Place Unit 4 Demolition 996295 06/17/2013 07/01/2013 06/17/2013 Other: Certificate of Beneficial Occupancy
6705 Crawford Hall Renovation 991028 06/10/2013 06/24/2013 06/11/2013 Other: CP3 Dwgs Resubmittal with Backcheck
6704 Engineering Parking Structure 5109157 06/10/2013 06/24/2013   Install Smart Grid Solar Car Shade
6703 Business Unit 2 990500 06/10/2013 06/24/2013 06/10/2013 Other: CP #3 dwgs for Stamp/Sign w/backcheck
6702 Gavin Herbert Eye Institute 998170 06/07/2013 06/21/2013 06/26/2013 RFI: #1565.001_Tunnel construction at Garden Level w/Backcheck
6701 Gavin Herbert Eye Institute 998170 06/06/2013 06/20/2013 06/20/2013 Submittal: #465-01 3200_Fire Access Plan w/Reference
6700 Gavin Herbert Eye Institute 998170 06/06/2013 06/20/2013 06/13/2013 RFI: #1571_Flexible Fire Alarm Conduits
6699 CDC Exg Bldg FA Replacement 5109285 06/06/2013 06/20/2013 06/10/2013 Plans
6698 CDC Modular Expansion 5109306 06/06/2013 06/20/2013 06/10/2013 Back Check
6697 Student Ctr. AV System Consolidation 5109113 06/06/2013 06/20/2013 06/12/2013 Plans
6696 Crawford Hall Renovation 991028 06/05/2013 06/19/2013 06/18/2013 Submittal: #28 3112.1R2-Fire Alarm pkg w/backcheck
6695 Gavin Herbert Eye Institute 998170 06/04/2013 06/18/2013 06/20/2013 Other: SI # 13 dwgs for Stamp/Sign
6694 Gavin Herbert Eye Institute 998170 06/04/2013 06/18/2013 06/13/2013 Submittal: 418-07 8413-0_Electrial Fire stopping
6693 Intercollegiate Athletics Bldg. #625 (Formerly HOB 2) 5109339 06/04/2013 06/18/2013 06/10/2013 Plans & Submittals
6692 Arroyo Vista Community 5109142 06/04/2013 06/18/2013 06/10/2013 Plans
6691 Business Unit 2 990500 06/04/2013 06/18/2013 06/13/2013 RFI: #1096_POC Elevation for Fire Riser
6690 Sue & Bill Gross Hall - 4th Floor TI 994040 05/31/2013 06/14/2013 06/10/2013 Other: CP-1_G-Sheets
6689 Gavin Herbert Eye Institute 998170 05/30/2013 06/13/2013 06/03/2013 RFI #1566_Privacy Curtain Mesh Sprinkler Coverage
6688 BC's Cavern - Fire Alarm 5108323 05/30/2013 06/13/2013 06/03/2013 Plans/Specifications - Fire Alarm Submittal OMB Job. No. 64268
6687 Gavin Herbert Eye Institute 998170 05/29/2013 06/12/2013 06/03/2013 RFI #1565_Tunnel Construction at Garden Level Corridor
6686 Business Unit 2 990500 05/29/2013 06/12/2013 06/03/2013 RFI # 1095_Colloquium Occupant Load Factor
6685 Business Unit 2 990500 05/29/2013 06/12/2013 05/30/2013 Submittal: #23 0000-081_Tunnel work Plan (Phase 2)
6684 Business Unit 2 990500 05/29/2013 06/12/2013 05/29/2013 Submittal: #23 0000-076.1_Tunnel work Plan (Phase 1)
6683 Gavin Herbert Eye Institute 998170 05/24/2013 06/07/2013   Other SI #15 Dwgs
6682 Gavin Herbert Eye Institute 998170 05/24/2013 06/07/2013 05/29/2013 RFI #1561_Verbage for FDC Signs
6681 Gavin Herbert Eye Institute 998170 05/24/2013 06/07/2013 05/29/2013 RFI #1563_OCFA Building Number Location
6680 Student Center - Study Lounge 64268 05/17/2013 05/31/2013 05/23/2013 Fire Alarm Submittal
6679 Gavin Herbert Eye Institute 998170 05/15/2013 05/29/2013 05/15/2013 Other: 01 3200_SI #14 Dwgs
6678 Business Unit 2 990500 05/15/2013 05/29/2013 05/16/2013 RFI # 1084_Storm Drain Conflict
6677 Business Unit 2 990500 05/15/2013 05/29/2013 05/15/2013 SI #4 Dwgs
6676 Gavin Herbert Eye Institute 998170 05/14/2013 05/28/2013 05/22/2013 Submittal #28 0600_First responder radio Equipment lay-out_FRO
6675 Gavin Herbert Eye Institute 998170 05/14/2013 05/28/2013 05/21/2013 RFI #1118.001_Location of card Reader, Push pad & Knox Box w/1321.001 REF
6674 Business Unit 2 990500 05/14/2013 05/28/2013 05/20/2013 Submittal #23 0700-072 HVAC Insulation - Fast Wrap XL
6673 CDC Modular Expansion FA System Shop dwg. 5109312 05/14/2013 05/28/2013 05/17/2013 Plans/Specifications
6672 Business Unit 2 990500 05/14/2013 05/28/2013 05/16/2013 RFI #1078_UG Waterline Restraints w/Reference
6671 Gottschalk Medical Plaza 5109050/140821 05/09/2013 05/23/2013 05/22/2013 Plans/Bid Set (Bid set drawings with Engineer's Signature)
6670 ELF Engineering Laboratory Facility 5108921 05/08/2013 05/22/2013 05/16/2013 Plans/Submittal
6669 Gavin Eye Institute 998170 05/08/2013 05/22/2013 05/16/2013 Evacuation Maps
6668 LAW Bldg - Law Library 991107 05/08/2013 05/22/2013 05/16/2013 Location Proofs
6667 CDC Exg Bldg FA Upgrade 5109285 05/06/2013 05/20/2013 05/14/2013 Plans/Specifications
6666 Med. Sci C 114 5109318 05/06/2013 05/20/2013 05/14/2013 Plans - Re-Route Existing Exhaust System
6665 Business Unit 2 990500 05/03/2013 05/17/2013 05/06/2013 Submittal: #069-33 1110_Hot tap for A-C Pipe
6664 Medical Science C 5109267/150291 05/03/2013 05/17/2013 05/07/2013 Plans Bid Set
6663 Crawford Hall Renovation 991028 05/03/2013 05/17/2013 05/20/2013 CP3 dwgs w/backcheck
6662 Business Unit 2 990500 05/03/2013 05/17/2013 05/06/2013 Submittal #068-33 1110_Hot tap work plan & GSM Waterline tie-in
6661 Crawford Hall Renovation 991028 05/02/2013 05/16/2013 05/22/2013 Submittal #28 3111.02_Fire Alarm Dwg w/backcheck
6660 Business Unit 2 990500 05/01/2013 05/15/2013 05/08/2013 RFI - #1065_AHU Factory mounted Smoke Control
6659 Verano Unit 3 5109187 05/01/2013 05/15/2013 05/02/2013 Fire Alarm Upgrade
6658 Business Unit 2 990500 04/24/2013 05/08/2013 05/08/2013 RFI #1054_Emergency Phone Locations
6657 Valimar 5109350 04/23/2013 05/07/2013 04/24/2013 Plans
6656 Business Unit 2 990500 04/22/2013 05/06/2013 05/09/2013 Submittal #01 3200-064_SI -3 _G-sheets w/backchecks
6655 Business Unit 2 990500 04/19/2013 05/03/2013 05/15/2013 Submittal #01 3200-061_CP-3 Design Package - Vol 1 & Vol 2
6654 Enginerring Parking Structure 5109157 04/17/2013 05/01/2013 04/29/2013 Plans
6653 Robert Cohen Teather ( Studio Theater - 713) 5108942/991104 04/16/2013 04/30/2013 04/23/2013 Plans - Shop Drawings
6652 Student Center - Study Lounge 5109397/163198 04/15/2013 04/29/2013 04/18/2013 Specification/Submittals
6651 Crawford Hall Renovation 991028 04/10/2013 04/24/2003 04/15/2013 Submittal # 01 3200.01_DP_3 Design dwgs w/backcheck & Submittal # 01 3200.02_ DP 3 Specification
6650 Verano-4 Demolition 996295 04/15/2013 04/29/2013 04/15/2013 Submittal #01 3200-Civil Dwg Package for Stamp/Sign
6649 Multi-Bldg - Research Facilities Security Camera 5109112 04/15/2013 04/29/2013 04/19/2013 Plans
6648 Baseball Field 5109052/140822 04/15/2013 04/29/2013 04/23/2013 Plans - Bidset
6647 Business Unit 2 990500 04/12/2013 04/26/2013   Other: Conformed Dwgs-CP-2A for Records Only
6646 Business Unit 2 990500 04/12/2013 04/26/2013   Other: Conformed Dwgs-CP - 1 with SI for Records Only
6645 Gavin Herbert Eye Institute 998170 04/12/2013 04/26/2013 04/15/2013 Submittal # 418-07 8413-1_Electrical Firestopping - FRO
6644 Business Unit 2 990500 04/12/2013 04/26/2013 04/15/2013 RFI # 1022.001_Sprinklers under Exterior deck & Bld. Setbacks
6643 Hitachi 5109131 04/11/2013 04/25/2013 04/18/2013 Plans/EH&S Redlines
6642 Student Center - Study Lounge 12006 04/11/2013 04/25/2013 04/16/2013 Student Center - Study Lounge Set # 3
6641 McGaugh Hall 5108686 04/10/2013 04/24/2013 04/16/2013 Submittal
6640 Crawford Hall Renovation 991028 04/10/2013 04/24/2013 04/15/2013 Submittal # 01 3200.01_DP_3 Design dwgs w/backcheck & Submittal # 01 3200.02_ DP 3 Specification
6639 Student Center AV System Consolidation 5109113 04/09/2013 04/23/2013 04/16/2013 Plans
6638 Business Unit 2 990500 04/09/2013 04/23/2013 04/22/2013 Submittal # 33 1110-051 Water Distribution Product data
6637 Student Center - Study Lounge 12006 04/05/2013 04/19/2013 04/08/2013 Plans - Student Center - Study Lounge
6636 CDC EXG Bldg FA Upgrade 5109285 03/28/2013 04/11/2013 04/04/2013 Plans with Wet Signature
6635 CDC Expansion Modular 5109306 03/28/2013 04/11/2013 04/04/2013 Plans with Wet Signature
6634 Verano-4 Demolition 996295 03/27/2013 04/10/2013 03/28/2013 Submittal: #33 4100-24 Fire Road Trenching Plan with Backcheck
6633 Business Unit 2 990500 03/26/2013 04/09/2013 04/15/2013 Sl-1 Specs to Stamp/Sign
6632 Gavin Herbert Eye Institute 998170 03/26/2013 04/09/2013 03/28/2013 Submittal #378-08 5000 Fire Rated Glazing w/UL listing
6631 Gavin Herbert Eye Institute 998170 03/25/2013 04/08/2013 04/03/2013 Submittal #418-07 8413 Electrical Firestopping Penetration
6630 Robert Cohen Theater (Studio Theater-713) 5108942/991104 03/22/2013 04/05/2013 04/04/2013 Plans/Cut Sheets FA Devices
6629 Verano-4 Demolition 996295 03/22/2013 04/05/2013 03/27/2013 Submittal: #01000-24 Fire Road Trenching Plan
6628 Crawford Hall Renovation 991028 03/21/2013 04/04/2013 03/26/2013 Temporary Egress Plan
6627 Gavin Herbert Eye Institute 998170 03/21/2013 04/04/2013 03/22/2013 Submittal #378 Fire Rated Glazing
6626 Hitachi 5109131 03/20/2013 04/03/2013 04/05/2013 Plans
6625 BU2 990500 03/20/2013 04/03/2013 03/20/2013 CP-1, SI-1
6624 Law Library Expansion PH-1 991107 03/11/2013 04/01/2013 03/18/2013 RFI #13 Emergency Lighting Locations E-202 Stamp/Sign
6623 Gavin Herbert Eye Institute 998170 03/19/2013 04/02/2013 03/19/2013 Submittal #28 0600-402 First Responder Radio Communication
6622 CDC Modular Expansion 5109306 03/15/2013 03/29/2013 04/04/2013 Plans - Final Review
6621 CDC Exg Bldg FA Upgrade 5109285 03/15/2013 03/29/2013 04/04/2013 Plans - Final Review
6620 Gottschalk Medical Plaza 5109050/140821 03/14/2013 03/28/2013 03/26/2013 Plans/Specifications
6619 Baseball Field 5109052/140822 03/14/2013 03/28/2013 03/26/2013 Plans/Specifications
6618 Student Center - Study Lounge 12006 03/13/2013 03/25/2013 03/19/2013 Plan for Review
6617 Multi Bldg/Research Facility Security Camera ulti/Bldg/Research Facility Security Camera 5109112 03/11/2013 03/25/2013 03/18/2013 Plans/Final Review
6616 Engineering Gateway 5108907 03/11/2013 03/25/2013 03/18/2013 Plans, Final review, approval stamp
6615 Verano Unit 1-3 5109187 03/08/2013 03/22/2013 03/18/2013 Plans, 100%review, approval stamp, Fire Alarm upgrade, bldgs 900-1800 layout
6614 GHEI 998170 03/07/2013 03/21/2013 03/07/2013 Stamp and Sign SI-12
6613 Unex Bldg "D" 5109092 03/06/2013 03/20/2013 03/07/2013 Plans; final review
6612 BU2 990500 03/06/2013 03/20/2013 03/06/2013 RFI #1028_Standpipe Hose Connections
6611 BEC 5109296 03/05/2013 03/19/2013 03/06/2013 Arena Lighting
6610 Crawford Hall Renovation 991028 03/05/2013 03/19/2013 04/01/2013 Submittal # 28 3100-01_Fire Alarm dwgs
6609 BU2 990500 03/01/2013 03/15/2013 03/07/2013 RFI #1025_truck Delivery Route
6608 GHEI 998170 03/01/2013 03/15/2013 03/07/2013 Submittal # 26 3213-404_generator start up procedure
6607 GHEI 998170 02/28/2013 03/14/2013 03/11/2013 Submittal # 28 0600-402_First responder radio comunication
6606 GHEI 998170 02/28/2013 03/14/2013 03/19/2013 RFI # 1506_Two way communication to comply w/EN #47
6605 Verano-4 Demolition 996295 02/28/2013 03/14/2013 03/06/2013 Submittal # 01000-18_Road encroachment at Adobe circle
6604 Verano-4 Demolition 996295 02/28/2013 03/14/2013 03/06/2013 Submittal # 01000-17_Sidewalk encroachment Plan
6603 Verano- Demolition 996295 02/28/2013 03/14/2013 03/18/2013 Submittal # 02050-19_transite pipe removal plan
6602 BU2 990500 02/28/2013 03/14/2013 03/21/2013 RFI review 1024 Exit discharge
6601 RFI review 990500 02/28/2013 03/14/2013 03/26/2013 RFI review 1022 Omission of sprinklers under exterior decks and setbacks
6600 BU2 990500 02/28/2013 03/14/2013 03/22/2013 RFI Review 1020 Confirmation of hose pulls
6599 BU2 990500 02/28/2013 03/14/2013 03/11/2013 RFI review 1023 level 5 fire life safety
6598 Engineering Gateway 5108716 02/26/2013 03/12/2013 03/06/2013 Submittals; final review
6597 CDC (Exixting Bldg) FA update 5109283 02/25/2013 03/11/2013 03/05/2013 Plan Check
6596 CDC Modular Expansion 5109306 02/25/2013 03/11/2013 03/05/2013 Plan Check
6595 GHEI 998170 02/25/2013 03/11/2013 02/25/2013 Fire Sprinkler Dwgs_Approved as Noted_for records only
6594 Crawford Hall renovation 991028 02/25/2013 03/11/2013 02/27/2013 Temporary Extension of Fence 02/26 Thru 04/29
6593 Data Center relocation and Upgrade 997168 02/22/2013 03/08/2013 02/27/2013 Submittal #28 3111.01R2_Fire Alarm w/Backcheck F-002
6592 GHEI 998170 02/22/2013 03/08/2013 02/27/2013 RFI #1496_Atrium Artwork Connections
6591 BU2 990500 02/21/2013 03/07/2013 02/27/2013 RFI # 1011.001_FDC Extension at GSM-Re: check-valve
6590 BU2 990500 02/21/2013 03/07/2013 02/27/2013 RFI # 1018_GSM FDC extension material w/ ref: RFI 1011
6589 BEC 5109296 02/21/2013 03/07/2013 03/05/2013 Plans
6588 Business Unit 2 990500 02/21/2013 03/07/2013 02/27/2013 RFI # 1013_Mechanical Restrained Joints w/ QA response
6587 Gavin Herbert Eye Institue 998170 02/21/2013 03/07/2013 02/27/2013 Submittal: #28 3111-72.4_ Fire Alarm ( 2 Copies) w/back check
6586 Engineering Gateway 5108907 02/20/2013 03/06/2013 02/27/2013 Plans, Final Review, Approval Stamp
6585 Business Unit 2 990500 02/20/2013 03/06/2013 02/21/2013 RFI# 1016_Generator Transfer Switch Location
6584 Business Unit 2 990500 02/19/2013 03/05/2013 02/21/2013 RFI # 1017_Stand-pipe Isolation Control Valve & Fire Sprinkler Control Valve
6583 Business Unit 2 990500 02/19/2013 03/05/2013 02/21/2013 Other: Fire Life stafety package (G-sheets) w/Backcheck #6527
6582 Rederivation and Internal Quarantine Suite 997174 02/15/2013 03/01/2013 02/15/2013 Other: Certification of substantial completion
6581 BU2 990500 02/13/2013 02/27/2013 02/15/2013 RFI#1006.001_Temporary Exiting Thru GSM w/Backcheck
6580 Unex Building "D" 5109092 02/13/2013 02/27/2013 02/26/2013 Replace AHU + Condenser serving "D"
6579 Crawford Hall Renovation 991028 02/12/2013 02/26/2013 02/15/2013 Submittal # 01 7319.01_Selective Demolition Plan
6578 Crawford Hall Renovation 997028 02/12/2013 02/26/2013 02/25/2013 Other: 100% CD dwgs w/ G sheet comment response
6577 Crawford Hall Renovation 991028 02/11/2013 02/25/2013 02/11/2013 Other: Demo Dwgs_For info Only
6576 Crawford Hall Renovation 991028 02/07/2013 02/21/2013 02/15/2013 Submittal # 02 4119.01_Asbestos Abatement Work Plan
6575 BU2 990500 02/07/2013 02/21/2013 02/12/2013 RFI # 1012_Stair Access to Roof
6574 BU2 990500 02/07/2013 02/21/2013 02/12/2013 RFI # 1011_FDC Extension at GSM
6573 Crawford Hall Renovation 991028 02/07/2013 02/21/2013 02/12/2013 Submittal #07 8413.01_Fire stopping_Plumbing
6572 Law Library Expansion PH-1 991107 02/07/2013 02/21/2013 02/15/2013 Submittal #21 100.02R1_Fire Sprinkler Dwgs w/backcheck
6571 Engineering Gateway 5108907 02/07/2013 02/21/2013 02/26/2013 Plans, Final Review, Approval Stamp
6570 Data Center Relocation & Upgrade 997168 02/06/2013 02/20/2013 02/15/2013 Submittal # 28 3111.01R1_Fire Alarm w/Backcheck
6569 BC's Cavern 152501 02/06/2013 02/20/2013 02/15/2013 Spec
6568 GHEI 998170 02/05/2013 02/19/2013 02/07/2013 Other: Response to EN-11 #46_Pocket Door
6567 Engineering Gateway 5108907 02/04/2013 02/18/2013 02/15/2013 Plans, specifications, 100% review, approval stamp
6566 GHEI 998170 02/04/2013 02/18/2013 02/21/2013 Submittal #21 1000-390 Fire Suppresion materials and Equip #2
6565 GHEI 998170 02/04/2013 02/18/2013 02/04/2013 Other: Current Conformed CD-FRO FOR RECORDS ONLY
6564 BU2 990500 01/30/2013 02/13/2013 01/30/2013 Other: G-104_Fire Access Plan w/ Backcheck #6520
6563 Sue & Gross Hall 994038 01/29/2013 02/12/2013 01/29/2013 Other: User requested renovations- P2D Partition
6562 GHEI 998170 01/29/2013 02/12/2013 02/12/2013 RFI # 1487-EN11 #45_Sprinkler Obstruction in Atrium
6561 BU2 990500 01/29/2013 02/12/2013 01/29/2013 BU2 CP-1
6560 Hitachi 5109131 01/29/2013 02/12/2013 02/15/2013 Plans, 80% review, comments and corrections
6559 Crawford Hall Renovation 991028 01/28/2013 02/11/2013 02/05/2013 Other: Fencing and Lay-down plan_Option A&B
6558 Arroyo Vista Housing 5109061 01/28/2013 02/11/2013 02/05/2013 Plans, 80% Review, comments and corrections
6557 Law Library Expansion PH-1 991107 01/25/2013 02/08/2013 01/28/2013 Submittal: #28 3111.01_Fire Alarm Dwg w/ Product Data
6556 Data Center Relocation & Upgrade 997168 01/25/2013 02/08/2013 01/28/2013 Submittal: #28 3111.01_Fire Alarm Dwg & Product Data
6555 Crawford Hall Renovation 991028 01/25/2013 02/08/2013 02/01/2013 Other: G Sheets
6554 Data Center Relocation and Upgrade 997168 01/24/2013 02/07/2013 02/04/2013 Other: A315, M101, M-501 w/backcheck Hot-Cold Containment
6553 Bio sci 3 RIQS 997174 01/24/2013 02/07/2013 01/25/2013 Fire Alarm Plans & Product Data
6552 Rederivation & Internal Quarantine Suite 997174 01/23/2013 02/06/2013 02/01/2013 Submittal 21 1000-2_Fire Sprinkler- hanger and fastener
6551 GHEI 998170 01/23/2013 02/06/2013 01/23/2013 Other: SI-10 Dwgs Resubmittal with Backacheck 6503
6550 Engineering Gateway 5108907 01/22/2013 02/05/2013 02/01/2013 Plans, Final review, Approval Stamp
6549 Law Library Expansion PH-1 991107 01/22/2013 02/05/2013 01/25/2013 Submittal #28 3110.01_Fire Alarm Dwg & product data
6548 Bren Event Center 5109296 01/22/2013 02/05/2013 02/05/2013 Plans
6547 Data Center Relocation and Upgrade 997168 01/18/2013 02/01/2013 01/28/2013 Submittal # 21 1000.02_Fire Sprinkler Dwg-FP! w/ Backcheck # 6508
6546 Law Library Expansion PH-1 991107 01/18/2013 02/01/2013 02/24/2013 Submittal #21 100.02_Fire Sprinkler Dwg w/ Backcheck
6545 GHEI 998170 01/18/2013 02/01/2013 01/18/2013 SI-11
6544 Verano, Unit 1-3 5109187 01/18/2013 02/01/2013 01/22/2013 Plans, 100% review, approval stamp
6543 Engineering Gateway 5108907 01/18/2013 02/01/2013 03/05/2013 Roof Cover Fire Sprinkler Drawings
6542 Unex Building "D" 5109092 01/18/2013 02/01/2013 02/05/2013 Replace AHU and Condenser serving "D"
6541 BU2 990500 01/17/2013 01/31/2013 01/17/2013 Review Asbestos Workers Certs and medicals
6540 BU2 990500 01/17/2013 01/31/2013 01/17/2013 Review Asbestos Worker's Certs and Medicals
6539 Med Sci C 5109267 01/17/2013 01/31/2013 02/01/2013 Pland 90% CD, Specifications, Comments and Corrections
6538 Business Unit 2 990500 01/17/2013 01/31/2013 01/25/2013 RFI # 1006_Temporary Exiting thru GSM (Ref. EHS #6530)
6537 Gavin Herbert Eye Institute 998170 01/17/2013 01/31/2013 01/28/2013 Submittal #08 8000-378_fire Rated Glazing
6536 Engineering Gateway 5108716 01/16/2013 01/30/2013 02/01/2013 Submittals (fire pen/aircuity) etc
6535 Verano Place Demo 996295 01/16/2013 01/30/2013 01/16/2013 Other: Asbestos Worker's Certification & Medicals
6534 Rederivation & Internal Quarantine Suite (RIQS) 997174 01/15/2013 01/29/2013 01/16/2013 Submittal: Revised Fire Sprinkler Dwg W/Backcheck
6533 Business Unit 2 990500 01/15/2013 01/29/2013 01/28/2013 Other: CP-1_Site Utility & Grading Package (Specs & Dwgs)
6532 Law Library Expansion PH-1 991107 01/14/2013 01/28/2013 01/16/2013 Submittal #07 8413.02_3M Fire Barrier Pillow Product Data and Detail
6531 Law Library Explansion PH-1 997707 01/14/2013 01/28/2013 01/16/2013 Submittal #07 8413.01_Fire Stopping STI system # HW-D-0377
6530 Business Unit 2 990500 01/11/2013 01/25/2013 01/25/2013 Other: Temporary Fencing Plan- Phase 1 & 2
6529 Verano-4 Demolition 996295 01/11/2013 01/25/2013 01/15/2013 Other: Revised Temporary Fencing Plan
6528 Verano-Demolition 996295 01/11/2013 01/25/2013 01/16/2013 Submittal # 02050-7R_Traffic Routing & Flagman Plan
6527 Business Unit 2 990500 01/11/2013 01/25/2013 01/31/2013 Other: CP-1_G-sheets (revised) w/Backcheck for Stamp/sign
6526 Verano-4 Demolition 996295 01/11/2013 01/25/2013 01/16/2013 Submittal # 01021-6_Demolition & SWPPP Plan
6525 Verano Unit 1-3 5109187 01/10/2013 01/24/2013 01/10/2013 Upgrade F.A system at Verano units 1-13
6524 Law Library Expansion PH-1 997707 01/10/2013 01/24/2013 01/10/2013 DR-04_100%CD_E-202 for stamp/sign
6523 Business Unit 2 990500 01/10/2013 01/24/2013 02/05/2013 RFI # 1005_Schematic Design Fire Protection Report
6522 Business Unit 2 990500 01/09/2013 01/23/2013 01/30/2013 RFI #1004.001_Protection of the Elevator Shaft
6521 Verano-4 Demolition 996295 01/07/2013 01/21/2013 01/10/2013 Other: Temporary Fencing Plan
6520 Business Unit 2 990500 01/07/2013 01/21/2013 01/15/2013 Other: G-104_Fire Access Plan for OCFA review
6519 Rederivation & Internal Quarantine Suite (RIQS) 997174 01/07/2013 01/21/2013 01/10/2013 Submittal #13850-1R_Fire Alarm Product data & DWG w/Backcheck
6518 Bio Sci 3 RIQS 997174 01/07/2013 01/21/2013 01/09/2013 Fire Sprinkler Plan
6517 Bio Sci 3 RIQS 997174 01/04/2013 01/18/2013 01/08/2013 Firestopping Product Data
6516 Bio Sci 3 RIQS 997174 01/04/2013 01/18/2013 01/07/2013 Submittal: Fire alarm plans & product data
6515 GHEI 998170 01/03/2013 01/17/2013 01/08/2013 RFI: 1463: Test connection at sprinkler cabinet
6514 Verano-4 Demolition 996295 01/03/2013 01/17/2013 01/09/2013 Submittal # 02050-2B_Abatement - Lead w/Back check
6513 Verano- 4 Demolition 996295 01/03/2013 01/17/2013 01/10/2013 Other: SCAQMD_10-day Notification
6512 Verano- 4 Demolition 996295 01/03/2013 01/17/2013 01/09/2013 Submittal: #02050-2A_ Abatement-Asbestos w/ Back Check
6511 GHEI 998170 01/03/2013 01/17/2013 01/17/2013 Other: Fire Alarm Drawings (2 copies)
6510 Law Library Expansion PH-1 997707 12/21/2012 01/04/2013 01/03/2013 Other: DR-04_100%CDw/Backcheck #6484 for stamp/ sign
6509 Redrivation & Internal Quarantine Suite (RIQS) 997174 12/20/2012 01/03/2013 01/09/2013 Submittal #09 9200-1_Gypsum Board Assemblies
6508 Data Center Relocation & Upgrade 997168 12/20/2012 01/03/2013 01/08/2013 Submittal #21 100.02_Fire Sprinkler Dwg-FP1 w/backcheck #6498
6507 Data Center Relocation 997168 12/19/2012 01/02/2013 01/08/2013 Submittal # 21 1000.01_Fire Sprinkler Material
6506 Business Unit 2 990500 12/18/2012 01/01/2013 01/04/2013 Other: Revised G-sheets w/Backcheck #6475
6505 Verano-4 Demolition 996295 12/18/2012 01/01/2013 12/20/2012 Submittal #02050-3_demolition submittal
6504 Verano-4 Demolition 996295 12/18/2012 01/01/2013 12/20/2012 Submittal # 02050-2_Abatement-Asbestos
6503 Gavin Herbert Eye Institute 998170 12/17/2012 12/31/2012 01/09/2013 Other: SI #10_Drawing Revisions
6502 Primary Electrical Improvements Step 3 5108230 12/12/2012 12/26/2012 12/21/2012 Fence Plan
6501 Rederivation & Internal Quarantine Suite (RIQS) 997174 12/12/2012 12/26/2012 12/12/2012 Other: Stamped/signed constn. Documents_FOR RECORD ONLY
6500 Business Unit 2 990500 12/12/2012 12/26/2012 12/20/2012 RFI# 1003_Generator Stand By Time_NET- For Records
6499 Law Library Expansion PH-1 991107 12/12/2012 12/26/2012 12/20/2012 Submittal # 21 1000.02_Fire Sprinkler dwg FP-1
6498 Data Center Relocation & Upgrade 997168 12/12/2012 12/26/2012 12/13/2012 Submittal # 21 1000.01_Fire sprinkler Dwg. w/ Hot/cold containment
6497 Business Unit 2 990500 12/11/2012 12/25/2012 12/13/2012 RFI # 1004_Rated Protection of Elevator shaft
6496 CDC/Jamboree 5108962 12/10/2012 12/24/2012 12/19/2012 Plans, Specifications, Final Review
6495 Ayala Science Library T.I 991109 12/07/2012 12/21/2012 12/07/2012 Substantial completion sign off
6494 Verano Unit 1-3 5109187 12/06/2012 12/20/2012 01/07/2013 Upgrade F.A system at Verano Unit 1-3
6493 Rederivation & Internal Quarantine Suite (RIQS) 997174 12/06/2012 12/20/2012 12/11/2012 Final Construction Documents Restamp
6492 Data Center Relocation and Upgrade 997168 12/04/2012 12/18/2012 12/20/2012 SI # 1_Revised Dwgs. A315, M101& M501 w/Backcheck sheets for stamp/sign
6491 Data Center Relocation & upgrade 997168 12/04/2012 12/18/2012 12/10/2012 Submittal #07 8413.02_3M Fire Barrier Moldable Putty Pads MPP+
6490 Data Center Rlocation & upgrade 997168 12/04/2012 12/18/2012 12/10/2012 RFI # 10_Fire Stop at Wall - Electrical Penetration
6489 VPH Transformer Replacement 996268 12/03/2012 12/17/2012 12/03/2012 Sign Substantial Completion Certificate
6488 CDC Existing Bldg 5109285 12/03/2012 12/17/2012 12/11/2012 Plans, specifications, 100% review
6487 GHEI 998170 11/29/2012 12/13/2012 12/04/2012 RFI#1439_Terrace Occupant Load
6486 Eng. Gateway 5109181 11/29/2012 12/13/2012 12/07/2012 Demo Full Height & Tall Partitions and install 8' partitions
6485 GHEI 998170 11/28/2012 12/12/2012 11/28/2012 SI-7 Back Check
6484 Law Library Expansion PH-1 991107 11/27/2012 12/11/2012 11/27/2012 Other: revised 100% CD dwg Pkg w/Backcheck #6447
6483 Gross Hall Vivarium 997168 11/21/2012 12/05/2012 12/04/2012 Submittal #02.2 Hot/cold containment system with backcheck #6471
6482 Med Sci C 5109088 11/20/2012 12/04/2012 11/20/2012 Final Review
6481 Alumni Café- Sprinkler heads 12005 11/19/2012 12/03/2012 11/19/2012 Plans
6480 Crawford Hall Renovation 991028 11/19/2012 12/03/2012 11/26/2012 Others: 80% DD_Design Drawings
6479 Gross Hall Vivarium 994039 11/19/2012 12/03/2012 12/04/2012 11 600-011.2_Mortech Backdraft Workstation
6478 Data center relocation and upgrade 997168 11/19/2012 12/03/2012 11/19/2013 Other: Conformed CD drawings for records only
6477 Multi Building-Animal Research 5109112 11/19/2012 12/03/2012 12/07/2012 Plans
6476 Data Center Relocation & upgrade 997168 11/16/2012 11/30/2012 11/21/2012 Submittal #07 8413.02_Fire stopping
6475 Business Unit 2 990500 11/16/2012 11/30/2012 11/20/2012 Revised Fencing Plan and Fire access plan w/backcheck #6449
6474 Robert Cohen Theater 5108942/991104 11/14/2012 11/28/2012 11/19/2012 Plans, Specifications, Bidset
6473 McGaugh Hall & Reines 5108684 11/09/2012 11/23/2012 11/20/2012 Drawings, Submittal
6472 Data Center Relocation & Upgrade 997168 11/08/2012 11/22/2012 11/19/2012 Other: 100% CD Specifications
6471 Data Center Relocation & Upgrade 997168 11/08/2012 11/22/2012 11/14/2012 Submittal: # 02.1_Hot/Cold Containment System- Resubmittal w/backcheck
6470 GHEI 998170 11/06/2012 11/20/2012 11/20/2012 SI-7 review
6469 GHEI 998170 11/06/2012 11/20/2012 11/09/2012 #1423_Gang Drain @Stair #1 (response to EN11#32)
6468 GHEI 998170 11/06/2012 11/20/2012 11/09/2012 Submittal # 22 6700-323_Pure water piping product data
6467 Data Center Relocation & Upgrade 997168 11/06/2012 11/20/2012 11/19/2012 Submittal-Smoke damper-Ruskin FSD 60_For record Only
6465 Bren Hall 5108475/99326 11/05/2012 11/19/2012 11/07/2012 Install Awning Cover
6452 MH 3rd + 4th Floor Lab renovation 5109184 10/31/2012 11/14/2012 01/03/2013 Plans, 100% review, approval stamp
6451 CDC Child Development 5108962 10/31/2012 11/14/2012 11/13/2012 Plans, 100% review
6450 Gavin Herbert Eye Institute 998170 10/31/2012 11/14/2012 11/14/2012 RFI # 1422_Trapped Pipe @ Stair #1 (response to EN11#33)
6449 School of Business 990500 10/31/2012 11/14/2012 11/07/2012 School of Business Unit 2
6448 Law Library Expansion PH-1 991107 10/25/2012 11/08/2012 10/26/2012 Other: Demolition dwg PKg w/ Backcheck #6349
6447 Law Library Expansion PH-1 991107 10/24/2012 11/07/2012 11/09/2012 Other 100% CD Dwgs
6446 Engineering Gateway 5108907 10/24/2012 11/07/2012 11/09/2012 Fire Alarm upgrade ( Roof Covers )
6445 Bren Hall 5108475 10/22/2012 11/05/2012 10/30/2012 Install Awning Cover
6444 Newkirk Plumm Center 991301 10/19/2012 11/02/2012 11/05/2012 EVAC Maps
6443 Engineering Gateway 5109181 10/18/2012 11/01/2012 10/25/2012 Plans, final review
6442 Data Center relocation and Upgrade 997168 10/18/2012 11/01/2012 10/30/2012 Hot/cold Containment Systemwin plex/ sheet material
6441 Med Sci C 5109088 10/18/2012 11/01/2012 10/18/2012 Plans
6440 GHEI 998170 10/17/2012 10/31/2012 11/05/2012 Submittal #087111-300_Door Hardware
6439 SEP-HTW Extension to SOM 998587 10/15/2012 10/29/2012 10/22/2012 Other: Wall framing Shop dwgs w/Back check #6414
6438 Gavin Herbert Eye Institute 998170 10/15/2012 10/29/2012 10/17/2012 Submittal # 07 8413-316 Fire Stop Identification Tag
6437 Nat Sci 1 5109078 10/12/2012 10/26/2012 12/06/2012 Plans, specifications, final review
6436 MH 3+4 lab renovation 5109184 10/08/2012 10/22/2012 10/25/2012 MH 3+4 lab renovation
6435 Croul Hall 5109142 10/05/2012 10/19/2012 10/22/2012 Plans, Specficiations, !00% review
6434 Alumni Center 991301 10/04/2012 10/18/2012 10/16/2012 #21 1000-149_Fire Sprinkler-product data for EN-11 Resolution
6433 Data Center Relocation and upgrade 997168 10/04/2012 10/18/2012 10/16/2012 Submittal #07 8413.01_Penetration Stopping- 3M-100NS
6432 Alumni Center 12005 10/01/2012 10/15/2012 10/02/2012 Plans for Review
6431 SEP-HTW Extention to SOM 998587 10/01/2012 10/15/2012 10/01/2012 #30_Relocation of exicting 1" Sprinkler head and line
6430 GHEI 998170 10/01/2012 10/15/2012 10/01/2012 Submittal #07 8413-317 Fire Stop Identification Tag
6429 Croul Hall 5109142 09/27/2012 10/11/2012 10/01/2012 Plans, Specification, 100% review
6428 Zot n Go- Sprinkler heads BF-6614 09/27/2012 10/11/2012 09/27/2012 Plans, Specifications
6427 Med Sci C 5109088 09/27/2012 10/11/2012 09/27/2012 Renovate Lab
6426 Student Center N Lobby Reno 5108378 09/27/2012 10/11/2012 09/27/2012 Final Review
6425 Science Library 6th Flr TI 991109 09/27/2012 10/11/2012 09/27/2012 #211000-08_Fire sprinkler-final as built with backcheck
6424 Mesa Court-4 buildings 996265 09/27/2012 10/11/2012 09/27/2012 Evac Maps Mesa Court- 4 buildings
6423 Engineering Gateway 5109181 09/26/2012 10/10/2012 09/27/2012 Demo Full height and tall partitions and install 8' partitions
6422 GHEI 998170 09/26/2012 10/10/2012 09/26/2012 RFI review
6421 HIB 5109260 09/26/2012 10/10/2012 09/26/2012 Emergency repair/replacement of check valve
6420 Gavin Herbert Eye Institute 998170 09/26/2012 10/10/2012 10/03/2012 RFI # 1353.001_Fire Sorinklers at Oxygen Manifold & bio-waste enclosures w/backcheck
6419 Gavin Herbert Eye Institute 998170 09/25/2012     Submittal #07 8413-316 Fire Stop identification Tag-CEI
6418 Alumni Center 991301 09/24/2012 10/08/2012 09/25/2012 #21 1000.149 Fire Sprinkler for EN-11 Resolution
6417 Alumni Center - Café 12005 09/24/2012 10/08/2012 09/25/2012 Plans for Review
6416 Verano Place, unit 1-3 5108740 09/24/2012 10/08/2012 09/24/2012 Upgrade fire alarm system
6415 Science library 6th Flr TI 991109 09/21/2012 10/05/2012 09/27/2012 Submittal # 211000-07_Fire Sprinkler-Final w/backcheck
6414 SEP-HTW Extension to SOM 998587 09/19/2012 10/03/2012 09/25/2012 Other_Wall framing Shop Dwgs.
6413 Gavin Herbert Eye Institute 998170 09/19/2012 10/03/2012 09/25/2012 RFI#1371 Level 2 Shell Space Fire Smoke Detector
6412 Data Center Relocation and upgrade 997168 09/19/2012 10/03/2012 09/24/2012 Other: Airblock curtains
6411 Gavin Herbert Eye Institute 9989170 09/18/2012 10/02/2012 09/20/2012 Submittal 07 8413-307 Fire Stop Indentification Tag-Cosco
6410 Verano Place Housing Units 1 - 3 5108740 09/17/2012 10/01/2012 09/20/2012 Plans, specs, final review, approval stamp
6409 Gavin Herbert Eye Institute 998170 09/14/2012 09/28/2012 09/20/2012 Submittal #07 8413-306 Low voltage fire penetration
6408 Engineering Gateway 5108907 09/12/2012 09/26/2012 09/18/2012 Plans, Final Review
6407 Science Library 6tg Floor TI 991109 09/10/2012 09/24/2012 09/18/2012 Submittal #211000-05_Fire Sprinkler-Final
6406 Data Center Relocation & Upgrade 997168 09/10/2012 09/24/2012 09/10/2012 Submittal #23 3300.01_Air duct & accessories-Ruskin IBD-20 Fire damper
6405 SEP-HTW Extension to SOM 998587 09/10/2012 09/24/2012 09/10/2012 RFI#27_Modification to elevator relief louver at Sprague Hall 4th Stairwell
6404 SEP-HTW Extension to SOM 998587 09/10/2012 09/24/2012 09/13/2012 RFI 3 28_Sprinkler main passing thru Fire-rated enclosure
6403 GHEI 998170 09/07/2012 09/21/2012 09/13/2012 Submittal #28 3111-73.2 Fire Alarm Product data w/back chec #6265
6402 Gavin Herbert Eye Institute 998170 09/07/2012 09/21/2012 09/17/2012 RFI # 1353_Fire Sprinkler at Oxygen Manifold, and Bio-waste Enclosures
6401 Engineering Gateway 5108907 09/06/2012 09/20/2012 09/20/2012 Plans/ Specifications Calcs
6400 Robert Cohen Theater 5108942/991104 09/06/2012 09/20/2012 09/17/2012 Plans 100% CD
6399 Bren Hall 5108475 09/06/2012 09/20/2012 09/17/2012 Install Awning Final Rview Plans
6398 GHEI 998170 09/05/2012 09/19/2012 09/05/2012 RFI Review
6397 Central Plant 5108559 09/05/2012 09/19/2012 09/13/2012 Install Hvac ( submittal Review)
6396 Ayala Science 991109 09/05/2012 09/19/2012 09/10/2012 Evac Maps
6395 Mesa Court Renewal Unit 2 996265 08/31/2012 09/14/2012 08/31/2012 Beneficial Occupancy
6394 Gavin Herbert Eye Institute 998170 08/30/2012 09/13/2012 09/05/2012 Submittal #07 8413-296-1 Electrical Firestopping
6393 Gavin Herbert Eye Institute 998170 08/29/2012 09/12/2012 09/10/2012 RFI # 1350_Marking/Identification
6392 Science Library 6th Flr TI 991109 08/29/2012 09/12/2012 08/31/2012 Submittal #10 4400-01_Fire Extinguisher & Cabinet
6391 Science library 6th Flr TI 991109 08/27/2012 09/10/2012 09/05/2012 Submittal #21 1000-02_Fire Sprinkler material
6390 Gavin Herbert Eye Institute 998170 08/27/2012 09/10/2012 08/27/2012 RFI # 1321.001_Knox Box at Gerden Level Stair #2
6389 Renovate Lab 5109088 08/24/2012 09/07/2012 09/10/2012 Plans, Specification, 100% Review, Med Sci C
6388 Ayala Science Library 6th Floor Renovation 991109 08/24/2012 09/07/2012 08/27/2012 Fire Sprinklers
6387 Ayala Science Library 6th Floor Renovation 991109 08/24/2012 09/07/2012 08/27/2012 Sheet G-102 Fire Extinguisher Locations
6386 Gavin Herbert Eye Institute 998170 08/24/2012 09/07/2012 08/31/2012 Submittal #28 3111-072-2 Fire Alarm Drawings w/back check
6385 Gavin Herbert Eye Institute 998170 08/24/2012 09/07/2012 09/05/2012 Current CD w/OSHPD Changes (SI6)_Architectural Only-FRO
6384 Eng. III 5109133 08/23/2012 09/06/2012 09/10/2012 Submittal and Building Analysis
6383 Administrative Modular B Building 144911 08/22/2012 09/05/2012 08/28/2012 Space plan compliance w/cfm
6382 Mesa Court Renovation Unit 2 996265 08/22/2012 09/05/2012 08/22/2012 Mesa Court Renovation Unit 2
6381 Student Center- Subway 12004 08/22/2012 09/05/2012 08/22/2012 Interior Tenant Improvement New Subway, transmittal
6380 Data Center Relocation & Upgrade 997168 08/16/2012 08/30/2012 08/16/2012 100% CD dwgs for Stamp/Sign
6379 Alumni Center 991301 08/14/2012 08/28/2012 08/15/2012 100% Specifications Resubmittal ( Backcheck set attached )
6378 Alumni Center 991301 08/10/2012 08/24/2012 08/13/2012 100% Specifications
6377 Student Center North Lobby Renovation 5108378 08/10/2012 08/24/2012 09/17/2012 Student Center North Lobby Renovation
6376 CDC Modular Replacement 5108962 08/09/2012 08/23/2012 08/16/2012 CDC Modular Replacement
6375 Gross Hall Vivarium( GHARC) 994039 08/09/2012 08/23/2012 08/09/2012 Record Dwg Set (Half Size)- For Records Only
6374 Primary electrical improvements stp 3 5108230/996046 08/06/2012 08/20/2012 08/16/2012 Plans
6373 Administrative Modular - B 144911 08/06/2012 08/20/2012 08/13/2012 Plans, Final review, approval stamp
6372 Student Center-Subway 10015 08/06/2012 08/20/2012 08/14/2012 Plans
6371 SEP-HTW Extension to SOM 998587 08/03/2012 08/17/2012 08/07/2012 Submittal: #35_Piping and Fitting Re-route Fire Line at Gillespie
6370 New Swan Theater at Gateway Plaza 5109007 08/03/2012 08/17/2012 08/08/2012 Plans: Back Check
6369 Data center Relocation and Update 997168 08/02/2012 08/16/2012 08/08/2012 Other: AD-101-Fencing Plan
6368 Data Center Relocation and Upgrade 997168 08/01/2012 08/15/2012 08/14/2012 Other: Exterior demolition and concrete pad details
6367 Science Library Sixth Floor Tenant Improvements 991109 08/01/2012 08/15/2012 08/13/2012 #Submittal #07 8100-01 Fireproofing Data
6366 Gavin Herbert Eye Institute 998170 07/31/2012 08/14/2012 08/14/2012 RFI 1284.001 Fire stopping penetrations- Smoke Barrier w/Backcheck
6365 Data Center Relocation & Upgrade 997168 07/30/2012 08/13/2012 07/30/2012 Other: 70% CD Process Set w/ Backcheck #6345
6364 Engineering Gateway 5108907 07/27/2012 08/10/2012 08/01/2012 Plans, Preliminary Review, Comments and Corrections
6363 Mesa court Renewal Units 2 996265 07/27/2012 08/10/2012 07/31/2012 RFI #2-24_Fire Sprinkler in closet- RM 108
6362 Mesa court Renewal Units 2 996265 07/27/2012 08/10/2012 07/31/2012 RFI #2-22_Fire Sprinkler Line in Main Lobby
6361 Mesa court Renewal Units 2 996265 07/27/2012 08/10/2012 07/31/2012 RFI #2-23_Fire Sprinkler outisde Lanudry Rm.
6360 Gavin Herbert Eye Institute 998170 07/26/2012 08/09/2012 07/31/2012 RFI# 1295 Headroom Clear Space over Electrical Switchgear
6359 Arts Acoustic Repairs 991072 07/25/2012 08/08/2012 07/26/2012 RFI# 527 Fire Proofing at XMPL
6358 Science Library 6th Flr TI 991109 07/24/2012 08/07/2012 07/26/2012 RFI# 002_Fill of Existing monument/ Conformed 100% CD
6357 Mesa Court Renewal Units 2 996265 07/24/2012 08/07/2012 07/26/2012 RFI# 2-21_Relocation of Pull Station
6356 Gavin Herbert Eye Institute 998170 07/24/2012 08/07/2012 07/31/2012 RFI # 1300 Flexible Connections to FSDs
6355 Gavin Herbert Eye Institute 998170 07/24/2012 08/07/2012 08/01/2012 RFI# 1278.001 Fire Rated Termination at Mullions
6354 Gavin Herbert Eye Institute 998170 07/23/2012 08/06/2012 07/31/2012 Submittal#07-8413-258-1 Electrical Penetration Firestopping
6353 Alumni Center 991301 07/20/2012 08/03/2012 07/24/2012 RFI 063 Maximum Occupancy Sign for Balcony
6352 Mesa Court Renovation Unit 2 996265 07/20/2012 08/03/2012 07/26/2012 RFI 2-19
6351 Gavin Herbert Eye Institute 998170 07/20/2012 08/03/2012 07/26/2012 Submittal #08 3113-274 Universal Flush Access Panel Door
6350 Student Center North Entry 5108378 07/19/2012 08/02/2012 07/30/2012 Plans
6349 McGaugh Hall 5108686 07/19/2012 08/02/2012 07/31/2012 Other: Submittal for fire caulking.
6348 GHEI 998170 07/18/2012 08/01/2012 07/19/2012 RFI #1284, Fire Stopping Penetrations - Smoke Barriers
6347 Gavin Herbert Eye Institute 998170 07/18/2012 08/01/2012 07/18/2012 Conformed SI #6 - OSHPD3 Changes-For Records Only
6346 Science Library 6th Fl TI 991109 07/18/2012 08/01/2012 07/18/2012 Other: Conformed 100% CD - For Records Only
6345 Law Library and Data Center Relocation & Upgrade 991107/997168 07/17/2012 07/31/2012 07/20/2012 Other: First Floor & Site Demolition Plans_AD-101
6344 New Swan Theater 5109136 07/16/2012 07/30/2012 07/24/2012 Plans
6343 Gavin Herbert Eye Institute 998170 07/13/2012 07/27/2012 07/24/2012 #07 8413-22_Low Voltage Fire Penetration Assembly
6342 ELF 5108921 07/12/2012 07/26/2012 07/17/2012 Plans and Sketches
6341 GHEI 998170 07/12/2012 07/26/2012 07/17/2012 RFI #1286 Confirmation of Fire Stopping Penetration Requirements
6340 Alumni Center 991301 07/12/2012 07/26/2012 07/17/2012 #28 3111.060-2 Digital Addressable Fire-Alarm System
6339 Science Library 6th Flr TI 991109 07/11/2012 07/25/2012 07/20/2012 RFI# 002_Fill of Existing Monument
6338 Gavin Herbert Eye Institute 998170 07/11/2012 07/25/2012 07/20/2012 RFI # 1284_Fire Stopping Penetrations
6337 Science Library 6th floor TI 991109 07/10/2012 07/24/2012 07/10/2012 Other: 100% CD for stamp/sign w/ back check
6336 Gavin Herbert Eye Institute 998170 07/10/2012 07/24/2012 07/10/2012 Other: Revised SI-6_OSHPD3 Changes w/Narrative
6335 Science Library 6th floolr TI 991109 07/10/2012 07/24/2012 07/18/2012 Submittal: #28 3000-2R_Fire Alarm Dwgs w/ Backcheck #6324
6334 Science Library 6th Floor TI 991109 07/09/2012 07/23/2012 07/19/2012 Submittal: #09 2900-001_Gyp Board & Tapping data
6333 Data Center Relocation & Upgrade 997168 07/06/2012 07/20/2012 07/11/2012 Other: DPF Filter Regeneration & Hot/Cold Isle Containment System-Prelim. Info.
6332 Science Library 6th Flr TI 991109 07/05/2012 07/19/2012 07/19/2012 Submittal: #21 1000-002R_Fire Sprinkler Dwgs, w/Backcheck #6328
6331 Gavin Herbert Eye Institute 998170 07/03/2012 07/17/2012 07/03/2012 RFI# 1229.002_SCAQMD Permit for Emergency Generator
6330 Law Library Expansion PH-1 991107 07/02/2012 07/16/2012 07/19/2012 Submittal: #01 3200.01_Site Logistics
6329 Data Center Relocation & Upgrade 997168 07/02/2012 07/16/2012 07/10/2012 Submittal: #01 3200.01_Site Logistics
6328 Science Library 6th floor TI 991109 06/29/2012 07/13/2012 07/03/2012 Submittal: #21 1000-002_Fire Sprinkler Dwgs, PD, Calcs
6327 Central Plant 5108559/111977 06/29/2012 07/13/2012 06/29/2012 Approval Stamp: Install HVAC
6326 Alumni Center 991301 06/28/2012 07/12/2012 07/11/2012 Submittal: #21 1000-110_Fire Sprinkler Dwgs, PD, Calcs w/ Backcheck #6304
6325 SEP-HTW Extension to SOM 998587 06/28/2012 07/12/2012 06/29/2012 RFI: #04_Confirm elimination of 4th floor shaft w/ #6321
6324 Science Library Sixth Floor Tenant Improvements 991109 06/27/2012 07/11/2012 06/29/2012 Submittal: # 28 3000-02 Fire Alarm Shop Drawings
6323 Science Library Sixth floor Tenant Improvements 991109 06/27/2012 07/11/2012 06/29/2012 Submittal: #21 1000-02 Fire Sprinkler Shop Drawings
6322 Science Library sixth floor Tenant Improvements 991109 06/27/2012 07/11/2012 07/18/2012 Submittal: #28 3000-01 Fire Alarm Devices & Data
6321 SEP-HTW Extension to SOM 998587 06/27/2012 07/11/2012 06/27/2012 RFI # 04_Confirmation for 4th Floor Shaft
6320 Alumni Center 991301 06/25/2012 07/09/2012 06/26/2012 Submittal: Knox Box Product Data
6319 Gavin Herbert Eye Institute 998170 06/22/2012 07/06/2012 06/26/2012 Submittal:#07 8413-258 Electrical Penetration Firestopping
6318 Arts Bldg. 991072 06/22/2012 07/06/2012 06/25/2012 Other: Supplemental Information- ASIs for Accoustics
6317 Bio Sci. 3 5107073 06/22/2012 07/06/2012 06/27/2012 Plans/Final Review
6316 McGaugh Hall 5108686 06/22/2012 07/06/2012 06/27/2012 Other: Submittal for corridor access doors
6315 Social Ecology Plaza 5109132 06/21/2012 07/05/2012 06/25/2012 Specifications
6314 Mesa Court Renovation Site Paving and Eyebrow Rep. 996265SE 06/21/2012 07/05/2012 06/21/2012 Other: Constructtion Documents 100%
6313 Ayala Science Library-6th floor TI 991109 06/20/2012 07/04/2012 06/28/2012 Submittal: #28 3000-01_Fire Alarm Device PD & Shp dwgs
6312 Campus Village Housing 5108882/117686 06/19/2012 07/03/2012 06/20/2012 Plans: BID SET
6311 Gavin Herbert Eye Institute 998170 06/19/2012 07/03/2012 06/29/2012 Other: SI-6_OSHPD3 Changes w/Narrative
6310 Arts Bldg. 991072 06/19/2012 07/03/2012 06/26/2012 Other: ASIs for Accoustics: For review/stamp/sign
6309 Verano Place Housing Units 1, 2, 3 5108740 06/18/2012 07/02/2012 06/20/2012 Plans, Specifications
6308 Engineering Gateway 5108716 06/18/2012 07/02/2012 06/19/2012 Plans, Final Review
6307 Surface Street Bison Ave. Between Nat. Sci. #1 and Nat Sci #2 5109154 06/14/2012 06/28/2012 06/14/2012 Plans
6306 Alumni Center 991301 06/12/2012 06/26/2012 06/12/2012 Submittal #21 1000-110_Fire Sprinkler Dwgs, PD, Calcs FOR RECORDS ONLY
6305 Gavin Herbert Eye Institute 998170 06/12/2012 06/26/2012 06/14/2012 Submittal #07 8413-239_Plumbing/M/MP Penetration Firestopping
6304 Alumni Center 991301 06/12/2012 06/26/2012 06/18/2012 Other: Fire Sprinkler Plans, Calc, and Product Data
6303 SEP-HTW Extension to SOM 998587 06/12/2012 06/26/2012 06/19/2012 Other: Constn. Specifications
6302 Alumni Center 991301 06/06/2012 06/20/2012 06/08/2012 Submittal: #23 2113-094_Hydronic Piping & Valves
6301 Gavin Herbert Eye Institute 998170 06/06/2012 06/20/2012 06/06/2012 Other: SI-4_Conformed Dwgs FOR RECORDS ONLY
6300 Medical Education Building 5108453 06/06/2012 06/20/2012 06/19/2012 Plans, Specifications
6299 Alumni Center 991301 06/06/2012 06/20/2012 06/12/2012 Other: Fire Alarm Plans and Product Data
6298 Mesa Court Renewal Units 2 996265 06/06/2012 06/20/2012 06/08/2012 Submittal: #15400.038 Abatement Work Plan for Removal of Plumbing Line
6297 SEP-HTW Extension to SOM 998587 06/05/2012 06/19/2012 06/08/2012 Submittal #09 2900-25_Gypsum Board
6296 Verano Place Unit 4 Replacement 996268 06/05/2012 06/19/2012 06/12/2012 Submittal: #26 7200-04R1_Fire alarm- Mock-up Bldg w/ backcheck
6295 Verano Place Housing Units 1,2,3 5108740 06/05/2012 06/19/2012 06/14/2012 Plans, Specifications
6294 Gavin Herbert Eye Institute 998170 06/05/2012 06/19/2012 06/12/2012 Other: SI-5_Civil & Landscape sheets for Stamp/Sign
6293 Ayala Science Library 6th Floor Renovation 991109 06/04/2012 06/18/2012 06/12/2012 Other: Construction Drawings
6292 Croul Hall 5109142 06/01/2012 06/15/2012 06/01/2012 Approval Stamp
6291 Gavin Herbert Eye Institute 998170 06/01/2012 06/15/2012 06/01/2012 Other: CP-3 Conformed Specifications- FOR RECORDS ONLY
6290 Mesa Cour Renewal Units 2 996265 06/01/2012 06/15/2012 06/01/2012 Other: Conformed CD-FOR RECORDS ONLY
6289 Data Center Relocation & Upgrade 997168 06/01/2012 06/15/2012 06/04/2012 Submittal: #26 3213.02_Emergency Generator-DPF
6288 Gavin Herbert Eye Institute 998170 05/31/2012 06/14/2012 06/18/2012 Other: SI-3_G-103A, A-602, A-603 & E-113 w/Backcheck #6259- Sign/Stamp
6287 Croul Hall 5109142 05/30/2012 06/13/2012 05/31/2012 Final Review
6286 Alumni Center 991301 05/25/2012 06/08/2012 06/04/2012 Submittal: Fire Protection Specialties Product Data
6285 Middle Earth Housing 5108927 05/25/2012 06/08/2012 06/18/2012 Plans: BID SET CD
6284 Mesa Court Renovation Unit 2 996265 05/23/2012 06/06/2012 06/08/2012 Submittal: Asbestos/Lead Remediation Plan (Revised)
6283 Verano Place Unit 4 Replacement 996268 05/23/2012 06/06/2012 05/23/2012 RFI#188_Exit pathways for Bldg. 1thru 4
6282 Data Center Relocation & Upgrade 997168 05/23/2012 06/06/2012 05/29/2012 Submittal: #26 3213.01_Emergency Generator Product Data
6281 Ayala Science Library 6th Floor Renovation 991109 05/22/2012 06/05/2012 06/04/2012 Other: G Sheet Review
6280 Alumni Center 991301 05/21/2012 06/04/2012 06/04/2012 Submittal: #22 1116-093_Domestic Water piping and valves
6279 Medical Education Building 5108453 05/21/2012 06/04/2012 05/29/2012 Plans and Specifications
6278 Robert Cohen Theater (Studio Theater-713) 5108942/991104 05/18/2012 06/01/2012 06/08/2012 Plans 95%CD; Specifications; Other: Cutsheets & Fire Alarm Submittal
6277 Mesa Court Renovation Unit 2 996265 05/17/2012 05/31/2012 05/30/2012 Other
6276 Student Center N. Lobby & Stair 5108378 05/16/2012 05/30/2012 05/31/2012 Plans
6275 Reines Hall 5108687 05/15/2012 05/29/2012 05/23/2012 Other: Submittals for thermostat and aircuity push buttons-see submittal for room numbers
6274 Engineering Gateway 5108716 05/15/2012 05/29/2012 06/12/2012 Plans; specifications
6273 Gavin Herbert Eye Institute 998170 05/15/2012 05/29/2012 05/23/2012 Other: CP-3 Specs w/Backcheck #6223 for stamp/sign
6272 SEP-HTW Extension to SOM 998587 05/15/2012 05/29/2012 05/17/2012 Other: Electrical Fire stopping-Hilti
6271 Alumni Center 991301 05/11/2012 05/25/2012 05/11/2012 Other: ASI-Revised Sheet G-004, C104, C-105, A-001, A-101
6270 Verano Place Unit 4 996268 05/10/2012 05/24/2011 05/11/2012 RFI Review: 188 Exit Pathways for building 1-4 w/Backcheck #6261
6269 Gavin Herbert Eye Institute 998170 05/10/2012 05/24/2012 06/04/2012 Other: SI-4 Drawing Documents w/Narrative
6268 SEP-HTW Extension to SOM 998587 05/10/2012 05/24/2012 05/17/2012 Submittal: 07 8413.18-R1 Penetration Firestopping w/Backcheck #6248
6267 Mesa Court Renovation Unit 2 996265 05/04/2012 05/18/2012 05/21/2012 Other: Work Plan
6266 Mesa Court Renewal Units 2 996265 05/03/2012 05/17/2012 05/17/2012 Other: G-001 Fire Access & Fence Plan_Unit-2
6265 Gavin Herbert Eye Institute 998170 05/02/2012 05/16/2012 05/23/2012 Submittal # 28 3111-073-1 Fire Alarm Product Data w/BC
6264 Gavin Herbert Eye Institue 998170 04/30/2012 05/14/2012 04/30/2012 FOR RECORDS ONLY: Other : Conformed CP5 Landscape Pkg_FRO
6263 Gavin Herbert Eye Institute 998170 04/30/2012 05/14/2012 04/30/2012 FOR RECORDS ONLY- Other: Conformed CP3 Dwg Package_FRO
6262 `Gavin Herbert Eye Institute 998170 04/30/2012 05/14/2012 04/30/2012 FOR RECORDS ONLY: Revised G-008 for OCFA_Fro
6261 Verano Place Unit 4 Replacement 996268 04/30/2012 05/14/2012 05/09/2012 RFI#188_Exit pathways for bldg. 1 thru 4
6260 Gavin Herbert Eye Institute 998170 04/27/2012 05/11/2012   Submittal: 28 3111-072-1 Fire Alarm Shop Drawings
6259 GHEI 998170 04/27/2012 05/11/2012 05/11/2012 Other: SI-3
6258 Verano Place Unit 4 996268 04/27/2012 05/11/2012 04/27/2012 Other: Beneficial Occupancy
6257 Gross Hall, Hewitt Hall, Irvine Hall, MBO, BO 5108535 04/26/2012 05/10/2012 05/09/2012 Other: EJ/Photos
6256 Verano Place Housing Units 1,2,3 5108740 04/24/2012 05/08/2012 05/11/2012 Plans & Specifications
6255 Verano Place Unit 4 Replacement 996268 04/26/2012 05/10/2012 05/14/2012 Sumbittal: 26 7200-004.R0- Fire Alarm Mock-Up Building
6254 Medical Education Building 5108453 04/25/2012 05/09/2012 05/14/2012 Back check - plans & specs.
6253 Croul Hall Not assigned 04/25/2012 05/09/2012 05/02/2012 Plan, 100% review, comments and corrections
6252 Gavin Herbert Eye Institute 998170 04/23/2012 05/07/2012 04/30/2012 Submittal # 10 4400-158 Fire Extinguishers and Cabinets
6251 GHEI 998170 04/23/2012 05/07/2012 04/23/2012 Other: CP-3
6250 Gavin Herbert Eye Institute 998170 04/19/2012 05/03/2012 04/25/2012 Submittal: #21 10 00-174 Fire Suppression Materials & Equip.
6249 Mesa court Renewal Units 2 996265 04/19/2012 05/03/2012 05/09/2012 Submittal: #15300.3.9R2 Fire Sprinklers for Prado & Brisa w/backcheck
6248 SEP-HTW Extension to SOM 998587 04/18/2012 05/02/2012 04/30/2012 Submittal: 07 84 13.018- Penetration Firestopping
6247 Verano Place unit 4 renovations 996268 04/18/2012 05/02/2012 04/19/2012 Other: EVAC Maps-see corrections made
6246 Steele Burnand Anza-Borrego Research Center Phase 1 991084 04/18/2012 05/02/2012 04/18/2012 Other: 100% CD Package
6245 Humanities Instructional Bldg 991105/1047/P7 04/17/2012 05/01/2012 04/23/2012 Other: EVAC Maps, preliminary review
6244 Mesa Court Renewal Units 2 996265 04/12/2012 04/26/2012 04/19/2012 Submittal: #16720-1.2R_Fire life safety Package w/back check sets
6243 McGaugh Hall 5108947 04/12/2012 04/26/2012 04/13/2012 Plans: Modernize existing frieght elevator
6242 Engineering Tower 924 5108909 04/11/2012 04/25/2012 04/30/2012 Plans
6241 Alumni Center 991301 04/11/2012 04/25/2012 04/11/2012 Conformed CP3_For Records Only
6240 Anza Borrego Research Center Phase 1 991084 04/11/2012 04/25/2012 04/18/2012 Other: Code Analysis
6239 Student Center North Lobby 5108378 04/06/2012 04/20/2012 04/23/2012 Plans
6238 Unex Bldg "D" #234 5109092 04/06/2012 04/20/2012 04/19/2012 Plans (site)/Other: Photo + Email
6237 Verano Place Unit 4 Replacement 996268 04/06/2012 04/20/2012 04/13/2012 Mock-up Path from Adobe Circle South to Model Units
6236 Mesa Court Renewal Units 2 996265 04/05/2012 04/19/2012 04/12/2012 Submittal #15300-2. 1R_Fire Sprinkler Calcs, PD & DWGs. w/Backcheck #6185
6235 Alumni Center 991301 04/05/2012 04/19/2012 04/13/2012 Submittal #10 4400.043_Fire Extinguisher PD
6234 Mesa Court Renewal Units 2 996265 04/04/2012 04/18/2012 04/13/2012 RFI # 2-04_FA Comment- Pull Station @ New Storefront
6233 Alumni Center 991301 04/02/2012 04/16/2012 04/18/2012 Submittal: #28 3111.059_Fire Alarm System
6232 SEP HTW Extension to SOM 998587 04/02/2012 04/16/2012 04/02/2012 Other: Conformed CD set (Full size)- For Records Only
6231 Robert Cohen Theater (Studio Theater-713) 5108942/991104 04/02/2012 04/16/2012 04/11/2012 Plans: 50%CD
6230 Alumni Center 991301 03/28/2012 04/11/2012 03/28/2012 Other: Revised CD w/backcheck #6217
6229 Alumni Center 991301 03/28/2012 04/11/2012 04/04/2012 Submittal: #07 8413-037_Penetration Firestopping for Electrical
6228 Campus Village Housing 5108882/117686 03/26/2012 04/09/2012 04/05/2012 Plans: 90%CD
6227 Gavin Herbert Eye Institute 998170 03/26/2012 04/09/2012 04/03/2012 Submittal #23 3300-125 Metal Duct Accessories
6226 Gavin Herbert Eye Institute 998170 03/26/2012 04/09/2012 03/26/2012 Other: CP3
6225 Gavin Herbert Eye Institute 998170 03/26/2012 04/09/2012 03/26/2012 Other: SI #2_Revised G-sheets w/backcheck- See CP3 Backcheck
6224 Verano Place Unit 4 Renovation 996268 03/23/2012 04/06/2012 04/10/2012 EVAC Maps
6223 Gavin Herbert Eye Institue 998170 03/22/2012 04/05/2012 03/28/2012 Other: CP3_Specification
6219 Gavin Herbert Eye Institute 998170 03/20/2012 04/03/2012 03/28/2012 RFI# 1132_Hilti Penetration Fire stopping sleeve
6218 Pippin Commons 087-2011 03/19/2012 04/02/2012 03/22/2012 Plans, specs
6217 Alumni Center 991301 03/19/2012 04/02/2012 03/26/2012 Other: Revised 100% CD w/Backcheck set
6216 Gavin Herbert Eye Institute 998170 03/16/2012 03/30/2012 03/28/2012 RFI#1122_Top track Revisions.
6215 Mesa Court Renewal Units 2 996265 03/16/2012 03/30/2012 04/02/2012 Submittal: #16723-3R_Fire Alarm Dwgs w/#6187
6214 GHEI 998170 03/15/2012 03/29/2012 03/15/2012 Other: Revised G-Sheets
6213 Mesa Court Renewal Units 2 996265 03/15/2012 03/29/2012 03/28/2012 RFI #2.03_Fire Alarm Cable-Plenum rated?
6212 Verano Place Housing Laundry Room #2 5108958 03/15/2012 03/29/2012 04/04/2012 Plans 50%
6211 Newkirk Pavillion 5108905 03/14/2012 03/28/2012 03/27/2012 Final Review
6210 SEP HTW Extension to SOM 998587 03/14/2012 03/28/2012 03/21/2012 Submittal: Fencing & Parking Phase Plan w/ backcheck #6170
6209 SEP HTW Extension to SOM 998587 03/13/2012 03/27/2012 03/21/2012 Other: 100% CD_Originals w/ Backcheck #6169
6208 Humanities Instructional Bldg. -Reno 991105 03/13/2012 03/27/2012 03/13/2012 Submittal #28 3111_Fire Alarm Dwgs w/ back check
6207 Steele Bernard-Anza Borrego 991084 03/13/2012 03/27/2012 03/14/2012 100% CD Re-Submittal w/ Back check set
6206 Gavin Herbert Eye Institute 998170 03/09/2012 03/23/2012 03/22/2012 Other: CP3 Dwgs & specs w/ back check #6163
6205 McGaugh Hall 5108947 03/09/2012 03/23/2012 03/28/2012 Plans, Other submittal cut sheets
6204 Gavin Herbert Eye Institute 998170 03/08/2012 03/22/2012 03/29/2012 RFI #1108 Fire hydrant location to fire dept access
6203 Engineering Gateway 5108907 03/08/2012 03/22/2012 03/15/2012 Other: See attached 5 pages
6202 ARC 5108485 03/08/2012 03/22/2012 03/26/2012 Specifications
6201 Gavin Herbert Eye Institute 998170 03/07/2012 03/21/2012 03/14/2012 Submittal: #211000-086.1 Fire sprinkler dwgs. & calcs. w/ backcheck #6160 - Backcheck
6200 Gavin Herbert Eye Institute 998170 03/07/2012 03/21/2012 03/13/2012 RFI # 1079.001. Temp. Exit path for garden lvl (Ref. to #6174)
6199 Engineering Tower 5108922 03/06/2012 03/20/2012 03/07/2012 Plan: Back check revised drawings
6198 Humanities Instructional Bldg.- Reno. 991105 03/05/2012 03/19/2012 03/05/2012 For Record Only
6197 Gavin Herbert Eye Institute 998170 03/05/2012 03/19/2012 03/08/2012 RFI#1060.001_FSD Requirement at Rated walls & Partitions w/ Backcheck #6156
6196 Mesa Court Renewal Units 2 996265 03/02/2012 03/16/2012 03/08/2012 RFI#2.01_Exit Signage for Unit 2
6195 Gavin Herbert Eye Institute 998170 03/02/2012 03/16/2012 03/13/2012 RFI#1102_Shaft Termination in Garden Level Mech Rm. G-405
6194 Gavin Herbert Eye Institute 998170 03/02/2012 03/16/2012 03/08/2012 RFI#1091.001_Card Reader at Stair 1&2 w/Backcheck #6186
6193 McGaugh Hall 5108686 03/01/2012 03/15/2012 03/26/2012 100% Plans- Complete Submittal
6192 Verano Place Unit 4 Replacement 996268 03/01/2012 03/15/2012 03/22/2012 RFI#179_ ITC Knox Box
6191 Middle Earth Housing 5108927 02/29/2012 03/14/2012 03/15/2012 Plans: 100% CD
6190 Engineering Tower 5108922 02/29/2012 03/14/2012 03/05/2012 Partial Plan
6189 Steele Bernard 991084 02/29/2012 03/14/2012 03/08/2012 Other: 100% CD set- Mech, Elect, and Plumb.
6188 SSL Lab 334 Renovation 5108936 02/24/2012 03/09/2012 03/15/2012 Plans
6187 Mesa Court Renewal Units 2 996265 02/24/2012 03/09/2012 03/05/2012 Submittal 16720-3_Fire Alarm Dwgs, & Product Data
6186 Gavin Herbert Eye Institute 998170 02/24/2012 03/09/2012 02/28/2012 RFI #1091 Card Reader at Stair 1&2
6185 Mesa Court Renewal Unit 2 996265 02/23/2012 03/08/2012 03/13/2012 Submittal: 153000-2_Fire Sprinkler Dwgs, Calcs & Product Data
6184 Newkirk Pavillion 5108905 02/23/2012 03/08/2012 03/27/2012 Approval Stamp
6183 Steele Bernard 991084 02/23/2012 03/08/2012 02/28/2012 Other: 100% CD set
6182 Medical Education Building (TELEMED) 5108453 02/21/2012 03/06/2012 03/15/2012 Plans
6181 Alumni Center 991301 02/17/2012 03/02/2012 03/05/2012 Other: 100% CD
6180 HIB Renovation 991105 02/17/2012 03/02/2012 02/28/2012 Other: Complete Plans
6179 HIB Renovation 991105 02/17/2012 03/02/2012 03/05/2012 Other: Fire Alarms
6178 McGaugh Hall 5108686 02/17/2012 03/02/2012 02/28/2012 Other: Fire Wall Penetration Submittal
6177 Verano Place Unit 4 Replacement/ITC 996268 02/17/2012 03/02/2012 02/17/2012 Other: Egress Fencing Plan
6176 Gavin Herbert Eye Institute 998170 02/16/2012 03/01/2012 02/17/2012 RFI # 1081_Garden Level Corridor Rating in Suite
6175 Gavin Herbert Eye Institue 998170 02/16/2012 03/01/2012 02/17/2012 RFI # 1080_Mechanical Rm. Occupancy
6174 Gavin Herbert Eye Institute 998170 02/16/2012 03/01/2012 03/08/2012 RFI #1079_ Temporary alternate Exit Path for Garden Lvl.
6173 Engineering Tower 924 5108909 02/14/2012 02/28/2012 03/06/2012 Plans
6172 Old Chemical Shack 5108647 02/13/2012 02/27/2012 02/21/2012 Plans
6171 Verano Place Unit 4 Replacement 996268 02/10/2012 02/24/2012 02/22/2012 Other: G-005_Access alternate for OCFA
6170 SEP HTW Extension to SOM 998587 02/09/2012 02/23/2012 02/14/2012 Other: Phasewise Fencing Plan
6169 SEP HTW Extension to SOM 998587 02/07/2012 02/21/2012 02/13/2012 Other: DD Drawings
6168 HIB Renovation 991105 02/06/2012 02/20/2012 02/21/2012 Other: Egress Lighting Photometrics
6167 Alumni Center 991301 02/06/2012 02/20/2012 02/22/2012 Submittal# 015-33 1110.0_Water Distribution Product data
6166 Pippen Commons Middle Earth 5108732 01/31/2012 02/14/2012 01/31/2012 Cut sheet
6165 ARC 5708859 01/31/2012 02/14/2012 01/31/2012 Plans
6164 HIB Renovation 991105 01/27/2012 02/10/2012 02/17/2012 Other: Fire Protection Plan Review (Deferred Submittal)
6163 Gavin Herbert Eye Institute 998170 01/27/2012 02/10/2012 02/13/2012 Other: #01 3310.0-089_CP3 dwgs w/Backcheck #6141
6162 Reines Hall 5108687 01/26/2012 02/09/2012 02/15/2012 Other: Complte submittals- Please review all that applys to fire/safety
6161 Social Sciences Rm 334 (suite) Renovation 5108936 01/26/2012 02/09/2012 02/21/2012 Plans
6160 Gavin Herbert Eye Institute 998170 01/23/2012 02/06/2012 02/14/2012 Submittal #21 1000.01_Fire Protection Dwgs & PD
6159 SEP HTW Extension to SOM 998587 01/23/2012 02/06/2012 01/30/2012 Submittal #01 5000.001_SWPPP Plan
6158 Verano Place Unit 4 Replacement 996268 01/20/2012 02/03/2012 01/26/2012 RFI #158_Wet Location Exit signs
6157 Gavin Herbert Eye Institute 998170 01/20/2012 02/03/2012 01/26/2012 RFI #106_FSD not required in Corridor thru penetration
6156 Gavin Herbert Eye Institute 998170 01/20/2012 02/03/2012 02/01/2012 RFI #1060_FSD Requirement at Rated Walls & Partitions
6155 Gross Hall Vivarium (GHARC) 994039 01/20/2012 02/03/2012 01/26/2012 RFI#1195_Sprinkler Heads in Rm B-219
6154 Reines Hall 5108687 01/19/2012 02/02/2012 01/25/2012 Other: Cutsheets
6153 Reines Hall 5108687 01/19/2012 02/02/2012 01/25/2012 1. UL-Fire penerations, 2. Submittal for Aircuity
6152 Humanities Instructional Bldg.-Reno 991105 01/17/2012 01/31/2012 01/25/2012 Submittal: Egress Lighting Dwgs-Photometrics
6151 Humanities Instructional Bldg.-Reno 991105 01/17/2012 01/31/2012 01/31/2012 Submittal: Fire Alarm Product Data & Dwgs
6150 Humanities Instructional Bldg.-Reno 991105 01/17/2012 01/31/2012 01/19/2012 Submittal: Fire Protection Dwgs
6149 Gavin Herbert Eye Institute 998170 01/12/2012 01/26/2012 01/12/2012 Other: Conformed CP-2B Drawings & Specs-For Records Only
6148 Gavin Herbert Eye Institute 998170 01/11/2012 01/25/2012 01/25/2012 RFI #1050_ Alternate Means of Opening Protection-Water Curtains
6147 Verano Place Unit 4 Replacement 996268 01/09/2012 01/23/2012 01/09/2012 Fire Sprinkler As-Built Package-For Records Only
6146 Gavin Herbert Eye Institute 998170 01/06/2012 01/20/2012 01/23/2012 Submittal #28 3111-072.0_Fire Alarm Shop dwgs
6145 Gavin Herbert Eye Institute 998170 01/06/2012 01/20/2012 01/23/2012 Submittal #28 3111-073.0_Fire Alarm Product data
6144 ARC 5108859 01/09/2012 01/23/2012 01/23/2012 Plans, Specifications
6143 Claire Trevor Theatre 5109007 01/09/2012 01/23/2012 04/02/2012 Plan, Preliminary Review, Comments&Corrections
6142 Gross hall Vivarium (GHARC) 994039 01/05/2012 01/19/2012 01/05/2012 Submittal# 15950-200.0_Tab Report- For records Only
6141 Gavin Herbert Eye Institute 998170 01/03/2012 01/17/2012 01/17/2012 Other: CP 3 Dwg. Package
6140 Pippen Commons Middle Earth 5108732 12/20/2011 01/03/2012 01/06/2012 Install Duct Detector
6139 Gross Hall Vivarium 994039 12/20/2011 01/03/2012 12/20/2011 For Record Only
6138 Alumni Association 991305 12/19/2011 01/02/2012 12/19/2011 Alumni Association
6137 Middle Earth Quenya null 12/19/2011 01/02/2012 12/20/2011 Middle Earth Quenya
6136 Bren Events Center null 12/15/2011 12/29/2011 12/20/2011 Evacuation Maps
6135 Science Library 5108689 12/15/2011 12/29/2011 12/20/2011 Science Library; apply fire proofing to areas damaged during construction
6134 Science Library 5108689 12/14/2011 12/28/2011 12/15/2011 specs, final review, approval stamp, what product will you approve for this project
6133 HIB Renovation 991105 12/14/2011 12/28/2011 01/17/2012 Fire Alarm Plan Review
6132 HIB RENOVATION 991105 12/14/2011 12/28/2011 12/14/2011 100% Construction Documents
6131 Newkirk pavilion 5108905 12/14/2011 12/28/2011 12/20/2011 100% review, Approval stamp
6130 Engineering Tower 924 5108909 12/13/2011 12/27/2011 01/06/2012 Engineering Tower 924
6129 Anthill Pub & Grill . 12/12/2011 12/26/2011 12/14/2011  
6128 Primary Electrical Improvement- Step 3 5108230 12/08/2011 12/11/2011 12/12/2011 Plans, Final Review, and approval stamp
6127 Greenhouse 5108629 12/06/2011 12/20/2011 12/15/2011 Greenhouse Renovation
6126 Verano Place Unit 4 Replacement 996268 12/05/2011 12/19/2011 01/06/2012 Submittal # 21 9000.009RO Fire Sprinkler As-Builts w/#6074, 6090, 6099
6125 Verano Unit 4 996268 12/02/2011 12/16/2011 12/09/2011 submittal: calcs and pipe lengths
6124 Newkirk Pavillion 5108905 12/01/2011 12/15/2011 12/06/2011 Newkirk Pavilion
6123 Gavin Herbert Eye Institute 998170 11/30/2011 12/14/2011 12/19/2011 Submittal #21 1000-059.0_Fire Suppression Material & Equip
6122 Pippens Commons 5108732 11/28/2011 12/12/2011 12/06/2011 Install duct detector
6121 Gavin Herbert Eye Institute 998170 11/28/2011 12/12/2011 11/28/2011 For Record Only
6120 HIB Renovation 991105 11/21/2011 12/05/2011 11/30/2011 Fire Lane Safety Plan Check
6119 Gavin Herbert Eye Institute 998170 11/21/2011 12/05/2011 12/05/2011 Other: CP-2A_G-001, & G-002 for stamp/sign
6118 Engineering Tower Room 924 5108909 11/21/2011 12/05/2011 12/01/2011 Replace Lab Benches, Install Fume Hood
6117 Gross Hall Vivarium (GHARC) 994039 11/18/2011 12/02/2011 11/22/2011 Submittal: Level 0 Emergency Photmetric Plan-E-101EP w/ back check #6112
6116 Arts Building 991072 11/17/2011 12/01/2011 11/17/2011 Plans
6114 Arts Bldg. 991072 11/15/2011 11/29/2011 11/17/2011 Other: Sound Design Studio Accoustical Upgrades Dwgs.
6113 Gavin Herbert Eye Institute 998170 11/14/2011 11/28/2011   CP-2A Underground Utilities P-100U, E-100A & specs
6112 Gross Hall Vivarium (GHARC) 994039 11/14/2011 11/28/2011 11/16/2011 Level O Emergency Photometric Plan - E-101EP w/backcheck # 6085
6111 Gross Hall Vivarium (GHARC) 994039 11/14/2011 11/28/2011 11/28/2011 Other: SI # 4 specs 01333 & A-111
6110 Bren Event Center null 11/10/2011 11/24/2011 11/15/2011 Evacuation Maps
6109 Verano Place Unit 4 Replacement 996268 11/10/2011 11/24/2011 11/14/2011 RFI # 121 Stair Landing Window Fire Protection
6108 ARST Sound Design Studio 991072 11/09/2011 11/23/2011 11/15/2011 Submittal: Sound design studio dwgs
6107 Verano Place Unit 4 Replacement 996268 11/08/2011 11/22/2011 11/15/2011 Submittal # 21 9000-007 Fire Sprinkler-Butterfly Valve & waterflow PD
6106 Verano Place 996268 11/07/2011 11/21/2011 11/10/2011 Evacuation Maps
6105 Verano Place Unit 4 Replacement 996268 11/08/2011 11/22/2011 11/09/2011 RFI #131.1 Roof Duct Fire Rating w/Backcheck #6098
6104 Med Sci 'C' 112 5108363 11/07/2011 11/21/2011 11/09/2011 Lab Remodel - Fire Sprinkler Plans
6103 Soc Eco I & II null 11/02/2011 11/16/2011 11/08/2011  
6102 Gross Hall null 11/02/2011 11/16/2011 11/08/2011  
6101 Science Library 5108689 11/01/2011 11/15/2011 11/16/2011 Apply Fire proofing to areas damaged during construction
6100 Gavin Herbert Eye Institute 998170 11/01/2011 11/15/2011 11/21/2011 For Record Only
6099 Verano Place Unit 4 Replacement 996268 11/01/2011 11/15/2011 11/16/2011 Submittal # 21 9000.08 Fire Sprinkler As-Built-Bldg 4
6098 Verano Place Unit 4 Replacement 996268 10/28/2011 11/11/2011 10/31/2011 RFI: 131 Roof Duct Fire Rating
6097 Student Center B-106 5108754 10/27/2011 11/10/2011 11/16/2011 Student Center B-106 Blook Donor Center
6096 Steinhaus, Rowland, Med Sci C 5108715 10/24/2011 11/07/2011 10/28/2011 Ethernet runs from Telecom closets to BTU meters
6095 Gross Hall Vivarium (GHARC) 994039 10/24/2011 11/07/2011 10/31/2011 RFI# 1179 Location of Electical devices w/backcheck
6094 Alumni Center 991301 10/20/2011 11/03/2011 10/31/2011 Alumni Center
6093 Bio Sci 3 RIQS 997174 10/20/2011 11/03/2011 11/07/2011 RIQS Construction Drawings/Specs
6092 Gross Hall (Basement Only) null 10/18/2011 11/01/2011 10/20/2011 Gross Hall (Basement Only)
6091 Social Ecology 1 & 2 null 10/18/2011 11/01/2011 10/25/2011 Social Ecology 1 & 2
6090 Verano Place Unit 4 Replacement 996268 10/18/2011 11/01/2011 11/16/2011 Submittal # 21 9000-006 Fire Sprinkler As-Builts Bldg. 1,2 & 3
6089 Med Sci "A" Annex #819 5108691 10/14/2011 10/28/2011 11/07/2011 Submittal
6088 Nat Sci II #402 5108691 10/14/2011 10/28/2011 11/07/2011 Submittal
6087 Physical Scienes High Bay #404 5108691 10/14/2011 10/28/2011 11/07/2011 Submittal
6086 Med Surge I #810 5108691 10/14/2011 10/28/2011 11/07/2011 Submittal
6085 Gross Hall Vivarium 994039 10/12/2011 10/26/2011 10/20/2011 Submittal: #0170-01 3330_Level 0 Emergency Photometric Plan w/ Backcheck
6083 Verano Place Unit 4 Replacement 996268 10/11/2011 10/25/2011 10/20/2011 RFI: #114 Sprinkler Pipe Thread Sealant
6082 MSD Med Scie "D" 5108892 10/07/2011 10/21/2011 10/13/2011 Plans, Final Review, Approval Stamp, See Attached Documents
6081 Verano Place Unit 4 Replacement 996268 10/06/2011 10/20/2011 10/20/2011 Submittal: #21 9000-005_Fire Sprinkler As Builts-Bldg 2
6080 Gross Hall Vivarium (GHARC) 994039 10/04/2011 10/18/2011 10/20/2011 RFI # 1172 Fire stopping exhaust air ductwork penetrating thru exhaust shaft
6079 Gross Hall Vivarium 994039 09/29/2011 10/13/2011 10/20/2011 Submittal # 16000-165-0 Egress Door hardware product data & wiring
6078 Old Chemical Shack 5108647 09/29/2011 10/13/2011 10/28/2011 Remodel Bldg. for Incinerator installation
6077 Verano Place Unit 4 Replacement 996268 09/29/2011 10/13/2011 10/20/2011 Submittal # 21 9000-004 Ro Fire Sprinkler Dwgs - Bldg. 1 As-Built
6075 Gavin Herbert Eye Institute 998170 09/29/2011 10/13/2011 09/29/2011 SI #1 CP1 sheets C101 & C102
6074 Verano Place Housing Unit 4 Replacement 996268 09/27/2011 10/11/2011 11/16/2011 Fire Sprinkler Calculations
6073 Med Sci "D" - MSD 5108892 09/26/2011 10/10/2011 09/28/2011 Temporary version wireless cell site wall penetration
6072 Gottschalk Medical Plaza 10015 09/26/2011 10/10/2011 09/29/2011 Gottschalk Medical Plaza P.O.D. Express
6071 Gross Hall Vivarium (GHARC) 994039 09/26/2011 10/10/2011 09/28/2011 Design Package - ASI # 1 & 2 for sign/stamp
6070 Gorss Hall Vivarium (GHARC) 994039 09/26/2011 10/10/2011 09/29/2011 Other: Design Package - ASI #3
6069 Verano Place Unit 4 Replacement 996268 09/26/2011 10/10/2011 09/27/2011 RFI # 111 Knox Box Model # and location
6068 Gross Hall Vivarium (GHARC) 994039 09/22/2011 10/06/2011 09/23/2011 RFI #1164 Smoke detector in the Animal Storage - B505
6067 Verano Place Unit 4 Replacement` 996268 09/20/2011 10/04/2011 09/21/2011 RFI#113 Sprinkler Head at Transom Window Pocket
6066 Verano Place Unit 4 Replacement 996268 09/16/2011 09/30/2011 09/22/2011 Submittal: #26 7200-001R5_Fire Alarm-Housing w/Backcheck
6065 Verano Place Unit 4 Replacement 996268 09/16/2011 09/30/2011 09/22/2011 RFI: #107 Sprinkler Valve in Corridor Shafts
6064 Verano Place Unit 4 Replacement 996268 09/14/2011 09/28/2011 09/22/2011 RFI: 106 Sprinkler support details
6063 Gavin Herbert Eye Institute 998170 09/14/2011 09/28/2011 09/14/2011 Other: conformed CP-3A set FRO
6062 ELF #323 5108691 09/13/2011 09/27/2011 09/21/2011 Submittal (signage (2) is in original submittal; Final Review; Approval Stamp
6061 Infant Toddler Center 5108695 09/13/2011 09/27/2011 09/21/2011 Submittal (signage is in original submittal) Final Review; Approval Stamp
6060 Med Sci "C" 112 5108363 09/13/2011 09/27/2011 09/22/2011 Plans; Final Review; Approval Stamp
6059 Various Buildings 5108507 09/12/2011 09/26/2011 09/12/2011 Final Review; Approval Stamp
6058 Verano Place Housing Unit 6 5108424 09/09/2011 09/23/2011 09/14/2011 Plans, Specs, Final Review
6057 Ansul Systems R-102 109-2011 09/09/2011 09/23/2011 09/15/2011 Full size sets and R-102 Restaurant Fire Suppression System Manual.
6056 ghri 998170 09/08/2011 09/22/2011 09/08/2011 g sheets 100% cp-3a
6055 GHEI 998170 09/07/2011 09/21/2011 09/07/2011 G sheets
6054 Aldrich Hall 5th Flr Rm 510 5108816 09/02/2011 09/16/2011 09/08/2011 Plans, Final Review, Approval stamp
6053 Mesa Court Renewal Units 1 & 2 996265 09/01/2011 09/15/2011 09/01/2011 Other: Fire Alarm & Emergency Comm. System Record of Completion-(9 Bldgs)
6052 Mesa Court Renewal Units 1 & 2 996265 09/01/2011 09/15/2011 09/01/2011 Other: Contratctors' material & test certificates for piping (UG & AG)
6051 Gross Hall Vivarium (GHARC) 994039 09/01/2011 09/15/2011 09/08/2011 RFI # 1157, Duct detector for FSD downstream of EF-8
6050 Verano Place unit 4 Replacement 996268 09/01/2011 09/15/2011 09/01/2011 Other: Project specifications
6049 Mesa Commons-Ansul Systems R-102 null 09/01/2011 09/15/2011 09/01/2011 Ansul R-102 UL300 Fire Suppression Systems
6048 Reine's Hall 5108687 08/31/2011 09/14/2011 09/01/2011 HVAC Building upgrades from CV to VAV
6047 Student Center Bldg G 5108881 08/30/2011 09/13/2011 09/01/2011 Plans, Final Review
6046 Student Center Bldg G 510881 08/30/2011 09/13/2011 09/01/2011 Plans, Final Review
6045 Student Center "G" Building 5108881 08/30/2011 09/13/2011 08/30/2011 Renovate Student Center "G" Building
6044 Telemed 5108453 08/30/2011 09/13/2011 09/22/2011 Construct Mock Training Lab
6043 Gross Hall Animal Resource Center 994039 08/29/2011 09/12/2011 09/08/2011 147-08110-0 Doors at Gas Storage Room B645
6042 GHEI 998170 08/25/2011 09/08/2011 09/12/2011 RFI: # 1005 Fire Hydrant Run
6041 Aldrich Hall 5th Floor 5108816 08/23/2011 09/06/2011 08/24/2011 Plans; Final Review; Approval Stamp
6040 Gross Hall Animal Resource Center 994039 08/22/2011 09/05/2011 08/23/2011 Submittal # 152-16510-0 Exit Signs (wet locations)
6039 Verano Place LWH Floor Replace Ment 996268 08/19/2011 09/02/2011 08/23/2011 RFI: 81.1 Fire Bell locations
6038 Verano place unit 4 replacement 996268 08/17/2011 08/31/2011 09/01/2011 Specificiation backcheck w/ mark ups
6037 GHEI 998170 08/17/2011 08/31/2011 08/18/2011 Submittal: 33 3100.0 sitewater distribution
6036 GHEI 998170 08/17/2011 08/31/2011 08/23/2011 Other: G-sheet (revised) w/ backcheck set (CP3A)
6035 Mesa Court Renovation Units 1 & 2 996265 08/17/2011 08/31/2011 08/23/2011 Submittal: 3.7-15300 Elmdor Fire Riser Access Panel Product Data
6034 Lower Palo Verde 5108451 08/15/2011 08/29/2011 08/19/2011 Other: RFI
6033 ANSUL R-102 UL300 Fire Suppression Systems 104-2011 08/15/2011 08/29/2011 08/18/2011 ANSUL R-102 UL300 Fire Suppression Systems
6032 Aldrich Hall 5th Floor Rm. 510 5108816 08/15/2011 08/29/2011 08/18/2011 Plans; 100% Review; Approval Stamp
6031 Verano Place Unit 4 Replacement 996268 08/12/2011 08/26/2011 08/24/2011 Fire Alarm Re-Submittal (Housing) w/backcheck Set
6030 Student Center Bldg. 'G' - Suite 304 Renovation 5108881 08/11/2011 08/25/2011 08/22/2011 Plans
6029 Gross Hall Animal Resource Center 994039 08/11/2011 08/25/2011 08/22/2011 Submittal #032-01333-0 100% CD Specifications
6028 Gross Hall Animal Resource Center 994039 08/11/2011 08/25/2011 08/19/2011 Submittal #146-08110-0 Fire Rated Glazing
6027 GHEI 998170 08/10/2011 08/24/2011 08/10/2011 Other: Forward Road Closure Map to OCFA
6026 Studednt Center Building 3rd Floor G306+G308 5108881 08/10/2011 08/24/2011 08/22/2011 Plans
6025 Student Center Building G 3rd Floor 5108881 08/10/2011 08/24/2011 08/22/2011 Plans
6024 Bio Sci 3 510878 08/10/2011 08/24/2011 08/18/2011 Final Review, Approval Stamp
6023 Telemed 5108453 08/10/2011 08/24/2011 08/19/2011 Plans, Other, 100% Review and Approval Stamp-Cal Fire Cut Sheets( Enclosed)
6022 Mesa Court Renewal Units 1&2 996265 08/10/2011 08/24/2011 08/17/2011 RFI: 17 - Fire Sprinkler Access Panel in exterior wall
6020 Lower Palo Verde 5108451 08/09/2011 08/23/2011 08/15/2011 Other: RFI
6019 Verano Place Unit 4 Replacement 996268 08/09/2011 08/23/2011 08/15/2011 RFI: 62.1 Fire Rating & Transom Window
6018 Verano Place Unit 4 Replacement 996268 08/09/2011 08/23/2011 08/17/2011 Verano Place Unit 4 Replacement
6017 GHEI 998170 08/08/2011 08/22/2011 08/08/2011 Design Package CP-1
6016 ELF #323 5108691 08/05/2011 08/19/2011 08/17/2011 Other: Submittal; 100% Review; Approval Stamp
6015 Infant Toddler Center 5108695 08/05/2011 08/19/2011 08/17/2011 Other: Submittal 100% Review Approval Stamp
6014 Verano Place Unit 4 Replacement 996268 08/04/2011 08/18/2011 08/08/2011 Submittal # 26 7200-001R3 ITC Fire Alarm Submittal w/ Backchecks
6013 Med Sci "C" 5108363 08/03/2011 08/17/2011 08/22/2011 Plans, Preliminary Review, Comments & Corrections
6012 Gavin Herbert Eye Institute 998170 08/02/2011 08/16/2011 08/24/2011 Other: 100% DD Drawing Set
6011 Verano Place Unit 4 Replacement 996268 08/02/2011 08/16/2011 08/09/2011 RFI #78 Transom Windows @ Bldgs. 2 & 3
6010 Mesa Court Renewal Units 1 & 2 996265 08/02/2011 08/16/2011 08/15/2011 RFI #20 Fire Sprinkler underground from Sierra, Cuesta & Cielo
6009 Gavin Herbert Eye Institute 998170 08/01/2011 08/15/2011 08/01/2011 Other: Temporary Fencing Plan
6008 GSC 1st Floor 106D SOAR 5108766 08/01/2011 08/15/2011 08/05/2011 Plans; Final Review; Approval Stamp
6006 Ring Mall (3) locations 5108782 07/29/2011 08/12/2011 08/09/2011 Site maps; final review; Access/Egress for OCFA during repair work; approval stamp
6005 Mesa Court Renewal Units 1 & 2 996265 07/28/2011 08/11/2011 08/01/2011 RFI #16 Signage for FDC, OS&Y & Access Panels
6003 Gavin Herbert Eye Institute 998170 07/27/2011 08/10/2011 08/15/2011 Submittal # 33 3100-0 Site Water Distribution
6002 Gavin Herbert Eye Institute 998170 07/27/2011 08/04/2011 08/03/2011 Fire Access Plan and temp fire access
6001 Gross Hall, Hewitt Hall, Irvine Hall, MBD BLD, 5108535 07/27/2011 08/10/2011 08/05/2011 Other: EJ; Other: Ref. approved details for this project; Approval stamp
6000 Mesa Court Renewal Unit 1 & 2 996265 07/25/2011 08/08/2011 08/09/2011 RFI #17 Fire Sprinkler Access Panel
5999 ARC, Pilot Solar Panels 5018775 07/22/2011 08/05/2011 08/10/2011 Final Review, Approval Stamp
5998 Verano Place Maintenance Bldg. #5400 5108696 07/22/2011 08/05/2011 08/03/2011 Submittal
5997 Anteater Parking Structure 5108692 07/22/2011 08/05/2011 08/03/2011 Submittals
5996 Student Center 5108754 07/22/2011 08/05/2011 07/22/2011 Back Check - APA
5995 Gavin Herbert Eye Institute 998170 07/22/2011 08/05/2011 07/27/2011 Submittal: Fire access & fence, temp fire access w/ back # 5982 & 5970
5994 Gavin Herbert Eye Institute 998170 07/19/2011 08/02/2011 07/21/2011 6" Stand-pipe Flow to Roof Calcs w/ref: to CP1 (EHS #5978)
5993 Gavin Herbert Eye Institute 998170 07/19/2011 08/02/2011 08/09/2011 CP1A G-Sheets
5992 GSC 1st Floor 106D SOAR 5108766 07/18/2011 08/01/2011 07/27/2011 Plan Check
5991 Bio Sci 3 5108578 07/18/2011 08/01/2011 07/20/2011 Create four offices
5990 Gross Hall Vivarium (GHARC) 994039 07/15/2011 07/29/2011 07/18/2011 RFI # 1143 Temporary access to existing exhaust shaft
5989 Verano Place Unit 4 Replacement 996268 07/15/2011 07/29/2011 07/20/2011 RFI: #66 bathroom exhaust shaft
5988 Gross Hall Vivarium (GHARC) 994039 07/14/2011 07/28/2011 07/18/2011 ASI #1 & #2-Construction Dwgs for review/Sign & Stamp
5987 Gavin Herbert Eye Institute 998170 07/14/2011 07/28/2011 07/26/2011 G-003 Code summary/Fire Exiting Separation
5986 Verano Place Unit 4 Replacement 996268 07/12/2011 07/26/2011 07/12/2011 Submittal # 26 7200.001B-R2 Verano ITC Fire alarm w/backcheck
5985 null 5108230/996046 07/12/2011 07/26/2011 07/20/2011 Primary Electrical Improvements - Step 3
5984 Gross Hall Vivarium (GHARC) 994039 07/12/2011 07/26/2011 07/12/2011 RFI #1132 Duct Smoke Detector at AHUs
5983 Verano Place Unit 4 Replacement 996268 07/12/2011 07/26/2011 07/12/2011 For Records Only
5982 Gavin Herbert Eye Center 998170 07/11/2011 07/25/2011 07/14/2011 G-007 revised Fencing Plan w/backcheck
5981 Mesa Court Renewal Units 1 & 2 996265 07/11/2011 07/25/2011 07/14/2011 Submittal # 15300-3.6 "T" flange on Domestic Water service
5980 Student Ctr, Blood Donor Ctr 5108754 07/08/2011 07/22/2011 07/14/2011 Plans, Final Review, Approval Stamp
5979 Verano Place Unit 4 Replacement 996268 06/29/2011 07/13/2011 07/12/2011 Submittal # 26 7200.01R2_Fire alarm w/ Backcheck #5893
5978 Gavin Herbert Eye Center 998170 06/29/2011 07/13/2011 07/19/2011 Other: CP-1 package dwgs & specs
5977 Verano Place Unit 4 Replacement 996268 06/28/2011 07/12/2011 06/28/2011 Submittal # 21 9000.R6 Fire Sprinkler
5976 Verano Place Unit 4 Replacement 996268 06/28/2011 07/12/2011 06/28/2011 ASI #4 DP3 Infant Toddler Center
5975 Verano Place Unit 4 Replacement 996268 06/28/2011 07/12/2011 07/14/2011 RFI #062 Fire Rating at Transom Windows - regarding Dead-End
5974 Gross Hall Vivarium (GHARC) 994039 06/27/2011 07/11/2011 07/12/2011 Submittal #16900-033.2 Fire Alarm Dwg & PD w/Backcheck #5897
5973 Mesa Court Renewal Units 1 & 2 996265 06/27/2011 07/11/2011 06/30/2011 Mesa Court Renewal Units 1 & 2
5972 Lower Palo Verde 5108451 06/23/2011 07/07/2011 06/29/2011 Lower Palo Verde
5970 Gavin Herbert Eye Center 998170 06/23/2011 07/07/2011 06/28/2011 Site Fencing Plan - G-007
5969 Gross Hall Vivarium (GHARC) 994039 06/22/2011 07/06/2011 06/27/2011 RFI # 1127 _Access Door at Future Observation Hole at 2-Hr Wall
5968 Ansul Systems R-102 087-2011 06/22/2011 07/06/2011 06/27/2011 For review
5967 Verano Place Unit 4 Renovation 996268 06/22/2011 07/06/2011 06/30/2011 Other: code interpretation
5966 Pilot Solar Panels 5018775 06/21/2011 07/05/2011 07/12/2011 No Funding, Solar Panel Pilot Project
5965 Verano Place Unit 4 Replacement 996268 06/21/2011 07/05/2011 06/22/2011 Verano DP4- Current CD set including ASI #2-FRO
5964 Mesa Court Renewal Units 1 & 2 996265 06/21/2011 07/05/2011 06/22/2011 RFI #012 Reconfigured Fence Plan
5963 Verano Place Unit 4 Replacement 996268 06/20/2011 07/04/2011 06/22/2011 # 21 9000.001 R6 Fire Sprinkler Package w/backcheck #5934
5962 Croul Hall 5108507 06/20/2011 07/04/2011 06/20/2011 Aircuity SLT Means Appendix
5961 Gross Hall, Hewitt Hall, Irvine Hall, Med Ed. 5108535 06/16/2011 06/30/2011 06/21/2011 Riser cable inside (Plenum rated inner duct)
5960 Office & Warehouse Renovation 5108603 06/16/2011 06/30/2011 06/16/2011 Office & Warehouse Renovation (Limited)
5959 Verano Place Unit 4 996268 06/16/2011 06/30/2011 06/16/2011 DSA set - Delta 3
5958 Irvine Hall Dean's Suite Renovation 5108470 06/14/2011 06/28/2011 06/22/2011 Back check
5957 Gross Hall Vivarium 994039 06/14/2011 06/28/2011 06/20/2011 RFI #1086.001 Abandon FSD in place
5956 Mesa Court Renewal Units 1 & 2 996265 06/13/2011 06/27/2011 06/13/2011 Database
5955 EH&S 5108603 06/10/2011 06/24/2011 06/10/2011 Office & Wareshouse Renovation (Limited)
5954 Bren Hall 5108691 06/09/2011 06/23/2011 06/21/2011 5-year Fire Sprinkler Certification
5949 Claire Trevor Theatre 5108691 06/09/2011 06/23/2011 06/21/2011 5-year Fire Sprinkler Certification
5948 Mesa Court Renewal Units 1&2 996265 06/08/2011 06/22/2011 06/13/2011 16000-13 Light Submittal
5947 Mesa Court Renewal Units 1&2 996265 06/08/2011 06/22/2011 06/16/2011 15300 Fire Sprinkler Hot Tap abatement
5946 Mesa Court Renewal Units 1&2 996265 06/08/2011 06/22/2011 06/22/2011 Other 100% CD &Specs for sign and stamp
5945 Mesa Court Renwal Units 1&2 996265 06/07/2011 06/21/2011 06/22/2011 RFI 05 Fire Suppression - Backflow device Locations/reference
5944 Verano Place Unit 4 Replacement 996268 06/07/2011 06/21/2011 06/08/2011 Work Plan Review
5943 Gross Hall vivarium 994039 06/07/2011 06/21/2011 06/08/2011 RFI #1081.001 Exising FA Horns and Strobes in Remodel Area
5942 Verano Place Unit 4 Replacement 996268 06/07/2011 06/21/2011 06/08/2011 Submittla #08-5123-00R-0 Fire Rated Transon for re review w 5903
5941 Gross Hall Vivarium (GHARC) 994039 06/06/2011 06/20/2011 06/08/2011 RFI #1102_Auxiliary Drain valve location
5940 Gross Hall Vivarium (GHARC) 994039 06/06/2011 06/20/2011 06/08/2011 RFI #1086_Abandon FSD in Place
5939 Blood donor center @ Student Center 5108754 06/01/2011 06/15/2011 06/28/2011 Plans
5938 Mesa Court Renewal Units 1 & 2 996265 06/01/2011 06/15/2011 06/06/2011 RFI # 04_Fire Access Lane-Gate Closer to Viento
5937 Mesa Court Renewal Units 1 & 2 996265 05/31/2011 06/14/2011 06/06/2011 02050.32R Asbestos and Lead Remediation work plan - FRO
5935 Student Center - New Only 5108693 05/27/2011 06/10/2011 06/01/2011 Submittal; 100% Review; Approval Stamp
5934 Verano Place Unit 4 Replacement 996268 05/25/2011 06/08/2011 05/31/2011 Submittal #21 9000.001 R5_Fire Sprinkler Dwgs, PD and calcs w/ backcheck #5883
5933 Security Gate Arms at Fine Arts Road 5108780 Job#108333 05/25/2011 06/08/2011 05/25/2011 Plans
5932 Reines Hall 5108687 05/16/2011 05/30/2011 05/24/2011 Specifications, Submittal, Approval Stamp
5931 Mesa Court Renewal Units 1&2 996265 05/24/2011 06/07/2011 05/24/2011 Approved Fire Suppresion Material compment for stamps/sign
5930 Social Behavioral Sciences Gateway 91788 05/24/2011 06/07/2011 05/24/2011 Construct wall, dividing rm. 1231 in half
5929 Mesa Court Renewal Units 1 & 2 996265 05/24/2011 06/07/2011 05/24/2011 Database
5928 Lower Palo Verde 5108451 05/23/2011 06/06/2011 05/23/2011 Plans, Final Review
5927 Gross Hall, Hewitt Hall, Irvine Hall, Med Ed. 5108535 05/23/2011 06/06/2011 06/06/2011 Penetration, EJ and UL approval. IPAD wireless communication
5926 Irvine Hall Dean's Suite Renovation 5108470 05/23/2011 06/06/2011 06/06/2011 Irvine Hall Dean's Suite Renovation
5925 Mesa Court Renewal Units 1 & 2 996265 05/19/2011 06/02/2011 06/01/2011 Const. Dwgs. w/specs & elect. Light submittal for review & stamp/sign
5924 Fire Stopping 5108535 05/19/2011 06/02/2011 05/24/2011 Gross Hall, Hewitt Hall, Irvine Hall, Med. Ed. UL Details, Ref. Inner duct info. Approval stamp
5923 Mesa Court Renewal Units 1 & 2 996265 05/19/2011 06/02/2011 05/25/2011 # 16720-31 Resnet cable product data & plans w/reference-approved Fire Alarm
5922 Gross Hall Vivarium (GHARC) 994039 05/19/2011 06/02/2011 05/25/2011 Submittal #070-08311-0 Access Door & Frame
5921 Mesa Court Renewal Units 1 & 2 996265 05/19/2011 06/02/2011 05/24/2011 #02050-32 Asbestos & Lead Remediation Work Plan
5920 Gross Hall Vivarium (GHARC) 994039 05/19/2011 06/02/2011 05/26/2011 RFI #1088 Tunnel Corridor Near Gridline C and 8.5
5919 Pippens Commons 5108732 05/19/2011 06/02/2011 05/23/2011 Plans, 100 % Review
5917 Ansul Systems R-102 087-2011 05/19/2011 06/02/2011 05/26/2011 Fire System upgrade to UL 300
5916 Arts Bldg 991072B 05/18/2011 06/01/2011 05/23/2011 Other:A-110_Demising wall location & details w/ QA comments
5915 Student Center 5108730 05/16/2011 05/30/2011 05/23/2011 Install Foundation Trustee Donor Wall
5914 Berk Hall 994005 1047 P1 05/17/2011 05/31/2011 05/24/2011 Berk Hall
5913 Engineering Hall 990077 1042 P1 05/17/2011 05/31/2011 05/24/2011 Eval Proofs, Preliminary Review, Comments & Corrections
5912 Mesa Court Renewal Units 1 & 2 996265 05/13/2011 05/27/2011 05/23/2011 Other # 9R_Revised sheet A-100 Overall Site & Fire Access Plan
5911 Gross Hall Vivarium (GHARC) 994039 05/13/2011 05/27/2011 05/16/2011 Submittal # 085-10520-0 Fire extinguisher & cabinet
5910 Verano Place Unit 4 Replacement 996268 05/13/2011 05/27/2011 05/19/2011 Other: C-108 and C-109 for site water line revision
5909 Palo Verde Fire Alarm 5108451 05/13/2011 05/27/2011 05/17/2011 Plans, Cut Sheets, preliminary review, comments & corrections
5908 Gross Hall Vivarium 994039 05/12/2011 05/26/2011 05/16/2011 RFI #1053.003 Alternate means - Interlock Door Release w/#5895
5907 Gross Hall Vivarium (GHARC) 994039 05/12/2011 05/26/2011 05/18/2011 RFI# 1081 Existing FA Horns and Strobes in Remodel Area
5906 Gavin Herbert Eye Institute 998170 05/12/2011 05/26/2011   (database)
5905 Verano Place Unit 4 Replacement 996268 05/12/2011 05/26/2011 05/16/2011 Other: LHI Fueling Station Location
5903 Verano Place Unit 4 Replacement 996268 05/11/2011 05/25/2011 05/25/2011 Submittal: Submittal # 08 5123-001 Fire Rated Transom
5902 SE-2 Lab Renovation 5108679 05/10/2011 05/24/2011 05/23/2011 Plans, Specifications, Final Review, Approval Stamp
5901 Verano Place Unit 4 Replacement 996268 05/10/2011 05/24/2011 05/13/2011 RFI # 032 Domestic & Fire Water Sheet C-109 for approval
5900 Mesa Court Renewal Units 1 & 2 996265 05/10/2011 05/24/2011 05/11/2011 Mesa Court Renewal Units 1 & 2
5899 SBSG G-107 Sound Booth 5108761 05/09/2011 05/23/2011 05/13/2011 SBSG G-107 Sound Booth
5897 Gross Hall Viviarium 994039 05/09/2011 05/23/2011 05/18/2011 Submittal # 16900-033.01 Fire Alarm resubmittal w/backcheck #5848
5896 Hewitt Hall, Gross Hall 5108573 05/06/2011 05/20/2011   Plans, specs, final review, approval stamp
5895 Gross Hall Vivarium 994039 05/05/2011 05/19/2011 05/11/2011 RFI # 1053.002 Alternate means & methods interlock door release w/backcheck #5880
5894 Sprague Hall 5108507 05/05/2011 05/19/2011 05/09/2011 Aircuity Fire Stopping Details
5893 Verano Place Unit 4 Replacement 996268 05/05/2011 05/19/2011 05/23/2011 Submittal # 26 7200.003-RO Housing Fire Alarm dwgs & PD w/# 5872
5892 Verano Place Unit 4 Replacement 996268 05/05/2011 05/19/2011 05/23/2011 Submittal # 26 7200.002-RO-ITC Fire Alarms dwgs & Product Data
5891 Verano Place Unit 4 Replacement 996268 05/05/2011 05/19/2011 05/11/2011 Spec Section 21 9000-Fire Sprinkler System
5890 Gross Hall Vivarium 994039 05/04/2011 05/18/2011 05/18/2011 Submittal #055.08710 Door-hardware re-review
5889 Bren Hall 5108475/99326 05/03/2011 05/17/2011 05/16/2011 Install Awning Cover on 5th Floor
5888 CALIT2 5108639/96399 05/03/2011 05/17/2011 05/09/2011 4th Floor Renovation
5887 Mesa Court Renewal Units 1 & 2 996265 05/02/2011 05/16/2011 05/10/2011 #15300.3.2R Fire Suppression Re-Submittal w/#5866
5886 Primary Electrical Improvements Step 3 5108230 04/28/2011 05/12/2011 05/10/2011 Plans, Specifications,
5885 Gross Hall, Hewitt Hall, Irvine Hall, Med. Ed. 5108535 04/28/2011 05/12/2011 05/05/2011 Other: Floor Penetration Det. Approved & Proposed plenum rated innter duct.
5884 Mesa Court Renewal Units 1 & 2 996265 04/27/2011 05/11/2011 05/04/2011 Submittal # 08100_Frames & Hardware
5883 Verano Place Housing 996268 04/27/2011 05/11/2011 05/03/2011 Submittal # 21 9000.001-R3_Fire Sprinkler pkg w/5825
5882 Sprague Hall (Remaining Aircuity Install Deals 5108507 04/27/2011 05/11/2011 05/04/2011 Submittal
5881 Irvine Hall Dean's Suite 5108470 04/26/2011 05/10/2011 05/03/2011 Plans, 100% Review,
5880 Gross Hall Vivarium 994039 04/26/2011 05/10/2011   RFI #1053.001 Alternate Means & Methods interlock door release w/#5855
5878 SE-2 Lab Renovation 5108679 04/22/2011 05/06/2011 05/03/2011 Plans, Specs, Final review, Approval stamp
5877 Verano Place Housing 996268 04/20/2011 05/04/2011 04/20/2011 Other DP4_ASI 2 Conformed Housing dwgs FRO
5876 Verano Place Housing 996268 04/20/2011 05/04/2011 04/20/2011 Other: DP3_ASI 3-conformed ITC dwgs-FRO
5875 Gross Hall Vivarium (GHARC) 994039 04/20/2011 05/04/2011 04/27/2011 Submittal # 071-07841.0_Thru-Penetration Fire stop-Latex
5874 Gross Hall Vivarium (GHARC) 994039 04/20/2011 05/04/2011 04/27/2011 RFI # 1039.001_Card reader fire stop at existing 2HR separation
5873 Mesa Court Renewal 1 & 2 996265 04/20/2011 05/04/2011 04/27/2011 Submittal # 10520_Fire Extinguisher & Lettering
5872 Verano Place Housing 996268 04/20/2011 05/04/2011 04/27/2011 Submittal # 26 7200.001_fire alarm PD
5871 Verano Place / ITC 996268 04/19/2011 05/03/2011 04/27/2011 Temporary Fence Plan
5870 Med Sci 'C' 5108363 04/19/2011 05/03/2011 05/03/2011 Plans, Final Review, Approval Stamp
5869 Gross Hall Vivarium (GHARC) 994039 04/19/2011 05/03/2011 04/27/2011 Submittal # 055-08710.0 Door Hardwares
5868 Gross Hall Vivarium (GHARC) 994039 04/19/2011 05/03/2011 04/27/2011 Submittal # 054.08110.0 Steel Door w/frames & FRP Flush Doors
5867 Mesa Court Renewal Units 1&2 996265 04/15/2011 04/29/2011 04/27/2011 Submittal: #16720_fire alarm dwgs & product data w/ backcheck
5866 Mesa Court Renewal Units 1&2 996265 04/15/2011 04/29/2011 04/20/2011 Submittal: 153000_Fire progression Dwgs & Specs/calcs w/backcheck
5865 Gross Hall Vivarium (GHARC) 994039 04/14/2011 04/28/2011 04/20/2011 Submittal #07841-056.1 Thru Penetration Fire Stop System w/backcheck #5843
5864 Gross Hall Vivarium (GHARC) 994039 04/11/2011 04/25/2011 04/20/2011 RFI: #1060_Mechanical Tee Fittings
5863 Mesa Court Renewal Units 1& 2 996265 04/11/2011 04/17/2011   Other: A-100_Fire Access Plan
5862 Gross Hall Vivarium (GHARC) 994039 04/11/2011 04/25/2011 04/20/2011 RFI # 1040.001_Installation Procedure for Fire Sprinklers w/backcheck #5842
5861 Reines Hall 5108509 04/07/2011 04/21/2011 04/07/2011 Plans, final review, and approval stamp
5860 Verano Place Housing Unit 6 5108392 04/07/2011 04/21/2011 04/07/2011 Plans, Specs, Final Review
5859 Verano Place - ITC 996268 04/05/2011 04/19/2011 04/07/2011 ASI #3
5858 Verano Place Housing Unit 4 996268 04/05/2011 04/19/2011 04/05/2011 ASI #2
5857 RCT Landscape enhancement 991072 A 04/04/2011 04/18/2011 04/07/2011 #16000.10 - Exterior lighting & photometric w/backcheck
5856 Bren Hall 5108475-99326 04/04/2011 04/18/2011 04/11/2011 Approval Stamp
5855 Gross Hall Vivarium (GHARC) 994039 04/01/2011 04/15/2011 04/11/2011 RFI#1053_Alternate Means and Methods-Special Knowledge for Interlock Door Release.
5854 Gross Hall Vivarium 994039 03/31/2011 04/14/2011 04/11/2011 Submittal #139150-008.02 Fire Suppression Piping w/Backcheck set
5853 Student Center 5108730 04/25/2011 05/09/2011 04/29/2011 Plans (location & (E) Occup./Fire, Calcs. Only) Shop Dwgs. Allof the above
5852 Mesa Court Renewal Units 1 & 2 996265 03/31/2011 04/14/2011 04/07/2011 #16720 Fire Alarm Monitoring D/B Dwgs, Product Data, specs w/backcheck
5851 Mesa Court Renewal Units 1 & 2 996265 03/31/2011 04/14/2011 04/05/2011 RFI #1 Confirm elimination of PIC valves
5850 Verano Housing 996268 03/31/2011 04/14/2011 04/07/2011 G.005 w/Approved OCFA for Sign/Stamp
5849 Gross Hall Vivarium 994039 03/28/2011 04/11/2011 04/05/2011 RFI # 1044 Flexidrops - Fire Protection
5848 Gross Hall Vivarium 994039 03/28/2011 04/11/2011 04/07/2011 Submittal #16900-033.0 Fire Detection & Fire Alarm Dwgs
5847 Sprague Hall 5108507 03/24/2011 04/07/2011 04/11/2011 Specifications. Final Review. Approval Stamp.
5846 Bio Sci 3 5108507 03/24/2011 04/07/2011 04/11/2011 Specifications. Final Review. Approval Stamp.
5845 Gross Hall Vivarium 994039 03/24/2011 04/07/2011 04/11/2011 Gross Hall Vivarium
5844 Verano Place Housing 996268 03/24/2011 04/07/2011 04/20/2011 Verano Place Housing
5843 Gross Hall Viviarium 994039 03/24/2011 04/07/2011 03/29/2011 07-841 Thru-Penetration Fire Stopping
5842 Gross Hall Vivarium 994039 03/24/2011 04/07/2011 04/05/2011 RFI #1040 Installation Procedure for Fire Sprinkler
5841 Verano Place Housing 996268 03/23/2011 04/06/2011 03/29/2011 Submittal # 072100.001 Builing Insulation
5840 Gross Hall 994039 03/23/2011 04/06/2011 03/23/2011 Other: Underground piping & demising
5839 Med.Ed. 5108535 03/22/2011 04/05/2011 04/06/2011 Detail u/l. Preapproved u/l details. Device outsheets; WD reference plans
5838 Gross Hall Vivarium 994039 03/22/2011 04/05/2011 03/22/2011 Database
5837 Gross Hall Vivarium 994039 03/22/2011 04/05/2011 03/29/2011 RFI #1039.01 Card Reader Fire Stop at (E) 2hr - Separation Sensors
5836 CAL IT 2 5108639/96399 03/22/2011 04/05/2011 03/29/2011 4th Floor Renovation. Final Review. Approval Stamp.
5835 Sprague Hall 5108616 03/22/2011 04/05/2011 04/13/2011 Duct Replacement. Plans. Specifications. Final Review. Approval Stamp.
5834 Verano Place Housing 996268 03/16/2011 03/30/2011 03/16/2011 Other: DP4-Verano Housing_conformed ASI#1-FRO
5833 GHARC 994039 03/16/2011 03/30/2011 03/23/2011 Submittal: pipe insulation
5832 SE-2 Lab Renovation Phase 2 5108679 03/15/2011 03/29/2011 03/23/2011 SE-2 Lab Renovation. Phase 2
5831 Palo Verde Housing 5108653 03/15/2011 03/29/2011 03/23/2011 Palo Verde Housing - 7000 & 8000 Building only
5830 Verano Place Housing 996268 03/07/2011 03/21/2011 03/15/2011 Verano Place Housing
5828 Verano Housing 996268 03/14/2011 03/28/2011   G-005 OCFA Approved - FRO
5827 AIRB-2nd Floor Tenant Improvement 991092 03/14/2011 03/28/2011 03/15/2011 Fire Protection dwg for Additional Sprinklers
5826 AIRB-2nd Flr Tenant Improvement 991092 03/10/2011 03/25/2011 03/14/2011 Other: Door specification_90 minute rating
5825 Verano Place Housing 996268 03/10/2011 03/24/2011 03/18/2011 #21 9000-01 Fire Suppression Pkg (Housing)
5824 Sprague Hall 5108616 03/10/2011 03/24/2011 03/17/2011 Plans. 100% Review. Approval Stamp
5822 Mesa Court Renewal Units 1 & 2 996265 03/10/2011 03/24/2011 03/24/2011 15300 Fire Suppression Dwgs & calcs.
5821 Gross Hall Vivarium 994039 03/10/2011 03/24/2011 03/14/2011 RFI #1033 Changing Smoke Detectors to Heat Sensors
5820 Verano Place Housing 996268 03/10/2011 03/24/2011 03/14/2011 RFI #011 FDC Connection at ITC
5819 Fire Extinguisher Cabinets 5108728 03/10/2011 03/24/2011 03/10/2011 Other: Cut Sheets
5818 Med Ed, Irvine Hall, Hewitt Hall, Gross Hall 5108535 03/10/2011 03/24/2011 03/16/2011 Plans
5817 Sprinkler Plans 92396 03/10/2011 03/24/2011 03/16/2011 Sprinkler Plans
5816 CAL IT2 5108639/96399 03/09/2011 03/23/2011 03/16/2011 Final review, approval stamp
5815 Reines Hall 5108509 03/08/2011 03/22/2011 03/08/2011 Plans, Specifications, Final Review, Approval Stamp
5814 Med Sci "C" 5108363 03/08/2011 03/22/2011 03/21/2011 100% Review. Approval stamp
5813 Verano Place Housing 996268 03/07/2011 03/21/2011   RFI: #007 New water line location at ITC
5812 Gross Hall Vivarium 994039 03/07/2011 03/21/2011 03/07/2011 Other: 100% CD Drawings w/backsheet Set
5811 Gross Hall Vivarium (GHARC) 994039 03/07/2011 03/21/2011 03/07/2011 Other: Underground Piping & Demising Wall Package
5810 Verano Place Housing 996268 03/04/2011 03/18/2011 03/14/2011 Other: final specs w/backcheck
5809 Mesa Court Renewal Units 1 &2 996265 03/04/2011 03/18/2011 03/04/2011 Other: conformed construction contract-for records only
5808 Mesa Court Renewal Units 1 & 2 996265 03/04/2011 03/18/2011 03/16/2011 Submittal: 16720_fire alarm system dwgs & product data
5807 Bookstore (student center) 5108678 03/04/2011 03/18/2011 03/07/2011 Other: fire caulk details, 100% review, approval stamp
5806 Bookstore (Student Center) 5108678 03/02/2011 03/16/2011 03/07/2011 Other: fire caulk details, 100% review, approval stamp
5805 Bio Sci 3 5108507 03/01/2011 03/15/2011 03/14/2011 Specs, Final Review, and Approval Stamp
5804 Verano Place Housing 996268 02/24/2011 03/09/2011 02/24/2011 Other: DP2-ITC-ASI #02
5803 Verano Place Housing 996268 02/23/2011 03/09/2011 03/15/2011 Other: G-005 Fire Access Plan w/ OCFA backcheck $5788
5802 Gross Hall Vivarium (Gharc) 994039 02/23/2011 03/09/2011 02/28/2011 Other: G-006-Exiting Plan w/ Backcheck #5791
5801 Verano Place Housing 669268 02/23/2011 03/09/2011 02/24/2011 Other: DP4 - Verano Housing ASI #01
5800 Student Center 5108681 02/23/2011 03/09/2011 04/07/2011 Plans, specs, 100% review, comments & corrections, approval stamp
5799 Gross Hall Vivarium (GHARC) 994039 02/23/2011 03/09/2011 02/24/2011 Submittal: fire protection submiital
5798 Verano Place Housing 996268 02/18/2011 03/04/2011   other: swpp certification for signature
5797 RCT Landscape enhancement 991072A 02/18/2011 03/04/2011 02/24/2011 LE-01 photometric plan
5796 AIRB 2ND FLOOR TENANT IMPROVEMENT 991092 02/15/2011 03/01/2011 02/16/2011 FIRE PROTECTION DWG FP1 W BACK CHECK 5793
5795 Verano Lighting Retrofit 5108392 02/10/2011 02/24/2011 02/18/2011 Plans, Specification, Final Review,
5794 Cal IT 2 5108639 02/10/2011 02/24/2011 02/16/2011 Plans
5793 AIRB-2nd Floor Tenant Improvements 991092 02/02/2011 02/16/2011 02/08/2011 Fire Protection Dwg - FP1
5792 GHARC 994039 02/03/2011 02/17/2011 02/08/2011 Fence Plans - Phases 1 &2
5791 GHARC 994039 02/02/2011 02/16/2011 02/09/2011 Progress plans
5790 AIRB Floor Tenant Improvement 991092 02/01/2011 02/15/2011 02/01/2011 Conformed CD For Records Only
5789 RCT Landscape enhancement 991072 02/01/2011 02/15/2011 02/02/2011 001 Site Fence Plan
5788 Verano Place Housing 996268 01/28/2011 02/11/2011 02/01/2011 G-005 Fire Access palns for OCFA Approval w / background
5787 Student Center A.6 Stairs 5108378 01/28/2011 02/11/2011 01/31/2011 Plans, Other: revised; Final review, Other Marked up plans see attached transmittal; Approval stamp
5786 Verano Place Housing Units 1, 2, 3 5108395/67622 01/27/2011 02/10/2011 02/10/2011 Plans, Specifications, EH&S Redlines, Final Review, Approval Stamp
5785 Telemed 5108453 01/27/2011 02/10/2011 02/16/2011 Plans, Preliminary Review, Comments & Corrections
5784 AIRB 2nd Floor II 991092 01/26/2011 02/09/2011 01/26/2011 Other: 100 % CD Revised specs w/ back check 5780
5783 Gross Hall Vivarim 994039 01/26/2010 02/09/2011 01/26/2011 004 13915 0 Flow Test Report For Records Only
5782 Gross Hall vivarium 994039 01/26/2011 02/09/2011 01/31/2011 003 01500 0 Fence Plan ( Ph 1& 2)
5781 McGaugh Hall 5108686 01/25/2011 02/08/2011 01/31/2011 Bridging documents
5780 AIRB 2nd FLR TI 991092 01/24/2011 02/07/2011 01/26/2011 Other 100% CD_ for review
5779 Arts Bldg 991072 01/21/2011 02/04/2011 01/31/2011 Other: Certification letter
5778 Verano Place Housing 996268 01/21/2011 02/04/2011 01/21/2011 Other: DP4 Verano-Residential-conformed set (half-size) FRO
5777 Med Sci "C" 5108363 01/20/2011 02/03/2011 02/10/2011 Plans, 80% Review, Comments & Corrections
5776 Student Center null 01/20/2011 02/03/2011 01/20/2011  
5775 BP NORTH 5108576 01/18/2011 02/01/2011 02/01/2011 Plans, Design Engineers, comments, Material submittals
5774 Verano Place Housing 996268 01/13/2011 01/27/2011 01/13/2011 For Record Only
5773 Verano Place Housing 996268 01/13/2011 01/27/2011 01/25/2011 DP4 ASI 1 For Review, Stamp/Sign
5772 Student Center 5108378 01/12/2011 01/26/2011 01/19/2011 Plans 6001, 6002, A100, A101, A501, 100% review, approval stamp
5771 Verano Place Housing 996268 01/11/2011 01/25/2011 01/19/2011 Verano Place Housing
5770 Verano Place Housing 996268 01/07/2011 01/21/2011 01/10/2011 Other: Final DP4 drawing document (CD) w/ backcheck set
5769 Arts Building 991072 01/06/2011 01/20/2011 01/06/2011 For Record Only
5768 Verano Place Housing Unit 1,2,3 5108395 01/04/2011 01/18/2011 01/13/2011 Plans, specification, and final review
5767 Bren Hall 5108475/99236 01/03/2011 01/17/2011 01/12/2011 Request to CFM
5766 BP North 5108576 12/21/2010 01/04/2011 01/10/2011 plans, other, approval and stamp
5765 Palo Verde 5108323 12/16/2010 12/30/2010 01/12/2011 Fire Alarm Upgrade
5764 Verano Place Unit Replacement 996268 12/16/2010 12/30/2010 12/16/2010 DP-3 Final CD w Backcheck #5710
5763 BPNorth (School of Law) Deans Suite (Suite 1000) 5108576 12/13/2010 12/27/2010 12/20/2010 Other: cutsheets CSFM listing service, voltage drop calcs; submittal materials, approval stamp
5762 Verano Place Housing 996268 12/07/2010 12/21/2010 12/13/2010 Other: G-002 & G-005 Mark ups FRO
5761 Topio's at Student Center 100442 12/13/2010 12/27/2010 12/13/2010 Topio's/Bene's & Greens-Revised drawings #3; East Food Court-Student Center
5760 Verano Place Unit Replacement 996268 12/09/2010 12/23/2010 12/20/2010 DP 2 Specifiactions
5759 Verano Place Unit 4 Replacement 996268 12/09/2010 12/23/2010 12/20/2010 DP 4 Specifications
5758 Arts Building 991072 12/09/2010 12/23/2010 12/09/2010 submittal
5757 ARTS BLDG 991072 12/09/2010 12/23/2010 12/09/2010 Photometric review
5756 Verano Place Unit 4 Replacement 992268 12/07/2010 12/21/2010 12/09/2010 Submittal #33 1110.001 Site Water Distribution- PD, Maintenance, Conc. Mix
5755 Gross Hall Vivarium 994039 12/06/2010 12/20/2010 12/20/2010 Other: NIH DD Package resubmittal backcheck #5626
5754 Berk Hall Renovation 5108511 12/03/2010 12/17/2010 12/08/2010 Plans
5753 McGaugh Hall 503 5108344 12/01/2010 12/15/2010 12/02/2010 Specs M&O Manual (attached); Other: Blackberry Photo Sent (12/1) Dan's Photo included also CSFM valve listing.
5752 Verano Place Unit 4 Replacement 996268 12/01/2010 12/15/2010 12/15/2010 Verano Egress Lighting_Site & Residential Lighting Photometrics
5751 Med Sci "E" 5108608 12/01/2010 12/15/2010 12/15/2010 Plans, Final review, approval stamp
5750 Med Surge 1 5108567 11/30/2010 12/14/2010 12/01/2010 Plans, other, marked up plan
5749 Med Surge 1 5108567 11/22/2010 12/06/2010 11/29/2010 Plans, Final review, Approval stamp, Prior approved site plan
5748 mcgaugh hall 5108509 11/18/2010 12/02/2010 12/07/2010 submittal
5747 Verano Place Unit 4 Replacement 996268 11/17/2010 12/01/2010 11/22/2010 Other: Site plan for review w/OCFA
5746 Arts Bldg 991072 12/07/2010 12/21/2010 12/10/2010 Other: ASI#106.A Emergency Egress lighting flr plans only for stamp/sign, w/backcheck #5743
5745 Topio's at Student Center 100442 11/17/2010 12/01/2010 11/29/2010 Topio's /Bene's & Greens -revised dwgs #2
5744 Subway @ B.C.'s Cavern 10015 11/17/2010 12/01/2010 11/17/2010 10015-Subway T.I.; B.C's Cavern
5743 ARTS Bldg 991072 11/12/2010 11/26/2010 11/16/2010 Submittal: Egress lighting
5742 Education/Sol Moot Court/Classroom 1st Flr 5108203 11/10/2010 11/24/2010 11/17/2010 Plans, Specs, Final Review, Approval stamp
5741 Verano Place Unit 4 Replacement 996268 11/10/2010 11/24/2010 11/16/2010 RFI #002_Fire Rated Windows @ Residiential Unit Entrances
5740 McGaugh Hall 503 5108344 11/09/2010 11/23/2010 11/29/2010 Firetrol Controller Submittal 5481
5739 Verano Place Unit 4 Replacement 996268 11/08/2010 11/22/2010 11/24/2010 Other: DP4_Fire Access Package for OCFA w/Backcheck #5735-2 copies
5738 Med Sci E 5108608 11/04/2010 11/18/2010 11/12/2010 Remodel Student Lounge/ Fire Alarms
5737 Campus Map null 11/03/2010 11/17/2010 11/03/2010 Plans
5736 Subway @ B.C.'s Cavern 10015 11/01/2010 11/15/2010 11/12/2010 Two Full size sets for Subway from Mark Keller, Keller & Barre's Associates
5735 Arts Bldg 991072 10/29/2010 11/12/2010 11/04/2010 ASI 106 Emergency Egress Lighting floor plans and photometicrs,
5734 Verano Place Unit 4 Replacement 996268 10/29/2010 11/12/2010 10/29/2010 DP- 1 Demo Package signed/ stamped For Records Only
5733 Student Center( Crystal Cove Lobby) 5108579 10/28/2010 11/11/2010 10/28/2010 Plans, eh&s redlines, final review,
5732 McGaugh Hall 5108509 10/27/2010 11/10/2010 11/04/2010 Plans, 80% review, comments & corrections
5731 Med Sci E 5108608 10/25/2010 11/18/2010 10/28/2010 Plans, specs, final review, approval stamp
5730 Student Center (Crystal Cove Lobby) 5108579 10/25/2010 11/18/2010 10/27/2010 Plans, specs, EH&S redlines (copy), 100% review
5729 Engineering Unit 3-5th Flr 990077 10/22/2010 11/05/2010 10/22/2010 Other: Conformed CD for Records Only
5727 Middle Earth Renovation 996254 10/21/2010 11/04/2010 10/21/2010 Conformed CD for Records Only
5721 Verano Place Unit 4 Replacement 996268 10/21/2010 11/04/2010 11/02/2010 Other: SWPPP Manual
5719 Verano Place Unit 4 Replacement 996268 10/20/2010 11/03/2010 10/20/2010 Other: DP-4 Residential Design package 100CD Backcheck
5718 Verano Place Unit 4 Replacement 996268 10/20/2010 11/03/2010 10/27/2010 Other: DP-3_100% CD-infant toddler center package w/backcheck#5649
5717 Berk Hall Renovation 5108511 10/19/2010 11/02/2010 10/22/2010 Plans, Specifications, final review, and approval stamp
5716 Alumni Center, Gavin Herbert Eye Institute 991301, 998107 10/14/2010 10/28/2010 10/14/2010 Draft RFP (bid doc) (binder)--Alumni Center; Draft RFP (bid doc) (binder)--Gavin Herbert Eye Institute
5715 Education/sol moot court/Classroom Sprinkler 5108203 10/13/2010 10/27/2010 10/15/2010 Plans, final review, approval stamp
5714 Arts Bldg 991072 10/08/2010 10/22/2010 10/15/2010 Other: Shop dwgs re: ASI#103 compressor enclosure w/ backcheck#5707
5713 Verano Place Unit 4 Replacement 996268 10/08/2010 10/22/2010 10/08/2010 Other: DP-2_100% CD-signed/stamped-half size set for records
5712 Sol court/classroom EDV 1111+1121 5108203 10/05/2010 10/19/2010 10/07/2010 Plans, Final Review, and Approval Stamp
5711 Topio's at Student Center null 10/04/2010 10/18/2010 10/12/2010 Revised dwgs, original dwgs, specs sheet for E05 Cold Pan, Data/Spec for Ansul R102 (Wet Chemical) Fire
5710 Middle Earth Renovation 996254 10/01/2010 10/15/2010 10/11/2010 Other: 100% CD Specs for Stamp/Sign
5709 Verano Place Unit Replacement 996268 09/30/2010 10/14/2010 10/15/2010 DP 4 100% DD package w back check Gen 002,G005, G2-005
5708 Subway @ B.C Tavern Hospitality & Dining 09/28/2010 10/12/2010 10/11/2010 2 full size sets from Mark Keller & Barre Associates.
5707 Arts Building 991072 09/28/2010 10/12/2010 09/28/2010 ASI # 103
5706 Engineering Unit 3 5th Floor 990077 09/28/2010 10/12/2010 10/11/2010 Revised Specifications for Sign and Stamp #5663
5705 Verano Place Unit 4 Replacment 996268 09/28/2010 10/12/2010 10/13/2010 DP-4 Fire Access Plan G 005
5704 Reines Hall 5108509 09/23/2010 10/07/2010 10/11/2010 Plans, specs, 80% Review, and comments and corrections
5703 Med Sci E 5108608 09/23/2010 10/07/2010 10/05/2010 Plans, specs, prelim review, and comments and corrections
5702 CALIT 2 5108399 09/23/2010 10/07/2010 09/27/2010 other, submittal approval stamp
5701 BPN, Dean s Suite 5108576 09/23/2010 10/07/2010 10/05/2010 Cut Sheets, Lisinting Service, Submittal, Approval Stamp
5700 Verano Place Unit 4 Replacement 996268 09/23/2010 10/07/2010 09/23/2010 100% DP2 Prng
5699 Rowland Hall 5108213 09/22/2010 10/06/2010 09/30/2010 Plans, specifications, final review, and approval stamp
5698 Education 1st Floor 5108203 09/20/2010 10/04/2010 10/05/2010 Plans, , final reviewl, and approval stamp
5697 Berk Hall Renobation 5108511 09/17/2010 10/01/2010 10/07/2010 Plans, 100& Review, and comments and corrections
5696 Art Bldg 991072 09/17/2010 10/01/2010 09/27/2010 ASI # 13 ASK 192a& ASK 192b for acoustical enclosure around compressor
5695 Middle Earth Phase 1 996254 09/16/2010 09/30/2010 09/16/2010 Fire Stop Detail
5694 middle earth renovation 996254 09/16/2010 09/30/2010 09/20/2010 revised FA 098 FA 10 stamp/sign
5693 Education/moot court/classroom Rm 1111 & 1121 5108203 09/16/2010 09/30/2010 09/23/2010 plans, final review, approval stamp
5692 Med Sci E 5108608 09/15/2010 09/29/2010 09/20/2010 Plans, 80% review, comments & corrections.
5691 Engineering Unit 3-5th Flr 990077 09/13/2010 09/27/2010 09/17/2010 Submittal: Revised FP-11 for reception soffit sprinkler w/ ref. approved 5637
5690 Arts Bldg 991072 09/10/2010 09/24/2010 09/16/2010 Other: ASI#92 applied fireproofing on the beam at stair #2.
5689 Arts Bldg 991072 09/10/2010 09/24/2010 09/15/2010 Other: Air-Intelligence Detector Commisioning
5688 Arroyo Vista Housing spaces 5108580 09/08/2010 09/22/2010 09/08/2010  
5687 EH&S 41 5108538 09/07/2010 09/21/2010 09/20/2010 5 Year Sprinkler Certification
5686 Music & Media 726 5108538 09/07/2010 09/21/2010 09/20/2010 5 Year Sprinkler Certification
5685 Physical Sciences Lecture Hall 411 5108538 09/07/2010 09/21/2010 09/20/2010 5 year Fire Sprinkler Certifications
5684 Bio/Sci Schneidman Lecture Hall 501 5108538 09/07/2010 09/21/2010 09/20/2010 5 year fire sprinkler certification
5683 Smith Hall 710 5108538 09/07/2010 09/21/2010 09/20/2010 5 year Fire sprinkler certification
5682 Merage GSM 221 5108538 09/07/2010 09/21/2010 09/20/2010 5 year fire sprinkler certification
5681 Eng comp trailer 317 5108538 09/07/2010 09/21/2010 09/20/2010 5 year Fire Sprinkler Certification
5680 Middle Earth Renovation 996254 09/07/2010 09/21/2010 09/14/2010 Revised 100% w Backcheck for sign/stamp
5679 Arts Bldg. 991072 09/07/2010 09/21/2010 09/07/2010 28.3111.06 Fire Alarm pre action with Back check 5667
5678 Engineering Unit 3-5th floor 990077 09/07/2010 09/21/2010 09/23/2010 100% CD W Revised MEP for stamp sign Back Check #5642
5677 UCI Phs III East Site 2 08605 09/03/2010 09/17/2010 09/03/2010 AS-Built dwgs
5676 Arroyo Vista Holding Office 5108580 09/01/2010 09/15/2010 09/01/2010 Plans
5675 Verano Place Unit 4 Replacement 996268 08/30/2010 09/13/2010 09/15/2010 Other: DP-2_100% DD-Verano Maintenance Bldg. w/ Backcheck #5650
5674 verano place unit replacement 996268 08/27/2010 09/10/2010 09/08/2010 Submittal: Asbestos abatement
5673 Fire Hydrants and Fire Line null 08/26/2010 09/09/2010 08/26/2010 For Records Only
5672 Middle Earth Renovation 996254 08/26/2010 09/09/2010 08/30/2010 Fire Alarm DWGS & Product Data backcheck W/ 5665
5671 Arts Bldg. 991072 08/26/2010 09/09/2010 08/30/2010 ASI 101 Draft Stopping to cloose plenum above glass ceiling ( ASK 191)
5670 Arts Bldg. 991072 08/26/2010 09/09/2010 08/30/2010 ASI #097 Glass Guard Rail at East side of Corridor 2905 ( ask -186)
5669 Engineering Unit 3-5th floor 990077 08/26/2010 09/09/2010 08/30/2010 Submittal: revised FP-1 for Water curtain piping w ref to Efi #010
5668 MPAA (school of law 3rd & 4th flr renovation) 5108484 08/25/2010 09/08/2010 08/26/2010 Plans 1sheet A-O; 100% review; Comments & Corrections; Approval stamp
5667 Arts Bldg 991072 08/25/2010 09/08/2010 08/31/2010 Submittal: fire alarm pre-action product data & as built shop dwgs
5666 Education, Sol Moot Cert/ Classroom Renovation 5108203 08/24/2010 09/07/2010 09/07/2010 Plans, Final Review, Approval Stamp
5665 Middle Earth Renovation 996254 08/19/2010 09/02/2010 08/23/2010 Fire Alarm SWG & Product Data
5664 Verano Place Unity 4 Replacement 996268 08/19/2010 09/02/2010 08/23/2010 -008 Site Fencing Plan w Backecheck 5639 and 5643
5663 Engineering Unit 3-5th Floor 990077 08/19/2010 09/02/2010 08/31/2010 Other 100% Specs for Review and approval
5662 Sprague Hall 5108616 03/10/2011 03/24/2011 03/24/2011 Duct Replacement. Plans. 100% Review. Approval Stamp.
5661 Verano Place Unit 4 Replacentent 996268 08/17/2010 08/31/2010 08/19/2010 Draft SWPPP Plan
5660 Arts Bldg 991072 08/16/2010 08/30/2010 08/17/2010 Other: Emergency Light Bulletin Request #15 for Review
5659 Middle Earth Renovation 996254 08/13/2010 08/27/2010 08/24/2010 Submittal: 13915_Revised FP Dwgs (Delta 2) w/ approved set
5658 Engineering Unit 3-5th Floor 990077 08/13/2010 08/27/2010 08/16/2010 RFI: #010 Water curtain piping in vestibule (5901)
5657 Old Student Center 5108385 08/12/2010 08/26/2010 08/18/2010 submittals, approval stamp
5656 Engineering Unit 3-5th Floor 990077 08/12/2010 08/26/2010 08/18/2010 Submittal: 13915.02A_Lab Wing-Fire Suppression Dwgs & Calcs. w/ backcheck set #5637
5655 Med Surege 1 Emergency Repair 5108567 08/11/2010 08/25/2010 08/18/2010 Plans, 100% review, and approval stamp
5654 Verano Place 996268 08/11/2010 08/25/2010 08/11/2010 Demo Package
5653 UCI Stem Cell Research Center # 6085-00 994038 08/11/2010 08/25/2010 08/20/2010 Drawing
5652 SCRC Bldg 994038 08/06/2010 08/20/2010 08/11/2010 ALT means of Const, opening protection between 1st floor control area 2 & 3rd floor opening.
5651 Student Center Crystal Cove 5108579 08/06/2010 08/20/2010 08/18/2010 Plans, pre review,
5650 Verano Place Unit 4 Replacement 996268 08/05/2010 08/19/2010 08/17/2010 DP 2 Civil Struct, Package Maintenance Bldg
5649 Verano Place Unit 4 Replacement 996268 08/05/2010 08/19/2010 08/09/2010 G Sheets code analysis & Fire Exiting ( Infant Toddler Center)
5648 Verano Plane Unit Replacement 996268 08/05/2010 08/19/2010 08/09/2010 G Sheets code Anaylsis & Fire Eciting ( Residential)
5647 Mesa Court Prtotype Renovations 996264 08/05/2010 08/19/2010 08/05/2010 Conformed CD Set ( half size) For Record Only
5646 Middle Earth Renovation 996254 08/04/2010 08/18/2010 08/19/2010 Final CD DEG & Specs w Backcheck set 5586
5645 ARC 5108411 08/04/2010 08/18/2010 08/10/2010 Final review
5644 Middle Earth Renovation 996254 08/04/2010 08/18/2010 08/16/2010 Other: Final CD drawings & specs w/ backcheck set (EH&S #5586)
5643 Verano Place 996268 08/11/2010 08/25/2010 08/11/2010 Other: DP-0 Demolition package (Ref. EGS #5621)
5642 Engineering Unit 3-5th Floor 990077 08/04/2010 08/18/2010 08/18/2010 Other: Revised CD set for review w/ backcheck #5585
5641 Arts Bldg. 991072 08/04/2010 08/18/2010 08/24/2010 Other: G-102 Amendment w/ # 5616 (OCFA signed Letter)
5640 SE-2 lab 1377/1381 rev. 5108556 08/02/2010 08/16/2010 08/04/2010 Plans, final review, approval stamp
5639 Verano Place Unit 4 Replacement 996268 08/02/2010 08/16/2010   Other: C-101_Site fencing/emergency access plan
5638 Arroyo Vista Housing Office 5108580 07/30/2010 08/13/2010 08/06/2010 Plans, Final review, approval stamp
5637 Engineering Unit 3-5th Flr 990077 07/30/2010 08/13/2010 08/04/2010 Submittal: 13915-fire suppression dwgs & calcs.
5636 McGaugh Hall 5108505 07/30/2010 08/13/2010 08/10/2010 Fire Alarm Upgrades- 100 % review and Approval Stamp
5635 Arts Building 991072 07/29/2010 08/12/2010 07/29/2010 Floor Reduction Detail
5634 Mesa Court Phase 1&2 996264 07/29/2010 08/12/2010 07/29/2010 Architerual Package 100% CD
5633 Mesa Court Prototype renovation - Arroyo & Puente 996264 07/28/2010 08/11/2010 07/28/2010 For Records Only - approved fire protection drawing
5632 BPN RM 111, 1121 Moot Court, Lg Classroom 5108203 07/27/2010 08/10/2010 08/09/2010 Plan Check
5631 SCRC Bldg 994038 07/28/2010 08/11/2010 08/02/2010 Submittal- 21 0500 .B Level 2 Floor Opening Protection Clarification & Discussion W Back/check #5595
5630 Mesa Court Prototype renovation 996264 07/28/2010 08/11/2010 07/28/2010 Arroyo- False Beam for Hiding sprinkler heads- Revised Locations
5629 Middle Earth Renovation 996254 07/26/2010 08/09/2010   Other : approved fire protection dwgs-FRO
5628 Arts Bldg 991072 07/26/2010 08/09/2010 07/26/2010 Other: Evac Maps, Final review, approval stamp
5627 Langson Library 5108344 07/26/2010 08/09/2010 07/26/2010 Submittal: Engineering judgement, aproval stamp
5626 Gross Hall Vivarium 994039 07/23/2010 08/06/2010 08/06/2010 Other: DD package dated 6/30/10
5625 Arts Bidg. 991072 07/23/2010 08/06/2010 07/26/2010 Other: Enclosed soffit detail in MDF room for piping
5624 Arts Bldg. 991072 07/23/2010 08/06/2010 07/23/2010 Other: Letter from Berg painting air sense sampling pipe network - FRO
5623 Engineering Unit 3-5th Floor 990077 07/23/2010 08/06/2010 07/23/2010 RFI: #2.2 Orion piping wrap 5th floor lab wing
5622 GIS Campus Map none 07/22/2010 08/05/2010 07/22/2010 Other, for your information
5621 Verano Place Unit 4 Replacement 996268 07/22/2010 08/05/2010 08/09/2010 Other: DP-0_Temporary Facility & Site Utility Demolition & Erosion Control
5620 Mesa Court Prototype Renovation-Arroyo & Puente 996264 07/22/2010 08/05/2010 08/02/2010 RFI: #19 Fire Hose Location
5619 SE-2 lab/1377/1381 5108556 07/21/2010 08/04/2010 07/28/2010 plans, final review, approval stamp
5618 Rowland Hall 5108213 07/21/2010 08/04/2010 07/22/2010 Addendum
5617 Arts Bldg. 991072 07/21/2010 08/04/2010 07/22/2010 RFI: Sketch for RFI 230R
5616 Arts Bldg. 991072 07/21/2010 08/04/2010 07/26/2010 Submittal: Fire access plan
5615 Arc 5108411 07/21/2010 08/04/2010 07/26/2010 Final Review - back check
5614 Arroyo Cista Housing Office 5108580 07/20/2010 08/03/2010 07/26/2010 Plans
5613 Arroyo Vista Housing Office 5108580 07/20/2010 08/03/2010 07/20/2010 Plans product data sheets
5612 Mesa Court Prototype renovation-Arroyo & Puente 996264 07/16/2010 07/30/2010 07/19/2010 Submittal: 15300 revised fire suppression cut sheets & dwgs w/backcheck set #5556 Puente
5611 Mesa Court Protoype renovation Arroyo & Puente 996264 07/16/2010 07/30/2010 07/19/2010 Submittal: cut sheets, calc, materials
5610 Mesa Court Protoype renovation-Arroyo & Puente 996264 07/16/2010 07/30/2010 07/19/2010 Submittal: 15300 revised fire suppression cut sheets & dwgs w/backcheck set #5556 Arroyo
5609 Arroyo Vista Housing Office 5108580 07/16/2010 07/30/2010 07/19/2010 Plans, 100% review
5608 Arts. Bldg. 991072 07/14/2010 07/28/2010 07/26/2010 Other: Revised G - 102 per OCFA mark-ups w/ back check
5607 Site 2 sheet a1.40 east campus III 07/13/2010 07/22/2010 07/26/2010 Plans Spec, other
5606 Social Science Tower 201 5108344 07/12/2010 07/26/2010 07/14/2010 Other: submittal clarification, approval stamp
5605 Arts Bldg 991072 07/12/2010 07/26/2010 07/15/2010 Other: Evac maps, preliminary review, comments & corrections
5604 Arts Bldg 991072 07/09/2010 07/23/2010 07/13/2010 RFI: Floor renovation C-AJ-3084
5603 Mesa Court Prototype renovation-Arroyo & Puente 996264 07/09/2010 07/23/2010 07/19/2010 Submittal: 01500-Temporary facilities, controls & fencing backcheck set #5577
5602 Mesa Court prototype renovation-Arroyo & Puente 996264 07/09/2010 07/23/2010 07/14/2010 Submittal: 15300_Revised fire suppression cut sheets & dwgs w/ backcheck set #5556
5601 Mesa Court Prototype renovation-Arroyo & Puente 996264 07/09/2010 07/23/2010 07/13/2010 RFI: RFI #16_Arroyo False Beam to Hide Sprinkler Heads
5600 Irvine Hall 5107906 07/08/2010 07/22/2010 07/13/2010 Prior reviewed set of plans, 100% Review, Final Review and approval stamp
5599 Reines hall 5108509/ 998558 07/08/2010 07/22/2010 07/09/2010 Plans, specification, 80% review, and comments and corrections
5598 Arts Bldg. ( Struct cabling) 991072 07/08/2010 07/22/2010 07/19/2010 07.4800.04 Fire Stopping UL/cUL system # C-AJ 0058 _ FRO
5597 Langson Library 5108344 07/08/2010 07/22/2010 07/09/2010 Submittal, Fire Blanket
5596 Middle Earth Renovation 996254 07/07/2010 07/21/2010 07/13/2010 Submittal: 21.1000.01B_fire protection resubmitttal w/backcheck#5537
5595 SCRC Bldg 994038 07/07/2010 07/21/2010 07/14/2010 Submittal: 21 0500_level 2 floor opening protection clarification & discussion
5594 Mcgaugh Hall 5108505 07/06/2010 07/20/2010 07/13/2010 Plans, Specs, Final Review,Approval Stamp
5593 Verano Place Unit 4 Replacement 996268 07/02/2010 07/16/2010 07/02/2010 Conformed construction contract- Record Only
5592 Arts Bldg. 991072 07/02/2010 07/16/2010 07/13/2010 06-1053.01 Misc Carpentry- Plywood Flooring Fire Retardant Data
5591 SE 2 Lab 1377/1381 Renov. 5108556 07/01/2010 07/15/2010 07/12/2010 Plans, 100% Review and comments and corrections
5590 Arts Bldg 991072 07/01/2010 07/15/2010 07/13/2010 Submittal: 095417.01_plastic composite ceiling shop dwg & product data
5589 Social Science Tower 5108344 07/01/2010 07/15/2010 07/09/2010 Other: Add'l submittal; approval stamp
5588 9087 Sprague Hall null 06/30/2010 07/14/2010 06/30/2010 Other
5587 Social Science Tower 5108344 06/30/2010 07/14/2010 07/01/2010 Other: submittal; approvals stamp
5586 Middle Earth Renovation 996254 06/30/2010 07/14/2010 07/08/2010 Other: 100% CD dwgs for review/sign/stamp
5585 Eng. Unit 3-5th Flr 990073 06/30/2010 07/14/2010 07/13/2010 Other: 100% CD for review/sign/stamp
5584 Eng. Unit 3-5th Flr 990073 06/30/2010 07/14/2010 07/07/2010 Submittal: 16852.03 A_Fire alarm shop dwgs-Lab Wing
5583 Eng Unit 3-5th Flr 990073 06/30/2010 07/14/2010 07/08/2010 Submittal: 16852.02 A_Fire alarm shop dwgs--Dean's Suite
5582 Social Behavioral Science Lab G-105 5108532 06/29/2010 07/13/2010 07/08/2010 Plans, Specifications, Final Review, Approval Stamp
5581 Science Library 520 5108362 06/29/2010 07/13/2010 07/01/2010 Plans, specs, submittal , drawing sheets 52.0 & 53.1 details 13& 15.
5580 Eng Hall 5th Flr II 990073 06/28/2010 07/12/2010 06/28/2010 RFI: 2.1 fire wrapping Orion Vent Pipe
5579 MPAA 3+4 Renovation 5108484 06/28/2010 07/12/2010 07/08/2010 Plans, specs, final review, approval stamp
5578 Bren Event Center 901 5108387 06/28/2010 07/12/2010 06/29/2010 Other: submittal sketeches, approval stamp
5577 Mesa Court Prototype renovation - Arroyo & Puente 996264 06/24/2010 06/28/2010 06/25/2010 Submittal: 01500 Site layout plan - Arroyo & Puente
5576 Arts Bldg. 991072 06/24/2010 06/25/2010 07/08/2010 RFI: #476 Additional smoke detector Re: En11 dated 5/19/10
5575 Berkeley Place 5108344 06/22/2010 07/06/2010 06/25/2010 Submittal, approval stampe
5574 Science Library 520 5108344 06/21/2010 07/05/2010 06/23/2010 Submittal Approval Stamp
5573 Rowland Hall 400 5108344 06/21/2010 07/05/2010 06/23/2010 Submittal- approval Stamp
5572 Reines Hall 401 5108344 06/21/2010 07/05/2010 06/23/2010 Submittal- Approval Stamp
5571 Physical Science Classroom 413 5108344 06/21/2010 07/05/2010 06/23/2010 Submittal Approval Stamp
5570 Langson Library #102 5108344 06/21/2010 07/05/2010 06/23/2010 Submittal
5569 Croul Hall 5108344 06/21/2010 07/05/2010 06/23/2010 Submittal
5568 Arts Cultural & Technology 727 5108344 06/21/2010 07/05/2010 06/23/2010 Arts Cultural & Technology 727
5567 Student Center ( Old )n113 5108325 06/21/2010 07/05/2010 06/23/2010 Submittal approval Stamp
5566 Student Health Center 005 5108384 06/21/2010 07/05/2010 06/23/2010 Other: submittal, Approval stamp
5565 Subway at BC's Cavern Preliminary 06/21/2010 07/05/2010 06/25/2010 Subway at BC's Cavern
5564 Topio's Pizza 100442 06/21/2010 07/05/2010 06/28/2010 Student Center-East Food Court
5563 ARC 5108411 06/21/2010 07/05/2010 06/25/2010 Approval stamp
5562 BPN EDUCATION RM 1131 RENOVATION 5108308 06/18/2010 07/02/2010 06/29/2010 Plans, Specification, 100 Review and comments & Corrections
5561 Mesa Court Prototype Renovation 996264 06/18/2010 07/02/2010 06/22/2010 16700 Fire Alarm Re submittal w backcheck 5527
5560 Mesa Court Prototype renovation Arroyo & Puente 996264 06/18/2010 07/02/2010 06/22/2010 RFI 06 Electrical Rm door rating
5559 Mesa Court Prototype Renovation- Arroyo& Puente 996264 06/18/2010 07/02/2010 06/22/2010 RFI #05 Fire Sprinkler Confirmation
5558 Arts Building 991077 06/17/2010 07/01/2010 07/01/2010 G-102 Fire Access Site Plan
5557 Mesa Court Units 1&2 Rneovaton Protoype 996264 06/17/2010 07/01/2010 06/17/2010 For Record Only
5556 Mesa Court Prototype Renovation - Arroyo & Puente 996264 06/17/2010 07/01/2010 06/25/2010 15300 Fire Suppression Calcs, product and DEWGS Submittal W 5519
5555 Arts Building 991072 06/17/2010 07/01/2010 06/21/2010 Rfi Delete Smoke Detector
5553 Eng Hall 5th Floor 77 990073 06/17/2010 07/01/2010 06/21/2010 Fire Wrap/ orion vent fire
5552 Social Behavior 5108532 06/16/2010 06/30/2010 06/21/2010 Plans, scope review and consultation for sprinkler heads
5550 ARC 680 5108332 06/15/2010 06/29/2010 06/22/2010 Submittal- approval Stamp
5549 MSTB 415 51098344/62084 06/15/2010 06/29/2010 06/22/2010 Submittal/ Approval Stamp
5548 Queshey Hall 506 5108344/62084 06/15/2010 06/29/2010 06/22/2010 submittal/approval stamp
5546 Social Science Hall 200 5108344/62084 06/15/2010 06/29/2010 06/21/2010 submittal/approval stamp
5545 Social Science Lecture Hall 212 5108344/62084 06/15/2010 06/29/2010 06/21/2010 Submittal- approval stamp
5544 Beale Gallery 712 5108344/62084 06/15/2010 06/29/2010 06/21/2010 submittal/approval stamp
5543 Bren Event Center 5108387 06/14/2010 06/28/2010 06/16/2010 Sumittal, Approval Stamp
5542 Med. Surge I: AHU Emergency Repair 5108567 06/11/2010 06/25/2010 06/16/2010 Other: site plan with photos; Other: AHU location temp. 12 weeks duration; Approval Stamp
5541 Parking lot 1: entrance gate arm 5108375 06/11/2010 06/25/2010 06/16/2010 Plans, Final Review, Other: revise plan based on "MCN", Approval Stamp
5540 Arts Bldg 991072 06/11/2010 06/25/2010 06/16/2010 Submittal: 28 3111.04 fire alarm pre-action areas shop dwgs, product, calcs.
5539 Arts Bldg. 991072 06/10/2010 06/24/2010 06/16/2010 G-102 Fire Access Plan ( signed) For OCFA Review
5538 Middle Earth Renovation 996254 06/10/2010 06/24/2010 06/21/2010 21.1000.01 A Fire Suppression
5537 Middle Earth Renovation 996254 06/09/2010 06/23/2010 06/15/2010 Submittal: 21 1010.02A Fire suppression DWG'S Product ,calcs
5536 MESA COURT PROTOTYPE 996264 06/08/2010 06/22/2010 06/11/2010 01500 TEMPORARY FACILITIES & CONTROLS
5535 SCRC/GROSS HALL 994038 06/08/2010 06/22/2010 06/14/2010 PROPOSAL FOR LEVEL 2 RATING ISSUE
5534 Paul Merage Lobby Renovation 997146 06/08/2010 06/22/2010 06/08/2010 28.3111.02 Fire Alarm w back check 5518
5533 Irvine Hall 5107906 06/07/2010 06/21/2010 06/21/2010 Other: Enclosed reference only-approved stamped drawings 07.09.09, 12.17.09; 100% review Delta No. 6; Other: MAP, SA; approva stamp
5532 POD Express at Mesa Commons null 06/03/2010 06/17/2010 06/03/2010 Plans
5531 Mesa Court Units 1 & 2 Renovation Prototype 996264 06/03/2010 06/17/2010 06/14/2010 Conformed Construction Contract
5530 UDC Norte Maintenance Bldg. Vista Del Norte 06/03/2010 06/17/2010 06/09/2010 Plans
5529 Middle Earth Renovation 996254 05/28/2010 06/11/2010 06/09/2010 Other: Asbestos Abatement Notification
5528 Paul Merage Lobby Renov 997146 05/28/2010 06/11/2010 06/08/2010 RFI: #02 Proposed Fire Extinguisher Location
5527 Mesa Court Protoype Renoavtion Arroyo & Puente 996264 05/27/2010 06/10/2010 06/11/2010 28.3111.01 Fire Alarm DWG's & product data
5526 Arts Bldg. 991072 05/26/2010 06/02/2010 06/09/2010 Submittal: 024119.03 Asbestos Abatement Mesa Bldg.
5525 Arts Bldg. 991072 05/26/2010 06/02/2010 06/08/2010 Submittal: 104400.02 Fire Protection specialties - Fire Extinguisher
5524 Arts Bldg 991072 05/25/2010 06/08/2010 06/08/2010 159.3 EJ 122862D w backcheck 5451
5523 Middle Earth Phase 1 Renovation 996254 05/25/2010 06/08/2010 06/14/2010 Conformed Construction Contract
5522 Parking Lot 1: entrance/gate arms 5108375 05/21/2010 06/04/2010 06/09/2010 Plans, other: revision no. 2, final review, other: reference plans 01.28.10, approved stamp
5521 Engineering Unit 3-5th floor 990073 05/19/2010 05/20/2010 06/07/2010 Other: G-Sheets for approval
5520 Engineering Hall 5th Floor T1 990073 05/19/2010 05/19/2010 05/19/2010 Submittal: Fire Supression
5519 Mesacourt Unit 1&2 996264 05/18/2010 06/01/2010 06/07/2010 Fire Suppression DWGS
5518 Paul Merage Lobby Renov 997146 05/17/2010 05/31/2010 05/20/2010 Submittal: 28 3111.01-Fire alarm dwgs & product data
5517 Middle Earth Renovation 996254 05/17/2010 05/31/2010 05/19/2010 Other: 01 1010.02-phase 1 & 2 fencing plans
5516 Parking Lot 1 Entrance gate arm 5108375 05/14/2010 05/28/2010 05/20/2010 Plans, 100% review, approval stamp
5515 ARTS Bldg 991072 05/14/2010 05/28/2010 05/18/2010 RFI #352R2 Fire rated wall locations w/ back check #5384
5514 Site 1 08604 05/13/2010 05/27/2010 05/17/2010 supple mental bldg, signage per site walk draft/proofs, final review, and approval stamp
5513 MPAA 3&4TH FL RENOVATION 5108484 05/13/2010 05/27/2010 05/18/2010 PLANS, FINAL REVIEW, AND APPROVAL STAMP
5512 MPAA 3 & 4 Rennovation 5108484 05/12/2010 05/11/2010 05/12/2010 Plans
5511 Arts Bldg. 991702 05/12/2010 05/14/2010 05/12/2010 RFI: #443 MMPS Smoke Detectors vs. Beam
5510 SCRC 994038 05/11/2010 05/25/2010 05/12/2010 Certificate of Beneficial Occupancy
5509 MPAA 3 and 4 renov 5108484 05/10/2010 05/24/2010 05/10/2010 plans, final review, approval stamp
5508 SCRC/Cross Hall 994038 05/07/2010 05/21/2010 05/10/2010 Other: Level 2 proposal
5507 Stem Cell Bldg. 494038 05/06/2010 05/20/2010 05/10/2010 Evacuation Maps
5506 SCRC Bldg. 994038 05/05/2010 05/05/2010 05/05/2010 28 3111 Fire Alarm system - Record of completion report FRO
5505 SCRC Bldg. 994038 05/05/2010 05/05/2010 05/05/2010 Other: 23 0593 Prelim TAB Report for records only
5504 Middle Earth Rennovation 996254 05/05/2010 05/10/2010 05/06/2010 Other: 01 1010.01 Phase 1 & 2 Fencing Plans
5503 SCRC Bldg. 994038 05/05/2010 05/19/2010 05/05/2010 Other: 21 0500 NFPA-13 Certificates FRO
5502 Arts Bldg. 991072 05/05/2010 05/06/2010 05/05/2010 Submittal: 07 4800.03 Fire & Smoke Containment insulation system
5501 Arts Building 991072 05/04/2010 05/18/2010 05/12/2010 ASI # 54 Electrical Pass Through
5500 ARTS Bldg 991072 05/03/2010 05/17/2010 05/10/2010 RFI: 443 smoke detector
5499 Arts Building 991072 04/30/2010 05/14/2010 05/03/2010 EN 11 # 26 Letter from BERG
5498 SCRC 994038 04/30/2010 05/14/2010 05/03/2010 Architects, Letter for BO/SC
5497 ARTS Bldg 991072 04/29/2010 05/13/2010 05/03/2010 Submittal: paint booth 2/ Dean's letter
5496 Paul Merage Lobby Renov 997146 04/29/2010 05/13/2010 04/29/2010 Other 100% CD-stamped/signed -FRO
5495 ARTS Bldg 991072 04/29/2010 05/13/2010 05/12/2010 RFI 250R
5494 eng hall 5th floor int improvement 990073 04/29/2010 05/13/2010 04/29/2010 For Record Only
5493 Arts Bldg. 991072 04/28/2010 05/12/2010 05/01/2010 RFI: #205R ask 156 for revised detail @ 6/A-581
5492 Stem Cell 994038 04/27/2010 05/11/2010 05/03/2010 Evac Maps, Pre Review,
5491 Telemedince 5108364 04/27/2010 04/11/2010 04/27/2010 Specification, Final Review and Approval Stamp
5490 Paul Merage Lobby renovation 997146 04/23/2010 05/07/2010 05/03/2010 Submittal 08 3325.01 Smoke Containment coiling curtain
5489 MPAA 5108484 04/23/2010 05/07/2010 04/26/2010 Specifications and cutsheet, final review, and approval stamp
5488 Arts Bldg. 991072 04/23/2010 05/07/2010 04/27/2010 Submittal 10 9900.02 Building specialities Paint Booth
5487 pmbsb 997146 04/22/2010 05/06/2010 04/22/2010 submittal
5486 PMGSB Lobby Renovation 997146 04/22/2010 05/06/2010 04/22/2010 Other: Design Package 100%
5485 PMGSB Lobby review 997146 04/22/2010 05/06/2010 04/22/2010 Submittal: Fire smoke damper
5484 Student Center 80930 04/22/2010 05/06/2010 04/22/2010 Student Center
5483 SpragueHall 99414 04/21/2010 05/05/2010 04/22/2010 Basement Evac Maps Proofs
5482 Telemedicine 5108364 04/22/2010 05/06/2010 04/23/2010 Specifications, Final Review
5481 McGaugh Hall 5108344 04/21/2010 05/05/2010   Other: Electrical box submittal
5480 SCRC BLDG 994038 04/20/2010 05/04/2010 04/22/2010 RFI 1290 GENERATOR EMERGENCY PUSH BUTTON
5479 ARTS Bldg 991072 04/19/2010 05/03/2010 05/10/2010 Submittal 02 4119.02 Asbestos Abatement-prejob work plan
5478 Breast & Women Cancer Lab 994114 04/19/2010 05/03/2010 04/19/2010 Other: Fire alarm record of completion
5477 Breast & Women Cancer Lab 994114 04/19/2010 05/03/2010 04/21/2010 RFI: #039R_Standard Hilti Blank Opening in Concrete
5476 Paul Merage Lobby renovation 997146 04/16/2010 04/30/2010 04/21/2010 other: 100% cd w/ back check #5436
5475 Paul Merage Lobby renovation 997146 04/16/2010 04/30/2010 04/20/2010 submittal: 21 1000.01_prelim fire protection w/ back check
5474 PMGSB Lobby Renovation 997146 04/16/2010 04/30/2010 04/21/2010 submittal: fire sprinkler review/w Walter
5473 Aldrich Hall 5108195 04/15/2010 04/29/2010 04/15/2010 Fire Alarm Devices
5472 Paul Merage School of Business Lobby Remodel 997146 04/13/2010 04/13/2010 04/20/2010 Fire Suppression
5471 MPAA 314 Renov. 5108484 04/13/2010 04/27/2010 04/20/2010 Plan, Specification, final review and approval stamp
5470 Nat Sci I 517 5108344 04/13/2010 04/27/2010 04/20/2010 Submittal
5469 UNEX 'B' 5108455 04/09/2010 04/23/2010 04/09/2010 Plans; Other Fire Alarm Submitttal; Final Review; Approval Stamp
5468 Social Science Plaza B 213 5108344 04/08/2010 04/22/2010 04/21/2010 submittal
5467 Social Science Tower 201 5108344 04/08/2010 04/22/2010 04/20/2010 submittal
5466 Social Science Plaza A 211 5108344 04/08/2010 04/22/2010 04/19/2010 Submittal
5465 McGaugh Hall 503 5108344 04/08/2010 04/22/2010 04/19/2010 Submittal: Note Panel fully corroded will have separate submittal
5464 Med Sci C 821 5108344 04/08/2010 04/22/2010 04/19/2010 submittal
5463 Crawford Hall 903 5108344 04/08/2010 04/22/2010 04/19/2010 submittal
5462 Gillespie 837 5108398 04/08/2010 04/22/2010 04/21/2010 Submittal
5461 Hewitt Hall 843 5108400 04/08/2010 04/22/2010 04/19/2010 Submittal
5460 PMGSB Lobby Review 997146 04/07/2010 04/07/2010 04/07/2010 Other: 100% CD Review
5459 Sprague Hall null 04/07/2010 04/12/2010 04/12/2010 Evac maps
5458 Arts Bdg. 991072 04/06/2010 04/20/2010 04/07/2010 RFI 159.2h top of wall joint dwg #HWD 0042r,dtd 02/26/10, ehs # 5441
5457 Arts Bldg 991072 04/06/2010 04/20/2010 04/07/2010 RFI 159.2gtop of wall joint dwg #HWD 0042r,dtd 02/26/10, ehs # 5441
5456 Arts Bldg. 991072 04/06/2010 04/20/2010 04/07/2010 RFI 159.2f EJ DWG #122861A dtd re EHS # 5441
5455 Arts Bldg 991072 04/06/2010 04/20/2010 04/07/2010 RFI 159.2e EJ DWG #122861A dtd re EHS # 5441
5454 Arts Bldg 991072 04/06/2010 04/20/2010 04/07/2010 RFI 159.2d EJ DWG #122861A dtd re EHS # 5441
5453 Arts Bldg 991072 04/06/2010 04/20/2010 04/07/2010 RFI 159.2a EJ DWG #122861A dtd re EHS # 5441
5452 Arts Bldg. 991072 04/06/2010 04/20/2010 04/07/2010 RFI 159.2c EJ DWG #122861A dtd re EHS # 5441
5451 Arts Bldg. 991072 04/06/2010 04/20/2010 04/07/2010 RFI 159.2b EJ DWG #122861A dtd re EHS # 5441
5450 Aldrich Hall 260 5108361 04/06/2010 04/20/2010 04/09/2010 Submittal
5449 Arts Bldg 991072 04/02/2010   04/02/2010 RFI: 144R_Fireproofing @ Spandrel Glass
5448 Arts Bldg 991072 04/02/2010 04/16/2010 04/09/2010 Submittal: 28 3111.03 Fire Alarm dwgs & product data w/backcheck #5411
5447 Social Science Lab 202 5108344 04/02/2010 04/16/2010 04/08/2010 Submittal, Approval stamp
5446 Sprague Hall 839 5108344 04/02/2010 04/16/2010 04/08/2010 Submittal, Approval stamp
5445 Social Ecology II 215 5108344 04/02/2010 04/16/2010 04/08/2010 Submittal, Approval stamp
5444 Nat Sci I 517 5108344 04/02/2010 04/16/2010 04/06/2010 Submittal, approval stamp
5443 Aldrich Hall, 3rd Flr 5108195 04/02/2010 04/16/2010 04/05/2010 Plans, Submittal, final review, approval stamp
5442 Arts Bldg 991072 04/01/2010 04/15/2010 04/09/2010 ASI 070 EJ for SFRM on intersection of protected steel beam and conveyor
5441 Arts Bldg. 991072 04/01/2010 04/15/2010 04/07/2010 159.2 head of the Wall- Perpendicular to deck
5440 Site 1 - Bldg's 1A, 1B, 2 08604 03/31/2010 04/14/2010 04/07/2010 Other: 1st Flr Evac Signage, Proof set (JB3D) revised per site walk, Final Review, Approval Stamp
5439 Arts Bldg 991072 03/30/2010 04/13/2010 03/31/2010 21 1000.10 Water based Firs suppression System with backcheck 5414.
5438 Arts Bldg 991072 03/30/2010 04/13/2010 04/08/2010 ASI #063 Powerslider @ Doors g202A g202B
5437 Arts Bldg 991072 03/30/2010 04/13/2010 04/08/2010 RFI 330 Specification Section 07-4800
5436 Paul Merage S of M Lobby Remodel 997146 03/29/2010 04/12/2010 03/31/2010 Other: plans & existing code analysis
5435 MPAA 3rd & 4th Floor Renovation 5108484 03/29/2010 04/12/2010 03/31/2010 Plans: Back Check
5434 MPAA 3rd & 4th Floor Renovation 5108484 03/29/2010 04/12/2010 03/31/2010 Other: Back Check
5433 B&WCL 994114 03/24/2010 04/07/2010 03/31/2010 Submittal: sprinkler head submittal
5432 Steinhaus Hall # 502 5108344 03/23/2010 04/06/2010 03/29/2010 Submittal Approval Stamp
5431 MPAA #103 5108344 03/23/2010 04/06/2010 03/29/2010 Submittals, Approval Stamp
5430 Engineering Lecture Hall 5108344 03/23/2010 04/06/2010 03/29/2010 Submittals-approval stamp
5429 IOB 5108344 03/23/2010 04/06/2010 03/29/2010 Submittals
5428 Receiving Warehouse #91 5108344 03/23/2010 04/06/2010 03/29/2010 Submittals- Approval Stamp
5427 Site 1 08604 03/23/2010 04/06/2010 03/23/2010 Certificates, For Record Only
5426 ARTS Bldg 991072 03/22/2010 04/05/2010 04/08/2010 Submittal: 08-3325.02 Smoke containment coiling curtain w/ back check #5324 for freight elevator
5425 SCRC BLDG 994038 03/18/2010 04/01/2010 03/31/2010 RFI 1278 Changes to level 4 as per fm
5424 Breast & Cancer Lab 994114 03/18/2010 04/01/2010 03/23/2010 RFI 036 CORRIDOR B 500 CEIL. HEIGHT
5423 SCRC bldg 994038 03/16/2010 03/30/2010 03/22/2010 26 03213 414A Generator Testing Procedure
5422 humanities hall 5108344 03/16/2010 03/30/2010 03/23/2010 submittal, approval stamp
5421 engineering tower #303 5108344 03/16/2010 03/30/2010 03/29/2010 submittal, approval stamps
5420 krieger hall # 600 5108344 03/16/2010 03/30/2010 03/23/2010 submittal
5419 Student Center 3rd Floor Rm A322 5108491 03/15/2010 03/29/2010 03/17/2010 Plans, Submittal booklet and penetration detail
5418 UNEX "B" 5108455 03/12/2010 03/26/2010 03/18/2009 Plans, other submittal
5417 Alrich hall 5108195 03/10/2010 03/24/2010 03/10/2010 Plan, specifications
5416 Aldrich Hall 5108195 03/08/2010 03/22/2010 03/09/2010 Back Check
5415 BPN Rm 1131 Large Classroom null 03/08/2010 03/22/2010 03/11/2010 Plans
5414 Arts Bldg. 991072 03/04/2010 03/18/2010 03/16/2010 21 1000.09 Water Based Fire Suppressionw back check #5394
5413 Site 1 Bldg 1-A, 1-B, 2 08604 03/04/2010 03/18/2010 03/09/2010 Evac. Signage, Proof Set ( JB3D)
5412 Arts Bldg. 991072 03/03/2010 03/10/2010 03/04/2010 392 2 hour rating
5411 Arts 991072 03/03/2010 03/10/2010 03/09/2010 Fire alarm Submittal
5410 Student Center - 3rd Floor Rm A322 5108491 03/03/2010 03/17/2010 03/08/2010 Plans, other, submittal booklet and penetration details
5409 Engineering Gateway 5108344 03/03/2010 03/17/2010 03/04/2010 Plans, specs
5408 Hitachi/Plumwood 5108386 03/03/2010 03/17/2010 03/04/2010 Plans, specs
5407 Rowland Hall 5108213 03/02/2010 03/16/2010 03/10/2010 Addendum, Final Review, Approval Stamp
5406 Aldrich Hall 5108195 03/02/2010 03/16/2010 03/08/2010 Tennant Improvement ( FLS)
5405 UCI Phase 3 - Site 1 08604 03/02/2010 03/16/2010 03/10/2010 Temp. fencing/ access plan
5404 MPAA 3&4 RENOVATING 5108484 03/02/2010 03/16/2010 03/16/2010 Plans,Final Review, Approval Stamp
5403 SITE 2, UCI 3 UCI PHASE III 03/02/2010 03/16/2010 03/02/2010 Plans
5402 ARC 5108411 03/01/2010 03/15/2010 03/31/2010 Back Check
5401 E Campus Site 1 BLDG 1-A, 1-B, 2 08604 02/26/2010 03/12/2010 03/03/2010 Evaction & Emergency Signage- Proof Set
5400 Arts Bldg 991072 02/26/2010 03/12/2010 03/02/2010 RFI 390 Back to Back Elect Outlets in Walls
5399 991072 991072 02/26/2010 03/12/2010 03/03/2010 RFI 381- Pre Action Fire Suppression Sprinkler Systems
5398 BPS 3+4 Renovation 5108483 02/25/2010 03/11/2010 02/26/2010 Back Check
5397 Rowland Hall 5108213 02/25/2010 03/11/2010 03/03/2010 Addendum
5396 BPN RM 1131, Large Classroom 5108308 02/25/2010 03/11/2010 03/02/2010 Plans
5395 Arts Bldg 991072 02/23/2010 03/09/2010 02/26/2010 RFI#159 Head of wall rated assemblies
5394 Breast & Women Cancer lab 994114 02/22/2010 03/08/2010 02/23/2010 RFI #26 Couplings
5393 Bren Events Center 5108343 02/22/2010 03/08/2010 02/23/2010 Routing of Fire line/tamper switches
5392 Gateway Study Center 5108196-54558 02/22/2010 03/08/2010 02/23/2010 Evac. Maps, Final Reviews
5391 Arts Bldg 991072 02/18/2010 03/04/2010 02/23/2010 ASI # 46
5390 BPS 3&4 PLR Renovation 5108483 02/18/2010 03/04/2010 02/23/2010 Plans, Final Review
5389 Eng. Gateway/Hitachi Plumwood J1-5108344.04 02/17/2010 03/03/2010 02/23/2010 Other: cut sheet sprinkler heads, approval stamp
5388 Breast & Women Cancer 994114 02/17/2010 03/03/2010 02/26/2010 BWCL
5387 Arts Bldg 991072 02/17/2010 03/03/2010 02/25/2010 07 4800.02 Fire & Smoke containment Insulation System
5386 Arts Bldg 991072 02/17/2010 03/03/2010 02/23/2010 RFI 352 R Fire Rated Wall Location
5385 Site I 08604 02/16/2010 03/02/2010 02/16/2010 Certificates, For Record Only
5384 Breast & Women Cancer Lab 994114 02/11/2010 02/25/2010 02/17/2010 01.50000.01B Site Logistic Plan w/Back Check # 5370
5383 ARC 5108411 02/11/2010 02/25/2010 02/12/2010 Final Review
5382 Breast & Women Cancer lab 994114 02/09/2010 02/23/2010 02/12/2010 RFI #022 Sprinkler Heads- 200 Deg vs. 155 Deg.
5381 Aldrich Hall 2rd Academic Senate 5108195 02/09/2010 02/23/2010 02/09/2010 Final Review, Approval Stamp
5380 Mechanical Roof Plans null 02/05/2010 02/19/2010   Mechanical Roof Plans
5379 Phase III- Site 1 Bldg 1-B 08604 02/05/2010 02/19/2010 02/16/2010 Plans, shop DWGS, Final Review, and Approval Stamp
5378 Arts Bldg. 991072 02/05/2010 02/19/2010   21 1000.08.02 Water Based Fire Suppression System-Mesa w 5327
5377 BPN Rm 1131/Sol Large Classroom 5108308 02/04/2010 02/18/2010 02/09/2010 Plans, 100% review, final review, approval stamp
5376 Irvine Hall 5107906 02/04/2010 02/18/2010 02/04/2010 Other: cut sheet, final review, approval stamp
5375 Aldrich Hall 260 5108361 02/04/2010 02/18/2010 02/08/2010 Plans, Final review, approval stamp
5374 ARTS 991072 02/03/2010 02/17/2010   FIRE Suppression system
5373 Aldrich Hall 3rd Academic Senate 5108195 02/03/2010 02/17/2010 02/08/2010 Final Review, approval stamp
5372 SCRC BLDG 994038 02/02/2010 02/16/2010 02/04/2010 SI #7 Drawings & Specs for Sign Stamp
5371 Engineering Tower 5108460 02/02/2010 02/16/2010 02/08/2010 Structural Calcuations
5370 Breast & Women Cancer Lab 994114 02/02/2010 02/16/2010 02/04/2010 01.5000.01A Site Logistic Plan W Back Check # 5228
5369 Breast & Women Cancer lab 994114 02/02/2010 02/16/2010   10-4400.01 Fire Extinguisher & Cabinet
5368 ARC 5108422 01/29/2010 02/12/2010 02/02/2010 Final Review
5367 Bren Events Center 5108343 01/28/2010 02/11/2010 02/02/2010 Sprinkler shop drawings & hydroaulic cclacs for hose cabinets
5366 Breast and Women Cancer Lab 994114 01/28/2010 02/11/2010 01/29/2010 28.3111.02A Digital Addressable FA system w Back Check 5333
5365 Arts Bldg. e 01/27/2010 02/10/2010 01/27/2010 2101000.07 02 Water Based Fire Suppression System-Mesa
5364 Arts Bldg 991072 01/27/2010 02/10/2010 02/03/2010 21-1000-07-01 Water Based Fire Suppression System Arts 5328
5363 Arts 991072 01/27/2010 02/10/2010 01/27/2010 RFI: exterior wall types
5362 Bren Events Center 5108343 01/26/2010 02/09/2010 01/27/2010 Sprinkler Shop Drawings & Calcs
5361 Irvine Hall 5107906 01/25/2009 02/08/2009 01/26/2010 Plans - Reference - Cut Sheet
5360 Parking Lot 1 Entrance Gate Arms 5108375 01/25/2009 02/08/2009 01/28/2010 Plans updated
5359 Early Childhood 5108323 01/25/2010 02/08/2010 01/25/2010 Submittal
5358 Aldrich Hall 3rd 5708195 01/25/2010 02/08/2010 01/29/2010 Plans
5357 Aldrich Hall 5108361 01/25/2010 08/02/2010   Plans: Submittal booklet previously appoved
5356 Gateway Study Center null 01/22/2010 02/05/2010 01/25/2010 Other: evac maps second floor
5355 Breast and Women Cancer Lab 994114 01/21/2010 02/04/2010   Submittal: 21 1000.02B Water Based Fire Suppression System w Back Check # 5321
5354 Arts Bldg 991072 01/19/2010 02/02/2010 01/29/2010 Submittal: 07-4800.01_fire smoke containment insulation
5353 Arts Bldg 991072 01/19/2010 02/02/2010 01/21/2010 RFI: 333 smoke guard
5352 Arts Bldg 991072 01/19/2010 02/02/2010 01/21/2010 RFI: 320 vocal booth door
5351 BPS 3rd and 4th floor 5108425 01/15/2010 01/29/2010 02/01/2010 Plan, 100% Review and Comments and Corrections
5350 MPAA 3RD&4TH FLOOR RENOVATION 5108431 01/15/2010 01/29/2010 01/29/2010 Plans, 100 Review and Comments and corrections
5349 ARC 5108274 01/14/2010 01/28/2010 01/15/2010 Plans, Fire Proofing Submittal
5348 ARTS Bldg 991072 01/12/2010 01/26/2010 01/21/2010 Sumbittal, 07-8413.03 Penetration Stopping Electrical w backcheck # 5246
5347 East Campus UCI III null 01/12/2010 01/26/2010 01/12/2010 Plans, 100% Review, and approval Stamp
5346 Early Childhood 5108323 01/11/2010 01/25/2010 01/21/2010 Plans, Submittal., Final Review, and Approval Stamp
5345 Ben Events Center 5108343 01/08/2010 01/22/2010 01/12/2010 Other: submittalls
5344 BPN 5108308 01/07/2010 01/21/2010 01/21/2010 Plans, 100% Review, and comments and corrections
5343 Berk Hall null 01/05/2010 01/19/2010 01/08/2010 Final Review
5342 Arc 5108422 01/05/2010 01/19/2010 01/13/2010 80% Review
5341 ARC 5108411 01/05/2010 01/19/2010   80% Review
5340 Arts Bldg. 991072 01/05/2010 01/19/2010 01/13/2010 Submittal 28 3111.01 Fire Alarm system Shop DWG & Product Data
5339 Engineering tower 5108460 01/05/2010 01/19/2010 01/05/2010 Plans
5338 Engineering Tower 5108410 01/05/2010 01/19/2010 01/05/2010 Plans,
5337 Bren Events Center 5108343 12/18/2009 01/01/2010 01/05/2010 submittals,replace fire line
5336 Engineering Gateway 5108344 12/18/2009 01/01/2010 01/05/2010 Other, approval Stamp
5335 Med Ed Bldg 991970 12/18/2009 01/01/2010 01/07/2010 420 Fire Treated Wood
5334 Med Ed Bldg. 991970 12/18/2009 01/01/2010 01/07/2010 419 FRP for Janitor Closet
5333 Breast & Women Cancer Lab 994114 12/18/2009 01/01/2010 01/08/2010 28-3111-01 Digital Addressable Fire Alarm System w/ Back Check 5232
5332 Michael Clayton 5107906 12/17/2009 12/31/2009 12/17/2009 Plans: Proposed location of SD and B for discovered floor configuration
5331 CDC 5108458 12/17/2009 12/31/2009   Plans, Final Review, Approval Stamps
5330 Parking Lot NO1 Entrance/ Gate Arms 5108375 12/17/2009 12/31/2009 01/18/2010 Updated, Final Review, Aproval Stamp
5329 Intersection @ California &b Adobe 5108383 12/17/2009 12/31/2009 12/17/2009 Plans 80% Review, and Approval Stamp
5328 Arts Bldg. 991072 12/17/2009 12/31/2009 01/05/2010 21-1000.05 Fire Suppression Calce& Shop DEG & Test Results w back check
5327 Arts Bldgs 991072 12/17/2009 12/31/2009 01/07/2010 21-1000-06 Fire Suppression Mesa Road Bldg- Calcs & Shop Drawings
5326 Arts Bldg. 991072 12/17/2009 12/31/2009 01/05/2010 #325 Stari # 2 Stand Pipe & FHV HUB Drain
5325 Bren Events Center 5108343-76608-74080- 12/15/2009 12/29/2009 12/16/2009 Replace Fire Line
5324 Arts Bldg 991072 12/15/2009 12/29/2009 12/16/2009 08-3325-014 Smoke Containment Coling Curtain Data Shop DWG
5323 Structure "Bookstore" B211 68947 12/14/2009 12/28/2009 12/16/2009 Door Specs.
5322 Steinhaus Hall 68361-1 12/14/2009 12/28/2009 12/15/2009 Specs and device loads as requested
5321 Breast & Women Cancer Lab 994114 12/11/2009 12/25/2009 01/05/2010 21 1000.02 Water Based Fire Suppression System W/Back Check
5320 SCRC BLDG 994038 12/11/2009 12/25/2009 12/17/2009 SI #6 Revised Sheet L 502w/back check fro stamp/sign
5319 MEDICAL EDUCATION TELEMEDICINE 991970 12/11/2009 12/25/2009 12/14/2009 FINAL REVIEW
5318 HIB 5108344 12/11/2009 12/24/2009 12/16/2009 APPROVAL STAMP, OTHER
5317 Student Center 68947 12/10/2009 12/24/2009 12/10/2009 Plans, appoval stamp
5316 Arts Bldg. 991072 12/09/2009 12/23/2009 12/15/2009 Submittal: 28 3111.01 electronic safety fire alarm system equipment & devices
5315 Aldrich Hall 5108361 12/09/2009 12/23/2009 12/16/2009 Plans
5314 Arts Bldg. 991072 12/08/2009 12/22/2009 01/12/2010 RFI # 242 Revised G-004 per back check # 5303
5313 Arts Bldg. 991072 12/08/2009 12/22/2009 12/09/2009 RFI # 294 Density Requirement for Pre action system
5312 Early Childhood Education Center 5108523 12/07/2009 12/21/2009 12/09/2009 Plans, Specifications, Eh&S Redlines, Final Review and Approval Stamp
5311 Arts Bldg. 991072 12/04/2009 12/18/2009 12/16/2009 23-3300.02 Air Duct Aceessories Fire Smoke damper
5310 Breast & Women Cancer Lab 994114 12/04/2009 12/18/2009 12/04/2009 For Record Only
5309 Dining Services null 12/04/2009 12/18/2009 12/04/2009 Sink Series
5308 Parking Lot No 1 Entrance / Gate Arms 5108375 12/03/2009 12/17/2009 12/17/2009 Updated, Revised
5307 B&WCL 994114 12/02/2009 12/16/2009 12/02/2009 RFI #2 Wall Rating
5306 B&WCL 994114 12/02/2009 12/16/2009 12/02/2009 100 % CD's
5305 ARC Gear UP Laundry Rm Renov 5108274 12/02/2009 12/16/2009 12/02/2009 8 1/2x11 prints, Fire proofing submittal, plans
5304 Medical Education (Berk Hall) null 12/01/2009 12/15/2009 12/03/2009 Final review
5303 ARTS Bldg 991072 11/30/2009 12/14/2009 12/03/2009 RFI 242
5302 B& WCL 994114 11/24/2009 12/08/2009 11/25/2009 Fire Suppression Spec
5301 Med Ed Bldg 991970 11/24/2009 12/08/2009 11/25/2009 Riser Pressure Gadge
5300 Arts Bldg 991072 11/20/2009 12/04/2009 12/03/2009 RFI: RFI#307 smoke dampers-specs 23 3300.2.6C
5299 Med ed bldg 991970 11/20/2009 12/04/2009 11/23/2009 Other: certificate of beneficial occupant
5298 Arts Bldg 991072 11/18/2009 12/02/2009 12/02/2009 RFI: #221-soffit @ line d/3.2 for HWR pipe in machine rm.
5297 Med Ed Bldg 991970 11/18/2009 12/02/2009 11/18/2009 Other NFPA 13 & 24
5296 Breast & Women Cancer Lab 994114 11/17/2009 12/01/2009 11/25/2009 21 1000.01 Water based suppression-hydraulic calcs.
5295 Med Ed Bldg. 991970 11/16/2009 11/30/2009 11/17/2009 Other: L2 Damer Detail
5294 UCI East Campus Student housing Ph. 3 Site2 - Bldg, A17 30500 null 11/16/2009 11/30/2009 11/23/2009 As built - shop drawings
5293 UCI East Campus Student housing Ph. 3 Site2 - Bldg, E6 33400 null 11/16/2009 11/30/2009 11/23/2009 Shop drawings
5292 Fire Alarm System null 11/16/2009 11/30/2009 11/23/2009 Shop drawings
5291 Med Ed Bldg 991970 11/16/2009 11/30/2009 11/17/2009 Other L-2 Louver detail
5290 Atrs Bldg. 991072 11/16/2009 11/30/2009 11/16/2009 Other: 100% CD Specs - stamped/signed - FRO - For Record Only
5289 Arts Bldg. 991072 11/16/2009 11/30/2009 11/17/2009 Submittal: #10 4400.01 Fire protection specialties - fire extinguisher
5288 Med Ed Bldg. 991970 11/16/2009 11/30/2009 11/17/2009 RFI: 402 electric gate
5287 Early Childhood Education Center 5108323 11/16/2009 11/30/2009 11/18/2009 Back Check
5286 East Campus Phase III Bldg D15 30400 null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5285 East Campus Phase III Site 2 Bldg A13 30800 null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5284 East Campus Phase III A14 30600 null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5283 East Campus Phase III Bldg A7 32600) null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5282 East Campus Phase III B1 30000) null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5281 East Campus Phase III( Bldg 5 33200) null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5280 East Campus Phase III Site 2 Bldg C-18 30700) null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5279 East Campus Phase III Site 2 , BLDG 32200 C-3 null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5278 East Campus Student Phase III Site 2 Bldg B16 30300 null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5277 East Campus Phase III Site 2 ( Bldg B2 30200) null 11/13/2009 11/27/2009 11/13/2009 Shop drawings, Approval Stamp
5276 East Campus Phase III Site 2 Bldg D11 ( 32900) null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5275 East Campus Phase III( Bldg C9 32700) null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5274 East Campus Phase III- Bldg (A10 32800) null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5273 East Campus Phase III Site 2 ( Bldg A4 324000) null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings Approval Stamp
5272 East Campus III Site 2 ( D12 31000) null 11/13/2009 11/27/2009 11/13/2009 Shop drawings, approval Stamp
5271 East Campus Ph. III ( D8 32500) null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, approval stamp
5270 Med Ed Bldg. 991970 11/13/2009 11/27/2009 11/17/2009 Water Curtain 211000.06
5269 Breat & Womens Cancer Lab 994114 11/13/2009 11/27/2009 11/25/2009 Flow Test Report ( Calculations)
5268 East Campus null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings
5267 East Campus Phase III null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings, Approval Stamp
5266 East Campus Phase III Site 2 A22 ( 31500) null 11/13/2009 11/27/2009 11/13/2009 Shop Drawings. Approval Stamp
5265 East Campus Phase III- Site 2 C20( 31100) null 11/13/2009 11/27/2009 11/13/2009 Fire alarm System- shop drawings, approval stamp
5264 Steinhaus 68361-1 11/12/2009 11/26/2009 12/02/2009 other: submittals, final review, approval stamp
5263 ARTS Bldg 991072 11/12/2009 11/26/2009 11/12/2009 other dp4 100% cd
5262 Med Ed. Bldg. 991970 11/10/2009 11/24/2009 11/12/2009 Asi #44 Rev. 1 _ G006 sheet For Stamp/Sign #5235 For Ref.
5261 Med Education 991970 11/10/2009 11/24/2009 11/12/2009 Evac Maps
5260 Arts Bldg. 991072 11/10/2009 11/24/2009 11/10/2009 ASI # 8 Stamped /Signed For Record Only
5256 Med Ed Bldg. 991970 11/10/2009 11/24/2009 11/16/2009 Material and Test certificate
5255 breast & women cancer lab 994114 11/09/2009 11/23/2009 11/16/2009 other: 100% cd drawing set
5254 Med Ed 991970 11/09/2009 11/23/2009 11/10/2009 RFI water curtain
5253 SCRC Bldg 994038 11/06/2009 11/20/2009 12/02/2009 Submittal: #23 0500.361B_Aircuity A/V Lab Alarm w/ Backcheck #5229
5252 SCRC Bldg 994038 11/06/2009 11/20/2009 11/16/2009 Submittal: #08 3113.372A_Access Door
5251 SCRC Bldg 994038 11/06/2009 11/20/2009 11/10/2009 Submittal: #07-8413.371A_A&H Communication Firestopping
5250 ARC Gear Up Laundry Room Renov. 5108274 11/06/2009 11/20/2009 11/16/2009 Plans ref. only; other: Fire proofing submittal structural
5249 Arts Bldg 991072 11/06/2009 11/20/2009 11/06/2009 Other: ASI #8
5248 MED ED BLDG 991970 11/04/2009 11/18/2009 11/10/2009 ASI # 054 WATER CURTAIN @ SOUTH LOBBY WINDOW
5247 Stemcell Bldg. 994038 11/04/2009 11/18/2009 11/04/2009 SI #6 SIGNED/STAMPED- FOR RECORDS ONLY
5246 Arts Bldg. 991072 11/04/2009 11/18/2009 11/16/2009 07-8413-02 Penetration Stopping ( Electrical)
5245 Arts Bldg. 991072 11/04/2009 11/18/2009 11/17/2009 RFI 263 Clarification of Details 15&16/A-540
5244 Arts Bldg. 991072 11/04/2009 11/18/2009 11/06/2009 277 RFI Plywood Backing Panel @ Tel
5243 STEMCELL Research 994038 11/04/2009 11/18/2009 11/04/2009 Other: SI 6R (review) w/revised sheets 2/ response
5242 B&WCL 994114 11/03/2009 11/17/2009 11/12/2009 Fire Protection DWG( Pre)
5241 Med Ed Bldg. 991970 11/03/2009 11/17/2009 11/10/2009 07-8000-04 Penetration Stopping Opener??
5240 Parking Lot No.1 Entrance/Gate arms 5108375 11/02/2009 11/16/2009 11/16/2009 Plans updated; approval stamp
5239 Irvine Hall 5107906 11/02/2009 11/16/2009 11/02/2009 plans, other, proposed location of SD to be reviewed for modification; other: review and resolve
5238 Arts Bldg 191072 10/29/2009 11/12/2009 11/23/2009 242 corridor rating
5237 Arts Bldg 991072 10/28/2009 11/11/2009 11/06/2009 Other: DP4-100% CD specs for review (ref. 5233)
5236 Med Ed Bldg 991970 10/28/2009 11/11/2009 11/02/2009 other: Louver / damper detail approval (L1)
5235 Med Ed Bldg 991970 10/28/2009 11/11/2009 11/02/2009 Other: G-006 fire access lane
5234 ARTS Bldg 991072 10/28/2009 11/11/2009 11/02/2009 Other: Abatement-asbestos removal @ existing production studio
5233 Arts Building 991072 10/27/2009 11/10/2009 10/27/2009 DP -4 Specs Cover For Stamp Sign
5232 Breast & Women's Cancer Lab 994114 10/26/2009 11/09/2009 11/03/2009 Other: Simplex preliminary review
5231 Arts Bldg 991072 10/23/2009 11/06/2009 10/27/2009 07-8413-01 Penetration Stopping Test Results
5230 5108342/996281 5108342/996281 10/21/2009 11/04/2009 10/28/2009 100% review, other FD access plan
5229 Classroom & Office Building 994038 10/21/2009 11/04/2009 10/27/2009 Submittal: 23.0500.361A Aircuity A/V lab alarms
5228 B&WCL 994114 10/21/2009 11/04/2009 10/27/2009 Submittal: #01.5000.01 site logistics plan
5227 Early Childhood Ed Center 5108323 10/21/2009 11/04/2009 11/02/2009 Plans, other booklet
5226 Breast WCL 994114 10/20/2009 11/03/2009 11/04/2009 G Sheets
5225 Irvine Hall 5107906 10/20/2009 11/03/2009 10/29/2009 Plans Product Data Sheet
5224 Med Ed Bldg 991970 10/20/2009 11/03/2009 10/27/2009 Sub 10-4400.01 Fire Extinguisher Substitution
5223 UCI Phase III - Site 1 - Community Building 08604 10/19/2009 11/02/2009 10/20/2009 Back Check
5222 ARC Gear Up Laundry Room Renovation 5108274 10/16/2009 10/30/2009 10/23/2009 Plans Ref. Only - Final Review
5221 Arts bldg 991072 10/16/2009 10/30/2009 10/18/2009 RFI 230-R fire riser connection
5220 Arts Bldg 991072 10/16/2009 10/30/2009 10/20/2009 RFI 230.1 mesa rd fire riser connection
5219 Med Ed Bld critical 991970 10/16/2009 10/30/2009 10/16/2009 RFI 392 fire damper
5218 Gateway study center 5108349 10/16/2009 10/30/2009 10/20/2009 plans, final review, approval stamp
5217 Med Ed 991970 10/16/2009 10/30/2009 10/16/2009 RFI: 393 natural ventilation
5216 Engineering Tower 5108410 10/14/2009 10/28/2009 10/29/2009 Plans, other calc's
5215 Parking lot no. 1: entrance/gate arms 5108375 10/14/2009 10/28/2009 10/27/2009 Plans, final review approval stamp
5214 Med Ed Bldg. 991970 10/12/2009 10/26/2009 10/15/2009 Other\' ASI # 140 - Added exit door from mech. Penthouse for stamp signs
5213 SCRC 994038 10/12/2009 10/26/2009 10/18/2009 ASI #6
5212 Breast & Women's Cancer Lab 994114 10/09/2009 10/23/2009 10/13/2009 Other Code analysis/Egress plan
5211 ARTS BUILDING 991072 10/08/2009 10/22/2009 10/13/2009 #242 CORRIDOR RATING
5210 Medical Ed Bldg 991970 10/02/2009   10/02/2009 Other: Med-Ed Café conformed CD-FRO
5209 Bonney Center 5108095 10/02/2009 10/16/2009 10/02/2009 Approval stamp
5208 Arts Bldg 991072 10/02/2009 10/16/2009 10/13/2009 RFI: 242 Corridor Rating
5207 Irvine Hall 998579 10/01/2009 10/15/2009 10/08/2009 submittals
5206 med ed bldg 991970 09/30/2009 10/14/2009 10/08/2009 Submittal: #21.1000.05 water curtain sprinkler
5205 Med Ed Bldg 991970 09/30/2009 10/14/2009 10/12/2009 RFI 383 FS correction 8/18/09
5204 Medical Ed Bldg 991970 09/30/2009 10/14/2009 10/12/2009 RFI 381 Fire correction Notice #44
5203 Medical Ed Bldg 991970 09/30/2009 10/14/2009 10/12/2009 RFI: 382 firestopping
5202 Stemcell Research Bldg 994038 09/29/2009 10/13/2009 10/12/2009 07-8413-349A Penetration firestopping electrical
5201 Arts Building 991072 09/29/2009 10/13/2009 10/14/2009 238 Gurmet Access/Passenger Elv.
5200 Law Building 65764 09/29/2009 10/13/2009 09/29/2009 Plans
5199 SCRC 994038 09/25/2009 10/09/2009 10/08/2009 1182 Stand Pipe, stair 2 @ levels 2,3,4
5198 Arts Building 991072 09/25/2009 10/09/2009 10/08/2009 230.1 Mesa Rd Fire Riser Connections
5197 Arts Bldg. 994038 09/25/2009 10/09/2009 10/12/2009 RFI 230, Fireriser Connection Ref EN-11
5196 Stemcell Research Bldg 994038 09/25/2009 10/09/2009 10/08/2009 0277-07-8413 B Penetraton Firestopping w/ BC # 5126
5195 Arts Building 991072 09/24/2009 10/08/2009 10/08/2009 011.1 Detail Revisions for RFI # 11
5194 Arts Building 991072 09/24/2009 10/08/2009 10/12/2009 144 Arts Bldg Detail 11/A -523
5193 Medical Education Café 991970 09/24/2009 10/08/2009 09/24/2009 Other: Design Package Review
5192 Arts Bldg 991072 09/24/2009 10/08/2009 10/20/2009 21-1000-02 Fire Suppresstion Shop Dwgs, product data and calcs.
5191 Stemcell Research Bldg 994038 09/24/2009 10/08/2009 09/26/2009 11&3 Door #1902 W Fire lite glass
5190 UCI PHASE, III SITE 3 08606 09/22/2009 10/06/2009 09/22/2009 CERTIFICATES, RECORD COPY
5189 Stemcell Research Bldg 994038 09/22/2009 10/06/2009 09/23/2009 07-8413-0277B Penetration Stopping c-A3, 5029, CAJ 5103. EJ 3
5188 Medical Education Bldg 991970 09/22/2009 10/06/2009 10/01/2009 ASI # 38- ADDL.Exit signs@LVL 2&3
5187 UCI East Campus Student Hsg. Ph3 site 2 Bldg E6 "addr. 33400" null 09/21/2009 10/05/2009 09/30/2009 Shop drawings; other, approval stamp
5186 UCI East Campus Student Hsg. Ph3 site 2 "Mainte. Bldg" addr. 30100 null 09/21/2009 10/05/2009 09/30/2009 Shop drawings, approval stamp
5185 Wahoo's Fish Taco-student center 20907 09/18/2009 10/02/2009 09/23/2009 Plans, specs
5184 Uci Phase III- East Campus Student Housing UCI East Campus 09/17/2009 10/01/2009 09/29/2009 Shop Drawings, Other, Approval Stamp
5183 Law Building 65764 09/17/2009 10/01/2009 09/17/2009 Please provide installation detail.
5182 Med Ed. 991970 09/14/2009 09/28/2009 09/16/2009 Other: Roof egress plan
5181 Wahoo's Fish Taco-Student Center 20907 09/11/2009 09/25/2009 09/17/2009 Plans, Specs
5180 PANDA PROJECT U1-09-D2220 09/10/2009 09/18/2009 09/11/2009 ANSUL SYSTEM
5179 Arts Building 991072 09/10/2009 09/24/2009 09/10/2009 Spray applied Firproofing
5178 Irvine Hall 998579/5107906 09/08/2009 09/22/2009 09/15/2009 Submittals
5177 Gateway Study Ctr. 1st floor security Barrier 5108349 09/08/2009 09/22/2009 09/11/2009 Plans, final review, and approval stamp
5176 Student Center Ace Stairwell 5108378 09/08/2009 09/22/2009 09/08/2009 Plans, Preliminary Review,
5175 Wahoos Fish Taco 20907 09/08/2009 09/22/2009 09/15/2009 Field Bulletion #2
5174 STEMCELL 994038 09/08/2009 09/22/2009 09/15/2009 RFI #1161 Chemical Waste Pipe Wrap where located above ceiling
5173 ARTS BLDG 991072 09/08/2009 09/22/2009 09/14/2009 ASI Review & Stamp
5172 Social Ecology 5108060 09/04/2009 09/18/2009 09/15/2009 Plans, specs, final review, approval stamp
5171 Arts Building 991072 09/04/2009 09/18/2009 09/10/2009 Spray applied Fireproofing 07-2100-04
5170 Medical Education 991970 09/04/2009 09/18/2009 09/15/2009 28-3111 01F- Fire Alarm System Shop DWGS
5169 Arts Building 991072 09/03/2009 09/17/2009 09/10/2009 Spray Applied FireProofing
5168 Social Behavioral 991268 09/03/2009 09/17/2009 09/03/2009 relocation of fire hydrant
5167 SCRC 994038 09/03/2009 09/17/2009 09/08/2009 2 hr Horizontal shaft on level 4
5166 Social and Behavioral Sciences 991268 09/02/2009 09/16/2009 09/03/2009 Relocaton of Fire Hyrdant @ plaza
5165 PANDA PROJECT 190603-U1-09-D2220 09/02/2009 09/16/2009 09/08/2009 Ansul System Revision #1
5164 Gateway study center study rooms 5104614 09/01/2009 09/15/2009 09/02/2009 Plans, Final review, approval stamp
5163 Stemcell Bldg 994038 09/01/2009 09/15/2009 09/03/2009 Submittal: #28.3111.0101E - Fire alarm sys w/ back check
5162 Med Ed 991970 09/01/2009 09/15/2009 09/11/2009 Other: Engineering judgement-circuit protection 2
5161 Med Ed 991970 09/01/2009 09/15/2009 09/11/2009 Other: Engineering judgement-circuit protection 1
5160 Wahoo's Fish Taco - Student Center 20907 08/31/2009 09/14/2009 09/10/2009 Plans
5159 Wahoo's Fish Taco - Student Center 20907 08/31/2009 09/14/2009 09/15/2009 Plans & Specs
5158 Wahoo's Fish Taco - Student Center 20907 08/31/2009 09/14/2009 09/15/2009 Plans
5157 Arts Building 991072 08/27/2009 09/10/2009 08/31/2009 spray applied fire roofing
5156 Student Ctr. 65535 08/27/2009 09/10/2009 08/27/2009 Plans and approval stamp
5155 Med Ed Bldg 991970 08/27/2009 09/10/2009 08/28/2009 358 Penhouse efress & Code interr?????
5154 Arts Building 991072 08/27/2009 09/10/2009 08/31/2009 07-8100-03 Applied Fireproofing w/backcheck # 5098
5153 Uci Phase III, Site 1, community Bldg. 08604 08/25/2009 09/08/2009 08/31/2009 Shops, DWGS, Product Data, Approval Stamp
5152 PANDA PROJECT 190603-U1-09-D2220 08/25/2009 09/08/2009 08/27/2009 PANDA PROJECT 190603-U1-09-D2220
5151 Middle Earth Housing Renovations 996251 08/25/2009 09/08/2009 08/27/2009 Detail: Fire Riser Screen
5150 Arts Building 991072 08/24/2009 09/07/2009 08/28/2009 Submittal: # 08.7100.03 finish hardware project schedule & data
5149 Panda Express - Rev #2 190603 08/24/2009 09/07/2009 08/25/2009 Plans
5148 Gateway Ctr 1st flr security barrier 5108349 08/24/2009 09/07/2009 08/31/2009 Plans
5147 Stemcell Bldg. 994038 08/24/2009 09/07/2009 08/25/2009 Submittal: #28.3111-0101D Fire Alarm w/ backcheck #
5146 UCI East Campus Student Housing Ph. 3 Site 2, Bldg. E6 Addr 33400 null 08/21/2009 09/04/2009 08/27/2009 Back Check - Previously approved (revised) Other: Shop drugs & calcs
5145 UCI East Campus Student Housing Phase 3 Site 2 - Maintenance Bldg. Addr. 30100 null 08/21/2009 09/04/2009 08/21/2009 For Record Only
5144 Humanities Gateway 991077 08/21/2009 09/04/2009 08/27/2009 Other: SWPP- Notice of termination for signatures
5143 Stemcell Bldge 994038 08/19/2009 09/02/2009 08/26/2009 Submittal: 0202C.21.1000 Fire sprinklerw/back check #5403
5142 Medical Ed 991970 08/19/2009 09/02/2009 08/24/2009 Other: ASI#037 signage package g.007, g-008, g-009
5141 Mesa ct Unit 5108330 08/18/2009 09/01/2009 08/19/2009 cuts sheets, 100%b review and approval stamp
5140 Arts Bldg. 991077 08/18/2009 09/01/2009 08/20/2009 08-1113.01 hollow metal door 4 frames
5139 SSE-1 Room 138 Renovation 5108060 08/17/2009 08/31/2009 08/27/2009 Plans
5138 Phase 3 site 1 08604 08/14/2009 08/28/2009 08/14/2009 Plans, approved, record
5137 Phase 3 site 1 08604 08/14/2009 08/28/2009 08/14/2009 Plans, Asbuilt, record
5136 UCI E Campus Studt Hsg.ph3-site2 bldgA17 (Rev Addr. 30500) null 08/14/2009 08/28/2009 08/14/2009 Other: shop dwg & calcs; For record only
5135 UCI E. Campus Studt Hsg. Ph3-site 2-bldg 'E6'-Rev (Addr33400) null 08/14/2009 08/28/2009 08/17/2009 Other: shopdwgs & calcs, approval stamp
5134 Arts Bldg 991072 08/14/2009 08/28/2009 08/20/2009 Submittal: #08.7100.02 Finish hardware product schedule
5133 Gateway Study Center Study Rooms 5104614 08/14/2009 08/28/2009 08/18/2009 Plans, specs, final review, approval stamp
5132 Med Ed 991970 08/14/2009 08/28/2009 08/17/2009 Other
5131 Med Sciences D 5108352 08/12/2009 08/26/2009 08/13/2009 Specs, final review, approval stamp
5130 Medical Sciences C (Rm 0121) 5108202 08/12/2009 08/26/2009 08/13/2009 Specs, final review, approval stamp
5129 Panda project U1-09-D2220 08/11/2009 08/25/2009 08/17/2009 Plans and revisions
5128 Mesa Court Unit 11 5108373 08/11/2009 08/25/2009 08/11/2009 Plans, cut Sheets, 100% Review and approval stamp
5127 Med ED Café 991970 08/10/2009 08/24/2009 08/24/2009 Review Café TI drawings pkg.
5126 Stemcell Research Bldg 994038 08/10/2009 08/24/2009 08/11/2009 277B 07 8413 Penetration Firestopping for stamp/sign off
5125 Med Sci D 5108314 08/10/2009 08/24/2009 08/10/2009 Fire alarm and detection system
5124 Wahoos Fish Taco 20907 08/08/2009 08/22/2009 08/11/2009 Plans
5123 Middle Earth Renovations 996251 08/05/2009 08/19/2009 08/05/2009 Other const documents w/back check
5122 Middle Earth Housing Renovations 996251 08/03/2009 08/17/2009 08/03/2009 Other construction documents package w/backcheck
5121 Med Sci C 5108202 07/31/2009 08/14/2009 07/31/2009 Specs, 100% review, approval stamp
5120 East Campus Site 3 Parking Structure 08606 07/30/2009 08/13/2009 08/05/2009 Signage submittal, final review, and approval stamp
5119 East Campus Site 3 Parking Structure 08606 07/30/2009 08/13/2009 08/05/2009 Plans, sub approval, and approval stamp
5118 Jamba Juice 1172 07/27/2009 07/30/2009 07/30/2009 Plans
5117 Bren Events Center 5108343 07/30/2009 08/13/2009 07/30/2009 Plans, Final Review and Approval Stamp
5116 Medical Science C 5108202 07/30/2009 08/13/2009 07/30/2009 Specifications, Approval
5115 BPS 4th Flr Rm 4500, 4900, 4830, 4850 Card key 5108221 07/29/2009 08/12/2009 07/31/2009 Plans, specs, final review, approval stamp
5114 BPS 4th Flr Smoke Curtain 5108221 07/29/2009 08/12/2009 07/30/2009 Plans, specs, final review, approval stamp
5113 Jamba Juice at Student Center 1172 07/29/2009 08/12/2009 08/05/2009 Plans
5112 Jamba Juice @ Student Center 1172 07/28/2009 08/11/2009 07/31/2009 Plans
5111 UCI Phase III - Site I 008604 07/27/2009     Weld Data
5110 Arts Bldg. 991072 07/24/2009 08/07/2009 07/24/2009 Submittal 07.8000.02 Spray applied fire proofing (Structure cd & e1 & E3a Sheets)
5109 BPS 4th Floor STE 4500 /Lobby 5108221 07/23/2009 08/06/2009 07/27/2009 Specification, Final Review, and Aproval Stamp
5108 Panda Express 190603U1i-09-D2220 07/23/2009 08/06/2009 07/29/2009 Plans
5107 UCI East Campus Student Housing Ph. 3 Site 2 Bldg. E-6 {Rev. Addr. # 33400 null 07/22/2009 08/05/2009   Shop drawings & codes
5106 Stemcell 994038 07/22/2009 08/05/2009 08/03/2009 277 07 8418 penetrated firestopping
5105 Medical Education Bldg 991970 07/22/2009 08/05/2009 07/22/2009 Other: ASI # 21 DSA Revisions
5104 Public Services 5108248 07/22/2009 08/05/2009 07/27/2009 Approval Stamp
5103 StemCell 994038 07/21/2009 08/04/2009 08/05/2009 Stem cell 0202B 21 1000 fire
5102 BPN Education Classroom 2nd & 3rd Flr 5108270 07/17/2009 07/31/2009 07/17/2009 Plans, Final review, approval stamp
5101 EU3 990073 07/17/2009 07/31/2009 07/30/2009 Please send to Rebecca Lally for Review
5100 Medical Ed Bldg 991970 07/17/2009 07/31/2009 07/17/2009 Submittal: Simplex
5099 Stemcell 994038 07/16/2009 07/30/2009 07/29/2009 28.3111.C Fire Alarm Shop DWG & Product Data Sheets
5098 ARTS 991072 07/16/2009 07/30/2009 07/27/2009 07 8100 01+ 07 800 02 Applied Fireproofing
5097 Humanities Gateway 991077 07/16/2009 07/30/2009 07/22/2009 RFI 0589, Baffle Detail ( RE ASI 004- Enclosed for Reference Only)
5096 Arroyo Vista 51058255105825 07/16/2009 07/30/2009 07/20/2009 Fire Alarm Calcs.
5095 Gateway Study Center 5108349 07/16/2009 07/30/2009   Plans, Final Review
5094 Med Sci ABCD 5108352 07/14/2009 07/28/2009 07/21/2009 Floor Plans, Specifications & Approval Stamp
5093 ARC 5108274 07/14/2009 07/28/2009 07/14/2009 Plans, Final Review, and apporval Stamp
5092 Social Behaviorial Sciences 991268 07/13/2009 07/27/2009 07/17/2009 Evacuation maps
5091 BRS 4th Ste 4500 Lobby 5108221 07/13/2009 07/27/2009 07/15/2009 Back check
5090 Libraries Gateway Study Center: Study Rooms (2nd floor) 5104614 07/13/2009 07/27/2009 07/23/2009 Plans & specs
5089 Jamba Juice at Student Center 1172 07/13/2009 07/27/2009 07/14/2009 Plans
5088 Middle Earth 996251 07/10/2009 07/24/2009 07/17/2009 Other: Returned dwgs, material, calcs
5087 s&bs 991268 07/09/2009 07/23/2009 07/09/2009 0265-13935 C Preaction Submittal
5086 Irvine Hall 5107906 07/09/2009 07/23/2009 07/09/2009 Plans, Final Review, and Other, Approval Stamp
5085 BPN Education Classroom 2nd & 3rd Floor 5108270 07/09/2009 07/23/2009 07/15/2009 Plans, Specification, Final Review and Approval Stamp
5084 Humanities 991077 07/08/2009 07/22/2009 07/22/2009 Submittal: 01782.01.A, D&M Manuals (#3 of 7, firesupp. Piping)
5083 Medical Education bldg 991970 07/08/2009 07/22/2009 07/09/2009 RFI #327 sidewall heads in breezeways.
5082 Stemcell research bldg 994038 07/08/2009 07/22/2009 07/08/2009 Other: SI #5 - half size (for records only)
5081 BPS 4th Flr ste 4500/Lobby 5108221 07/08/2009 07/22/2009 07/13/2009 Specs, final review, approval stamp
5080 MEH ALDOR - Rohan Fire Doors 5108179 07/08/2009 07/22/2009 07/09/2009 Other: Fire sprinkler cut sheets
5079 Publiv Services 5108248 07/07/2009 07/21/2009 07/14/2009 100% Review
5078 Middle Earth 996251 07/07/2009 07/21/2009 07/08/2009 Fire project DWG's and Materials
5077 Humanities 991077 07/14/2009 07/21/2009 07/14/2009 0579, Relocation of Fire Extinguisher Cabinet
5076 East Campus Student Housing Ph3 Site 2 Comm. Bldg null 07/07/2009 07/21/2009 07/07/2009 Plans, For Record Only
5075 SCRC 994038 07/06/2009 07/20/2009 07/06/2009 Other: SI review
5074 Medical Education Bldg. 991970 07/06/2009 07/20/2009 07/13/2009 Other: 3M Fire barrier duct wrap, 615 blanket for fire resistive vent
5073 UCI Student Housing Site 1 08604 07/06/2009 07/20/2009 07/08/2009 Back Check
5072 BPS 4th Ste 4500 Lobby 5108221 07/02/2009 07/16/2009 07/13/2009 Plans, Specification, Final Review, and Approval Stamp
5071 Middle Earth 996251 07/01/2009 07/15/2009 07/06/2009 Drawings
5070 Strategic Energy Plan- Energy Efficiency Projects 998551 06/30/2009 07/15/2009 06/30/2009 For Reference Only
5069 Humanities 991077 06/30/2009 07/14/2009 06/30/2009 ASI #4 Stamped -Signed- For Record Only
5068 S&BS 991268 06/30/2009 07/14/2009 07/09/2009 1388 Bollard Spacing
5067 Middle Earth Renovation 996251 06/30/2009 07/14/2009 07/07/2009 Fire Alarm Data + DWG's
5066 Stemcell research bldg. 994038 06/29/2009 07/13/2009 07/17/2009 Submittal: #273A.21.1000 water curtain - alt. Methods
5065 Humanities 991077 06/29/2009 07/13/2009 07/13/2009 RFI: #575 dor 1904.4 hardware change
5064 UCI East Campus Student Housing Ph. 3 Site 2 - Blgs. D-12, D15, C9 & main. Bkdg, D15 null 06/29/2009 07/13/2009 07/06/2009 Appr. Shop drawings
5063 Med Sci D 5108314 997441 06/29/2009 07/13/2009 07/08/2009 Back Check
5062 East Campus Phase III Parking Structure 08606 06/26/2009 07/10/2009 06/26/2009 Plans, Spec and For Record Only
5061 East Campus Phase III Site 1 Bldg 1&2 08604 06/26/2009 07/10/2009 07/08/2009 Product Data
5060 East Campus Phase III Site 1 Community Bldg 08604 06/26/2009 07/10/2009 07/15/2009 Shop Drawings Product Data
5059 Gateway Study Ctr. 1st floor ( Loading Dock) 5108349 06/26/2009 07/10/2009 07/14/2009 Plans, Final Review, and Approval Stamp
5058 BPS 4th floor RMS 4500,4830,4850 & 4900 5108221 06/26/2009 07/10/2009 07/09/2009 Plans, Specifications,Final Review and Approval Stamp
5057 Medical Education Building 991970 06/25/2009 07/09/2009 07/09/2009 Exposed Fire sprinklers at Breezway
5056 BPS 4th 4830+4850 5108307 06/25/2009 07/09/2009 06/29/2009 Plans, Final Review, Approval Stamp
5055 BPS 4th Ste 4500 5108221 06/25/2009 07/09/2009 06/25/2009 Specificaitons, Final Review , and Approval Stamp
5054 East Campus Site 1 Bldg 1&2 07604 06/24/2009 07/08/2009 07/02/2009 RFI No 1.284, Final Review and Approval Stamp
5053 East Campus Phase III Site 1 Bldg 1&2 ( A,B,C) 08604 06/24/2009 07/08/2009 06/24/2009 Weld Data, For record only
5052 S&BS 991268 06/23/2009 07/07/2009 07/01/2009 0351-16850 A Spots and Pots 3rd Floor
5051 S&BS 991268 06/23/2009 07/07/2009 06/23/2009 0331-16850B Sequesnce of Operations
5050 S&S 991268 06/23/2009 07/07/2009 06/23/2009 0099-16850 Fire Alarm " Spots & Dots"
5049 Middle Earth Housing Renovations 996251 06/23/2009 07/07/2009 06/25/2009 Hydraulic coils, prod, FP dwgs
5048 East Campus Student Hsg. Ph 3 Site 2 Bldg D ( review address 32900) null 06/22/2009 07/06/2009 06/26/2009 Rev shop drawings, Approved, approval stamp
5047 East Campus Stud. HSG Ph.3 - Blad A-13 ( 30800) null 06/22/2009 07/06/2009 06/22/2009 Shop drawings, approved For Record Only
5046 Med Ed Bldg. 991970 06/22/2009 07/06/2009 06/25/2009 #315 Stand Pipe Braking
5045 Bren Events Center 5108343 06/19/2009 07/03/2009 06/26/2009 Plans, Final Review, and approval stamp
5044 Humanities 991077 06/19/2009 07/06/2009 07/01/2009 0575, Door 1904.4 Hardware Change
5043 Libraries Gateway CTR. 5104614 06/19/2009 07/03/2009 06/29/2009 Plans, 100% Review, and comments and corrections
5042 Middle Earth Housing Renovations 996251 06/18/2009 07/08/2009 06/25/2009 # 1. Item 1,2,3
5041 1172 Jamba Juice- Student Center 1172 Jamba Juice 06/18/2009 07/02/2009 06/22/2009 Plans for review
5040 Humanities 991077 06/18/2009 07/02/2009 06/25/2009 0575, Door 1904.4 Hardware Change
5039 Middle Earth Housing Renovations 996251 06/18/2009 07/02/2009 06/25/2009 Microbial Workplan
5038 Humanities Gateway 991077 06/17/2009 07/01/2009 07/01/2009 Other Evacuation Maps
5037 Social & Behavioral Science 991268 06/17/2009 07/01/2009 06/25/2009 Other EVAC maps, preliminary review
5036 UCI E Campus Phase III, Site1 08604 06/16/2009 06/30/2009 06/30/2009 Other: counter door, final review, approval stamp
5035 Middle Earth Housing Renovations 996251 06/15/2009 06/29/2009 06/23/2009 Project Drawings
5034 BPS 4th SOL Faculty OFC 5108221 06/15/2009 06/29/2009 06/22/2009 Plans, Final Review, and Approval Stamp
5033 SCRC 994038 06/15/2009 06/29/2009 06/16/2009 26.3213 Generator AQMD PERMIT
5032 Medical education Bldg. 9911970 06/15/2009 06/29/2009 06/16/2009 RFI 267.1
5031 scrc 994038 06/15/2009 06/29/2009 06/18/2009 Fire Alarm Submittal
5030 Gateway CTR. Studyrooms 5104614 06/15/2009 06/29/2009 07/01/2009 Plans,, Comments & Corrections
5029 East Campus Housing Ph. 3 Site 1 08604 06/15/2009 06/29/2009 06/17/2009 Rh&S Redlines, Final Review and Approval Stamp
5028 Berkely Place South 997085 06/12/2009 06/26/2009 06/25/2009 EVAC. MAPS, Final Review
5027 Humanities 991077 06/12/2009 06/26/2009 06/25/2009 ASI 004
5026 Middle Earth Quenya 5108247 06/11/2009 06/25/2009 06/16/2009 Plan, Mold Abatement work plan
5025 Middle Earth Queny 5108247 06/11/2009 06/25/2009 06/23/2009 specifications, fire stop specs review
5024 ARC ANTEATER RECREATION CENTER 5108274 06/11/2009 06/25/2009 06/30/2009 Plans, spec, 100% Review and comments, corrections and approval stamp
5023 MED ED BLDG 991970 06/11/2009 06/25/2009 06/16/2009 267.1 REVISED WALL ASSEBLY
5022 med ed 991970 06/11/2009 06/25/2009 06/16/2009 Review & approved ASI 2.6
5021 Stemcell Research Bldg. 994038 06/11/2009 06/25/2009 06/11/2009 SI #4 DWG SET 1/2 ( For Records Only)
5020 EU3/Kiosk 990073 06/10/2009 06/24/2009 06/11/2009 Sheets added to construciton set for review
5019 SCRC 994038 06/10/2009 06/24/2009 06/10/2009 SI 4
5018 Med Sci D 5108314 06/10/2009 06/24/2009 06/24/2009 100 % final Review, approvals stamp
5017 Medical Ed. Bldg. 991970 06/09/2009 06/23/2009 06/16/2009 ASIU -026 2 hr rated plemums
5016 Police Dept. 5108248 06/09/2009 06/23/2009 06/25/2009 100 Review, Plans,
5015 UCI EAST CAMPUS ST. HSG PH.3 SITE 2 BLDG A-13( REV ADDR 30800) null 06/09/2009 06/23/2009 06/17/2009 shop drawing other, approval stamp
5014 UCI EAST CAMPUS STUDENT HSG. SITE 2 BLDG D12( REV ADDR 31000) null 06/09/2009 06/23/2009 06/26/2009 SHOP DRAWINGS, Other, and approval stamp
5013 UCI EAST CAMPUS HSG. PH3 SITE2 COMM.BLDG null 06/09/2009 06/23/2009 06/26/2009 Shop drawing and resubmittal, approval stamp
5012 Mesa Court Housing 5108330 06/09/2009 06/23/2009 06/10/2009 Plans, 100% review, and Approval Stamp
5011 UCI EAST CAMPUS STUDENT HSG. PH.3 BLDG C-9 (REV ADD 32700) null 06/09/2009 06/23/2009 06/26/2009 Shop drawings. Approval Stamp
5010 UCI EAST CAMPUS, STU. HSG. PH.3 SITE 2 MAIN. BLDG ( REV 30100) null 06/09/2009 06/23/2009 06/26/2009 Shop drawings, Approval Stamp
5009 UCI East Campus St HSG. Ph 3 Site 2 Bldg 5 ( Rev Addr 33200) null 06/09/2009 06/23/2009 06/26/2009 Shop drawings, other, approvla Stamp
5008 UCI E.CAMPUS STU. HSG PH.3 SITE 2 BLDG D15 (REV ADDR 30400) null 06/09/2009 06/23/2009 06/26/2009 Shop Drawing- Approval Stamp
5007 UCI E.CAMPUS ST.HOUS, PH.3 SITE 2 " MAIN BLDG" null 06/09/2009 06/23/2009 06/09/2009 Appr. Shop Drawing. Approval Stamp- For Record Only
5006 UCI PHASE 2 SITE1 08604 06/05/2009 06/19/2009 06/17/2009 Plans, EH&S Redlines, Final Review, and Approval Stamp
5005 UCI PHASE 3 SITE 1 08604 06/05/2009 06/19/2009 06/05/2009 F/A BLDG 2 APPROVED
5004 UCI PHASE SITE 1 08604 06/05/2009 06/19/2009 06/05/2009 For Record Only- F/S BLDG 1- APPROVE
5003 Medical Education Bldg 991970 06/04/2009 06/18/2009 06/09/2009 28-3111O.I.D Fire alarm system shop dwgs w/ all earlier back checks
5002 SCRC 994038 06/04/2009 06/18/2009 06/11/2009 Fire Alarm 0101B-21-3111
5001 S&BS 991268 06/04/2009 06/18/2009 06/16/2009 03646-139157A Fire Suppression DWGS
5000 S&B 991268 06/04/2009 06/18/2009 06/23/2009 0280-13915C Fire Suppression Show DWG
4999 Mesa Court Housing 5108330 06/03/2009 06/17/2009 06/17/2009 Plans, 100% Review, Approval Stamp
4998 BPN 2nd +3rd Education Classroom 5108270 06/03/2009 06/17/2009 06/18/2009 Plans, Final Review, and Approval Stamp
4997 BPS 4500 Faculty Ofc 5108221 06/03/2009 06/17/2009 06/11/2009 Plans, Final Review, and Approval Stamp
4996 Uci Mc Shell Space Completion & Site Improvements 994620 06/03/2009 06/17/2009 06/16/2009 Demolition Plan UCIMC Building 1B
4995 Stemcell Research Bldg. 994038 05/29/2009 06/12/2009 05/29/2009 CP-03 Specs Stampe & Signed For Record Only
4994 Jamba Juice @Student Center 1172 05/28/2009 06/11/2009 06/05/2009 Full size sets for Jamba Juice for PDMS- Plans
4993 Stemcell Research Bldg 994038 05/28/2009 06/11/2009 05/28/2009 0134C-21 1000 Water Based Fire Suppression( Back check # 4322)
4992 East Campus St. Hsg. Ph.3 Site Comm. Bldg, null 05/27/2009 06/10/2009 06/26/2009 Shop Drawing + Prod Data, Other, Approval Stamp
4991 East Campus Student Hsg. Ph. 3 Site 2 Comm. Bldg null 05/27/2009 06/10/2009 06/04/2009 Shop drawing, Rebsubmittal Approval Stamp
4990 East Campus St. Hsg. Ph. 3 Site 2 Bldg D-12 ( Rev Address 31000) null 05/26/2009 06/09/2009 06/01/2009 Rev shop Degs & Calcs, approval stamp
4989 East Campus St. HSG. Ph.3 -Site 2 Bldg A-13 ( Rev Address #30800) null 05/26/2009 06/09/2009 06/04/2009 Shop Dwgs & Calcs, Approval Stamp
4988 East Campus HSg, Ph.3 Site 2 Bldg D-15( Rev addr# 30400) null 05/26/2009 06/09/2009 06/04/2009 Shop dwg and calcs
4987 East Campus Student Housing Ph 3 Site 2 Maintenance null 05/22/2009 06/05/2009 06/02/2009 Shop Drawings and Calcs.- Approval Stamp
4986 Humanities Gateway 991077 05/22/2009 06/05/2009 06/01/2009 ASI 004 Fire Alarm & Suppression System updates& Landscape irrigation
4985 Humanities Gateway 991077 05/22/2009 06/05/2009 05/28/2009 RFI 0564- Clerestory sprinkler change
4984 Middle Earth Housing Renovations 760290-76643 05/22/2009 06/05/2009 05/22/2009 Conformed Construction Contract- For Record Only
4983 SCRC 994038 05/22/2009 06/05/2009 05/22/2009 Stmp CO-3 Spec Cover
4982 East Campus St. Hsg. Site 2 Bldg C-9 Revised address 32700 null 05/21/2009 06/04/2009 06/01/2009 Shop drawings and calcs, Approval Stamp
4981 East Campus St. Hsg. Ph. 3 Site 2 Bldg 5 Revised Address 33200 null 05/21/2009 06/04/2009 06/01/2009 Shop Drawings Fire alarm System
4980 East Campus St HSG. Ph. 3 Bldg D-8& D-11 null 05/21/2009 06/04/2009 05/21/2009 Approved Shop drawings- For Record Only
4979 Humanities 991077 05/21/2009 06/04/2009 05/28/2009 RFI 557 Stair 3 rated wall and suffit
4978 East Campus Student Housing Ph 3 Site 2 Rev head layout for units null 05/21/2009 06/04/2009 05/21/2009 Approved shop drawings For Record Only
4977 Mesa Court Housing 5108330 05/19/2009 06/02/2009 05/27/2009 Plans, Specifications, 100% Review, and comments and corrections
4976 Bren Events Center 5108343 05/19/2009 06/02/2009 06/01/2009 Plans, Final Review, and approval stamp
4975 UCI EAST CAMPUS ST. HOUSING PH.3 SITE 2 null 05/19/2009 06/02/2009 05/27/2009 Prod Data, Detail, & Approval Stamp
4974 East Campus Student Ph. 3 null 05/19/2009 06/02/2009 05/19/2009 Shop Drawing, For Record only
4973 Humanities 991077 05/18/2009 06/01/2009 05/20/2009 RFI 514 R2 Electric box roug-in @ 2hr wall
4972 Arroyo Vista Housing Repairs Group C1 5108262 05/18/2009 06/01/2009 05/18/2009 Other, Resubmit Mold Abatement work Plan
4971 STEMCELL 994038 05/18/2009 06/01/2009 05/18/2009 CP_3 Specification- Back Check
4970 Medical Education Bldg 991970 05/15/2009 05/29/2009 05/19/2009 298 Stairwell #2- Area of Refuse
4969 Stemcell Reseach Bldg 994038 05/14/2009 05/28/2009 05/14/2009 SI #2 Stamped /Signed For RECORDS ONLY
4968 S&BS 991268 05/14/2009 05/28/2009 05/21/2009 1363 Sprinkler Head Locations
4967 5108270 5108270 05/13/2009 05/27/2009 05/18/2009 Plans, Final Review, Approval Stamp
4966 Med Sci D 5108314 05/13/2009 05/27/2009 05/28/2009 Plans, 80% review
4965 BPS 4th flr Faculty ofc/Food Cart 5108221 05/13/2009 05/27/2009 05/20/2009 Plans, Final review, approval stamp
4964 Humanities Gateway 991077 05/12/2009 05/26/2009 05/21/2009 EVAC Maps
4963 Medical Education Bldg 991970 05/12/2009 05/26/2009 05/19/2009 23-3300-01A Combination Fire/Smoke Damper product Data
4962 S&BS 991268 05/12/2009 05/26/2009 05/21/2009 1349-Buidling Signage
4961 S&BS 991268 05/11/2009 05/25/2009 05/13/2009 0189-08311- Access Panel Door Pull
4960 BPS 4TH Floor Facult Ofc/Food Cart 5108221 05/08/2009 05/22/2009 05/11/2009 Plans, Approval Stamp
4959 UCI PHASE 3 SITE1 08604 05/08/2009 05/22/2009 05/19/2009 PLANS, DETAILS ONLY, REVISED SEISMIC DETAILS
4958 S&BS 991268 05/08/2009 05/22/2009 05/14/2009 Submittal: 0280-13915B
4957 East Campus Site 3 Parking Structure 08606 05/08/2009 05/22/2009 05/13/2009 Shop DWGS, Final Review, and Approval Stamp
4956 East Campus Phase 3 Bldg s 1&2 ( A,B, C) Site 1 08604 05/08/2009 05/08/2009 05/08/2009 Pipe Weld Data- For Record Only
4955 Site 1 Building 1 East Campus 08604 05/08/2009 05/22/2009 05/20/2009 Plans, EH&S redline, addenum, Final Review
4954 Stemcell Research Bldg 994038 05/07/2009 05/07/2009 05/07/2009 SI #3 Package For Record Only
4953 Stemcell Research Bldg 994038 05/07/2009 05/07/2009 05/07/2009 CP#3A For Record Only
4952 Stemcell Research Bldg 994038 05/07/2009 05/07/2009 05/07/2009 CP #5 ( Stamped /signed) For Record Only
4951 EU3 990073 05/07/2009 05/21/2009 05/08/2009 Submittal
4950 Nat Sci 1 RM 3134 45261 05/07/2009 05/21/2009 05/07/2009 Plans,
4949 UCI Ph 3, site 1 08604 05/06/2009 05/20/2009 05/15/2009 Plans, EH&S relines, Final review, Approval stamp
4948 East Campus Student Hsg. Ph 3 Site 2 Bldg D-8 { revised address 32500} null 05/05/2009 05/19/2009 05/13/2009 Shop drawings & Calcs
4947 East Campus Student Hsg. Ph3 Site 2 Bldg D-11 { Reivised address 32900 null 05/05/2009 05/19/2009 05/13/2009 Shop drawing and calcs, approval
4946 East Campus Stud. Hsg Ph 3 bldg 2 { rev address 31300} null 05/05/2009 05/19/2009 05/05/2009 Appr. Shop Drawingd, For Record Only
4945 East Campus Stud. Hsg, Site 2 Bldg C-20 { rev addr. 31100} null 05/05/2009 05/19/2009 05/05/2009 Apps. Shop drawings, For Record Only
4944 SCRC 994038 05/05/2009 05/19/2009 05/05/2009 1 CP-S
4943 Stemcell 994038 05/05/2009 05/19/2009 05/05/2009 204A-01-3310 CP 2A G- Sheets
4942 BPS 4TH FLOOR FACULTY OFC 5108221 05/05/2009 05/19/2009 05/19/2009 Plans, Specifications, 100% review, comments & corrections, and approval stamp
4941 Stemcell Research Bldg 994038 05/04/2009 05/18/2009 05/11/2009 Cp-3 Specs for review
4940 Social and Behavioral Sciences 991268 05/01/2009 05/15/2009 05/11/2009 328-8911 A Waterfall Glazing Calacs @ Stair #2
4939 Social & Behavioral Sciences 991268 05/01/2009 05/15/2009 05/11/2009 328-16850 A A&H Fire Alarm sequ of OP. Matrix
4938 Uci Ph. III- Site 1 08604 04/30/2009 05/14/2009 05/19/2009 Plans, Final Review, and Approval Stamp
4937 Sprague Hall Roof top mech 5108171 04/30/2009 05/14/2009 05/04/2009 Courtesy Review- Attn Scott Jackson
4936 Social & Behavioral 991268 04/30/2009 05/14/2009 05/13/2009 328-13935A Costco, Fire Sprinkler system
4935 Social Behavioral 991268 04/30/2009 05/14/2009 05/13/2009 326-02510 A Savala o&m's ( h20 dist. & fire suppression)
4934 Medical Education Bldg 991970 04/30/2009 05/14/2009 05/05/2009 ASI #11- Fire Access Plan ( G-Sheet)
4933 Medical Education 991970 04/30/2009 05/14/2009 04/30/2009 RFI 281 21 way communciation device @ area of refuse
4932 SCRC 994038 04/30/2009 05/14/2009 04/30/2009 SI #3 Sheet A-612
4931 Jamba Juice @ Student Center 1172 04/30/2009 05/14/2009 05/05/2009 Submittals for Review
4930 Stemcell Research Bldg 994038 04/29/2009 05/13/2009 05/18/2009 202A-21-1000 Fire sprinkler system & hydrauil calcs.
4929 East Campus Student Hsg. Ph 3 Site 2 Bldg D-15 Rev address 30400 null 04/28/2009 05/12/2009 05/06/2009 Shop dwgs & Calcs, Approval Stamp
4928 East Campus Student Ph3 Site 2 Bldg D-12 Revised Addr #31000 null 04/28/2009 05/12/2009 05/06/2009 Shop Drawings Calcs- Approval Stamps
4927 East Campus St. Hsg. Ph3 Site2 null 04/28/2009 05/12/2009 05/06/2009 Shop dwg Detail- Approval Stamp
4926 East Campus Student Housing Ph. 2 Site 2- Unit Head Layout Revised null 04/28/2009 05/12/2009 05/12/2009 Shop Drawings- Approval Stamp
4925 Humanities Gateway 991077 04/28/2009 05/12/2009 05/13/2009 RFI 510R1- 1he Seperation
4924 Humanities Gateway 991077 04/28/2009 05/12/2009 05/18/2009 RFI 0540 Revised Prep Line
4923 Middle Earth Housing 5108179 04/28/2009 05/12/2009 05/12/2009 Plans, Final Review, and Comments
4922 Stemcell Resarch Bldg 994038 04/27/2009 05/11/2009 05/18/2009 13413-21-1000 Water Based Fire Suppression Material W Backcheck #4800
4921 SCRC 994038 04/27/2009 05/11/2009 04/27/2009 Other SI
4920 Medical Education bldg. 991970 04/24/2009 05/08/2009 05/11/2009 28-3111-01C Digital Adressable Fire Alarm . SWGS with back Check
4919 Berk Hall EH&S Project 04/23/2009 05/07/2009 05/18/2009 Other
4918 Humanities 991077 04/23/2009 05/07/2009 05/05/2009 RFI 0514 Elect Box Rough In
4917 Humanities 991077 04/23/2009 05/07/2009 05/05/2009 RFI 0506 1 hour rated assembly
4916 East Campus Student Housing Ph3 Site 2 null 04/23/2009 05/07/2009 05/06/2009 Product Data , Details, Approval Stamp
4915 EU3 990073 04/23/2009 05/07/2009 04/30/2009 Evac Maps
4914 StemCell Research Bldg. 994038 04/22/2009 05/06/2009 04/22/2009 68C-01-3310 SI # 1 Resubmittal Dated 4/21/2008 w/ back check
4913 Sprague Hall- Roof Top Mechhanical Rm 5108171 04/21/2009 05/05/2009 04/27/2009 Pipe Sleeve Details, Final Review EJ from 3m per your request
4912 East Campus Student Hsg. Ph. 3 Site 2 Bldg E null 04/20/2009 05/04/2009 05/05/2009 Shop Dwgs & Calcs, approval Stamp
4911 East Campus Student Housing A-22 31500 Ph. 3 Site 2 null 04/20/2009 05/04/2009 04/20/2009 Shop[ Drawing, As builts
4910 Law School Library 997085 04/17/2009 05/01/2009 04/27/2009 Resubmittal- Deltaz
4909 UCI Site 3 Parking Structure 08606 04/16/2009 04/30/2009 05/06/2009 Submittal, Final review, Approval stamp
4908 BPN Education classroom 5108270 04/16/2009 04/30/2009 05/05/2009 Plans, 100% review, comments & corrections
4907 S&BS 991268 04/15/2009 04/29/2009 04/27/2009 Submittal: 099-16850E
4906 Medical Education Bldg. 991970 04/14/2009 04/28/2009 04/21/2009 RFI: RFI # 267 2 HR Enclosure Adj. Stair #1
4905 Humanities 991077 04/14/2009 04/28/2009 04/15/2009 RFI: 0516
4904 Humanities 991077 04/14/2009 04/28/2009 04/27/2009 RFI: 489R1
4903 Site 1-Bldg's 1&2 (A,B &C) 08604 04/13/2009 04/13/2009 04/13/2009 Other: weld certs, record, submitted for RECORD ONLY
4902 Medical Education Bldg 991970 04/13/2009 04/13/2009 04/13/2009 Other ASI-20 Stamped/signed (1/2 side) for Records only
4901 East Campus Student Housing Ph 3 Site 3 Bldg C-21 null 04/10/2009 04/24/2009 04/28/2009 Shop drawings,, approval Stamp
4900 East Campus Student Housing Ph 3 Site 2 Bldg 20 null 04/10/2009 04/24/2009 04/28/2009 Shop drawings, Approval Stamp
4899 East Campus Student Housing Phs3 site 2 null 04/10/2009 04/24/2009 04/10/2009 Approve Shop Drawings, approved For Record Only
4898 Humanities 991077 04/10/2009 04/24/2009 04/14/2009 ASI #3
4897 MED ED BLDG 991970 04/10/2009 04/24/2009 04/10/2009 Level 3 Revisions
4896 Stemcell Research bldg. 994038 04/10/2009 04/24/2009 04/10/2009 RFI 1043R001- corzan CPVC for Ro Water Distribution
4895 BPS 4th Floor Faculty Office 5108221 04/10/2009 04/24/2009 04/14/2009 Plans, 100% Review, and Approval Stamp
4894 Med ED Bldg. 991970 04/09/2009 04/23/2009 04/09/2009 Level 3 revisions
4893 Site 3 UCI Site Parking Structure 08606 04/09/2009 04/23/2009 04/28/2009 Shop DEW, Resubmittal, comments + corrections
4892 SCRC 994038 04/08/2009 04/22/2009 04/15/2009 RFI 1074 Schedule 10 pipe
4891 SCRC 994038 04/08/2009 04/22/2009 04/15/2009 RFI: 1075 fire protection meeting summary
4890 Bren Hall 5108259/50535 04/08/2009 04/22/2009 04/13/2009 Plans, Final Review, Approval Stamp
4889 SCRC 994033 04/06/2009 04/20/2009 04/08/2009 1069 Light Hazard Classification
4888 Croul Hall 5108263 04/07/2009 04/21/2009 04/14/2009 Plans, Final Review,
4887 Irvine Hall 5107906 04/07/2009 04/21/2009 04/13/2009 Plans, specifications, final review, approval stamp
4886 EU3 990073 04/07/2009 04/21/2009 04/09/2009 13900 06
4885 EU3 990073 04/07/2009 04/21/2009 04/15/2009 RFI 639
4884 Phase III Bldg 1&2 (A,B,B) 08604 04/07/2009 04/21/2009 04/27/2009 Product Data, 100% Review, and Approval Stamp
4883 Middle Earth Housing 5108179 04/06/2009 04/20/2009 04/13/2009 Plans, Specification, EH&S Redlines, Final Review, Approval Stamp
4882 Medical Education Buidling 991970 04/06/2009 04/20/2009 04/15/2009 ASI 109, Exterior wall type in breezeway @ Storefrontframesfg.
4881 Medical Education Building 991970 04/06/2009 04/20/2009 04/15/2009 ASI 017 Interior Partition Types, Levels 1&2
4880 East Campus Ph 3 Site 2, Blds, A4, B16, A22, A7,B1,A17,& A10 null 04/03/2009 04/17/2009 04/03/2009 For Record Only East Campus Ph 3 Site 2, Blds, A4, B16, A22, A7,B1,A17,& A10
4879 EU3 990073 04/03/2009 04/17/2009 04/07/2009 EU3 Kiosk plan review resubmission, w/ previous as Ref ( Cover SHt ot)
4878 East Campus null 04/02/2009 04/16/2009 04/02/2009 Approved Shop drawings, approved For Record Only
4877 S&BS 991268 04/02/2009 04/16/2009 04/22/2009 Alternate Means, Water Curtain
4876 MSTB 2ND Env. Institute 5108196 04/02/2009 04/16/2009 04/03/2009 Plans, Approval Stamp
4875 East Campus Phase 3 Site 2 null 04/01/2009 04/15/2009 05/06/2009 Product Data Details, Approval Stamp
4874 Phase III Site 1 08604 04/01/2009 04/15/2009 04/15/2009 Plans, redlines, final review, and approval stamp
4873 Phase 3 Site 1 08604 04/01/2009 04/15/2009 04/08/2009 Plans, Redlines, Final Reviewl, Approval Stamp
4872 Student Housing Site 1 Bldg 1 08604 04/01/2009 04/15/2009 04/08/2009 Plans, Redlines, calcs, Final Review, and Approval Stamp
4871 Phase III Site 1 08604 04/01/2009 04/15/2009 04/16/2009 Specifications, Final Review, and Approval Stamp
4870 Humanities 991077 04/01/2009 04/15/2009 04/21/2009 0510 1 hr shaft walls
4869 East Campus Phs 3 Site 2 null 03/31/2009 04/14/2009 04/08/2009 Shop drawings,
4868 East Ca pus Student Ph3 Site 2 null 03/31/2009 04/14/2009 04/08/2009 Shop Drawings, approval stamp, other
4867 East Campus Student Hsg Ph32 null 03/31/2009 04/14/2009 04/08/2009 Shop Drawings, Other, Approval Stamp
4866 Site 2 Bldg A, B, C, Comm bldg, 08604 03/31/2009 03/31/2009 03/31/2009 Submittal, mix design, and product data
4865 Site 1 Bldg 1&2 ( A,B, C) null 03/31/2009 04/14/2009 03/31/2009 Submittal , mixed desing, product data, dinal review, and approval stamp
4864 East Campus Phase 3 Site 1 East Campus 03/31/2009 04/14/2009 03/31/2009 Other, Final Review, and Approval Stamp
4863 Med Ed 991970 03/31/2009 04/13/2009 04/07/2009 Levlel 3 revisions
4862 verano housing 996269 03/31/2009 04/14/2009 03/31/2009 Plans, Final Review, Approval Stamp
4861 Law School Library 997085 03/30/2009 04/13/2009 04/07/2009 Fire Alarm
4860 Humanities Gateway 991077 03/30/2009 04/13/2009 04/07/2009 0509- FSD Location
4859 S&BS 991268 03/30/2009 04/13/2009 04/07/2009 0283-07842B Fire Stopping
4858 Stem Cell 994038 03/30/2009 04/13/2009 04/07/2009 Knox Box
4857 Stem Cell Research Building 994038 03/30/2009 04/13/2009 03/30/2009 Records Set
4856 Medical Education bldg 9911970 03/25/2009 04/08/2009 03/31/2009 09-2116-03 Gyp Board Shaft Assembly Gyp liner panels
4855 Medical Education Bldg 991970 03/25/2009 04/08/2009 04/01/2009 09-2900-02 Gyp board Dens Amor Plus
4854 East CampusPhase 3 Site 2 Bldg B-1, Revised Address 30000 null 03/25/2009 04/08/2009 04/01/2009 Approval Stamp
4852 East Campus Student hs, Ph Site 2 Bldg A17, Revised address 30500 null 03/25/2009 04/08/2009 03/31/2009 Approval Stamp
4851 East Campus null 03/25/2009 04/08/2009   Shop Drawing, approval Stamp
4850 East Campus Student Housing Ph3 Site 2 BlC 3, reivised address 32200 null 03/25/2009 04/08/2009 04/08/2009 Approval Stamp
4849 East Campus Phase 3 Site 2 B A 14, Revised address 30600 null 03/25/2009 04/08/2009 04/01/2009 Approval Stamp
4848 East Campus Student Housing Ph 3 Site 2 Bldga A Revise Address 32800 null 03/25/2009 04/08/2009 04/01/2009 Approval Stamp
4847 East Campus- Phase 3 Site 2 Bldg A Revised Address 32400 null 03/25/2009 04/08/2009 04/01/2009 Approval Stamp
4846 East Campus phase 3 Site 2 , revised address 30 300 null 03/25/2009 04/08/2009 04/01/2009 Comments and corrections
4845 East Campus Phase 3 -Site 2 Bldg A22 Revised address 31500 null 03/25/2009 04/08/2009 04/01/2009 Shop drawing, approval stamp, other
4843 Law School Library 997085 03/25/2009 04/08/2009 03/31/2009 07-8413 Fire Stop
4842 Student Housing Phase 3 Site2 East Campus 03/25/2009 04/08/2009 03/31/2009 Other, Other, Approval Stamp
4841 SCRCB 994088 03/24/2009 04/07/2009 04/02/2009 Submittal: 0149A-01.3310
4840 Humanities Gateway 991077 03/24/2009 04/07/2009 03/30/2009 RFI: 0494
4839 EU3 990073 03/24/2009 04/07/2009 03/30/2009 Add new No 4009 series. 16852 01B - Fire alarm (see previous for ref)
4838 SSL-184 Floor 5108245 03/24/2009 04/07/2009 03/26/2009 Plans
4837 SCRC 994038 03/24/2009 04/07/2009 03/24/2009 Other: Stamp & Sign CP-3
4836 UCI East Campus Student Housing, Phase 3 - Site 2 null 03/24/2009 04/07/2009 03/31/2009 Back Check
4835 Social Behavioral 991077 03/23/2009 04/06/2009 03/23/2009 Other: Stamped fire drawings
4834 Humanities Gateway 991077 03/20/2009 04/03/2009 03/26/2009 09960.01B Intumescent Paint
4833 SCRC 994038 03/20/2009 04/03/2009 03/23/2009 Back Check Set to help w/ Review
4832 Parking Structure Site 3 08601 03/19/2009 04/02/2009 03/31/2009 Submittal, other, approval stamp
4831 S&BS 991268 03/19/2009 04/02/2009 03/30/2009 0282-13915
4830 MSTB Environment Instituet 5108196 03/19/2009 04/02/2009 03/31/2009 Plans, specifications, final review, and approval stamp
4829 Steinhaus Hall 5108206 03/19/2009 04/02/2009 03/30/2009 Plans, 100 Review, and approval stamp
4828 Law School Library 997085 03/18/2009 04/01/2009 04/02/2009 Fire Proofing thickness schedule
4827 Law School Library 997085 03/18/2009 04/01/2009 03/18/2009 Head of wall fire proofing
4826 Humanities 991077 03/18/2009 04/01/2009 03/31/2009 Arch Supplemental Insturction # 3
4825 Humanities 991077 03/18/2009 04/01/2009 03/28/2009 RFI 470 R1 Stair 3 code issues
4824 Humanities 991077 03/18/2009 04/01/2009 03/25/2009 RFI 494 Fire connection Piping color
4823 SCRCB 994038 03/18/2009 04/01/2009 03/25/2009 1058 Standpipe Hose Connection Ht.
4822 East Campus Student Housing null 03/18/2009   03/18/2009 For Record Only
4821 Bren Hall 5108259/50535 03/17/2009 03/31/2009 03/24/2009 Plans, other, 80% review, comments and corrections, material submittal
4820 Middle Earth Dorms 5108179 03/17/2009 03/31/2009 03/24/2009 Plans, specification, pre review, and approval stamp
4819 Croul Hall 5108263 03/17/2009 03/31/2009 03/24/2009 Plans, specification, pre review, and approval stamp
4818 Croul Hall 5108263 03/17/2009 03/31/2009 03/17/2009 Datmp
4817 Verano place 6100 5107983 03/17/2009 03/31/2009 03/17/2009 Details
4816 Law School Library 997085 03/16/2009 03/30/2009 03/24/2009 Submittal: 11-1000 Elev. Key pad
4815 Law School Library 997085 03/16/2009 03/30/2009 03/24/2009 Submittal: 08-1216 door submittal
4814 Stemcell Research Bldg. 994038 03/16/2009 03/30/2009 03/23/2009 Other: CP3 progress SES - Mechanical Sheets
4813 EU3 990073 03/16/2009 03/30/2009 03/24/2009 RFI 338R2
4812 Site 2-Bldg's A,B,C,E Comm. Bldg 08605 03/13/2009 03/27/2009 03/18/2009 Other: submittal-mix design/prod data, final review, approval stamp
4811 Site 1-Bldg's 1 & 2 (A,B & C) 08604 03/13/2009 03/27/2009 03/18/2009 Other: submittal-mix design/prod. Data, final review, approval stamp
4810 SSL 1st Flr renovation rm114/184/192 5108245 03/13/2009 03/27/2009 03/17/2009 Plans, specs, final review, approval stamp
4809 SCRCB 994038 03/13/2009 03/27/2009 03/13/2009 submtittal: CP-3 144A-01.3310
4808 Steinhaus Hall 991842 03/12/2009 03/26/2009 03/23/2009 RFI: E.T. on Tunnerl Assembly at rear exits
4807 SCRC 994038 03/12/2009 03/26/2009 03/12/2009 Submittal: G Sheets
4806 Stemcell Research Bldg. 994038 03/11/2009 03/25/2009 03/24/2009 RFI 1043 Hose Valve @ LVL 1 near Stair #1
4805 EU3 990073 03/10/2009 03/24/2009 03/23/2009 Evac. Map submittal
4804 Bren Hall 6th Floor 5108120 03/11/2009 03/25/2009 03/12/2009 Plans, Final Review, and Approval Stamp
4803 S&BS 991268 03/11/2009 03/25/2009 03/11/2009 SI 7R1
4802 Social Behavioral 991268 03/11/2009 03/25/2009 03/16/2009 294-08311-A Fire Rated Access Door & Frame
4801 Medical Education Bldg 991970 03/10/2009 03/24/2009 03/24/2009 28-3111.01B Fire Alarm shop DWGS
4800 SCRCB 994038 03/10/2009 03/27/2009 03/25/2009 0134A- 21.1000
4799 Engineering Tower 5108295 03/10/2009 03/24/2009 03/10/2009 Plans - Final Review
4798 BP 5108238 03/06/2009 03/20/2009 03/10/2009 Plans reviewed and stamped, approved
4797 Site 3 Parking Structure 08606 03/09/2009 03/23/2009 03/09/2009 Plans, approved SFM comp of Approved Submittal
4796 East Campus Student Housing Phase 3 Site 2 Bldg 2 08604 03/09/2009 03/23/2009 03/09/2009 Plans, For Record Only
4795 Arroyo Vista Housing Repairs Group C 5108262 03/09/2009 03/23/2009 03/16/2009 Plans, Transmittal- Reference(Marked up) is in your possession
4794 EU3 990073 03/09/2009 03/23/2009 03/24/2009 13900 06A; fire supplies piping
4793 East Campus St Housing. Phase 3 site 2 building tupe E null 03/06/2009 03/20/2009 03/24/2009 Shop Drawings & Calcs, approval Stamp
4792 SCRC 994038 03/06/2009 03/20/2009 03/17/2009 1049 Elev guide rail
4791 Irvine Hall 5107906 03/05/2009 03/19/2009 03/10/2009 Plans, Final Review, and approval Stamp
4790 Croul Hall 5108263 03/05/2009 03/19/2009 03/05/2009 Plans, Pre Review, and approval Stamp
4789 Humanities 991077 03/05/2009 03/18/2009 03/16/2009 01-9960-A Intumscent Coating
4788 UCI Site3 08606 03/04/2009 03/18/2009 03/17/2009 Shop SWG, Comments and Corrections, Approval Stamp
4787 Bren Hall 6th floor 5108120 03/04/2009 03/18/2009 03/10/2009 Plans, Final Review, and Approval Stamp
4786 Stemcell Research Bldg ( Sue Goss) 994038 03/04/2009 03/18/2009 03/12/2009 111A.21.1000 Water Based suppression system specs, product data + details
4785 Law School Library 997085 03/03/2009 03/17/2009 03/05/2009 Sprinkler Back Check
4784 eng tower 5108295 03/03/2009 03/17/2009 03/03/2009 Plans, Final Review, and Approval Stamp
4783 HUMNAITIES 991077 03/03/2009 03/17/2009 03/24/2009 RFI 489 Hollow Metal Door
4782 Law School Library 997085 03/03/2009 03/17/2009 03/12/2009 07-8100 01A Fire Proofing
4781 SCTC 994038 03/03/2009 03/17/2009 03/03/2009 Knox Box review
4780 EU3 990073 03/02/2009 03/16/2009 03/16/2009 16852 01B Fire Alarm { See Pre -01A for Ref only}
4779 EU3 990073 03/02/2009 03/16/2009 03/10/2009 Site Phasing/Fence Plan Phase IX
4778 East Campus, Student housing phase 3 site 1 08604 03/02/2009 03/16/2009 03/12/2009 RFI's Comments from benchmark and other info
4777 EU3 990073 03/02/2009 03/16/2009 03/16/2009 kiosk tenant improvements
4776 Student Housing Phase 3 Site 2, Bldg D-8 East Campus 03/02/2009 03/16/2009 03/12/2009 Shop Drawings and Calcs
4775 Student Housing Phase 3 Site 2 Maintenance Bldg East Campus 03/02/2009 03/16/2009 03/12/2009 Shop drawings & Calcs, Approval Stamp, Other
4774 East Campus Student Hsg- Phase 3 Site 2 Community and Maintenance Bldg null 03/02/2009 03/16/2009 03/02/2009 Approved Shop Drwgs, For Record Only
4773 East Campus Housing- Ph 3 site 2 bldg D-11 null 03/02/2009 03/16/2009 03/12/2009 Shop Drawings, Calcs
4772 BPS &BPN 5108095 02/27/2009 03/13/2009 03/09/2009 Final Review + Approval Stamp
4771 SCRCB 994038 02/26/2009 03/12/2009 03/30/2009 RFI 1043-CPVC WRAP
4770 east campus null 02/26/2009 03/12/2009 02/26/2009 Plans, Final Review, and Approval Stamp
4769 steinhauss hall 510256 02/26/2009 03/12/2009 02/26/2009 fire caulking submittal, final review, approval stamp
4768 Humanities 991077 02/26/2009 03/12/2009 03/05/2009 4-13915 a fire Suppression Hanger Piping
4767 East Campus Student Apts Site 2 08605 02/26/2009 03/12/2009 03/05/2009 Fire Extinguisher Submittal. Pre review and appoval stamp
4766 East Campus Student Apts Site 1 08604 02/26/2009 03/12/2009 03/04/2009 Fire Extinguisher - Submittal
4765 East Campus Student Ph 3 Site 2 bldg B null 02/25/2009 03/11/2009 02/25/2009 For Record Only
4764 Medical Education Bldg. 991970 02/25/2009 03/11/2009 03/03/2009 Proposal for standpipe closet and fire hose connection
4763 UCI East Campus Student Housing, Phase 3-site 2 "Community & Maintenance Bldg" null 02/24/2009 03/10/2009 02/25/2009 Other: shop drawings and calcs
4762 East Campus Student Aps Phase 2 Site 1 08604 02/24/2009 03/10/2009 02/25/2009 Trash chute, shop dwgs and Product Data, pre review, approval stamp
4761 East Campus Student Apts Phase 3 Bldg 1 08604 02/24/2009 03/10/2009 03/12/2009 Shop dwgs, calcs, 100% Review, and Approval Stamp
4760 Multiples 5086993 02/24/2009 03/10/2009 03/03/2009 Plans, Final Review, approval Stamp, Approval Stamp
4759 Social Behavioral 991077 02/24/2009 03/10/2009 03/11/2009 RFI 1262R2 Pod A firedamper install
4758 S&BS 991268 02/24/2009 03/10/2009 03/11/2009 Submittal 0283-07842 Fire Stopping
4757 Steinhaus Hall 5108256 02/24/2009 03/10/2009 02/24/2009 Fire Caulking Submittal, Final Review and Approval Stamp
4756 S&BS 991268 02/24/2009 03/10/2009 03/11/2009 RFI 1262R2 Fire Damper @ Pod A
4755 S&BS 991268 02/24/2009 03/10/2009 03/11/2009 Submittal-0277-07842 B Fire caulk locations
4754 S&BS 991268 02/24/2009 03/10/2009 02/24/2009 Submittal: 0277-07842-B Fire Caulk locations
4753 S&BS 991268 02/23/2009 03/09/2009 03/03/2009 Pre Action System 0265 13935 B
4752 Humanities 991077 02/23/2009 03/09/2009 03/29/2009 RFI 482 Fire Proofing @ stair 1ceiling
4751 Bren Hall 6th floor 5108120 02/23/2009 03/09/2009 02/25/2009 Plans, submittal
4750 Multiples 5086993 02/23/2009 03/09/2009 03/03/2009 Plans, Final Review, approval Stamp
4749 EU3 990073 02/20/2009 03/06/2009 03/05/2009 RFI 621
4748 Medical Building 991970 02/20/2009 03/06/2009 03/10/2009 Glazing submittal review
4747 Humanities 991077 02/20/2009 03/06/2009 03/10/2009 Submittal 9265- 01 C Gypsum Board Shart Wall
4746 Phase 3 Site 2 BLDG "D" East Campus 02/19/2009 03/05/2009 03/12/2009 Revised Shop Drawings and calculations, Approval Stamp
4745 Medical Education Bldg. 991970 02/19/2009 03/05/2009 02/19/2009 Approved Fire Sprinkler DWG ( 1/2 size) For Record Only
4744 Law School Library 997085 02/19/2009 03/05/2009 02/25/2009 Sumbittal- Fire Stop
4743 EU3 990073 02/19/2009 03/05/2009 03/05/2009 RFI 619
4742 Social Behavioral 991077 02/19/2009 03/05/2009 03/03/2009 1272R2 Stair 3
4741 Medical Education Bldg 991970 02/18/2009 03/04/2009 02/25/2009 09-2116-01 Gypsum Brd Shaft wall assemblies
4740 Medical Education Bldg 991970 02/18/2009 03/04/2009 03/02/2009 10-2213-01 Wire Mesh Partition SMP DWG & Product Data
4739 S&BS 991268 02/18/2009 03/04/2009 03/10/2009 0280 13915-A Water Container
4738 Fire Alarm Panel 5108238 02/18/2009 03/04/2009 02/24/2009 100 Review, approval stamp
4737 S&BS 991268 02/18/2009 03/04/2009 03/05/2009 Submittal: 0099-16850-D (5th floor T.I.)
4736 Law School Library 997085 02/18/2009 03/04/2009 02/26/2009 Submittal: SFM corrections of 100% CD's
4735 SCRCB 994038 02/18/2009 03/04/2009 03/03/2009 Submittal: 0101A.28.3111
4734 Medical ED Bldg 991970 02/17/2009 03/03/2009 02/17/2009 ASI 3 Signed /Stamped for Records
4733 Arroyo Vista Houisng Repairs 5108262 02/17/2009 03/03/2009 02/26/2009 Fire Cualking Submittal, Refer Working Drawings
4732 Humanities 991077 02/17/2009 03/03/2009 02/23/2009 RFI 474 Missing hydrant wall
4731 Medical Education 991970 02/17/2009 03/03/2009 02/17/2009 RFI: 226 Fire riser enclosure
4730 Medical Education Building 991970 02/17/2009 03/03/2009 02/17/2009 RFI: Level 2 Breezewalt express/ card readers
4729 Law School Library 997085 02/13/2009 02/27/2009 02/26/2009 28-2111-01 A Fire Alarm System
4728 Social and Behavioral Sciences 991268 02/13/2009 02/27/2009 02/25/2009 RFI 1280R2-Pre Action Panel Location
4727 Social and Behavioral Sciences 991268 02/13/2009 02/27/2009 02/18/2009 Submittal- 0282-13915 A, Fire Suppression Stand Pipe Details
4726 student housing phase 3 site 2 bldg A-4 east campus 02/13/2009 02/27/2009 02/24/2009 shop drawing and calcs
4725 student housing phase 3 site 2 bldg A-17 east campus 02/13/2009 02/27/2009 02/26/2009 shop drawings and calcs, approval stamp
4724 student housing phase 3 site 2 bldg B-2 east campus 02/13/2009 02/27/2009 02/26/2009 shop drawings and calcs, approval stamp
4723 student housing Phase 3- Site 2 BLDG C-19 east campus 02/13/2009 02/27/2009 02/26/2009 Shop drawings and calcs, approval stamp
4722 Student Housing Phase 3 Site 2 Bldg A-7 east campus 02/13/2009 02/27/2009 02/26/2009 shop drawings and calcs,approval stamp
4721 Student Housing phase 3 site 2 Bldg c-3 east campus 02/13/2009 02/27/2009 02/24/2009 Shop drawings and calcs, approval stamp
4720 student housing phase 3 site 2 bldg A-14 east campus 02/13/2009 02/27/2009 02/24/2009 Shop drawings, calcs, approval stamp
4719 Student House Phase 3 Site 2 Bldg A-10 East Campus 02/13/2009 02/27/2009 02/26/2009 Shop drawings and calcs. Approval stamp
4718 student housing phase 3 site 2 bldge "c-18" east campus 02/13/2009 02/27/2009 02/26/2009 Shop drawings and calcs
4717 Phase 3 Site 2 Bldg B-1 East Campus 02/13/2009 02/27/2009 02/24/2009 Shop drawings and calcs and other, approval stamp
4716 Site 2 Bldg- B16 East Campus Phase3 02/13/2009 02/27/2009 02/24/2009 Shop drawings and calc, approval stamp
4715 phase 3 site 2- bldg type c east campus 02/12/2009 02/26/2009 02/24/2009 Shop drawings, and calc
4714 phase 3 site 2 east campus 02/12/2009 02/26/2009 02/26/2009 shop drawings, for record only
4713 Arts Bldg 991072 02/12/2009 02/26/2009 02/18/2009 21-1000-04 Fire suppression system product data + swp
4712 Medical Education 991970 02/12/2009 02/26/2009 03/25/2009 G-Sheet Fire Access Review
4711 Medical Education Bldg 991970 02/12/2009 02/26/2009 02/12/2009 ASI #3 Back Check
4710 Medical Education Bldg 991970 02/12/2009 02/26/2009 02/17/2009 Fire Suppression DWGS
4709 Medical Education Bldg. 991970 02/12/2009 02/26/2009 02/12/2009 G-006 Fire Access site plant w/ Back check #4624
4708 Multiples 5086993 02/11/2009 02/25/2009 02/18/2009 Plans, Final Review and approval Stamp
4707 Phase 3 Site 2 BLDG Type B East Campus 02/11/2009 02/25/2009 02/17/2009 Shop dugs, and Cal
4706 Site2 Phase 3 East Campus 02/11/2009 02/25/2009 02/24/2009 Product Data, Details, Approval Stamp
4705 Social Behavioral 991268 02/10/2009 02/24/2009 02/25/2009 RFI 1280R1 Preaction Control Panel
4704 Phase 3 Site 1 East Campus 08604 02/10/2009 02/24/2009 02/11/2009 Plans, EH&S Redlines, Final Review, and Approval Stamp
4703 Phase 3 East Campus Site 1 08604 02/10/2009 02/24/2009 02/24/2009 Product Data, Final Review, and Approval Stamp
4702 Law School Library 997085 02/10/2009 02/24/2009 02/13/2009 Submittal: Shelving APD fire sprinklers
4701 Medical Ed. 991970 02/10/2009 02/24/2009 02/11/2009 Design: Fire Supression re Submittal
4700 Humanities 991077 02/10/2009 02/24/2009 02/25/2009 RFI F10 stair 3 code issues
4699 Humanities 99107 02/10/2009 02/24/2009 02/17/2009 RFI 453 Fire A mmunicator and Knox Box
4698 Humanities 9911077 02/10/2009 02/24/2009 02/17/2009 RFI 469 Detail at Grid 6.6
4697 Phase 3- Site 1 Bldg 1+2 08604 02/09/2009 02/23/2009 03/02/2009 Product Data subittal, final review, and approval Stamp
4696 Student Housing Phase 3 Site 2 East Campus 02/09/2009 02/23/2009 02/09/2009 Product Data For Record Only
4695 Housing Phase 3 Site 2 East Campus 02/09/2009 02/23/2009 02/09/2009 Shop Drawings, for Record Only
4694 EU3 990073 02/09/2009 02/23/2009 02/11/2009 RFI 600 R1 ( See att Ref RFI 600- EH&S 4652)
4693 EU3 990073 02/09/2009 02/23/2009 02/23/2009 RFI 605
4692 Humanities 991077 02/09/2009 02/23/2009 02/23/2009 Rfi 432 RI Roof Door
4691 S&BS 991268 02/06/2009 02/20/2009 02/24/2009 Si #7r1 (Back check) 5th floor changes
4690 S&BS 991268 02/06/2009 02/20/2009 02/18/2009 SI #6 rl User changes to room layout
4689 SCRCB 994038 02/06/2009 02/20/2009 02/25/2009 S.I. Key Utility Plan
4688 SCRCB 994038 02/06/2009 02/20/2009 03/24/2009 CP-5 Fire Access Plan
4687 MSTB- Enviornment Institute 5108196 02/05/2009 02/19/2009 02/25/2009 Plans,100% Review, comments and corrections
4686 Bren Hall 5108259 02/05/2009 02/18/2009 02/23/2009 Plans, Final Review, Approval Stamp
4685 SCRCB 994038 02/04/2009 02/18/2009 04/09/2009 Basis of design
4684 ARROYO VISTA HOUSING REPAIRS GROUP C 5108262 02/04/2009 02/18/2009 02/24/2009 PLANS, 100%REVIEW, MEMO, AND APPROVAL STAMP
4683 BPN & BPS 5108238 02/04/2009 02/18/2009 02/13/2009 Final Review and Approval Stamp
4682 Humanities 991077 02/04/2009 02/18/2009 02/05/2009 RFI 437 Stand Pipes Locations
4681 UCI Student Housing Apartments Phase 3 Site 1 08604 02/03/2009 02/17/2009 02/09/2009 submittal, approval
4680 Law School Library 997085 02/03/2009 02/17/2009 02/09/2009 Paint MSO's
4679 MSTB 5108120/997393B 02/03/2009 02/17/2009 02/13/2009 Plans, Final Review, and approval Stamp
4678 Berkelely Place 5108270 02/02/2009 02/16/2009 02/23/2009 Plans, Pre Review, and Comments and Corrections
4677 Humanities 991077 01/30/2009 02/13/2009 02/11/2009 RFI 426R1 1 hour rated walls south air handler
4676 Humanities 991077 01/30/2009 02/13/2009 02/04/2009 RFI 437 Stand Pipe Roof Locations
4675 Verano Housing Unit 3 996269-01430 01/30/2009 02/13/2009 02/03/2009 Submittal, Final Review
4674 Site 1 & Bldg 2 08604 01/30/2009 02/13/2009 02/03/2009 Plans, specifications, bells, Final Review, approval Stamp
4673 MSTB 5108120 01/29/2009 02/12/2009 02/02/2009 Plans
4672 Social and Behavioral 991268 01/29/2009 02/12/2009 02/04/2009 RFI 126251
4671 Social & Behavioral Sciences 991268 01/28/2009 02/11/2009 02/11/2009 SI 11- Rated Ptn @ Lobbies
4670 Student Housing Phase 3 Site 2 east campus 01/28/2009 02/11/2009 01/28/2009 Shop Drawings comments, and corrections, and approval stamp
4669 Verano Housing Unit 6 996263-01430 01/28/2009 02/11/2009 01/29/2009 Submittal
4668 Student Housing Phase 3 Site 2 East Campus 01/27/2009 02/10/2009 02/10/2009 Shop drawings , comments and corrections, approval stamp
4667 Middle Earth shoer Repair 5108247 01/27/2009 02/10/2009 01/28/2009 Plans, Final Review, and approval Stamp
4666 Social and Behavioral Sciences 991268 01/27/2009 02/10/2009 02/05/2009 RFI #1288 Fire Caulking Req
4665 admin 5th floor admin 5th floor 01/26/2009 02/09/2009 01/26/2009 Plans, as built, For Record Only
4664 Verano Housing Unit 6 996269-01430 01/26/2009 02/09/2009 01/29/2009 Other, final review
4663 BPN 1000 5107957/990509 01/26/2009 02/09/2009 01/26/2009 Final Review, approval stamp
4662 UCI PHASE III SITE 1 08604 01/23/2009 02/06/2009 02/09/2009 SHOP DRAWINGS APPROVAL STAMP
4661 UCI PHASE III SITE 1 08604 01/23/2009 02/06/2009 02/09/2009 RFI & ARCH STRUCTURE DETAIL, FINAL REVIEWS, APPROVAL STAMP
4660 UCI PHASE III SITE 1 08604 01/23/2009 02/06/2009 02/09/2009 PRODUCT DATA SUBMITTAL
4659 Medical Education Bldg 991970 01/23/2009 02/06/2009 02/03/2009 28 311 01A Fire Alarm Resubmittal
4658 Med Ed 991970 01/23/2009 02/06/2009 02/03/2009 216 Valve Height AFT
4657 Med Ed 991970 01/23/2009 02/06/2009 02/03/2009 #215 Sprinklers under stairs
4656 BREN HALL 5108259 01/22/2009 02/05/2009 01/27/2009 PLANS, PRELIMINARY REVIEW, COMMENTS AND CORRECTIONS
4655 EU3 990073 01/22/2009 02/05/2009 02/04/2009 16852 01B
4654 EU3 990073 01/22/2009 02/05/2009 01/26/2009 RFI 604
4653 EU3 990073 01/22/2009 02/05/2009 02/03/2009 RFI 589 WITH CLARIFICATIONS
4652 EU3 990073 01/22/2009 02/05/2009 01/28/2009 RFI: 600
4651 EU3 990073 01/22/2009 02/05/2009 01/26/2009 See Attached email and cover sheet
4650 UCI Ph3 Site 1 Bldg 1 08604 01/22/2009 02/05/2009 02/04/2009 Plans, EH&S Redlines, Calcs, Final Review, comments & corrections, and approval stamp
4649 MSTB 5108120 01/22/2009 02/05/2009 01/27/2009 PLANS, SUBITTLA FOR DEVICES, 100% REVIEW, AND APPROVAL STAMP
4648 Medical Education Bldg 991970 01/21/2009 02/04/2009 02/04/2009 06-0500-2A Firestopping product data w/backcheck #4429
4647 S&BS 991268 01/20/2009 02/03/2009 01/28/2009 1280 2nd preaction control panel location
4646 Social and Behaviroal Sciences 991268 01/20/2009 02/03/2009 02/05/2009 0277-07842 Fire Caulking
4645 Stenhaus Hall 991842 01/20/2009 02/03/2009 01/21/2009 RFI + UL listing for drywall
4644 EU3 990073 01/16/2009 01/30/2009 01/21/2009 RFI 601
4643 BPN & BPS 5108238 01/16/2009 01/30/2009 01/21/2009 100% Review
4642 east campus phase 08604 01/15/2009 01/29/2009 01/26/2009 FOR AARON
4641 student housing phase 3 site 2 community bldg east campus student 01/15/2009 01/29/2009 01/28/2009 prod data, shop swgs and calcuations
4640 Student housing phase 3 Site 2 east campus 01/15/2009 01/29/2009 01/28/2009 Product Data
4639 Site 1 Bldg 2 08064 uci phase 3 01/14/2009 01/28/2009 01/20/2009 Plans, Calc, 100% Review, comments & Corrections, and approval stamp
4638 Humanities 991077 01/14/2009 01/28/2009 01/26/2009 RFI 432 Roof Door
4637 Humanities 991077 01/14/2009 01/28/2009 01/29/2009 426 RFI 1 hr rated walls
4636 Multiples 5086993 01/13/2009 01/27/2009 01/26/2009 Plans, Final, Approval Stamp
4635 EU3 990073 01/13/2009 01/27/2009 02/03/2009 01782-01A O+M MANUAL
4634 Site 3 Parking Structure Site 3 08606 01/09/2009 01/23/2009 01/26/2009 Shop SWG and Calls , 2nd Submittal, Approval Stamp
4633 Social & Behavioral Sciences 991268 01/09/2009 01/23/2009 01/15/2009 274-9265 A Taggle bolts E elevator Shaft
4632 law school library 9907085 01/08/2009 01/22/2009 01/08/2009 100 % CD Review
4631 SCRCB 994038 01/07/2009 01/21/2009 01/21/2009 SI Fire Water Revisions
4630 Berkeley Place South 5108221 01/07/2009 01/21/2009 01/14/2009 Plans,Specifications, EH&S Redlines, Final Review, Approval Stamp
4629 Langson Library 5107917 01/07/2009 01/21/2009 01/07/2009 one Page sketch, approval stamp
4628 Bldg 1 Site 1 08604 Phase 3, Site 01/07/2009 01/21/2009 01/15/2009 Plans, Final Review, approval Stamp
4627 Site 1 East Campus Student Asdpt BLDG -1 08604 01/07/2009 01/21/2009 01/15/2009 Specifications, Final Review, Approval Stamp
4626 Social Behavioral 991268 01/07/2009 01/23/2009 01/09/2009 255-07842 B Fire Caulking Exterior Façade
4625 SSL 1ST Floor Renovation 5108245 01/06/2009 01/21/2009 01/26/2009 Plans, 100% Review, comments and Corrections
4624 Medical Education 991970 01/07/2009 01/21/2009 01/12/2009 G Sheet (G005)
4623 Phase 3 East Camus Parking Structure 08606 site 3 01/06/2009 01/20/2009 01/28/2009 Shop drawings, sample, plans, approval stamp
4622 Med Ed Bldg 991970 01/06/2009 01/20/2009 01/13/2009 21 1000
4621 Medical Ed. Bldg. 991970 01/06/2009 01/20/2009 01/08/2009 Submittal 22 0700.01
4620 Medical Education Bldg. 991970 01/06/2009 01/20/2009 01/14/2009 Submittal 21 1000.02
4619 Law School Library 997085 01/06/2009 01/20/2009 01/06/2009 Re Review of Comments
4618 BPN 1000 5107957 12/23/2008 01/06/2009 01/08/2009 FINAL REVIEW
4617 MSTB 2ND 5108120 12/23/2008 01/06/2009 01/06/2009 SUBMITTAL FINAL REVIEW, & Approval Stamp
4616 UCI EAST CAMPUS STUDENT HOUSING PHASE 3 SITE 2 BLDG 22& COMMUNITY BULIDING null 12/19/2008 01/02/2009 01/05/2009 PRODUCT DATA, SHOP DRAWING AND CALCUATION
4615 UCI EAST CAMPUS STUDENT HOUSING PH 3 SITE 2 null 12/19/2008 01/02/2009 01/05/2009 PRODUCT DATA, APPROVAL STAMP
4614 UCI SITE 1 EAST CAMPUS STUDENT 08604 12/19/2008 01/02/2009 12/19/2008 PLANS, EH&S REDLINES, NARRATIVE AS IS, 100% REVIEW, COMMENTS & CORRECTIONS, APPROVAL STAMP
4613 S&BS 991268 12/19/2008 01/02/2009 01/09/2009 S.I #7 5th floor changes
4612 S&BS 991268 12/19/2008 01/02/2009 01/07/2009 S>I #6 I=User Changes to room layout
4611 S&BS 991268 12/19/2008 01/02/2009 01/15/2009 0266-13915-A Fire Suppression 5th floor
4610 S&BS 991268 12/19/2008 01/02/2009 01/26/2009 0265-13935-A Fire Suppression
4609 EU3 990073 12/19/2008 01/02/2009 01/13/2009 RFI 591-
4608 EU3 990073 12/19/2008 01/02/2009 01/13/2009 RFI 589
4607 Law Schoot Library 997085 12/19/2008 01/02/2009 12/22/2008 1st and 2nd floor, g-001 and g-002
4606 SCRCB 994038 12/18/2008 01/01/2009 01/29/2009 Progress Set of CD-3
4605 Medical Education Bldg. 991970 12/17/2008 12/31/2008 01/08/2009 ASI #3
4604 East Campus Student apt Site 1 08604 12/16/2008 12/30/2008 01/05/2009 Plans, EH&S Redlines, 100% Review, and Approval Stamp
4603 East Campus Student Apts 08604 Site 1 12/16/2008 12/30/2008 01/05/2009 Specifications, EH&S Redlines, 100% Review and approval stamp
4602 East Campus Student Apts 08604 Site 1 12/16/2008 12/30/2008 01/05/2009 Product Data, Final Review, Approval Stamp
4601 New Modular Units, Parking Lot 16 5108044 12/16/2008 12/30/2008 01/08/2009 Final Review and Approval Stamp
4600 Medical Education Bldg 991970 12/16/2008 12/30/2008 01/06/2009 Submittal- door Hardware 08711.01 B
4599 Arts Building 991072 12/15/2008 12/29/2008 01/06/2009 Submittal: Finish Hardware
4598 Berkeley Place South 5108221 12/15/2008 12/29/2008   Plans, Specification, 100 % Review, Comments and Corrections, Approval Stamp
4597 Croul Hall 5108263 12/10/2008 12/24/2008 12/16/2008 Plans, Final Review, and Approval Stamp
4596 EU3 990073 12/12/2008 12/26/2008 12/19/2008 RFI 585
4595 Modular Building Parking Lt 6 5108044 12/11/2008 12/25/2008 12/12/2008 Final Review, Approval Stamp
4594 ARTS BUILDING 991972 12/11/2008 12/25/2008 12/16/2008 HANGERS &SUPPORTS
4593 ARTS BUILDING 991072 12/11/2008 12/25/2008 12/22/2008 RFI, DRAIN @ ELECTRICAL ENCLOSED
4592 EU3 990073 12/11/2008 12/25/2008 12/19/2008 RFI 574
4591 Stem Cell 994038 12/10/2008 12/24/2008 12/10/2008 For Records only
4590 Medical Education Bldg 991976 12/10/2008 12/24/2008 12/16/2008 189 class III stand pipes
4589 Bonney Center 5108095 12/09/2008 12/23/2008 12/18/2008 Plans, specifications, eh&s redlines, review, approval stamp
4588 Arroyo Vista Housing Repairs Group C 5108262 12/05/2008 12/19/2008 12/22/2008 Plans, Review, & Approval Stamp
4587 Student Health 5089114 12/05/2008 12/19/2008 12/09/2008 Plans, Other, 100% review, Approval stamp
4586 EU3 990073 12/05/2008 12/19/2008 12/19/2008 Submittal: 07841 OIC - Firestopping
4585 Stemcell Research Bldg 994038 12/04/2008 12/18/2008 12/19/2008 Info : Location of bagged fire hydrants
4584 Social and Behavioral Sciences 991268 12/04/2008 12/18/2008 12/10/2008 Confirming Verbal Approval #1265
4583 Social and Behavioral Sciences 991268 12/04/2008 12/18/2008 12/22/2008 0255-07842-A Fire caulk and exterior
4582 Student Housing Ph3 Site 2 East Campus 12/04/2008 12/18/2008 01/13/2009 Submittal, shop drawgs, calcs, final review, approval stamp
4581 Student Housing Ph3 Site 2 East Campus 12/04/2008 12/18/2008 12/12/2008 Shop dwgs & calcs, final review , and approval stamp
4580 UCI Phase III- Site 1-Bldg. 08604 East Campus 12/04/2008 12/18/2008 12/16/2008 Shop drawings, final review, comments & corrections and apporval stamp
4579 Site 1 Phase III East Campus 12/04/2008 12/18/2008 12/04/2008 for record only
4578 Aldrich Hall 5093015 12/04/2008 12/18/2008 12/04/2008 Plans, specificationks submittals, final review and approval stamp
4577 Mesa office/ Mesa Arts 5108030 12/04/2008 12/18/2008 12/04/2008 Plans, specifications, submittals, final review and approval stamp
4576 Site 3 Parking Structure 08606 East Campus 12/03/2008 12/17/2008 01/05/2009 Plans, Resubmittal, approval Stamp
4575 EU3 990073 12/03/2008 12/17/2008 12/19/2008 RFI 544
4574 Site 2 Community Bldg 08605 East Campus 12/02/2008 12/16/2008 12/16/2008 Shop Drawings, comments and corrections, approval stamp
4573 Site 1 , A-1, A2, 1-B. Bldg.2 08604 East Campus 12/02/2008 12/16/2008 12/16/2008 Shop Drawings, Comments & Corrections, Approval Stamp
4572 Phase III Site 1 Student Apts East Campus 12/02/2008 12/16/2008 12/03/2008 Plans, Calcs, Comments and Corrections, and Approval Stamp 1st submittal
4571 ARTS BLDG 991072 12/01/2008 12/15/2008 12/22/2008 07-8100-02 APPLIED FIREPROOFING & PRODUCT DATA SHOP DWGS
4570 LAW SCHOOL LIBRARY 997085 12/01/2008 12/15/2008 12/11/2008 G-001 - G-002
4569 EU3 990073 12/01/2008 12/15/2008 12/11/2008 RFI 550
4568 EU3 990073 11/26/2008 12/10/2008 12/19/2008 RFI 546
4567 Eu3 990073 11/26/2008 12/10/2008 12/10/2008 RFI 566
4566 Croul Hall 5108263 11/26/2008 12/10/2008 12/03/2008 Plans, 100% Review, Comments and corrections, Approval Stamp
4565 STUDENT APS SITE 1 08604 EAST CAMPUS 11/25/2008 12/09/2008 11/25/2008 PRODUCT DATA FOR RECORD ONLY
4564 STUDENT APTS SITE 1 08604 EAST CAMPUS 11/25/2008 12/09/2008 12/03/2008 PRODUCT DATA, FINAL REVIEW, COMMENTS AND CORRECTIONS
4563 S&BS 991268 11/25/2008 12/09/2008 11/25/2008 G-Sheets
4562 S & BS 991268 11/25/2008 12/09/2008 11/25/2008 G sheets review (resubmittal)
4561 social behavioral 991077 11/25/2008 12/09/2008 11/25/2008 RFI 1262
4560 SCRCB 994038 11/25/2008 12/09/2008 11/25/2008 CP2-A, 027A-D1-3310
4559 UCI East Campus 08604- Site 1 11/24/2008 12/08/2008 11/26/2008 Plans, hydraulic calcs, comments and corrections, approval stamp
4558 East Campus Student Housing 08604 Site 1 11/24/2008 12/08/2008 12/03/2008 Plans, preliminary review, comments and corrections
4557 Mesa C Arts Bldg. 991072 11/24/2008 12/08/2008 11/24/2008 DP-4 FINAL CONFORMED DWG SETS 1 1/2 & 1 FULL- For Record Only
4556 Verano Bldg 5108199 11/24/2008 12/08/2008 12/03/2008 Plans, 100% Review, Final Review, and Approval Stamp
4555 Bonney center 5108095 11/21/2008 12/05/2008 11/25/2008 plans, re review, and comments and corrections
4554 Arts Building 991072 11/20/2008 12/04/2008 11/20/2008 P. 502 Correction Back Check
4553 SCRCB 994038 11/20/2008 12/04/2008 11/24/2008 CP2-A 027A-D1 1310
4552 Bio Sci 3 991835 11/19/2008 11/19/2008 11/19/2008 For Record Only BSL3 Commissioning Report - For Records Only
4551 RFI 551 990073 11/19/2008 12/03/2008 11/25/2008 RFI 551
4550 EU3 990073 11/19/2008 12/03/2007 11/25/2008 RFI 547
4549 Arts Building 991072 11/19/2008 12/03/2008 11/24/2008 No 26 3213.01 Engine Generator Product Data
4548 Student Housing Ph 3 Site 2 East Campus 11/18/2008 12/02/2008 11/26/2008 Shop Drawings and Calcs, Final Review, Approval Stamp
4547 Humanites Gateway 99107B 11/18/2008 12/02/2008 11/27/2008 Specifications, finals Review a
4546 Student Housing Phase 3 East Campus 11/17/2008 12/01/2008 12/03/2008 Product Data, Shop Dug, and Calculations Comments, and corrections, and Approval Stamp
4545 Law School Library 997085 11/17/2008 12/01/2008 11/24/2008 G-001, G-002
4544 EU3 990073 11/17/2008 12/01/2008 11/17/2008 Won door shop DWGS 08370 01E (08370 03C)
4543 EU3 990073 11/17/2008 12/01/2008 11/17/2008 14210.03D
4542 EU3 990073 11/17/2008 12/01/2008 11/17/2008 16770 1C
4538 MSTB 5108196 11/17/2008 12/01/2008 11/18/2008 Plans
4537 eu3 990073 11/17/2008 12/01/2008 11/24/2008 RFI 557
4536 EU3 990073 11/17/2008 12/01/2008 11/17/2008 RFI 517 R2-RE DCFM # 4488 IN REVIEW
4535 Arts Bldg. 991072 11/17/2008 12/01/2008 11/17/2008 100% Corrected CD
4534 EU3 990073 11/14/2008 11/28/2008 11/17/2008 rfI 545
4533 parking lot 16 5168044 11/14/2008 11/28/2008 11/14/2008 Final Review and Approval Stamp
4532 SCRCB 994038 11/13/2008 11/27/2008 11/14/2008 CP-2A STRUCTURE SHEETS
4531 MSTB TRAINING ROOM 112 5108022 11/13/2008 11/27/2008 11/14/2008 PLANS, FINAL REVIEW, APPROVAL STAMP
4530 Medical Edu Bldg. 991970 11/13/2008 11/27/2008 11/25/2008 #21-1000-01 Water Based Fire Suppression
4529 S&BS 5th floor TI 991268 11/13/2008 11/27/2008 11/20/2008 G sheet review( 5th floor build Out)
4528 Humanites 991077 11/13/2008 11/27/2008 11/13/2008 RFI 374
4527 SCRC 994038 11/13/2008 11/27/2008 11/24/2008 Fence Revision/Temp Access for OCFA
4526 ARC Expansion 990096 11/14/2008 11/28/2008 11/17/2008 #10431.85E Bldg Evac Signa W/Backcheck #4490
4525 Site 3 Parking Gargage East Campus Ph III 11/13/2008 11/27/2008 11/13/2008 Submittal Pending approval, Approval Stamp
4524 MSTB 5108120 11/13/2008 11/27/2008 11/14/2008 PLANS, 80% REVIEW, AND COMMENTS AND CORRECTIONS
4523 Medical Ed Bldg 991970 11/12/2008 11/26/2008 11/17/2008 Rfi 168 analysis for fire sprinklers
4522 BPN / 1000 5107957 11/12/2008 11/26/2008 11/14/2008 100% Review
4521 RFI 534 990073 11/10/2008 11/24/2008 11/17/2008 Rfi 534
4520 SCRC 994038 11/10/2008 11/24/2008 11/10/2008 SWPP Plan? FRO ATTN Dick Sun
4519 Rowland Hall 19664 ( CAP)?? 11/10/2008 11/24/2008 11/17/2008 Evac map, Final Review,
4518 Student Housing Phase 3 Site 2 East Campus 11/07/2008 11/21/2008 11/26/2008 Submittal shop drawings and calcuations
4517 Humanities Gateway 99107B 11/07/2008 11/21/2008 11/14/2008 Specifications
4516 Irvine Hall 5107906 11/06/2008 11/20/2008 11/12/2008 Plans, 100 Review, comments and Corrections
4515 Cross Cultural Center 5108085 11/06/2008 11/20/2008 11/06/2008 Plans, Specification, Final Review and approval Stamp
4514 EU3 990073 11/06/2008 11/20/2008 11/17/2008 RFI 378R2
4513 Parking Lot 16 5108044 11/05/2008 11/19/2008 11/06/2008 Final Review
4512 Berkeley Place 5108221 11/05/2008 11/19/2008 11/23/2008 Smoke barrier for elevators as discussed, final review, and approval stamp
4511 Social & Behavioral 991268 11/05/2008 11/19/2008 11/05/2008 5th floor TI ( GISO A-151,A-152)
4510 East Campus Site 1 08604 11/04/2008 11/18/2008 11/06/2008 Submittal 1-011-13900-1
4509 Phase 3 Student Apt Site2 08605 11/04/2008 11/18/2008 11/14/2008 Submittal and Approval Stamp
4508 SCRCB 994038 11/04/2008 11/18/2008 11/04/2008 CP-1 Rev1 0015A-01-3310
4507 SCRCB 994038 11/04/2008 11/18/2008 11/04/2008 003-B 01.5000 " G-Sheets"
4506 EU3 990073 11/04/2008 11/18/2008 11/17/2008 RFI 400 R1
4505 Medical Education Bdg 991970 11/03/2008 11/17/2008 11/17/2008 ASI #004-28-3111, Addressable fire alarm spec
4504 Arroyo Vista Group B 1060/1062 5105825 11/03/2008 11/17/2008 11/04/2008 Plans, FA submitall , Other. Approval Stamp
4503 SCRC 994038 10/31/2008 11/14/2008 11/13/2008 Other: Fence plan revision
4502 Bio Sci 3 Bldg 991835 10/31/2008 11/14/2008 11/12/2008 Submittal: #625-01810-B BSL3 Functional Performance test review
4501 Student Housing Phase 3 Site2 East Campus Student 10/30/2008 11/13/2008 11/20/2008 Fire Sprinklers
4500 East Campus Ph3 Site 1 08604 10/30/2008 11/12/2008 11/13/2008 Plans, Hydraulic calcs, comments & corrections, approval stamp
4498 EU3 990073 10/29/2008 11/12/2008 11/13/2008 166701B
4497 EU3 990073 10/29/2008 11/12/2008 11/12/2008 16770 02A
4496 EU3 990073 10/29/2008 11/12/2008 11/07/2008 RFI 528
4495 EU3 990073 10/29/2008 11/12/2008 11/12/2008 16852 01B
4494 Middle Earth Shower Repair 5108247 10/29/2008 11/12/2008 11/04/2008 Plans, courtesy review
4493 Arroyo Vista Group B 1060/1062 5105825 10/28/2008 11/11/2008 10/28/2008 Plans, fa Submittal Stamped Set Please expediate project fa contactor is scheduled to install on 10/29/2008
4492 Medical Education Bldg. 991970 10/28/2008 11/11/2008 11/07/2008 ASI #4 28.3111-Addressable Fire Alarm
4491 Parking Lot 16 5108044 10/28/2008 11/11/2008 11/10/2008 Final Review
4490 Arc Expansion 990096 10/21/2008 11/04/2008 10/29/2008 10431.85.D BLDG Evacuation Signs
4489 EU3 990073 10/24/2008 11/07/2008 11/06/2008 14210 O/C
4488 EU3 990073 10/24/2008 11/07/2008 11/17/2008 RFI 517
4487 Modular Buildings 5108044 10/23/2008 11/06/2008 10/29/2008 100% Review
4485 EU3 990073 10/23/2008 11/06/2008 10/29/2008 Won Door Shop DWGS 083870.01; 08370 03B
4484 EU3 990073 10/23/2008 11/06/2008 10/30/2008 RFI 465
4483 Social & Behavioral Sciences 991268 10/23/2008 11/06/2008 10/30/2008 0218-07842- Fire Reist. Joint Systems
4482 Humanites 991077 10/23/2008 11/06/2008 10/30/2008 07842.01A Fire Resistant Joint System
4481 Humanities 991077 10/23/2008 11/06/2008 11/06/2008 09265.01.b Wall Assemblies Prod Data
4480 Humanities 991077 10/23/2008 11/06/2008 10/29/2008 08347.01.A smoke Containment
4479 Rowland Hall Tenent Improvements 990120 10/23/2008 11/06/2008 10/23/2008 for Record onlyFinal Constructions Set As Built
4478 Humanities 991077 10/23/2008 11/06/2008 10/30/2008 09250.01.B Gypsum board Prod Data
4477 EU3 990073 10/23/2008 11/06/2008 11/04/2008 RFI 400- Resubmit per con with aaron and hpcc
4476 EU3 990073 10/23/2008 11/06/2008 11/07/2008 RFI 378R2 Stair Power Data
4475 Social and Behavioral Sciences 991268 10/23/2008 10/06/2008 10/23/2008 CD #5 DWG and Supplemental Inst#5 Conformed
4474 SCRCB 994038 10/22/2008 11/05/2008 10/28/2008 0015-A-01.3310 (cp-1)
4473 engineering department eg 2100 10/22/2008 11/05/2008 10/28/2008 PLANS
4472 UCI EAST CAMPUS Site 1 Building 2 08604 10/21/2008 11/04/2008 11/04/2008 plans, calculations, and first submission
4471 Social and Behavioral Sciences 991268 10/21/2008 11/04/2008 10/29/2008 Supplemental insturecitons # 4R-1
4470 EU3 990073 10/21/2008 11/04/2008 10/30/2008 08370 01C
4469 EU3 990073 10/21/2008 11/04/2008 10/28/2008 417 R2
4468 Medical Education Bldg. 991970 10/17/2008 10/31/2008 10/28/2008 08-7111-01A Door Hardware schedule resubmittal
4467 Arts Building 991072 10/17/2008 10/31/2008 10/30/2008 100% Specifications
4466 Student Housing Phase III/Pool East Campus 10/16/2008 10/30/2008 10/22/2008 Plans
4465 Medical Education Bldg 991970 10/16/2008 10/30/2008 10/20/2008 01 3150 03 Fire Sprinkler cod dwgs for 2 3 floors
4464 Modular Units 990510 10/16/2008 10/30/2008 10/21/2008 Specifications
4463 SCRCB 994038 10/16/2008 10/30/2008 10/21/2008 NOI SWPPP REVIEWED BY OUTSIDE CONSULTANT
4462 Arts Building 991072 10/16/2008 10/30/2008 10/28/2008 ESP#2 Delta 3 Revisions, Site electrical
4461 Art Building 991072 10/16/2008 10/30/2008 11/03/2008 100% CD Drawings
4460 STUDENT HEALTH 5089114 10/15/2008 10/29/2008 10/21/2008 PLANS, FA SUBMITTAL 100 % REVIEW , APPROVAL STAMP ,PROJECT MUST BE CONSTRUCTED IN PHASESPM INCLUDE PRIOR APPROVED SET OF DRAWINGS 06/23/2008
4459 eng tower 5107980 10/15/2008 10/29/2008 10/21/2008 plans phase I&II, 100% review, and comments and corrections
4458 EU3 990073 10/14/2008 10/28/2008 10/23/2008 08311 01A Standpipe access panel product data
4457 Site 3 Parking garage East Campus III 10/13/2008 10/27/2008 10/21/2008 Submittal
4456 Site 3 Parking Garage East Campus III 10/13/2008 10/27/2008 10/13/2008 Approved civil drawings
4455 Phase 3 Site 2 East Campus 10/13/2008 10/27/2008 10/13/2008 For Record Only
4454 Site 1 08604 Students Apartments EAST CAMPUs III 10/13/2008 10/27/2008 10/13/2008 Approved civil Drawings
4453 HUMANITIES 991077 10/10/2008 10/24/2008 10/22/2008 RFI 302 B LINE WALL RATING
4452 EU3 990073 10/10/2008 10/24/2008 10/22/2008 08120 OLD FIRE RATED ALL FRAMES, PART 08120 01C INC FORF
4451 SCRCB 994038 10/10/2008 10/24/2008 11/05/2008 007A-23,0500 LAB EXHAUST SYSTEM
4450 STEM CELL RESEARCH CENTER 994038 10/10/2008 10/24/2008 11/04/2008 BACK OF DESIGN FOR LAB EXHAUST
4449 ACADEMIC SENATE 5108159 10/10/2008 10/24/2008 10/21/2008 PLANS, SPECIFICATIONS, EH&S REDLINES, FINAL REVIEW, AND APPROVAL STAMP
4448 EU3 990073 10/09/2008 10/23/2008 10/22/2008 RFI 400 RESUBMITTED WITH CORRECTONS
4447 EU3 990073 10/09/2008 10/23/2008 10/14/2008 16770 01B SECURITY SYSTEM SHOP DWGS ( A" VERSION INC FOR REF ONLY
4446 EU3 990073 10/09/2008 10/23/2008 10/22/2008 RFI 420 R2 L3 BEAM FIX STL FIREPROOFING
4445 BERKELEY PLACE 5108008 10/09/2008 10/23/2008 10/09/2008 PLANS, FINAL REVIEW AND APPROVAL STAMP
4444 eng gateway eg2100 10/09/2008 10/23/2008 10/16/2008 plans, 100 review
4443 EU3 990073 10/09/2008 10/23/2008 10/14/2008 RFI 507
4442 EU3 990073 10/09/2008 10/23/2008 10/22/2008 08120 01D
4441 Cross Cultural Center 991268 10/08/2008 10/22/2008 10/20/2008 Plans, Specificaton, 80% Review , Comments and Corrections
4440 SOCIAL AND BEHAVIORAL SCIENCES 991268 10/08/2008 10/22/2008 10/14/2008 SUPPLEMENTAL INSTUCTION #5
4439 EU3 990073 10/08/2008 10/22/2008 10/13/2008 KIOSK CONSTRUCTION DWG SET. PREVIOUSLY REVIEWD W/ CLARIFICATION ON FUTURE EQUIPMENT
4438 Social and Behavioral Sciences 991268 10/08/2008 10/22/2008 10/09/2008 CDS CIVIL LANDSCAPE PLAN FOR SIGN OFF
4437 MTSB 5108120 10/08/2008 10/22/2008 10/16/2008 Plans, Final Review, and Approval Stamp
4436 EU3 990073 10/07/2008 10/21/2008 10/14/2008 FA SET( ORIG) STAMPED 8-4, MECH REF SET STAMPED 5-5-08
4435 HUMANITIES 991077 10/07/2008 10/21/2008 10/09/2008 13915.02 B FIRE SPRINKLER
4434 ALBERTO 990073 10/07/2008 10/21/2008 10/09/2008 RFI 486
4433 EU3 990073 10/07/2008 10/21/2008 10/14/2008 RFI 417R1
4432 ADMIN RM 115J 5093015 10/07/2008 10/21/2008 10/07/2008 Plans, Final review and Stamp
4431 MSTB 5108120 10/07/2008 10/21/2008 10/07/2008 Plans, Final Review
4430 Modular Units 990510 10/06/2008 10/20/2008 10/09/2008 Fianl Review
4429 Medical Education Bldg 991970 10/06/2008 10/20/2008 10/09/2008 #26-0500-02 firestopping product data
4428 EU3 990073 10/03/2008 10/17/2008 10/06/2008 RFI 498
4427 Berkeley Place 3200 5108008 10/01/2008 10/15/2008 10/02/2008 Plans, Fnal Review, and Approval Stamp
4426 Med surge 1 : Fire Sprinkler Install 5057413 09/30/2008 10/14/2008 09/30/2008 Plans, final Review, and approval Stamp
4425 EU3 990073 09/30/2008 09/30/2008 09/30/2008 TEMP PLAN FOR EVENT ( REVISED)
4424 student apartments phase 3 site 2 uci east campus 09/29/2008 10/13/2008 09/30/2008 phase 3 site 2
4423 SCRCB 994038 09/29/2008 10/13/2008 09/29/2008 001B-01 5000 FENCING PLAN + ORIGINAL
4422 PARKING STRUCTURE EAST CAMPUS PH III 09/29/2008 10/13/2008 10/01/2008 APPROVED SUBMITTALS,
4421 Berkeley Place 5108008 09/26/2008 10/10/2008 10/02/2008 plans, final review and approval stamp
4420 Mesa Court Housing 52108155 09/25/2008 10/09/2008 09/25/2008 Final review and Approval Stamp
4419 Modular Buildings 5108044 09/24/2008 10/08/2008 09/29/2008 Final Review
4418 EAST CAMPUS III PARKING GARAGE EAST CAMPUS 09/24/2008 10/08/2008 10/02/2008 APPROVED SUBMITTALS, ALL RFI RESPONSES TO DATE
4417 UCI EAST CAMPUS PHASE III, PARKING GARAGE PARKING GARAGE 09/24/2008 10/08/2008 09/24/2008 FOR RECORD ONLY
4416 EU3 990073 09/24/2008 10/08/2008 10/01/2008 RFI 420 BEAM FIX FIRE PROOFING( SEE RFI 420 FOR REF)
4415 EU3 990073 09/23/2008 10/07/2008 10/02/2008 RFI 378R1- AARON SEE OTHER SUBMITTAL
4414 Wet Utility Submittal null 09/23/2008 10/07/2008 09/23/2008 INFO ONLY
4413 UCI Phase 3 Site 1 null 09/23/2008 10/07/2008 09/23/2008 INFO ONLY
4412 EU3 990073 09/22/2008 10/06/2008 09/30/2008 08370 03A WON-DOOR COVER DOOR
4411 EU3 990073 09/22/2008 10/06/2008 10/02/2008 RFI 422
4410 Stemcell Research Bldg ( SCRCB) 994038 09/22/2008 10/06/2008 09/24/2008 001-5000A Fencing Plan
4409 Humanities 991077 09/22/2008 10/06/2008 09/22/2008 Stamped Drawing Fire Suppresion- For Record Only
4408 Arts Building 991072 09/19/2008 10/03/2008 09/24/2008 ESP-2 Sheet A-432, transformer enclosure
4407 Humanities 991077 09/18/2008 10/02/2008 09/23/2008 FRI 273 fire extinguisher
4406 EU3 990073 09/18/2008 10/02/2008 10/02/2008 RFI 378R1
4405 Berkeley Place 5108008 09/18/2008 10/02/2008 09/19/2008 Plans
4404 EU3 990073 09/18/2008 10/02/2008 09/30/2008 08120 O/C ( PREVIOUS REVIEW ATT FOR REF)
4403 EU3 990073 09/18/2008 10/02/2008 09/23/2008 07841 02B
4402 SCRCB 994038 09/17/2008 10/01/2008 09/26/2008 G-SHEETS, FIRE/LIFE SAFETY( PRELIM REVIEW)
4401 Berkley Place 3rd floor: Academic Senate 5108159 09/16/2008 09/30/2008 09/30/2008 Plans
4400 Irvine Hall 5107906 09/16/2008 09/30/2008 09/16/2008 Plans and Final Review
4399 EU3 990073 09/16/2008 09/30/2008 09/23/2008 RFI 400
4398 SOCIAL AND BEHAVIORAL SERVICES 991268 09/15/2008 09/29/2008 09/15/2008 FIRE ALARM AND FIRE SUPRESSION DWG'S
4397 EU3 990073 09/15/2008 09/29/2008 10/02/2008 KIOSK CONSTRUCTION, DWG SET FOR REVIEW/APPROVAL
4396 Berkeley Place Remodel 3200 5108008 09/12/2008 09/26/2008 09/18/2008 Plans,and Devices
4395 Arts 991072 09/11/2008 09/25/2008 09/16/2008 ESP #2 Delta 3 Revisions, site Electrical
4394 Social and Behavioral Science 991268 09/11/2008 09/25/2008 09/11/2008 1-Set originals and 1 set bfm back check
4393 BPN 1000 5107957 09/10/2008 09/24/2008 09/10/2008 Approval Stamp
4392 Med Surge 1 5057413 09/09/2008 09/23/2008 09/15/2008 Plans, specifications, final Review
4391 Verano Housing Unit 6 5065021 09/09/2008 09/23/2008 09/09/2008 Plans,
4390 EU3 990073 09/09/2009 09/23/2009 09/10/2009 RFI: RFI 318
4389 Social and Behavioral Sciences 9911268 09/08/2008 09/22/2008 09/16/2008 Interior Partition types- Supplemental Instructions
4388 Arts 991072 09/08/2008 09/22/2008 09/08/2008 ESP-1 G-Sheet Review (g-101)
4387 UCI PHASE III, SITE 3 PARKING STRUCTURE 08606 09/05/2008 09/19/2008 10/09/2008 ADDENDUM, WATER SYSTEM ANALYSTS, FINAL REVIEW
4386 EU3 990073 09/05/2008 09/19/2008 09/11/2008 RFI 425
4385 EU3 990073 09/05/2008 09/19/2008 09/16/2008 RFI 438
4384 EU3 990073 09/05/2008 09/19/2008 09/10/2008 RFI 449
4383 EU3 990073 09/05/2008 09/19/2008 09/16/2008 10536 01A KIOSK SUNSHADE COVER
4382 EU3 990073 09/05/2008 09/19/2008 09/16/2008 16852 01A, FIRE ALARM PRODUCT DATA
4381 EU3 990073 09/05/2008 09/19/2008 09/10/2008 07841-03H EJ AJ2312
4380 Humanities 991777 09/08/2008 09/22/2008 09/11/2008 13915.02 B Fire Sprinkler Piping
4379 Telemedicine 991970 09/04/2008 09/18/2008 09/16/2008 28 3111.01 Digital Accessable Fire Alarm System
4378 UCI Phase III East Campus Student Housing -Lot 2 08605 09/04/2008 09/18/2008 09/04/2008 Site Access, gate location exhibits, submitted for review per your request
4377 UCI Student Housing E. Campus Student Housing Lot 1 08604 09/04/2008 09/18/2008 09/04/2008 Site Access Gate location exhibit,, submitted for review per hour request
4376 UCI Phase III East Campus Student Housing Site 3 08606 09/04/2008 09/18/2008 09/04/2008 Site Access Gate location Exhibits, submitted for review per your request
4375 UCI Phase III East Campus Student Housing Site 2 08605 09/04/2008 09/04/2008 09/04/2008 Site Access Gate location Exhibits, submitted for review per your request
4374 UCI PHASE III E.CAMPUS STUDENT HOUSING SITE 1 08604 09/04/2008 09/18/2008 09/04/2008 Site access, gate location Exhibits, submitted for your review per your request
4373 Parking Lot 16 5408044 09/03/2008 09/17/2008 09/04/2008 Approval stamp
4372 Telemed Education BLDG 991970 09/02/2008 09/16/2008 09/02/2008 Construction Staging Site Access Plan, Stamped
4371 Newkirk Pavallion Elevator 990050 E 09/02/2008 09/16/2008 09/02/2008 For Record Only
4370 Social and Behavioral Sciences 991268 09/02/2008 09/16/2008 09/11/2008 Fire Stopping Electrical
4369 Social and Behavioral Sciences 991268 09/02/2008 09/16/2008 09/10/2008 Fire Stopping Mechancial
4368 East Campus SH Phase 3 Site 2 08-606 09/02/2008 09/16/2008 09/04/2008 Site Staging Logistics and hydrant location, final review,
4367 East Campus SH Phase 3 Site 2 08-605 09/02/2008 09/16/2008 09/04/2008 Site Staging, logistics and hydrant location, final review, and submitted for EH&S request
4366 East Campus SH Phase 3 Site 1 08-604 09/02/2008 09/16/2008 09/04/2008 Site Staging, logistics and hydrant location, final review, submitted per EH&S request
4365 Berkeley Place North 1000 Law School Dean Suite 5107957 09/02/2008 09/16/2008 09/02/2008 Plans, 100% Review and comments and Corrections
4364 Medical Education 991970 09/02/2008 09/16/2008 09/02/2008 OCFA site access plan
4363 Telemedicine 991970 08/29/2008 09/12/2008 09/16/2008 Fire Sprinkler System
4362 Photovoctaic System Installation Natural Science 1 08/28/2008 09/11/2008 08/28/2008 Plans, Cal Fire Doc
4361 EU3 990073 08/27/2008 09/10/2008 09/03/2008 07841 02B FIRE STOPPING PD UL W-L 8050 ( SEE REF) COPY
4360 EU3 990073 08/27/2008 09/10/2008 09/03/2008 RFI 420 L3 BEAM FIX FIREPROOFING
4359 BPS 3500 5108041 08/27/2008 09/10/2008 08/28/2008 Approval Stamp
4358 Parking Lot 16; Modulars 5108044 08/27/2008 09/10/2008 08/28/2008 Final Review + Approval Stamp
4357 EU3 990073 08/27/2008 09/10/2008 09/03/2008 SUBMITTAL: 08370 01B WON DOOR SHOP DWGS
4356 EU3 990073 08/27/2008 09/10/2008 09/03/2008 RFI 436
4355 EU3 990073 08/27/2008 09/10/2008 09/03/2008 RFI 417 FIREPROOFING 2ND FLOOR DECK
4354 Arts Bldg. 991072 08/25/2008 09/08/2008 09/10/2008 Revise stamped "G: Sheets, (Previous set for Ref). For approval /stamp
4353 EU3 990073 08/25/2008 09/08/2008 08/27/2008 RFI 8121 01B, Fire Rated Aluminum Frames
4352 EU3 990073 08/25/2008 09/08/2008 08/26/2008 Rfi 434 Ele. Push Button Loc.
4351 Law Library 997085 08/21/2008 09/04/2008 09/03/2008 DWG and comments Review
4350 Humanities 991077 08/21/2008 09/04/2008 09/16/2008 Other: Fire Suppression
4349 MSTB 5108120 08/21/2008 09/04/2008 09/10/2008 Plans, preliminary review,
4348 Social & Behavioral Sciences 991268 08/20/2008 09/03/2008 09/10/2008 Submittal: 0911-013320-A CD-4; Fire Alarm
4347 Student Services I/II 510811 08/19/2008 09/02/2008 08/19/2008 Plans, spec, final review and approval stamp
4346 Parking Structures A&B Uci Site 3 08/07/2008 08/21/2008 08/07/2008 Plans,Final Review, comments and corrections and approval stamp
4345 Parking Lots A&B Uci Site 3 08/07/2008 08/07/2008 08/07/2008 Plans, Final Review, For Record Only
4344 Social and Behavioral Sciences 991268 08/18/2008 09/01/2008 08/19/2008 Submittal: 0195-09220-A Urgent!!!
4343 Site 1+2 Spec only E.Campus Phas III 08/18/2008 09/01/2008 08/18/2008 Specifications, Other
4342 Social and Behavioral Sciences 991268 08/15/2008 08/29/2008 08/27/2008 Alternate Means of Eval. 2 sets fo Drawings & Calcs are provided
4341 Medical Education Buidling 991970 08/15/2008 08/29/2008 08/18/2008 OCFA Site Access Plan
4340 Student Services I/II 5108111 08/14/2008 08/28/2008 08/22/2008 Plans, Specifications, Final Review, + Approval Stamp
4339 Site 2 East Campus Phase II 08/14/2008 08/28/2008 08/18/2008 Plans, Landscape only, EH&S Redlines, Fianl Review
4338 Site 1 East Campus Phase 08/14/2008 08/27/2008 08/18/2008 Plans Landscape only, EH&S Redlines, Final Review
4337 Medical Education Bldg. 991975 08/14/2008 08/28/2008 08/14/2008 Submittla, Project Specs
4336 Irvine Hall 5107906 08/14/2008 08/28/2008 08/19/2008 Plans, Pre Review, Comments and Comments
4335 Site 1 + 2 Specifications Only East Campus Phase II 08/13/2008 08/27/2008 08/19/2008 Specifications
4334 Befkeley PlaceNorth Law School 5107957 08/12/2008 08/26/2008 08/19/2008 Plans, specifications, 100% review , Comments and corrections
4333 Site 2 East Campus III 08/12/2008 08/25/2008 08/12/2008 For Record Only
4332 Site1 East Campus 08/12/2008 08/25/2008 08/12/2008 Plans, EH&S redlines, Fianl Review
4331 Site 2 East Campus 08/12/2008 08/25/2008 08/12/2008 East Campus Phase III
4330 Site 1 East Campus 08/12/2008 08/25/2008 08/18/2008 Plans, EH&S Redlines, Final Review
4329 Humanities 991077 08/12/2008 08/25/2008 08/15/2008 DSA Comments
4328 EU3 990073 08/12/2008 08/26/2008 08/18/2008 RFI 395
4327 Arc EXP 990096 08/11/2008 08/25/2008 08/12/2008 Submittal: Evacuation Signs- Re Review
4326 Arts Building 991072 08/11/2008 08/25/2008 08/14/2008 Other: ESP #01: G-001-G-005+ G101, G105
4325 Medical Ed. Bldg 991970 08/11/2008 08/25/2008 08/11/2008 Submittal : OCFA Fence Plan
4324 PHASE 3 UCI STUDENT HOUSING 08/08/2008 08/22/2008 08/08/2008 For Record Only
4323 EU3 990073 08/08/2008 08/22/2008 08/14/2008 RFI: Fire Supression DWGS
4322 Site 2 East Campus III 08/07/2008 08/21/2008 08/07/2008 Back Check
4321 Humanities 991077 08/06/2008 08/20/2008 08/11/2008 Submittal 09250.01.A Gypsum Board Prod. Data
4320 Humanities 991077 08/06/2008 08/20/2008 08/11/2008 Submittal 07841-03A Firestopping for HVAC
4319 Humanities 991077 08/06/2008 08/20/2008 08/12/2008 07811-01 A Sprayed Fire Resistive Material
4318 Humanities 991077 08/06/2008 08/20/2008 08/12/2008 07842-01 A Fire Resistant joint system prod.
4317 Humanities 991077 08/06/2008 08/20/2008 08/12/2008 submittal: 09265-01-A Gupsumboard Shaft wall Prod. Data
4316 EU3 990073 08/06/2008 08/20/2008 08/11/2008 RFI 407
4315 EU3 990073 08/04/2008 08/18/2008 08/06/2008 Fire Alarm Spec.
4314 EU3 990073 08/04/2008 08/18/2008 08/08/2008 RFI 378
4313 EU3 990073 08/04/2008 08/18/2008 08/06/2008 RFI 273 R2 Revised SK-1 ( included as REF- Previous RFI 273R2 approved 7/28)
4312 EU3 990073 08/04/2008 08/18/2008 08/06/2008 RFI 311 R1- ( with previous submission includes as Ref, sketch 1 revised
4311 Medical Education Building 991970 08/04/2008 08/18/2008 08/11/2008 Request to relocte ior Trailer
4310 Med Sci 5108009 08/01/2008 08/15/2008 08/04/2008 Plans,EH&S Redlines, Final Review, and Approval Stamp
4309 EU3 990073 08/01/2008 08/15/2008 08/06/2008 RFI 338 RI See Rfi338 for Ref)
4304 Site 1+2 Specifications only East Campus III 07/31/2008 08/14/2008 08/12/2008 Specifications
4303 Medical Education 991970 07/30/2008 08/13/2008 08/04/2008 Fence Plan wi Trailer Locations
4302 Parking Lot 160 5408044 07/30/2008 08/13/2008 07/31/2008 Approval Stamp
4301 Mesa Court Housing Phase 2 ( 5 BLDGS) 5108155 07/29/2008 07/29/2008 07/29/2008 Plans, Specification, 100% Review, Comments + Corrections
4300 EU3 990073 07/29/2008 08/12/2008 07/31/2008 08120 02A Fire Rated Door ASST
4299 07481 03G 990073 07/29/2008 08/12/2008 07/31/2008 07841 03 G Engineering Judgement
4298 Fire supresson 990073 07/29/2008 08/12/2008 08/06/2008 Fire Supression Shts FP 120, Fp121 Revise Corridore Piping Rep
4297 ARC Expansion 990096 07/29/2008 08/12/2008 08/01/2008 Fire Alarm Resubmittal per field for stamp/sign
4296 ARC Expansion 990096 07/25/2008 08/08/2008 07/30/2008 Evacuation signs and locations
4295 Medical Education Building 991970 07/24/2008 08/07/2008 08/06/2008 100% CD Specifications
4294 Humanities 991077 07/24/2008 08/07/2008 07/28/2008 RFI : 179 Relocation of Knox Box
4293 Fire Alarm Corrections 990073 07/24/2008 08/07/2008 08/14/2008 Resubmition of tri, fire alarm, submittal ( with pick up of previous red lines- set inc for ref.)
4292 Social and Behavioral Sciences 991268 07/23/2008 08/06/2008 07/23/2008 100% Conformed CD-3 Drawing Package 1 half size set, 1 full size set
4291 Site 2 All Buildings East Campuss III 07/23/2008 08/06/2008 07/29/2008 OCFA Plan check review, Plans final Review and Approval Stamp
4290 Med Sci 5108009 07/22/2008 08/05/2008 07/29/2008 Plans, Pre Review, + comments and corrections
4289 Medical Educaton 991970 07/22/2008 08/05/2008 07/30/2008 RFI Fence/Trailer location Revision
4288 Newkirk Pavilion Elevator( Baseball) 990050E 07/22/2008 08/05/2008 08/01/2008 RFI #5 Protection in Elevator Shaft- Sprinkler Memo
4287 EU3 990073 07/18/2008 08/01/2008 07/28/2008 RFI 197R2
4286 EU3 990073 07/18/2008 08/01/2008 07/28/2008 RFI 324
4285 EU3 990073 07/18/2008 08/01/2008 08/28/2008 SUBMITTAL: 07841-03G
4284 Social & Behavioral Sciences 991268 07/17/2008 07/31/2008 07/22/2008 RFI Enrty Lobby Sprinklers
4283 EU3 990073 07/17/2008 07/31/2008 07/28/2008 RFI 273 R2 ( With Corrections) ( See attached sheet as Ref.)
4282 EU3 990073 07/17/2008 07/31/2008 07/28/2008 RFI 311 R1 ( With Corrections), See attached sheet as ref)
4281 Stem Cell Research Buliding 994038 07/16/2008 07/30/2008 07/22/2008 Rfi: Proprietary Bidding RFI = Confidential
4280 Social and Behavioral Sciences 991268 07/15/2008 07/29/2008 07/31/2008 Submittal: Fire Alarm System Drawings
4279 Mesa Court Housing Phase 2 (5 Bldgs) 5108155 07/15/2008 07/29/2008 07/16/2008 Plans, Specificaton
4278 Science Library Cell Site 5061431 07/15/2008 07/29/2008 07/15/2008 Plans, Final Review, + Approval Stamp
4277 Medical Education Bldg. 991970 07/15/2008 07/29/2008 07/15/2008 Other: Final CD
4276 EU3 990073 07/14/2008 07/28/2008 07/15/2008 RFI 351 R1
4275 UCI Site 3 Parking Structure, and Surface Lots A+B UCI SITE 3 07/10/2008 07/24/2008 07/28/2008 Plans, Final Review, comments and Corrections Approval Stamp -2 rolls and 1 packet
4274 Berkeley Place 5108008 07/10/2008 07/24/2008 07/10/2008 Plans,+ Approval Stamp
4273 Student Services I&II 5108111 07/10/2008 07/24/2008 07/22/2008 Plans, Specification, Final Review + Approval Stamp
4272 Socail and Behavioral Sciences 991268 07/10/2008 07/24/2008 07/10/2008 Submittal dinal construciton Drawings
4271 Physical Science Lecture Hall 5102027 07/10/2008 07/24/2008 07/22/2008 Pland, 100% Review, and Approval Stamp
4270 Social Science Lecture Hall 5108026 07/10/2008 07/24/2008 07/15/2008 Plans, 100% Review and approval Stamp
4269 EU3 990073 07/10/2008 07/24/2008 07/15/2008 RFI 311 R1
4268 EU3 990073 07/10/2008 07/24/2008 07/15/2008 RFI 273 R2
4267 Site 1 East Campus III 07/09/2008 07/23/2008 07/29/2008 Plans
4266 Social and Behavioral Sciences 991268 07/09/2008 07/23/2008 07/15/2008 Submittal : 0172-13915-A Fire Supression Piping
4265 Medical Education Bldg 991970 07/08/2008 07/22/2008 07/08/2008 Submittal : 100% CD Civil Sheets
4264 Baseball Clubhouse 990050 07/08/2008 07/22/2008 07/08/2008 Simplex
4263 EU3 990073 07/07/2008 07/21/2008 07/14/2008 Submittal: 07841F
4262 EU3 990073 07/07/2008 07/21/2008 07/14/2008 Submittal: 07841-E
4261 Newkirk pavilion elevator 990050E 07/07/2008 07/21/2008 07/14/2008 RFI: Fire protection in elevator shaft
4260 E. Campus Phase III Site 2 E Campus Phase 3 S2 07/07/2008 07/21/2008 07/15/2008 Plans- 5 rolls total
4259 Campus Road Repairs 5108004 07/07/2008 07/21/2008 07/08/2008 Layout drawings and schedule for the project
4258 Medical Education Building 991970 07/07/2008 07/21/2008 07/07/2008 Submittal: Final CD's
4257 Humanities Gateway 991077 07/02/2008 07/16/2008 07/08/2008 Submittal 16852-01-C Fire alarm dwgs with backcheck #4182
4256 Humanities Gateway 991077 07/02/2008 07/16/2008 07/07/2008 Submittal: 13915-02A Fire Sprinkler Piping
4255 Humanities Gateway 991077 07/02/2008 07/16/2008 07/08/2008 Submittal # 07841-02-A Fire stopping submittal
4254 Steinhaus hall 991842 07/02/2008 07/16/2008 07/14/2008 other: Landfill
4253 Medical Education Building 991970 07/02/2008 07/16/2008 07/02/2008 Submittal: Revised/Updated Civil Sheets
4252 EU3 990073 07/01/2008 07/15/2008 07/07/2008 Submittal 14210 Elevator Shop DWG
4251 Medical Education Building 991970 07/01/2008 07/15/2008 07/01/2008 Submittal : Fence Plan Revision
4250 Medical Evacuation 991970 07/01/2008 07/15/2008 07/01/2008 Submittal 100% CD final
4249 Steinhaus Hall 991842 06/30/2008 07/14/2008 07/08/2008 Submittal- 07-02700-01A
4248 EU3 990073 06/30/2008 07/14/2008 07/08/2008 RFI: 342R1
4247 social and behavioral sciences 991268 06/26/2008 07/10/2008 07/02/2008 Submittal 0085-13915 Fire suppression Piping
4246 Social and Behavioral Sciences 991268 06/25/2008 07/09/2008 07/02/2008 Other: G-Sheets
4245 Humanities Gateway 991077 06/25/2008 07/09/2008 06/25/2008 Duplicates, disregard
4244 Humanities Gateway 991077 06/25/2008 07/09/2008 06/25/2008 Duplicates-disreguard
4243 Berkeley Place 5108008 06/24/2008 07/08/2008 07/01/2008 Plans, Preliminary Review, and comments and Corrections
4242 Humanities 991077 06/24/2008 07/08/2008 07/02/2008 136 RI Fire line Material
4241 Humanities 991077 06/24/2008 07/08/2008 06/24/2008 RFI 179 Relocation knowbox
4240 Humanities 991077 06/24/2008 07/08/2008 06/24/2008 RFI 180 Fire Riser @ Stair 3 Foundation
4239 Mesa Office 5108030 06/24/2008 07/08/2008 06/24/2008 plans, final review and approval stamp
4238 Humanities 991077 06/24/2008 07/08/2008 07/14/2008 Submittal Fire Suppression dug dated 06/18/2008
4237 Humanities 991077 06/24/2008 07/08/2008 07/02/2008 Submittal 6-2510-A Building Connections
4236 Baseball Clubhouse Elevator 990050 E 06/23/2008 07/07/2008 07/03/2008 Submittal: Simplex
4235 Social & Behavioral Sciences 991268 06/20/2008 07/04/2008 07/02/2008 Submittal 0162-13915 A Fire Suppression Piping
4234 EU3 990073 06/20/2008 07/04/2008 06/24/2008 RFI 369
4233 EU3 990073 06/20/2008 07/04/2008 06/25/2008 Included in package new DWG set, Previous approved set; mech dwg set. Is for reference only.
4232 EU3 990073 06/19/2008 07/03/2008 07/02/2008 RFI 323R1
4231 EU3 990073 06/19/2008 07/03/2008 06/25/2008 RFI 197R1
4230 EU3 990073 06/19/2008 07/03/2008 06/25/2008 Submittal: 07841-03D
4229 EU3 990073 06/19/2008 07/03/2008 06/24/2008 RFI 351
4228 EU3 990073 06/19/2008 07/03/2008 06/25/2008 Submittal: 07841-03C
4227 Social and Behavioral Sciences 991268 06/19/2008 07/03/2008 06/20/2008 Other: Red Marked Sets
4226 Humanities Gateway 991077 06/19/2008 07/03/2008 07/07/2008 RFI # 180 Fire Riser at stair #3 Foundation
4225 Structure 3 A&B E Campus Parking 06/19/2008 07/03/2008 06/25/2008 Plans, Final Review, Comments & Corrections, and Approval Stamp
4224 Student Health Center 5089114 06/18/2008 07/02/2008 06/23/2008 Final Review , 3rd Submittal
4223 Stem Cell Research Ctr Bld 994038 06/16/2008 06/30/2008 06/20/2008 RFI: Stem Cell RFI
4222 Social and Behavioral Sciences 991268 06/17/2008 07/01/2008 06/20/2008 submittal g sheets re review
4221 NEW STUDENT CENTER 5108014 06/13/2008 06/27/2008 06/18/2008 RESUBMITTAL
4220 ARC EXPANSION 3 990096 06/13/2008 06/27/2008 06/16/2008 SUBMITTAL 08711-17-C DOOR HARDWARE PRODUCT DATA
4219 EU3 990073 06/13/2008 06/27/2008 06/16/2008 SUBMITTAL 07841-05A
4218 MED ED 991970 06/12/2008 06/26/2008 06/12/2008 100 % SUBMITTAL
4217 Med Ed 991970 06/12/2008 06/26/2008 06/12/2008 Submittal
4216 EU3 990073 06/12/2008 06/26/2008 06/16/2008 EU3
4215 ADMIN 115 J 5093015 06/12/2008 06/26/2008 06/16/2008 Eh& S Redlines, Final Review, and Approval Stamp
4214 HUNANITIES INSTRCUTIONAL BLDG. 25543 06/12/2008 06/26/2008 06/16/2008 EVAC MAPS, FINAL REVIEW , AND APPROVAL STAMP
4213 HUMANITIES HALL 25531 06/12/2008 06/26/2008 06/16/2008 EVAC MAP, FINAL REVIEW, APPROVAL STAMP
4212 ENGINEERING TOWER 25044 06/12/2008 06/26/2008 06/16/2008 EVAC MAPS, FINAL REVIEW, APPROVAL STAMPE
4211 SOCIAL SCI TOWER 25063 06/12/2008 06/26/2008 06/16/2008 EVAC, MAPS, FINAL REVIEW, APPROVAL STAMP
4210 RU3 990073 06/12/2008 06/26/2008 06/16/2008 RFI 341
4209 Parking Lot 16 Site Work 51080441 06/12/2008 06/26/2008 07/01/2008 Review
4208 Social and Behavioral Science 991268 06/11/2008 06/25/2008 06/16/2008 Other: Please add slip sheets to new G- Sheets set for sign off
4207 EU3 990073 06/11/2008 06/25/2008 06/16/2008 RFI 323
4206 EU3 990073 06/11/2008 06/25/2008 06/16/2008 SUBMITTAL 07841-05A FIRESTOPPING SEALANT
4205 Mesa Office Building 5108030 06/10/2008 06/24/2008 06/18/2008 CD Plan, 100% Review, + Approval Stamp
4204 Mesa Arts Building 5108031 06/10/2008 06/24/2008 06/18/2008 Plans, 100% Review, + Approval Stamp
4203 Science Library Cell Site 5061431 06/10/2008 06/24/2008 06/16/2008 Plans, 100% Review, and Approval Stamp
4202 Bio Science 3 991835 06/10/2008 06/24/2008 06/12/2008 Submittal 605-13900-B Fire Sprinkler- As bulit
4201 EU3 990073 06/09/2008 06/23/2008 06/12/2008 RFI 344
4200 RFI 303 990073 06/09/2008 06/23/2008 06/12/2008 RFI 303
4199 RFI 338 990073 06/09/2008 06/23/2008 06/12/2008 RFI 338
4198 EU3 990073 06/09/2008 06/23/2008 06/12/2008 RFI 334
4197 Student Health 5089114 06/09/2008 06/23/2008 06/11/2008 Plans, Final Review, + Approval Stamp
4196 Social and Behavioral Science 991268 06/06/2008 06/20/2008 06/09/2008 Other: Includes slip sheet goo4
4195 Social and Behaviroal Sciences 991268 06/06/2008 06/20/2008 06/12/2008 Other G- Sheets
4194 Social and Behavioral Sciences 991268 06/05/2008 06/19/2008 06/12/2008 Submittal 0107-13915 C Fire Supression Piping
4193 EU3 990073 06/04/2008 06/18/2008 06/12/2008 Submittal 08211 03 A Flushwood Doors
4192 Social and Behavioral Sciences 991268 06/03/2008 06/17/2008 06/06/2008 Other: 8 1/2 x 11 Tabulatons
4191 New Student Center 5108014 06/02/2008 06/16/2008 06/11/2008 80% Review
4190 Natural Science II 5087491 05/30/2008 06/13/2008 06/04/2008 Plans, Final Review, Approval Stamp
4189 EU3 990073 05/29/2008 06/12/2008 06/02/2008 RFI 331 FIRE EXTINGUISHER RELOCATION
4188 EU3 990073 05/29/2008 06/12/2008 06/02/2008 RFI 281 r1
4187 Humanities 991077 05/28/2008 06/11/2008 05/28/2008 DWG Stamped
4186 EU3 990073 05/28/2008 06/11/2008 06/02/2008 RFI 273 r1
4185 Arc Expansion 990096 05/28/2008 06/11/2008 06/02/2008 Submittal # 16521.88 Exterior Exit Sign
4184 Parking Lot 16 Site Work 5108044 05/27/2008 06/10/2008 06/03/2008 100% Review
4183 Medical Education 991970 05/23/2008 06/06/2008 06/03/2008 Submittal: 100% CD Set
4182 Humanities Bldg. 991077 05/23/2008 06/06/2008 06/06/2008 Submittal : 16852 01 B Fire Alarm Drawing
4181 ARTS BUILDING 991072 05/23/2008 06/06/2008 06/03/2008 SUBMITTAL 01 5000-01-C FENCE PLAN
4180 UCI SITE 3 PARKING STRUC. LOTS A&B EAST CAMPUS 05/23/2008 06/06/2008 06/05/2008 PLANS, 100% REVIEW, APPROVAL STAMP
4179 Humanities Gateway 991077 05/23/2008 06/06/2008 06/02/2008 RFI # 136 South Fire Lane
4178 Humanities 991077 05/21/2008 05/21/2008 05/21/2008 Stamped specs for record only
4177 ENGINEERING TOWER 25044 05/20/2008 06/03/2008 05/27/2008 EVAC. MAP
4176 HIB 25543 05/20/2008 06/03/2008 05/27/2008 EVAC MAPS
4175 Social Science Tower 25063 05/20/2008 06/03/2008 05/27/2008 Evacuations Maps
4174 Humanities Hall 25531 05/20/2008 06/03/2008 05/27/2008 Evacuation Map
4173 EU3 990073 05/20/2008 06/03/2008 06/02/2008 SUBMITTTAL 06402-03A FIRE RETARDANT TREATED WOOD PD
4172 EU3 990073 05/19/2008 06/02/2008 06/02/2008 RFI 310
4171 Public Services bldg' Park Ofc Renovation 5107975 05/19/2008 06/02/2008 05/21/2008 Plans, specification, final review, and approval stamp
4170 PARKING STRUCTURE LOTS A&B UCI SITE 3 05/19/2008 06/02/2008 05/19/2008 PLANS, 100% REVIEW , APPROVAL STAMP, OTHER: REVISED PLANS PER OC FIRE DEPT.
4169 EU3 990073 05/16/2008 05/30/2008 05/21/2008 SUBMITTAL 08211 FLUSH WOOD DOORS
4168 EU3 990073 05/16/2008 05/30/2008 05/21/2008 RFI 279 R1
4167 EU3 990073 05/16/2008 05/30/2008 05/20/2008 RFI 301
4166 EU3 990073 05/15/2008 05/29/2008 05/20/2008 SUBMITTAL FA SET RE REVIEW CORRECTED SET.
4165 EU3 990073 05/15/2008 05/29/2008 05/20/2008 SUBMITTAL 08347 01B
4164 EU3 99073 05/14/2008 05/28/2008 05/21/2008 RFI 60R1
4163 EU3 99007 05/14/2008 05/28/2008 05/21/2008 RFI 261 R1
4162 Student Health 5089114 05/14/2008 05/27/2008 05/21/2008 Plans, specification, 80% review
4161 Social and Behaviroal Sciences 991268 05/13/2008 05/27/2008 05/20/2008 Other: 8 1/2 x 11 Tabulations, Soc Sci Unit2 G1.1 & A0.1 Sheet
4160 EU3 990073 05/13/2008 05/27/2008 05/21/2008 : RFI 274
4159 EU3 990073 05/13/2008 05/27/2008 05/22/2008 First time submittal RFI 186
4158 HIB RM 185 5080048 05/13/2008 05/27/2008 05/19/2008 Plans, 100% Review, and Approval Stamp
4157 Humanities 991077 05/09/2008 05/23/2008 05/09/2008 Other 100% CD
4156 SSL 3RD FLR RENOVATION 5100764 05/08/2008 05/22/2008 05/13/2008 Plans, specification, final review approval stamp
4155 EU3 990073 05/07/2008 05/21/2008 05/13/2008 RFI 215 RI RESUBMITTED WITH PREV AS REF.
4154 East Campus Site 3 05/07/2008 05/21/2008 05/20/2008 Review
4153 East Campus Site 2 05/07/2008 05/21/2008 05/20/2008 Review
4152 East Campus Site 1 05/07/2008 05/21/2008 05/20/2008 Review
4151 EU3 990073 05/06/2008 05/20/2008 05/08/2008 FIRST TIME SUBMITTAL
4150 EU3 990073 05/06/2008 05/20/2008 05/08/2008 FIRST TIME PROJECT SUBMITTAL
4149 EU3 990073 05/06/2008 05/20/2008 05/08/2008 FIRST TIME PROJECT SUBMITTAL
4148 Arts Building 991072 05/06/2008 05/20/2008 05/13/2008 ESP # 3 G-003N005 G101 103
4147 EU3 990073 05/06/2008 05/20/2008 05/20/2008 Submittal- First time submittal
4146 Nat Science II room 4361 5087491-18378 05/06/2008 05/20/2008 05/13/2008 Plans, Final Review, and Approval stamp
4145 Social and & Behavioral Sciences 991268 05/06/2008 05/19/2008   Other G-004 Sheet Property Lines
4141 EU3 990073 05/05/2008 05/19/2008 05/13/2008 First Time Submittal 08347 Smoke guard model 200 submittal package
4140 Humanities Gateway 991077 05/05/2008 05/19/2008 05/13/2008 RFI 0413
4139 UCI REPLACEMENT HOSPITAL 994500 05/05/2008 05/16/2008 05/05/2008 UCI RECPLACEMENT HOSPITAL HP
4138 Disabled Stundent Center Trailer 5105518 05/02/2008 05/16/2008 05/06/2008 Plans
4137 Social & Behavioral Sciences 991268 05/02/2008 05/16/2008 05/06/2008 Submittal: 0129-13915 A Fire Suppression Piping
4136 BPN 1000 5107957 05/02/2008 05/16/2008 05/06/2008 100% Review. Comments and Corrections
4135 EU3 990073 05/02/2008 05/16/2008 05/08/2008 RFI 281
4134 EU3 990073 05/02/2008 05/16/2008 05/08/2008 RFI 215
4133 EU3 990073 05/02/2008 05/16/2008 05/06/2008 RFI 215 RI
4132 EU3 990073 05/01/2008 05/15/2008 05/08/2008 RFI 279
4131 Site 3 Parking lots A&B Site 3 05/01/2008 05/15/2008 05/16/2008 Plans, 100% Review, and Approval Stamp
4130 BPS 3500 5108041 05/01/2008 05/15/2008 05/06/2008 Final Review and Approval Stamp
4129 Site 2 E. Campus Phase3 04/30/2008 05/14/2008 04/30/2008 Exit G planS
4128 Bioscience 3 991835 04/30/2008 05/14/2008 05/08/2008 Submittal: 0605-13900 As bulit fire sprinkler dur for sign stamp. Back check sets turned in 05/01/2008
4127 Social & Behavior Sciences 991268 04/30/2008 05/14/2008 05/08/2008 Submittal 0107-13915 B Fire supression piping
4126 EU3 990073 04/30/2008 05/14/2008 05/06/2008 Submittal: 07841 03B First time Submittal
4125 Site 1 Building E. Campus Phase III 04/29/2008 05/13/2008   100 % Review
4124 Site 2 bulidings E. Campus Ph 3 04/29/2008 05/13/2008 06/02/2008 100% Review
4123 EU3 990073 04/29/2008 05/13/2008 04/29/2008 Submittal Same Set Uci Titlebox
4122 Humanities Gateway 991077 04/28/2008 05/12/2008 04/29/2008 RFI Fire line Material_ RFI 0136
4121 Social Sci Lab 3rd floor 380/390 5100764 04/28/2008 05/12/2008 04/29/2008 Plans, Specifications, 100% Review + Final Review, comments and Corrections and Approval Stamp
4120 EU3 990073 04/25/2008 05/09/2008 04/25/2008 Submittal 07841 04A First time Project Submittal Product data for engineering judgement -shaftwall
4119 EU3 990073 04/25/2008 05/09/2008 05/06/2008 Submittal : 07841.04A Product Data for Engineering Judgement Shaftwall 1st time submittal
4118 Humanities Hall 25531 04/23/2008 05/07/2008 04/30/2008 Evac Maps, Premiminary Review, + comments + corrections
4117 Social Science Tower 25063 04/23/2008 05/07/2008 04/30/2008 Evac. Maps, Premininary Review, + Comments and Corrections
4116 Humanities Inst.mBld. 25543 04/23/2008 05/07/2008 04/30/2008 Evac Maps, Preminary Review, + comments and corrections
4115 BPS 3500 5108041 04/22/2008 05/06/2008 04/22/2008 100 % Review + Approval Stamp, C,D, + F checked off yes
4114 Arts Building 991072 04/22/2008 05/06/2008 04/29/2008 G-101 Code Information siteplan
4113 EU3 990073 04/22/2008 05/06/2008 04/23/2008 Changes to 2nd floor only- SHT FA-10 + TYCO letter ( re: calcs) ( Balance of set for REF only)
4112 EU3 990073 04/22/2008 05/06/2008 04/29/2008 Submittal # 13900-024- attach prev for ref only
4111 Aldrich Park 5103434 04/22/2008 05/06/2008 04/23/2008 Plans, Specification, Final Review, + Approval Stamp- Civil, Mechanical, plumbing or electrical
4110 Medical Education 991970 04/22/2008 05/06/2008 04/22/2008 Submittal: 65% CD A-G all checked off "no"
4109 Unit 6, Verano Place Housing 5065081 04/22/2008 05/06/2008 04/22/2008 Plans, specification, Final Review, and approval Stamp- Fire alarm protection system
4108 Bioscience 3 991835 04/21/2008 05/05/2008 04/21/2008 other: SWPP - Notice of termination
4107 Engineering Tower null 04/21/2008 05/05/2008   Other: EVDC Maps, preliminary review, comments and corrections
4106 ARTS Bldg 991072 04/21/2008 05/05/2008 04/21/2008 Other: sheet c-201 utility plan
4105 Crawford hall Locker room 5099656/21161 04/18/2008 05/02/2008 04/18/2008 Plans,100% review
4104 Humanities Bldg, 991077 04/17/2008 05/01/2008 04/23/2008 RFI: 123 DCVBFA Location A-G checked off " No"
4103 Arts Building 991072 04/15/2008 04/28/2008 04/21/2008 Other: Fire Access plan for OCFA Approval A-G all checked off " No"
4102 Ecampus Site III/Parking Structure 7037 04/14/2008 04/28/2008 04/14/2008 2 plans, 80% Review + Comments and Corrections
4101 Social & Behavioral Sciences 991268 04/14/2008 04/28/2008 04/24/2008 Submittal: 0099-16850-B Spots and Dots " Fire Alarm" A-G checked off " NO"
4100 Arroyo Vista Group -B 5105825 04/11/2008 04/25/2008 04/14/2008 Other- Detail , 100% review, photos, and approval stamp.
4099 EU3 990073 04/11/2008 04/25/2008 04/28/2008 Other: Cardiovascular Bulletin#6 &2 A-G all checked off "NO"
4098 Humanities Gateway 991077 04/10/2008 04/24/2008   Other G-103 Fire Safety Plan A-G All marked " NO"
4097 Arc Expansion 990096 04/10/2008 04/24/2008 04/14/2008 Submittal 07841-33b Through Penetration Fire stop System A-G all marked " No"
4096 Bio Science 3 991835 04/10/2008 04/24/2008 04/14/2008 Submittal: 0602-13915-A Sprinkler riser closest on 1st and 2nd A-G all marked "NO"
4095 EU3 990073 04/10/2008 04/24/2008 04/11/2008 Other: Cardiovascular center change plan approval. A-G all checked off "No"
4094 Bio Science 3 991835 04/08/2008 04/22/2008 04/10/2008 Other: Response to EN -11#108 Dated 4/02/08 Sprinkler Riser Closet A-G all checked off "No":
4093 AVH Group B 1014, 1016, 1018, 1020 5105825 04/08/2008 04/22/2008 04/10/2008 Plans+ Other, 100% review, + approval stamp
4092 Social & Behavioral Sciences Bldg. 991268 04/07/2008 04/21/2008 04/22/2008 Submittal 100% CD-# const.docs A.M.E.P sheets review ( G,C,&l for Ref only) 1stime submittal B-G checked off "NO"
4091 Arts building 991072 04/07/2008 04/21/2008 04/07/2008 Other civil/ Utility plan Fh water A-g checked off " No" for Record only
4090 Arc Expabnsion 990096 04/01/2008 04/15/2008 04/03/2008 07841-33A = through penetration firestop system A-G checked off " NO"
4089 Arc Expansion 990096 04/01/2008 04/15/2008 04/03/2008 08711-17B = Finish hardware Schedule A-G checked off "No"
4088 Humanities Gateway Bldg. 991077 04/01/2008 04/15/2008 04/21/2008 Desgn Submittal- 100% CD Package A-G checked off " NO"
4087 Arc Expansion 990096 03/31/2008 04/14/2008 04/03/2008 Submittal 10220.76= Fire Protection Specialties
4086 Arroyo Vista Group B 5105825 03/31/2008 04/14/2008 04/07/2008 Plans, Marked up Plans, Final Review, and Approval Stamp. D,E,F checked off "Yes" all others "No".
4085 EU3 990073 03/31/2008 04/14/2008 03/31/2008 SUBMITTAL 07842 PD FOR FIRE RESISTIVE JOINT SYSTEMS, A-G CHECKED OFF "NO"
4084 Social & Behavioral Sciences 991268 03/27/2008 04/10/2008 03/31/2008 Other: Elec. Cope, spec. section, e-mail from arch.
4083 Medical Education 991970 03/27/2008 04/10/2008 04/14/2008 Other: 65% CD set
4082 Site II - Building exiting( OCFA) E. Campus Phase III 03/27/2008 04/10/2008 04/23/2008 Plans A-B yes
4081 Site I E. Campus Phase III 03/27/2008 04/10/2008 04/22/2008 Plans
4080 Rowland Hall 990120 03/26/2008 04/09/2008 04/22/2008 Other: Fire alarm system record of completion
4079 EU3 990073 03/25/2008 04/08/2008 03/31/2008 RFI: 225- tower pyramid fire rating
4078 EU3 990073 03/25/2008 04/08/2008 03/31/2008 RFI: RFI 229 Won-door pocket door frame
4077 EU3 990073 03/21/2008 04/04/2008 03/25/2008 RFI: 209 First time submittal B-G checked off no
4076 Mesa Court Prototype Renovation - Arroyo & Puente 996264 06/30/2010 07/14/2010 07/08/2010 Other: 100% architectural CD for review
4075 Humanity Office Bldg- Deck Repair 5104326 03/20/2008 04/03/2008 03/21/2008 Plans. Final review, + approval stamp.
4074 Social & Behavioral Services 991268 03/20/2008 04/03/2008 04/03/2008 Submittal: 0107-13915-A, Fire Suppression Pipe Drawings and Calc. First time Submittal, B-G checked off " NO".
4073 Arc Expansion 990096 03/18/2008 04/01/2008 03/24/2008 Submittal: 08211.25 Please use as backcheck for a wood flash door ( EHS# 4062) A-G checked off "NO"
4072 Student Services 1 5101379/997369 03/18/2008 04/01/2008 03/18/2008 Plans, 100% Review, Other ( Arch, Elec, + Mech) Approval Stamp C,D,&E checked off Yes, all others " NO".
4071 Arc Expansion 990096 03/18/2008 04/01/2008 03/26/2008 RFI 024: Kitchen Hood A-G checked off "NO"
4070 Berkeley Place South, Suite #3500 5108041 03/18/2008 04/01/2008 03/18/2008 Plans, 100% and Final Review, Back Check by Dale Saunders, C,D,&E checked yes, all others checked "NO"
4069 Natural Sci II 4341 5087491/18378 03/18/2008 04/01/2008 03/21/2008 Plans + Final Review, D checked off yes all other no
4068 EU3 990073 03/18/2008 04/01/2008 03/31/2008 Fire Alarm Submittal- A-G check off "NO"
4067 EU3 990073 03/18/2008 03/31/2008 03/24/2008 Submittal: Temporary standpipe review- First time project submittal A checked yes- B-G checked "No".
4066 EU3 990073 03/17/2008 03/31/2008 03/24/2008 Submittal: RFI 198 R1 - Clarification ( RFI 198 was approved- Change Drawing Wall Labels. Per--2) for record A-G all checked off "NO".
4065 Arc Expansion 990096 03/17/2008 03/31/2008 04/22/2008 Submittal: 11-16852-B Addressable Fire Alarm- Items A-G checked off " NO"
4064 East Campus Phase III null 03/14/2008 03/28/2008 03/17/2008 Plans- Site I
4063 EU3 990073 03/14/2008 03/28/2008 06/03/2008 Report on alternate method of compliance for HVAC mechanical design for approval.
4062 ARC Expansion null 03/13/2008 03/27/2008 03/25/2008 Wood Doors- Fire Rated
4061 Arc Expansion 990096 03/13/2008 03/27/2008   Submittal 16852.11.B= Adressable fire alarm
4060 Public Services Bldg,/ Parking office Renovation 5107975 03/11/2008 03/25/2008 03/18/2008 Plans, Specifications, 100% review, Request to CFM comments,corrections & approval stamp
4059 Admin 115 J 5093015 03/11/2008 03/25/2008 03/18/2008 Plans- 100% review, comments and corrections and approval stamp
4058 Arc Expansion 990096 03/11/2008 03/25/2008 03/26/2008 Submittal 067-16770- Security System
4057 EU3 99007 03/11/2008 03/25/2008 03/14/2008 Submittal 15053. 1A, Welding Pressure Piping Certification
4056 Engineering Unit III 990073 03/10/2008 03/24/2008 03/11/2008 RFI #198
4055 Engineering Unit III 990073 03/10/2008 03/24/2008 03/11/2008 RFI #128
4054 East Campus Phase III null 03/10/2008 03/24/2008   Submittal Review/Plans- Site 2
4053 East Campus Phase III null 03/10/2008 03/24/2008   Submittal Review/Plans- Site 1
4052 Bio Sciences 3 991835 03/07/2008 03/21/2008 04/03/2008 AI-101, AI-111,AI-201, AI-211 SHEETS
4051 Med Sci Annex "A" 5106715 06/06/2008 03/17/2008   Plans, final Review, approval of stamp, Items C,D,E,&F checked off yes
4050 Berkeley Place South 3500 5108041 03/06/2008 03/17/2008 03/10/2008 Plans, 100% Review
4049 Humanities Building 991077 03/03/2008 03/17/2008 03/25/2008 16852-01-A First time Project Submittal
4048 HOB-2 Repairju 5104326 03/06/2008 03/20/2008 03/11/2008 Plans and Specifications, 100% review, approval for stamp
4047 Arc Expansion 990096 03/05/2008 03/19/2008 03/11/2008 07411-046A Manufactured roof panels( supplemental information)
4046 EU3 990073 03/05/2008 03/19/2008 03/11/2008 Submittal 07842- Fire resistive joint systems- 1st time project submittal
4045 ARC EXPANSION 990096 03/03/2008 03/17/2008 03/03/2008 Please use as back check for EH&S #4038, 16852-11B : Addressabel firealarm system
4044 EU3 990073 03/03/2008 03/17/2008 03/04/2008 RFI 0097R2
4043 East Campust Phase III null 03/03/2008 03/17/2008 03/06/2008 Plans- Premininary Review for Site 2
4042 East Campur Phase III null 03/03/2008 03/17/2008 03/06/2008 Plans- Preliminary Review
4041 Student Services 1 5101379/997369-9881 03/03/2008 03/17/2008 03/06/2008 plans, arch+ elec,
4040 Medical Educaton Building 991970 02/28/2008 03/13/2008 03/04/2008 Site Water Distribution Piping Product Data
4039 Verano Place 2107983 02/28/2008 03/13/2008 02/28/2008 Other - former stamp only updated project number
4038 ARC Exp 990096 02/27/2008 03/08/2008 03/11/2008 Shop dugs for addressable F.A. System/168520-11B:addressable firealarm system (03/03/2008)
4037 Social & Behavioral Sciences 991268 02/25/2008 03/10/2008 03/06/2008 0099-16850-A Fire Alarm
4036 berkeley place south suite 3500 5108041 02/21/2008 03/06/2008 02/22/2008 plans
4035 EU3 990073 02/21/2008 03/06/2008 02/28/2008 RFI 141 R1
4034 Bio Science 3 991835 02/20/2008 03/05/2008 02/25/2008 Submittal: 0583-07841-A thru penetration detail- slap penetration risen
4032 Social Ecology 5100385 02/19/2008 03/04/2008 02/25/2008 Plans, Final Review
4031 Engineering Unit III 990073 02/19/2008 03/04/2008 02/19/2008 Fire Suppression Drawings (Reference w/EH&S#4002) per S. Jackson
4030 Humanities Gateways 991077 02/15/2008 02/29/2008 02/15/2008 Other: Supp. 90% Design Package (C-231-G122)
4029 Medical Education Building 991970 02/15/2008 02/29/2008 02/21/2008 Submittal: 01.5000.02: Remote Laydown Fence Plan
4028 Bio Sci III null 02/15/2008 02/29/2008 02/20/2008 Other: Evac Map Proofs
4027 Medical Education Bldg 991970 02/15/2008 02/29/2008 02/15/2008 Other: Stamp & Sign Approved Pkgs.
4026 Bio Science 3 991835 02/13/2008 02/27/2008 02/13/2008 Submittal: 0579-16230-A - Generator Load Bank Test Report
4025 Humanities Gateways 991077 02/13/2008 02/27/2008 02/15/2008 Other: RJA Report - Installation of Sprinklers Above Ceiling Clouds
4024 Berkeley Place South 5108041 02/13/2008 02/27/2008 02/13/2008 Other, Account Fund Stub: 990509, 25% Design
4023 Arc Expansion 990096 02/12/2008 02/26/2008 02/15/2008 Submittal: 09250.49A: Gypsum Board/Fiberock Panels
4022 Social & Behavioral Sciences Building 991268 02/12/2008 02/26/2008 02/20/2008 Submittal: 0085-13915-A. Fire Suppression Material
4021 Aldrich Park Fire Lane 5103434 02/12/2008 02/26/2008   Plans, Preliminary Review
4020 EU3 990073 02/11/2008 02/25/2008 02/14/2008 Submittal: Fire Suppression (DCFM Markups) Copy of Scan-Previous Submittal.
4019 EU3 990073 02/08/2008 02/22/2008 02/14/2008 Submittal: 13900.01A Welding Procedure & Qualifications
4018 Med. Sci. Annex "A" 5106715 02/07/2008 02/21/2008 02/12/2008 Plans: Final Review, Approval Stamp, Back Check
4017 Medical Education Building 991970 02/07/2008 02/21/2008 02/14/2008 ESP Pkg#2 - Civil/ Utility Package
4016 EU3 990073 02/07/2008 02/21/2008 02/15/2008 Submittal: 100% Fire Alarm Drawings/Product Data
4015 Arc Expansion 990096 02/06/2008 02/20/2008 02/11/2008 Submittal : #53-80711: Finish Hardware Schedule
4014 Verano Place 6100 5107983 02/06/2008 02/20/2008 02/06/2008 Other - Submittal; Account Fund Stub: 642073.66990.03
4013 Unit 6, Verano Place House 5065021 02/01/2008 02/15/2008 02/08/2008 Plans, Specifications, EH&S Redlines; 100% Review
4012 Social & Behavioral Science 991268 02/01/2008 02/15/2008 02/01/2008 Other - 1 Set of G-Sheets Stamped and Approved by SFM
4011 Verano Place 6100 5107893 01/31/2008 02/14/2008 02/04/2008 Plans, Final Review
4010 Verano Place 6100 5107965 01/31/2008 02/14/2008 02/04/2008 Plans, Preliminary Review
4009 Arroyo Vista: Group B 5105825 01/31/2008 02/14/2008 02/08/2008 Plans, Specifications, 100% Review, Final Review
4008 Phase III - Site 1 E. Campus Phase III 01/31/2008 02/14/2008 02/21/2008 Plans
4007 Phase III - Site 2 E. Campus Phase III 01/31/2008 02/14/2008 02/21/2008 Plans
4006 Arc Expansion 990096 01/31/2008 02/14/2008 02/06/2008 Submittal - #09250.49: Gypsum Board - Fiberrock Panels VH1 - Abuse-Resistant
4005 Arc. Exp. 990096 01/31/2008 02/14/2008 01/31/2008 Submittal - Fire Supp. Piping DWGs
4004 Social & Behavioral Science 991268 01/30/2008 02/13/2008 01/30/2008 Other: G-Sheets/I-Elel. DWG For Reference, Back Check
4003 EU3 990073 01/29/2008 02/12/2008 01/29/2008 Other
4002 Engineering Unit III 990073 01/29/2008 02/12/2008 01/29/2008 RECORD ONLY per Scott Jackson
4001 Bio Sci III 991835 01/29/2008 02/12/2008 02/07/2008 Other - Evac Maps, Preliminary Review
4000 Medical Education Bldg. 991970 01/28/2008 02/11/2008 02/14/2008 Submittal - 65% DD Drawings
3999 Rowland Hall 990120 01/28/2008 02/11/2008 01/30/2008 Submittal - #195-01770 - Fire Alarm System - NPPA72
3998 Socil Ecology - 1: Upgrade Fire Alarm System 505787 01/28/2008 02/11/2008 01/28/2008 Other - Detail, Approval Detail With Acceptions, Approval Stamp
3997 McGaugh Hall Vivarium Expansion 991012 01/28/2008 02/11/2008 01/28/2008 Submittal - 11602 Fume Hood Test Reports
3996 Arc Expansion 990096 01/25/2008 02/08/2008 01/29/2008 RFI - UL Design FA 1057 For F&T Ratings
3995 Arts Building 991072 01/24/2008 02/07/2008 02/05/2008 Other: Laydown area/ fencing plan sheet CSA-01 &02
3994 Med. Sci. Annex "A" 5106715 01/24/2008 02/07/2008 01/28/2008 Plans
3993 E. Campus Phase III null 01/23/2008 02/06/2008 01/23/2008 Plans
3992 E. Campus Phase III null 01/23/2008 02/06/2008 01/23/2008  
3991 Medical Education 991970 01/23/2008 02/06/2008 02/11/2008 submittal: SWPPP review
3990 Arc Expansion 990096 01/23/2008 02/06/2008 01/23/2008 Other - CD Package Update 1/15/08
3989 Humanities Gateway Bldg. 991077 01/23/2008 02/06/2008 02/01/2008 Other - Design Submittal - 90% CD Package
3988 Humanities Gateway 991077 01/23/2008 02/06/2008 01/29/2008 Submittal - 16050.01.A - Elect. Thru Penetration Firestopping
3987 Arc Expansion 990096 01/23/2008 02/06/2008 01/30/2008 Other - Final Specifications Dated 1/15/08
3986 Medical Education Bldg. 991970 01/23/2008 02/06/2008 01/23/2008 Submittal - Site Fence & Access for OCFA
3985 Social Ecology- 1 Upgrade Fire Alarm 5057087 01/22/2008 02/05/2008 01/24/2008 Other - Back Check
3984 EU3 990073 01/22/2008 02/05/2008 01/28/2008 Other
3983 EU3 990073 01/22/2008 02/05/2008 01/28/2008 Other
3982 Social Ecology 1 SE-1Renovation07/08 01/22/2008 02/05/2008 02/04/2008 Plans, EH&S Redlines, Addendum
3981 Arc Expansion 990096 01/18/2008 02/01/2008 01/18/2008 Other - Approved CD DNG Package
3980 Arc Expansion 990096 01/18/2008 02/01/2008 01/28/2008 07411.46 = Manufactured Roof Panels
3979 Verano Place 5107984 01/17/2008 01/31/2008 01/17/2008 Plans & Specifications
3978 AIRB 5107978 01/17/2008 01/31/2008 01/17/2008 other
3977 EU3 990073 01/16/2008 01/30/2008 01/30/2008 Schirmer report
3976 Social & Behaviorial Sciences Project 991268 01/16/2008 01/30/2008 01/16/2008 Other: Hot tap line chlorination report
3975 Verano Place Bldg. #6100 null 01/15/2008 01/29/2008 01/15/2008 Plans, Specifications
3974 Croul Hall 1222 5107931 01/14/2008 01/28/2008 01/15/2008 Plans
3973 ARC Expansion 990096 01/11/2008 01/25/2008 01/28/2008 Back check Review - Fire proofing
3972 Engineering Unit III 990073 01/11/2008 01/25/2008 01/16/2008 RFI #141
3971 AB Trailer @Lot 8 991077 01/10/2008 01/24/2008 01/28/2008 Fire Alarm Test Review
3970 Medical Education 991970 01/09/2008 01/23/2008 01/17/2008 Submittal: Site fence/fire access plan
3969 Rowland Hall 990120 01/08/2008 01/22/2008 01/08/2008 RECORD ONLY
3968 Engineering Unit III 990073 01/07/2008 01/21/2008 01/08/2008 Submittal #10520
3967 Engineering Unit III 990073 01/07/2008 01/21/2008 01/08/2008 Submittal #07841-B
3966 Social Ecology 1/Renov. 07-08 5100385 01/03/2008 01/17/2008 01/09/2008 Submittal Review
3965 Social Behavioral Sciences 991268 01/03/2008 01/17/2008 01/08/2008 Submittal #011-02510-0
3964 Engineering Unit III 990073 01/03/2008 01/17/2008 01/08/2008 Submittal #07300-01-C